Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.

EZEIFEDI OBINNA RESUME 2015

132 vues

Publié le

  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

EZEIFEDI OBINNA RESUME 2015

  1. 1. EZEIFEDI OBINNA 34B Okilton Drive, Okilton Estate Phone: 08039251309 Port Harcourt, Rivers State E-mail: zefedi@yahoo.com Accomplished proactive Procurement and Project Management Professional with experience in implementing business methods and process developments that increase quality, reduce cycle time and enhance yields while reducing bottom-line costs. Proven ability in strategic planning, project management, cost-control, improving operational efficiency, and increasing productivity. Hands-on experience in managing multi-facility distribution and customer operation sites. Immense exposure to revitalizing operational performance with a focus on continual process improvement and value-added solutions that improve the overall organizational performance and aligned deliverables. Having good communication skills effectively foster cooperation between stake-holders and clients. Areas of Expertise  Project Management  Planning & Control  Strategic Planning/Analysis  M.S. Project & Primavera P6  Tender Designing  Competitive Intelligence  New Business Development  Implementing & Testing  Procurement & Inspection  Cross Functional  Administrative Operations  Client Relations Professional Experience WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. JULY 2010 – PRESENT MANAGER, PROJECT/ENGINEERING (Jan 2014 – Present) Determines project responsibilities by identifying project phases and elements; assigning personnel to phases and elements; reviewing bids from contractors. Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.  Efficiently develops project objectives by reviewing project proposals and plans; conferring with management.  Planning and designing projects using Primavera P3 software also tender design and bid management.  Confirms product performance by designing and conducting tests. Maintains project schedule by monitoring project progress, coordinating activities, resolving problems.  Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions. And controls project costs by approving expenditures, administering contractor contracts.  Prepares project status reports by collecting, analyzing, summarizing information and trends; recommending actions and monitor process for continuous improvement. PROJECT HANDLED  MOBIL - Provision of vessels Provision Of Jack Up Barge To Support Edop Shutdown Activities And Other Jobs As Required  ADDAX - Call-Off Contract For Construction And Installation Of Onshore Pipelines  TOTAL - Contract for Bunkering Inspection Services Offshore  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Construction, Replacement And Repair Of Flowlines In Spdc-Land - ADNE W2L Flowline  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land - Integrity check for ETELEBOU W1L/S & W2L/S FLOWLINES  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Gbarain 24 well hook-up  SHELL - Construction, Replacement And Repair Of Flowlines In Spdc-Land Integrity test at ADIBAWA F/S  SHELL - Replacement of collapsed flare stack/walkway, pilot line and riser in NELS swamp Location  SAIPEM - Supply of Filters ‘T’ or ‘Y’ welded – Ongoing  SAIPEM - Supply of Bridge Cranes – Ongoing  SAIPEM – Construction of Fire Panel Complex – Bid Stage PROJECT ENGINEER (JULY 2010 – DEC 2013) Determined project responsibilities by identifying project phases and elements, assigning personnel to phases and elements, reviewing bids from contractors. Determined project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates. Determined
  2. 2. EZEIFEDI OBINNA: 08039251309 Resume, Page 2 project schedule by studying project plan and specifications; calculating time requirements; sequencing project elements.  Assisted in developing project objectives by reviewing project proposals and plans, conferring with management.  Confirmed product performance by designing and conducting tests.  Maintained project schedule by monitored project progress; coordinated activities; resolved problems. PROJECT HANDLED  Procured and inspected of Line Carbon Steel Line Pipes and transfer from Wharf to SHELL materials Warehouse and installation of Offshore Electric Motor from ABB South Africa for TOTAL E & P PLC.  Materials Handling (line-pipes) for SHELL at Kidney Island.  Etelebou Flowline Decommissioning & Hook-up  Obigbo North Well 53T Leak Repairs, EH3148  Gasliftline Replacement & Burial of Imo Wells 53S & 32L/S, EH6513  Replacement / Burial of Flowline in PH2 District, EH3148 INTERCONTINENTAL BANK PLC, PORT HARCOURT, RIVERS STATE. Aug 2008 – Jan 2010 RELATIONSHIP OFFICER  Established new relationships and maintained existing relationships through excellent service delivery.  Constantly meet and surpassing set targets and ensured adequate service and products availability and visibility.  Created operational plans to manage existing customers and updating reports based on customer’s feedback also build up customer’s interest on new and existing products. Implemented product marketing plan. WILKRISS NIGERIA LIMITED, PORT HARCOURT, RIVERS STATE. APRIL 2008 – July 2008 SAFETY ENGINEER  Formulated and communicated HSE rules and guidelines. Ensured HSE compliance at all times by organizing safety meetings and toolbox talks and constantly met and surpassed set HSE targets on projects.  Ensured safety at office and site. Prepared and ensured compliance with safety procedures. Trainings NNPC/NAPIMS Industrial Training Jan-June 2004 Project Management – Vast Integrated Solutions Ltd – June 2013 Human resources & Skill Acquisition Development – Nov. 2007 HSE-MS & Quality Management System – April 2008 Environmental Awareness / Unsafe Act Audit (SPDC) – August 2008 Legislation & Compliance / Safe handling of Chemicals (SPDC) HSE Competence Development Training (Nigerian Institute of Safety Professional) - April and August 2008 Fire Fighting / First Aid Course (NISP) – April 2008 Hazard and Effect Management Process / Emergency response (SPDC) - April 2008 Corrosion and Coating (Jimcol Resources) - Jan. 2010 Use of D-Meter and Reporting (Jimcol Resources) - Jan. 2010 Cathodic Protection and Applications (Jimcol Resources) - Jan. 2010 Welding and Welding Defects Identifications (Jimcol Resources) - Jan. 2010 NDT methods, Procedures and Application (Jimcol Resources) - Jan. 2010 Plant Design Management System (PDMS)software Design Training – June 2010 Autocad 2D and 3D software Design Training – June 2010 Caesar II software Design Training – June 2010 Heart and Mind HSE Training (SPDC) – August 2010 Training on use of Microsoft Project and Primavera P3 software – Nov.2010 – Feb. 2011 Certified Welding Inspector Training – (in View) May 2012
  3. 3. EZEIFEDI OBINNA: 08039251309 Resume, Page 3 Education & Training Bachelor of Science(Hons), Materials and Metallurgical Engineering, University of Lagos, City, Lagos Senior Secondary School Certificate, Oguola Primary school, Benin City, ST First School leaving certificate Licenses and Certificates Member, Project Management Institute- PMI IN VIEW: Project Management Professional Sept 2015: PMI IN VIEW: Certified Welding Inspector May 2012: AWS/Gennesaret Resources Nigeria Ltd Proficiency in use of Autocad 2D and 3D June - July 2010: Vast Integrated Solutions Ltd Proficiency in use of Plant Design Management System (PDMS) June - July 2010: Vast Integrated Solutions Ltd Proficiency in use of Caesar II Pipe Stress Analysis Software June - July 2010: Vast Integrated Solutions Ltd Health, Safety and Environment (HSE) Supervisor Level 3 APRIL 2008: Nigeria Institute of Safety Professionals Health, Safety and Environment (HSE) Appreciation Level 2 NOV.2007: Horebson Resources Human resources & Skill Acquisition Development APRIL 2008: Nigeria Institute of Safety Professionals Health, Safety and Environment (HSE) Appreciation Level 2 Jan. 2008: Jimcol Resources Nigeria Limited Corrosion/Coating Training Programme Mar. 2011: Chip – Bits Technology Proficiency in Project Management (Microsoft Project and Primavera) Personal Details Date of Birth: March 3RD, 1980 • Sex: Male • Nationality: Nigerian

×