SlideShare a Scribd company logo
1 of 16
Download to read offline
Optima            o
 In control since 1995




       Optima S5 to S7 Conversions
                         The risk-free upgrade option   1
Optima      In control since 1995
                                  o
What is this processor?
  The new* S57 processor has been developed to run Step5 and
  Step7 programs simultaneously
How does this help the upgrade?
  Program conversion can be taken in stages according to shutdown
  timescales
Are these the only benefits?
  NO. Our upgrade route is unique and allows complete flexibility of
  hardware upgrades as well, be that SCADA systems or servo
  drives
* The processor, having successfully undergone beta-trials for over 3 years at key customer sites is now available for full release



                                          Optima S5 to S7 conversions
                                                  Your risks                                                                          2
Optima     In control since 1995
                                 o
Your problems:
    CPU’s are now unsupported by Siemens
    Specialist S5 modules can contain unsupportable code
    Data held on EEPROM / Battery Backup – possibility of total data
    loss on battery/EEPROM failure
    Other systems connected to S5 are obsolete as well
               PC’s running machine SCADA or other applications
               Serial communication to Third party systems
    Spares cost and availability:
*Prices obtained from Siemens A&D Mall 27th April 2009 for a 928 processor. Cheaper prices may be available for refurbished items



                                        Optima S5 to S7 conversions
                                                Your risks                                                                          3
Optima              o
   In control since 1995




Up until now, the only option has been to take the machine down
completely and re-fit the entire PLC system including all ancillary items:
SCADA systems, operator HMI’s, Factory-wide automation monitoring
      Do you know every function on every screen?
      Recipes, trending, logging of data.
      Are there even backup configurations for all these?
Serial/Ethernet communications with custom protocols
      How do you know what protocol is used (this data held on EEPROM in processor
      and only accessible with Siemens COM525 package and programmer – also now a
      rarity)
      After conversion, how do you know the protocol will still work with equipment




                           Optima S5 to S7 conversions
                               What do I do first???                                  4
Optima             o
  In control since 1995




Function of dedicated option modules to be replicated
     IP246 (Positioning)
     IP244 (13-channel PID controller)
     CP523 …544 (Communications)
All the above need to be rewritten and commissioned
Are you sure all functionality has been covered?
What if each module function could be converted step-by-step to
S7 and even tested alongside the original?
Well, now it can!


                          Optima S5 to S7 conversions
                              What do I do first???               5
Optima             o
  In control since 1995




What this solution offers:
Large machines carry large risks, so minimise the risk by reducing
the engineering at each stage
     Take project stages one step at a time
     Identify key functional areas – target these for upgrade
     Fit key equipment in stages – even test side-by-side
     Fully test new kit, then decommission old equipment
Number of shutdowns required can vary according to complexity
and the time available



                          Optima S5 to S7 conversions
                            Is there another way???                  6
Optima             o
  In control since 1995




Main S5 Hardware Systems are:
115U Rack
     CPU 941, 942, 943, 944, 945
135/155U Rack
     CPU 922, 928, 928B, 948
150U Rack
     CPU 921, 922




                          Optima S5 to S7 conversions
                             Common S5 Systems          7
Optima             o
  In control since 1995




Rack types:
115, 135, 150, 155 U
     U denotes a standard rack
115, 135, 150, 155 F
     F denotes ‘Fault-tolerant’
115, 135, 150, 155 H
     H denotes ‘High-availability’
This system only supports the U rack (most common)
Only single-processor racks are supported


                          Optima S5 to S7 conversions
                           S5 Systems Supported         8
Optima             o
  In control since 1995




The 115U Rack processor:
Replaces CPU’s
     941
     942
     943
     944
     945
Designed to meet specification of the
high-end processor 945
S7 operation equivalent: S7-416 high-
performance processor

                          Optima S5 to S7 conversions
                                  115U series           9
Optima             o
  In control since 1995




The 135U Rack processor:
Replaces CPU’s
     922
     928
     928B
     948
Designed to meet specification of the
high-end processor 948
S7 operation equivalent: S7-416 high-
performance processor


                          Optima S5 to S7 conversions
                                  135U series           10
Optima             o
  In control since 1995




The 150 Rack processor:
Replaces CPU’s
     921
     922
Designed to meet specification of 922
S7 operation equivalent: S7-416 high-
performance processor




                          Optima S5 to S7 conversions
                                  150 series            11
Optima     In control since 1995
                                   o
        The advanced S57 processor runs the S5 program and is
        programmed using Siemens SIMATIC STEP5 software *
        The S57 processor also runs an S7 program and is programmed
        using Siemens SIMATIC STEP7 software
        Machine operates exactly as with the original processor
        New S7 code is written stage-by-stage and runs alongside the S5
        program
        New code activated in stages
        All diagnostic features of STEP5 and STEP7 retained
        Compatibility with all STEP5 and STEP7 FC’s, FB’s, OB’s, etc.
* some re-work of S5 code may be required depending on program complexity and original processor type. For example, a 941 program is not directly compatible with a 945 processor
so this must be converted prior to install in S57 processor. Optima will advise and complete this all as part of the upgrade.




                                           Optima S5 to S7 conversions
                                                How does it work?                                                                                                              12
Optima              o
   In control since 1995




In addition to converting the program from Step 5 to Step 7, other upgrade
options are:
Replace ageing SCADA or HMI systems with Ethernet based systems
      Create new WinCC application to run alongside your existing SCADA system. Fully
      test the new SCADA before de-commissioning you old system
      Upgrade to new Siemens TP’s, MP’s with Ethernet capability
Create new PROFIBUS network and replace old networked devices with
new
      Remote Input/Outputs
      New AC, DC or servo drive systems




                           Optima S5 to S7 conversions
                             Other shutdown options                                     13
14          Your choice
     Optima S5 to S7 conversions
                                        000,01 fo tesffo yb 7 petS ni
                                        elbissecca skcolb atad 5 petS
                                                   000,04 fo
                                        tesffo yb 7 petS ni elbissecca
                                            sdrow yromem 5 petS
                                           elcyc 7S hcae dnammoc
                                          CU yb dellac si dna 10001
                                        CF ni ’sediser‘ margorp 5 petS
       000,01 fo tesffo yb 7 petS ni
       elbissecca skcolb atad 5 petS
                  000,04 fo
       tesffo yb 7 petS ni elbissecca
           sdrow yromem 5 petS
                                                    In control since 1995
                                             o       Optima
Optima             o
  In control since 1995




Our S5 to S7 upgrades allow a degree of flexibility that no other
provider can offer
Shutdown times to suit you
Pinpoint critical items
Software written by our Siemens Solution Partner qualified
engineers




                          Optima S5 to S7 conversions
                                                                    15
                                 Your choice
Optima                o
     In control since 1995




The new S57-II Processor is now available!
    On-board networks available using additional plug-in module



    Super-fast program execution: <10ns operation time
    4 x Ethernet ports each with a dedicated communication processor
    Integrated e-mail client and Web-server onboard
    Even more flexible upgrade opportunities




                             Optima S5 to S7 conversions
                                                                       16
                                    Your choice

More Related Content

What's hot

PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System Report
Fasih Ahmed
 
Drives and motors 2014
Drives and motors 2014Drives and motors 2014
Drives and motors 2014
thanhtanbinh
 
StrategicMaintenance7-28-07
StrategicMaintenance7-28-07StrategicMaintenance7-28-07
StrategicMaintenance7-28-07
Kevin Oswald
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applications
Emerson Exchange
 
Delta v advanced control overview_en
Delta v advanced control overview_enDelta v advanced control overview_en
Delta v advanced control overview_en
Luis Atencio
 

What's hot (18)

Fieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusFieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying Fieldbus
 
Evolution of Control System in Egbin Power Plc
Evolution of Control System in Egbin Power PlcEvolution of Control System in Egbin Power Plc
Evolution of Control System in Egbin Power Plc
 
PLC Based Annunciation System Report
PLC Based Annunciation System ReportPLC Based Annunciation System Report
PLC Based Annunciation System Report
 
Drives and motors 2014
Drives and motors 2014Drives and motors 2014
Drives and motors 2014
 
Working of DCS systems
Working of DCS systemsWorking of DCS systems
Working of DCS systems
 
StrategicMaintenance7-28-07
StrategicMaintenance7-28-07StrategicMaintenance7-28-07
StrategicMaintenance7-28-07
 
Fieldbus tutorial part 3 example applications
Fieldbus tutorial part 3   example applicationsFieldbus tutorial part 3   example applications
Fieldbus tutorial part 3 example applications
 
Control using wireless measurements
Control using wireless measurementsControl using wireless measurements
Control using wireless measurements
 
Delta v advanced control overview_en
Delta v advanced control overview_enDelta v advanced control overview_en
Delta v advanced control overview_en
 
Fieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDLFieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDL
 
Rotork CMA Compact Electric Valve Actuators
Rotork CMA Compact Electric Valve ActuatorsRotork CMA Compact Electric Valve Actuators
Rotork CMA Compact Electric Valve Actuators
 
Machine monitoring system
Machine monitoring systemMachine monitoring system
Machine monitoring system
 
Inst maint practices
Inst maint practicesInst maint practices
Inst maint practices
 
Control loop_foundation_overview
 Control  loop_foundation_overview Control  loop_foundation_overview
Control loop_foundation_overview
 
New Trends in Automation
New Trends in AutomationNew Trends in Automation
New Trends in Automation
 
CustomDrives
CustomDrivesCustomDrives
CustomDrives
 
DCS
DCSDCS
DCS
 
Electric Control Valve Actuators for Industrial Process Applications
Electric Control Valve Actuators for Industrial Process ApplicationsElectric Control Valve Actuators for Industrial Process Applications
Electric Control Valve Actuators for Industrial Process Applications
 

Similar to S57 Optimacs processor - S5 to S7 PLC upgrades

Basic Control System unit5
Basic Control System unit5Basic Control System unit5
Basic Control System unit5
Asraf Malik
 
Advanced motion controls servo drive catalog
Advanced motion controls servo drive catalogAdvanced motion controls servo drive catalog
Advanced motion controls servo drive catalog
Electromate
 

Similar to S57 Optimacs processor - S5 to S7 PLC upgrades (20)

Advanced PLC Programming Course EMERSON EDUARDO RODRIGUES
Advanced PLC Programming Course EMERSON EDUARDO RODRIGUESAdvanced PLC Programming Course EMERSON EDUARDO RODRIGUES
Advanced PLC Programming Course EMERSON EDUARDO RODRIGUES
 
Advanced PLC Programming Course EMERSON EDUARDO RODRIGUES
Advanced PLC Programming Course EMERSON EDUARDO RODRIGUESAdvanced PLC Programming Course EMERSON EDUARDO RODRIGUES
Advanced PLC Programming Course EMERSON EDUARDO RODRIGUES
 
S7 bas-16
S7 bas-16S7 bas-16
S7 bas-16
 
Simatic s7 400 cpu , pc
Simatic s7  400 cpu , pcSimatic s7  400 cpu , pc
Simatic s7 400 cpu , pc
 
02
0202
02
 
WT.PPTX
WT.PPTXWT.PPTX
WT.PPTX
 
D11 2011-en
D11 2011-enD11 2011-en
D11 2011-en
 
manuales y guías PLC siemens Simatic S7
manuales y guías  PLC siemens Simatic S7manuales y guías  PLC siemens Simatic S7
manuales y guías PLC siemens Simatic S7
 
Basics_of_PLCs.pdf
Basics_of_PLCs.pdfBasics_of_PLCs.pdf
Basics_of_PLCs.pdf
 
SIEMENS Basic Course of PLC EMERSON EDUARDO RODRIGUES
SIEMENS Basic Course of PLC EMERSON EDUARDO RODRIGUESSIEMENS Basic Course of PLC EMERSON EDUARDO RODRIGUES
SIEMENS Basic Course of PLC EMERSON EDUARDO RODRIGUES
 
ScilabTEC 2015 - Xilinx
ScilabTEC 2015 - XilinxScilabTEC 2015 - Xilinx
ScilabTEC 2015 - Xilinx
 
Basic Control System unit5
Basic Control System unit5Basic Control System unit5
Basic Control System unit5
 
Advanced motion controls servo drive catalog
Advanced motion controls servo drive catalogAdvanced motion controls servo drive catalog
Advanced motion controls servo drive catalog
 
Siemens catalog tong hop simotion
Siemens catalog tong hop simotionSiemens catalog tong hop simotion
Siemens catalog tong hop simotion
 
Profinet in process automation - Peter Brown
Profinet in process automation - Peter BrownProfinet in process automation - Peter Brown
Profinet in process automation - Peter Brown
 
Catalogue - Lenze Smart Motor
Catalogue - Lenze Smart MotorCatalogue - Lenze Smart Motor
Catalogue - Lenze Smart Motor
 
The logic behind choosing logic controllers
The logic behind choosing logic controllersThe logic behind choosing logic controllers
The logic behind choosing logic controllers
 
5 Things to Know about the F75P
5 Things to Know about the F75P5 Things to Know about the F75P
5 Things to Know about the F75P
 
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
 
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
5 Things to Know about the F75P: a Vital Embedded Computer for Safety-Critica...
 

More from Optima Control Solutions

Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Optima Control Solutions
 
Power conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by OceanflowPower conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by Oceanflow
Optima Control Solutions
 
Drives Software Programming – using PLC or Drive bespoke programming?
Drives Software Programming – using PLC or Drive bespoke programming?Drives Software Programming – using PLC or Drive bespoke programming?
Drives Software Programming – using PLC or Drive bespoke programming?
Optima Control Solutions
 
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINEDRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
Optima Control Solutions
 
Web tension control - loadcells vs. dancer rollers
Web tension control - loadcells vs. dancer rollersWeb tension control - loadcells vs. dancer rollers
Web tension control - loadcells vs. dancer rollers
Optima Control Solutions
 
Industrial robots: The new era of industrial automation
Industrial robots: The new era of industrial automationIndustrial robots: The new era of industrial automation
Industrial robots: The new era of industrial automation
Optima Control Solutions
 
Safety control systems: Some essential considerations
Safety control systems: Some essential considerationsSafety control systems: Some essential considerations
Safety control systems: Some essential considerations
Optima Control Solutions
 
AssetManager - downtime and production reporting
AssetManager - downtime and production reportingAssetManager - downtime and production reporting
AssetManager - downtime and production reporting
Optima Control Solutions
 

More from Optima Control Solutions (14)

Control Systems Obsolescence – Support Strategies and Key Considerations
Control Systems Obsolescence – Support Strategies and Key ConsiderationsControl Systems Obsolescence – Support Strategies and Key Considerations
Control Systems Obsolescence – Support Strategies and Key Considerations
 
Machine Vision: The Key Considerations for Successful Visual Inspection
Machine Vision: The Key Considerations for Successful Visual InspectionMachine Vision: The Key Considerations for Successful Visual Inspection
Machine Vision: The Key Considerations for Successful Visual Inspection
 
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by OptimaPegler Yorkshire record 25% uptime improvement after upgrade by Optima
Pegler Yorkshire record 25% uptime improvement after upgrade by Optima
 
Power conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by OceanflowPower conversion system design for tidal stream generator by Oceanflow
Power conversion system design for tidal stream generator by Oceanflow
 
Drives Software Programming – using PLC or Drive bespoke programming?
Drives Software Programming – using PLC or Drive bespoke programming?Drives Software Programming – using PLC or Drive bespoke programming?
Drives Software Programming – using PLC or Drive bespoke programming?
 
Focus on Complex Winders
Focus on Complex WindersFocus on Complex Winders
Focus on Complex Winders
 
UPGRADE BY OPTIMA CONTROL SOLUTIONS IS FUELLING DUNLOP’S PRODUCTIVITY DRIVE
UPGRADE BY OPTIMA CONTROL SOLUTIONS IS FUELLING DUNLOP’S PRODUCTIVITY DRIVEUPGRADE BY OPTIMA CONTROL SOLUTIONS IS FUELLING DUNLOP’S PRODUCTIVITY DRIVE
UPGRADE BY OPTIMA CONTROL SOLUTIONS IS FUELLING DUNLOP’S PRODUCTIVITY DRIVE
 
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINEDRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
DRIVE SOLUTION FROM OPTIMA DOUBLES PRODUCTIVITY FOR LAMINATING LINE
 
Web tension control - loadcells vs. dancer rollers
Web tension control - loadcells vs. dancer rollersWeb tension control - loadcells vs. dancer rollers
Web tension control - loadcells vs. dancer rollers
 
Industrial robots: The new era of industrial automation
Industrial robots: The new era of industrial automationIndustrial robots: The new era of industrial automation
Industrial robots: The new era of industrial automation
 
Safety control systems: Some essential considerations
Safety control systems: Some essential considerationsSafety control systems: Some essential considerations
Safety control systems: Some essential considerations
 
AssetManager - downtime and production reporting
AssetManager - downtime and production reportingAssetManager - downtime and production reporting
AssetManager - downtime and production reporting
 
Using the AC Drive Motor as a Transducer for detecting electrical and electro...
Using the AC Drive Motor as a Transducer for detecting electrical and electro...Using the AC Drive Motor as a Transducer for detecting electrical and electro...
Using the AC Drive Motor as a Transducer for detecting electrical and electro...
 
Production line drives: Understanding the control system
Production line drives: Understanding the control systemProduction line drives: Understanding the control system
Production line drives: Understanding the control system
 

Recently uploaded

Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Safe Software
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot ModelNavi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Navi Mumbai Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers:  A Deep Dive into Serverless Spatial Data and FMECloud Frontiers:  A Deep Dive into Serverless Spatial Data and FME
Cloud Frontiers: A Deep Dive into Serverless Spatial Data and FME
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
Apidays Singapore 2024 - Scalable LLM APIs for AI and Generative AI Applicati...
 
Artificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : UncertaintyArtificial Intelligence Chap.5 : Uncertainty
Artificial Intelligence Chap.5 : Uncertainty
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Strategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a FresherStrategies for Landing an Oracle DBA Job as a Fresher
Strategies for Landing an Oracle DBA Job as a Fresher
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
Web Form Automation for Bonterra Impact Management (fka Social Solutions Apri...
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin WoodPolkadot JAM Slides - Token2049 - By Dr. Gavin Wood
Polkadot JAM Slides - Token2049 - By Dr. Gavin Wood
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
Apidays New York 2024 - Accelerating FinTech Innovation by Vasa Krishnan, Fin...
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
Ransomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdfRansomware_Q4_2023. The report. [EN].pdf
Ransomware_Q4_2023. The report. [EN].pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 

S57 Optimacs processor - S5 to S7 PLC upgrades

  • 1. Optima o In control since 1995 Optima S5 to S7 Conversions The risk-free upgrade option 1
  • 2. Optima In control since 1995 o What is this processor? The new* S57 processor has been developed to run Step5 and Step7 programs simultaneously How does this help the upgrade? Program conversion can be taken in stages according to shutdown timescales Are these the only benefits? NO. Our upgrade route is unique and allows complete flexibility of hardware upgrades as well, be that SCADA systems or servo drives * The processor, having successfully undergone beta-trials for over 3 years at key customer sites is now available for full release Optima S5 to S7 conversions Your risks 2
  • 3. Optima In control since 1995 o Your problems: CPU’s are now unsupported by Siemens Specialist S5 modules can contain unsupportable code Data held on EEPROM / Battery Backup – possibility of total data loss on battery/EEPROM failure Other systems connected to S5 are obsolete as well PC’s running machine SCADA or other applications Serial communication to Third party systems Spares cost and availability: *Prices obtained from Siemens A&D Mall 27th April 2009 for a 928 processor. Cheaper prices may be available for refurbished items Optima S5 to S7 conversions Your risks 3
  • 4. Optima o In control since 1995 Up until now, the only option has been to take the machine down completely and re-fit the entire PLC system including all ancillary items: SCADA systems, operator HMI’s, Factory-wide automation monitoring Do you know every function on every screen? Recipes, trending, logging of data. Are there even backup configurations for all these? Serial/Ethernet communications with custom protocols How do you know what protocol is used (this data held on EEPROM in processor and only accessible with Siemens COM525 package and programmer – also now a rarity) After conversion, how do you know the protocol will still work with equipment Optima S5 to S7 conversions What do I do first??? 4
  • 5. Optima o In control since 1995 Function of dedicated option modules to be replicated IP246 (Positioning) IP244 (13-channel PID controller) CP523 …544 (Communications) All the above need to be rewritten and commissioned Are you sure all functionality has been covered? What if each module function could be converted step-by-step to S7 and even tested alongside the original? Well, now it can! Optima S5 to S7 conversions What do I do first??? 5
  • 6. Optima o In control since 1995 What this solution offers: Large machines carry large risks, so minimise the risk by reducing the engineering at each stage Take project stages one step at a time Identify key functional areas – target these for upgrade Fit key equipment in stages – even test side-by-side Fully test new kit, then decommission old equipment Number of shutdowns required can vary according to complexity and the time available Optima S5 to S7 conversions Is there another way??? 6
  • 7. Optima o In control since 1995 Main S5 Hardware Systems are: 115U Rack CPU 941, 942, 943, 944, 945 135/155U Rack CPU 922, 928, 928B, 948 150U Rack CPU 921, 922 Optima S5 to S7 conversions Common S5 Systems 7
  • 8. Optima o In control since 1995 Rack types: 115, 135, 150, 155 U U denotes a standard rack 115, 135, 150, 155 F F denotes ‘Fault-tolerant’ 115, 135, 150, 155 H H denotes ‘High-availability’ This system only supports the U rack (most common) Only single-processor racks are supported Optima S5 to S7 conversions S5 Systems Supported 8
  • 9. Optima o In control since 1995 The 115U Rack processor: Replaces CPU’s 941 942 943 944 945 Designed to meet specification of the high-end processor 945 S7 operation equivalent: S7-416 high- performance processor Optima S5 to S7 conversions 115U series 9
  • 10. Optima o In control since 1995 The 135U Rack processor: Replaces CPU’s 922 928 928B 948 Designed to meet specification of the high-end processor 948 S7 operation equivalent: S7-416 high- performance processor Optima S5 to S7 conversions 135U series 10
  • 11. Optima o In control since 1995 The 150 Rack processor: Replaces CPU’s 921 922 Designed to meet specification of 922 S7 operation equivalent: S7-416 high- performance processor Optima S5 to S7 conversions 150 series 11
  • 12. Optima In control since 1995 o The advanced S57 processor runs the S5 program and is programmed using Siemens SIMATIC STEP5 software * The S57 processor also runs an S7 program and is programmed using Siemens SIMATIC STEP7 software Machine operates exactly as with the original processor New S7 code is written stage-by-stage and runs alongside the S5 program New code activated in stages All diagnostic features of STEP5 and STEP7 retained Compatibility with all STEP5 and STEP7 FC’s, FB’s, OB’s, etc. * some re-work of S5 code may be required depending on program complexity and original processor type. For example, a 941 program is not directly compatible with a 945 processor so this must be converted prior to install in S57 processor. Optima will advise and complete this all as part of the upgrade. Optima S5 to S7 conversions How does it work? 12
  • 13. Optima o In control since 1995 In addition to converting the program from Step 5 to Step 7, other upgrade options are: Replace ageing SCADA or HMI systems with Ethernet based systems Create new WinCC application to run alongside your existing SCADA system. Fully test the new SCADA before de-commissioning you old system Upgrade to new Siemens TP’s, MP’s with Ethernet capability Create new PROFIBUS network and replace old networked devices with new Remote Input/Outputs New AC, DC or servo drive systems Optima S5 to S7 conversions Other shutdown options 13
  • 14. 14 Your choice Optima S5 to S7 conversions 000,01 fo tesffo yb 7 petS ni elbissecca skcolb atad 5 petS 000,04 fo tesffo yb 7 petS ni elbissecca sdrow yromem 5 petS elcyc 7S hcae dnammoc CU yb dellac si dna 10001 CF ni ’sediser‘ margorp 5 petS 000,01 fo tesffo yb 7 petS ni elbissecca skcolb atad 5 petS 000,04 fo tesffo yb 7 petS ni elbissecca sdrow yromem 5 petS In control since 1995 o Optima
  • 15. Optima o In control since 1995 Our S5 to S7 upgrades allow a degree of flexibility that no other provider can offer Shutdown times to suit you Pinpoint critical items Software written by our Siemens Solution Partner qualified engineers Optima S5 to S7 conversions 15 Your choice
  • 16. Optima o In control since 1995 The new S57-II Processor is now available! On-board networks available using additional plug-in module Super-fast program execution: <10ns operation time 4 x Ethernet ports each with a dedicated communication processor Integrated e-mail client and Web-server onboard Even more flexible upgrade opportunities Optima S5 to S7 conversions 16 Your choice