BACKGROUND
• Lack of confidence in estimated savings
from energy efficiency projects
• Low level of knowledge on the
benefits of energy efficiency
• Poor familiarity with new technologies
and most efficient equipment
• High risk perception of investments
and low return expectations
• Financing availability misaligned
with investment needs
ESI PROGRAMME
Regional Energy Savings
Insurance programme, validates
and guarantees savings from
implementation of energy
efficiency projects and/or
measures
The ESI Programme, developed by the IDB, removes barriers to energy investments through four instruments that
mitigate Project risks and foster business confidence in this type of Investment:
Mitigation Instruments
1. Standard contract that formalizes the energy savings
proposal and the conditions in which the project will be
developed.
2. Energy saving insurance, which is activated in the event
of non-compliance with the savings or generation
promise.
3. Technical validation of the savings, that is carried out by
an independent entity with experience in the certification
of energy projects.
4. Financing under competitive conditions that is channeled
through Financial Institutions interested in creating a
market and a portfolio of projects with guaranteed energy
savings.
Mitigation instruments
1. SI ESI information system for project
registration and monitoring
https://esievaluacion.org
2. Evaluation methodologies and
methodological guide
3. Contract model for the development of
projects
Tools
INTEREST RATE 3.17%
TERM* Up to 20 years
BROKERAGE FEE
3.00%
MAXIMUM AMOUNT
FINANCED** US$2.00 Million
Conditions of the Credit Line
Addressed to:
1. SMEs sector
2. Energy Efficiency Projects
3. Generation projects with self-consumption component (up to 2 MW)
*Maximum term for fixed assets.
** Allowed co-financing
GRACE PERIOD Up to 2 years
84
Energy efficiency credit lines for SMEs
$18.47 Million available
Year Quantity Value
2021 5 $2,881,950.60
2022 39 $10,015,698.81
2023 4 $2,229,087.84
In progress 36 $6,405,208.70
TOTAL 84 $21,531,945.95
Energy Efficiency
projects
$ 21,531,945.95
Total Project Value
5
39
4
36
97
$2.88
$10.02
$2.23
$6.41
$37.95
0
20
40
60
80
100
120
$0.00
$5.00
$10.00
$15.00
$20.00
$25.00
$30.00
$35.00
$40.00
2021 2022 2023 En proceso PIPELINE
Millions
Current investments
Cantidad Montos
Status of the placement of the Energy Efficiency Line in SMEs
YEAR Quantity TOTAL
2020 1 $ 164,000.00
2021 4 $ 2,717,950.60
2022 38 $ 10,015,698.81
TOTAL 43 $ 12,897,649.41
# SME TOTAL
44 SME 1 $2,000,000.00
45 SME 2 $46,307.86
46 SME 3 $162,000.00
42 SME 3 $20,779.98
TOTAL $2,229,087.84
TOTAL ACCUMULATED $15,126,737.26
Banco Hipotecario, 10,
22%
BANCOVI, 6, 13%
BANCO INDUSTRIAL,
11, 24%
Banco Azul, 11, 24%
G&T, 2, 5%
ACACYPAC, 1, 2%
INTEGRAL, 1, 2% CREDICOMER,
1, 2%
PENTAGONO, 1, 2% PRIBANTSA, 1, 2%
ATLANTIDA, 1, 2%
1 2
3
4
5
6
ESI
Model
Accredited Entity Accredited Entity
Company
Bank
Technology Provider
Insurance Company
FINANCING
SAVINGS
ESI Process
COMPANY -
DEVELOPER
Contract defining
project
DEVELOPER -
VALIDATOR
Technical validation
and financing
BANK - COMPANY
Credit analysis
BANK - COMPANY
Funding request
DEVELOPER –
INSURANCE CO
Approval of energy
savings insurance
BANK - BANDESAL - COMPANY
Loan dispersement
COMPANY - VALIDATOR
Verification of
installation
DEVELOPER
Savings report
ESI Programme
BARRIERS OF
THE LINE
Low demand from financial institutions for the line of Credit (only 5 FIs)
The brokerage margin for the Credit line disincentives participation by more FIs
Presence of other Credit lines in the market that competed with the EE Credit line for
SMEs
Long Project Development period (6 months). Delays in obtaining permits required for
projects.
SMEs delayed the start of projects due to time needed for cost Benefit análisis of the
project
Substantial increases in equipment and international freight costs
Transaction costs of the Banks offset concessional lines of Credit provided to the financial
institutions and impacts project viability.
Lessons Learned
01
The approach and accompaniment of the Executing Agency to the Intermediary Financial
Institutions allows speeding up the rediscount processes of the credits placed under the Line of
Energy Efficiency in SMEs.
02
Events with unions helped to increase interest among SMEs in the implementation of energy
efficiency projects and increase project pipelines.
03
The establishment of Energy Efficiency Credit lines allowed the financial institutions to attract new
clients

More Related Content

Similar to Credit lines for energy efficiency in SME's: Moises Velasquez, Bandesal.pdf

Session 2 - Presentation by Jan-Willem Van De Ven, EBRD
Session 2 - Presentation by Jan-Willem Van De Ven, EBRDSession 2 - Presentation by Jan-Willem Van De Ven, EBRD
Session 2 - Presentation by Jan-Willem Van De Ven, EBRDOECD Environment
 
CEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIICEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIIOECD Environment
 
מצגת מבוא על אסקו
מצגת מבוא על אסקומצגת מבוא על אסקו
מצגת מבוא על אסקוHanan E. Levy
 
Technology & quality msme for finance, subsidy & project related support co...
Technology & quality msme   for finance, subsidy & project related support co...Technology & quality msme   for finance, subsidy & project related support co...
Technology & quality msme for finance, subsidy & project related support co...Radha Krishna Sahoo
 
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaBapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaOECD Environment
 
Making the demand side more investable 12 9 17-2
Making the demand side more investable 12 9 17-2Making the demand side more investable 12 9 17-2
Making the demand side more investable 12 9 17-2Steven Fawkes
 
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and Investment
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and InvestmentAhmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and Investment
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and InvestmentOECD Environment
 
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17RudySturkCGB
 
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMCExperience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMCOECD Environment
 
The role of cities in increasing investor confidence in energy efficiency
The role of cities in increasing investor confidence in energy efficiencyThe role of cities in increasing investor confidence in energy efficiency
The role of cities in increasing investor confidence in energy efficiencySteven Fawkes
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptxMayurHiwarkar4
 
Capital-Marrkets-Our-Group.pdf
Capital-Marrkets-Our-Group.pdfCapital-Marrkets-Our-Group.pdf
Capital-Marrkets-Our-Group.pdfANAADI7
 
Accelerating Investment in Energy Efficiency
Accelerating Investment in Energy Efficiency Accelerating Investment in Energy Efficiency
Accelerating Investment in Energy Efficiency Steven Fawkes
 
2022_ge_investor_day_presentation.pdf
2022_ge_investor_day_presentation.pdf2022_ge_investor_day_presentation.pdf
2022_ge_investor_day_presentation.pdfSreyaMukherjeeUS
 

Similar to Credit lines for energy efficiency in SME's: Moises Velasquez, Bandesal.pdf (20)

Session 2 - Presentation by Jan-Willem Van De Ven, EBRD
Session 2 - Presentation by Jan-Willem Van De Ven, EBRDSession 2 - Presentation by Jan-Willem Van De Ven, EBRD
Session 2 - Presentation by Jan-Willem Van De Ven, EBRD
 
MM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLDMM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLD
 
CEFI Roadmap for India workshop III
CEFI Roadmap for India workshop IIICEFI Roadmap for India workshop III
CEFI Roadmap for India workshop III
 
מצגת מבוא על אסקו
מצגת מבוא על אסקומצגת מבוא על אסקו
מצגת מבוא על אסקו
 
Technology & quality msme for finance, subsidy & project related support co...
Technology & quality msme   for finance, subsidy & project related support co...Technology & quality msme   for finance, subsidy & project related support co...
Technology & quality msme for finance, subsidy & project related support co...
 
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in IndonesiaBapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
Bapak Hariyanto, MEMR - Energy Conservation Investment in Indonesia
 
Making the demand side more investable 12 9 17-2
Making the demand side more investable 12 9 17-2Making the demand side more investable 12 9 17-2
Making the demand side more investable 12 9 17-2
 
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and Investment
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and InvestmentAhmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and Investment
Ahmad Rifqi, OJK - Sustainable Financing Support for Clean Energy and Investment
 
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
Connecticut Green Bank Stakeholder Webinar Quarter 4 FY17
 
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMCExperience and Challenges faced in complying with EEC - Benjamin Borja, APMC
Experience and Challenges faced in complying with EEC - Benjamin Borja, APMC
 
Siqens GmbH
Siqens GmbHSiqens GmbH
Siqens GmbH
 
Behaviour Change programmes in SMEs
Behaviour Change programmes in SMEsBehaviour Change programmes in SMEs
Behaviour Change programmes in SMEs
 
The role of cities in increasing investor confidence in energy efficiency
The role of cities in increasing investor confidence in energy efficiencyThe role of cities in increasing investor confidence in energy efficiency
The role of cities in increasing investor confidence in energy efficiency
 
3.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 23.3 akinci tskb - green finance v 2
3.3 akinci tskb - green finance v 2
 
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy ConferenceAdhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
Adhi Satriya, PT Andritz Hydro, 2014 ASEAN-OECD Investment Policy Conference
 
Corporate Profile 2023.pptx
Corporate Profile 2023.pptxCorporate Profile 2023.pptx
Corporate Profile 2023.pptx
 
Capital-Marrkets-Our-Group.pdf
Capital-Marrkets-Our-Group.pdfCapital-Marrkets-Our-Group.pdf
Capital-Marrkets-Our-Group.pdf
 
Accelerating Investment in Energy Efficiency
Accelerating Investment in Energy Efficiency Accelerating Investment in Energy Efficiency
Accelerating Investment in Energy Efficiency
 
Sidbi presentation
Sidbi presentationSidbi presentation
Sidbi presentation
 
2022_ge_investor_day_presentation.pdf
2022_ge_investor_day_presentation.pdf2022_ge_investor_day_presentation.pdf
2022_ge_investor_day_presentation.pdf
 

More from OECD Environment

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfOECD Environment
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...OECD Environment
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...OECD Environment
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...OECD Environment
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...OECD Environment
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...OECD Environment
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...OECD Environment
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...OECD Environment
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESOECD Environment
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...OECD Environment
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...OECD Environment
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijOECD Environment
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...OECD Environment
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...OECD Environment
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysOECD Environment
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsOECD Environment
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoOECD Environment
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghOECD Environment
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngOECD Environment
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikOECD Environment
 

More from OECD Environment (20)

GREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdfGREEN Action Task Force - Full Presentations.pdf
GREEN Action Task Force - Full Presentations.pdf
 
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
Case Study: Peptides-based Plant Protection Product (harpin proteins*) by Ros...
 
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
CLE Contribution on the Assessment of Innovative Biochemicals in the EU Statu...
 
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...Additional Considerations for Pesticide Formulations Containing Microbial Pes...
Additional Considerations for Pesticide Formulations Containing Microbial Pes...
 
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
Role of genome sequencing (WGS) in microbial biopesticides safety assessment ...
 
Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...Considerations for Problem Formulation for Human Health Safety Assessments of...
Considerations for Problem Formulation for Human Health Safety Assessments of...
 
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
How to Identify and Quantify Mixtures What is Essential to Know for Risk Asse...
 
APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...APVMA outcome-focussed approach to data requirements to support registration ...
APVMA outcome-focussed approach to data requirements to support registration ...
 
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGESThe U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
The U.S. Perspective on Problem Formulation for Biopesticides: Shannon BORGES
 
Problem formulation for environmental risk assessment – Finnish case study: ...
Problem formulation for environmental risk assessment – Finnish case study:  ...Problem formulation for environmental risk assessment – Finnish case study:  ...
Problem formulation for environmental risk assessment – Finnish case study: ...
 
Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...Problem formulation for environmental risk assessment in the context of EC Re...
Problem formulation for environmental risk assessment in the context of EC Re...
 
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma BabijCanadian Perspective on Problem Formulation for Biopesticides: Emma Babij
Canadian Perspective on Problem Formulation for Biopesticides: Emma Babij
 
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
Problem Formulation as an Ecological Testing and Assessment Tool for Microbia...
 
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...History, principles and use for biopesticide risk assessment: Boet Glandorf a...
History, principles and use for biopesticide risk assessment: Boet Glandorf a...
 
CCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeawaysCCXG global forum, April 2025, Key takeaways
CCXG global forum, April 2025, Key takeaways
 
CCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter resultsCCXG global forum, April 2024, Mentimeter results
CCXG global forum, April 2024, Mentimeter results
 
CCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara FaldutoCCXG global forum, April 2024, Chiara Falduto
CCXG global forum, April 2024, Chiara Falduto
 
CCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth SinghCCXG global forum, April 2024, Siddharth Singh
CCXG global forum, April 2024, Siddharth Singh
 
CCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine AngCCXG global forum, April 2024, Geraldine Ang
CCXG global forum, April 2024, Geraldine Ang
 
CCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël JachnikCCXG global forum, April 2024, Raphaël Jachnik
CCXG global forum, April 2024, Raphaël Jachnik
 

Recently uploaded

Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Sapana Sha
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024itadmin50
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130Suhani Kapoor
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Standkumarajju5765
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerSuhani Kapoor
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...Amil baba
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Environmental Toxicology (environmental biology)
Environmental Toxicology (environmental biology)Environmental Toxicology (environmental biology)
Environmental Toxicology (environmental biology)RaviPrajapat11
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...Call Girls in Nagpur High Profile
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas💥Victoria K. Colangelo
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...Call Girls in Nagpur High Profile
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Roomdivyansh0kumar0
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashikranjana rawat
 

Recently uploaded (20)

Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCeCall Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
Call Girls In Dhaula Kuan꧁❤ 🔝 9953056974🔝❤꧂ Escort ServiCe
 
Green Marketing
Green MarketingGreen Marketing
Green Marketing
 
E Waste Management
E Waste ManagementE Waste Management
E Waste Management
 
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
Call Girls In Okhla DELHI ~9654467111~ Short 1500 Night 6000
 
DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024DENR EPR Law Compliance Updates April 2024
DENR EPR Law Compliance Updates April 2024
 
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
VIP Call Girls Service Bandlaguda Hyderabad Call +91-8250192130
 
Sustainable Packaging
Sustainable PackagingSustainable Packaging
Sustainable Packaging
 
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort serviceyoung Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
young Whatsapp Call Girls in Delhi Cantt🔝 9953056974 🔝 escort service
 
Green Banking
Green Banking Green Banking
Green Banking
 
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night StandHot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
Hot Call Girls |Delhi |Preet Vihar ☎ 9711199171 Book Your One night Stand
 
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service BikanerLow Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
Low Rate Call Girls Bikaner Anika 8250192130 Independent Escort Service Bikaner
 
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
NO1 Verified kala jadu karne wale ka contact number kala jadu karne wale baba...
 
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(AISHA) Wagholi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur EscortsCall Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
Call Girl Nagpur Roshni Call 7001035870 Meet With Nagpur Escorts
 
Environmental Toxicology (environmental biology)
Environmental Toxicology (environmental biology)Environmental Toxicology (environmental biology)
Environmental Toxicology (environmental biology)
 
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...Booking open Available Pune Call Girls Budhwar Peth  6297143586 Call Hot Indi...
Booking open Available Pune Call Girls Budhwar Peth 6297143586 Call Hot Indi...
 
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation AreasProposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
Proposed Amendments to Chapter 15, Article X: Wetland Conservation Areas
 
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...Booking open Available Pune Call Girls Parvati Darshan  6297143586 Call Hot I...
Booking open Available Pune Call Girls Parvati Darshan 6297143586 Call Hot I...
 
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Kalighat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Kalighat 👉 8250192130 Available With Room
 
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service NashikRussian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
Russian Call Girls Nashik Anjali 7001305949 Independent Escort Service Nashik
 

Credit lines for energy efficiency in SME's: Moises Velasquez, Bandesal.pdf

  • 1. “Credit lines for Energy Efficiency in SMEs”
  • 2. BACKGROUND • Lack of confidence in estimated savings from energy efficiency projects • Low level of knowledge on the benefits of energy efficiency • Poor familiarity with new technologies and most efficient equipment • High risk perception of investments and low return expectations • Financing availability misaligned with investment needs
  • 3. ESI PROGRAMME Regional Energy Savings Insurance programme, validates and guarantees savings from implementation of energy efficiency projects and/or measures
  • 4. The ESI Programme, developed by the IDB, removes barriers to energy investments through four instruments that mitigate Project risks and foster business confidence in this type of Investment: Mitigation Instruments 1. Standard contract that formalizes the energy savings proposal and the conditions in which the project will be developed. 2. Energy saving insurance, which is activated in the event of non-compliance with the savings or generation promise. 3. Technical validation of the savings, that is carried out by an independent entity with experience in the certification of energy projects. 4. Financing under competitive conditions that is channeled through Financial Institutions interested in creating a market and a portfolio of projects with guaranteed energy savings. Mitigation instruments 1. SI ESI information system for project registration and monitoring https://esievaluacion.org 2. Evaluation methodologies and methodological guide 3. Contract model for the development of projects Tools
  • 5. INTEREST RATE 3.17% TERM* Up to 20 years BROKERAGE FEE 3.00% MAXIMUM AMOUNT FINANCED** US$2.00 Million Conditions of the Credit Line Addressed to: 1. SMEs sector 2. Energy Efficiency Projects 3. Generation projects with self-consumption component (up to 2 MW) *Maximum term for fixed assets. ** Allowed co-financing GRACE PERIOD Up to 2 years
  • 6. 84 Energy efficiency credit lines for SMEs $18.47 Million available Year Quantity Value 2021 5 $2,881,950.60 2022 39 $10,015,698.81 2023 4 $2,229,087.84 In progress 36 $6,405,208.70 TOTAL 84 $21,531,945.95 Energy Efficiency projects $ 21,531,945.95 Total Project Value 5 39 4 36 97 $2.88 $10.02 $2.23 $6.41 $37.95 0 20 40 60 80 100 120 $0.00 $5.00 $10.00 $15.00 $20.00 $25.00 $30.00 $35.00 $40.00 2021 2022 2023 En proceso PIPELINE Millions Current investments Cantidad Montos
  • 7. Status of the placement of the Energy Efficiency Line in SMEs YEAR Quantity TOTAL 2020 1 $ 164,000.00 2021 4 $ 2,717,950.60 2022 38 $ 10,015,698.81 TOTAL 43 $ 12,897,649.41 # SME TOTAL 44 SME 1 $2,000,000.00 45 SME 2 $46,307.86 46 SME 3 $162,000.00 42 SME 3 $20,779.98 TOTAL $2,229,087.84 TOTAL ACCUMULATED $15,126,737.26 Banco Hipotecario, 10, 22% BANCOVI, 6, 13% BANCO INDUSTRIAL, 11, 24% Banco Azul, 11, 24% G&T, 2, 5% ACACYPAC, 1, 2% INTEGRAL, 1, 2% CREDICOMER, 1, 2% PENTAGONO, 1, 2% PRIBANTSA, 1, 2% ATLANTIDA, 1, 2%
  • 8. 1 2 3 4 5 6 ESI Model Accredited Entity Accredited Entity Company Bank Technology Provider Insurance Company FINANCING SAVINGS
  • 9. ESI Process COMPANY - DEVELOPER Contract defining project DEVELOPER - VALIDATOR Technical validation and financing BANK - COMPANY Credit analysis BANK - COMPANY Funding request DEVELOPER – INSURANCE CO Approval of energy savings insurance BANK - BANDESAL - COMPANY Loan dispersement COMPANY - VALIDATOR Verification of installation DEVELOPER Savings report
  • 11. BARRIERS OF THE LINE Low demand from financial institutions for the line of Credit (only 5 FIs) The brokerage margin for the Credit line disincentives participation by more FIs Presence of other Credit lines in the market that competed with the EE Credit line for SMEs Long Project Development period (6 months). Delays in obtaining permits required for projects. SMEs delayed the start of projects due to time needed for cost Benefit análisis of the project Substantial increases in equipment and international freight costs Transaction costs of the Banks offset concessional lines of Credit provided to the financial institutions and impacts project viability.
  • 12. Lessons Learned 01 The approach and accompaniment of the Executing Agency to the Intermediary Financial Institutions allows speeding up the rediscount processes of the credits placed under the Line of Energy Efficiency in SMEs. 02 Events with unions helped to increase interest among SMEs in the implementation of energy efficiency projects and increase project pipelines. 03 The establishment of Energy Efficiency Credit lines allowed the financial institutions to attract new clients