1. ORVILLE R. GENORING
#19 Calachuchi Street
Western Bicutan, Taguig City
Philippines 1008
Mobile No. (+63) 927-524-1972
(+63) 949-878-8028
Email address: orville.genoring@yahoo.com
WORK EXPERIENCES:
COMMSRESOURCES LTD
North Side House, 5th
Floor, No. 69 Tweedy Road
Bromley, Kent, BR1 3WA, UK
Telephone Number : +44 (0) 20 8313 6666
+44 (0) 20 8313 6601
Ericsson- Digicell Discovery Project: (September 4, 2014 – February 25, 2015 )
Port of Moresby, Papua New Guinea
Tower Erector , Telecom Rigger, Technician
• Works on erection of tower
• Review and check tower blueprint/ plan
• Inventory of tower parts from stock yard to staging area and site location
• Segregate and organize tower parts/ member
• Setting of base frame 1 first section
• Setting up of jimpole (manual crane) lifting equipment
• Perform assembling of tower structures (face by face)
• Works on lifting and landing of tower structures
• Accomplishes final correction of bolts.
• Climb tower 30M, 45M self support
• Conduct technical site survey, antenna height, picturing
• Installation of microwave antenna minilink 1.2
• Installation of RAU, if cable, grounding and MMU insertion, and troubleshooting
• Installation of Ericsson cabinet RBS 6601, ESC, SAU, DUG, TCU, NPU
• Installation of Radio Remote Unit (RRU)
• Install DC cable
• Do align microwave links.
• Installation of 1.8V-Satelite, dish, feedhorn, LNB, BUC, modem and cabling.
• Do align V-SAT
• Installation of 300 watts solar panel
• Installation of mobile charging station.
2. COMMSRESOURCES LTD
North Side House, 5th
Floor, No. 69 Tweedy Road
Bromley, Kent, BR1 3WA, UK
Telephone Number : +44 (0) 20 8313 6666
+44 (0) 20 8313 6601
Ericsson- Digicell Transmission Project: (November 14, 2013 – January 10, 2014 )
Port of Moresby, Papua New Guinea
Rigger Installer/ Technician
• Climb tower 30M, 60M, 100M self support
• Conduct technical site survey, antenna height, tower height, picturing.
• Installation of microwave antenna minilink, 0.6, 0.9, 1.2, 1.8
• Installation of RAU, if cable, grounding and MMU insertion, and troubleshooting
• Installation of Ericsson cabinet RBS 6301, RBS 6101, 3x2-2G, 3x1-3G AC 11-15 outdoor
and associated hardware.
• Installation of Radio Remote Unit (RRU)
• Installation of battery
• Install DC cable
• Do align microwave links
• Technical support for Digicell GSM C.O.W (Cell site On Wheels) that supports in any
special events and provides instant GSM coverage in any port of Moresby.
COMMSEC INCORPORATION
3F S&G Bldg., 2268 Aurora Blvd., Pasay City, 1300 Philippines
Telephone Number : +63(2) 852-5678
SMART Antenna Swap Project: (May 21, 2013 – August 30, 2013)
NCR – South Luzon
Telecom Rigger/ Technician
• Climb tower 50M self support
• Perform de-installation of old antenna and installation of new Cellmax Antenna based on
the recommended tilts, azimuth and height. Termination of new antenna to jumper cable.
• Assist team on identifying and remedy problems related BTS RF connector and feeder
faults.
• Perform VSWR sweep test measurement
• Perform re-tilt/ re-panning as per require to revisit site.
• Conduct technical site survey and site audit including antenna parameter measurement i.e
sector antenna Azimuth, electrical tilts, mechanical tilts, antenna height, tower height,
picturing.
GLOBALLIGHT COMMUNICATION SOLUTIONS, INCORPORATION
Cubao, Quezon City, Philippines
3. GLOBE Telecom BTS Expansion Project: (October19, 2012 – December 24, 2012)
Rigger Installer/ Technician
• Climb tower (50M) self support, guy tower, monopoles
• Install Feeder and Jumper Cable, connector
• Installation of Grounding System
• Installation of Huawei outdoor equipment for 2G, 3G and LTE site
• Installation of DC Power, rectifier, and batteries
• Installation of Panel Antenna
• Hardware installation Standards for Globe Telecom NEMESIS Project (FMS)
CONEC INCORPORATION
Makati City, Philippines
SMART Telecom/ ZTE & Ericsson Project: (October 2, 2011- June 3, 2012)
Rigger Installer/ Technician
• Climb tower (50M) self support, guy tower, monopoles
• Installation of Ericsson cabinet RBS 6301 outdoor
• Installation of Radio Remote Unit (RRU)
• Installation of Ericsson cabinet RBS 6201
• Installation of DC cable, power tapping, grounding, UTP cable, full hot standby, hotslide,
swinging of jumper cable, testing, dismantling
• Installation of 7/8 Coaxial Cable, grounding, connector, jumper cable
• Installation of battery
• Installation of Base Band Unit (BBU) and Radio Remote Unit (RRU)
• Installation of Tellabs 8620 converter
• Installation of P119A Power Distribution Unit (PDU)
• Installation of power cable and tributary cable to MDF
• Installation of Panel Antenna
VERACITY SYNERGY SOLUTION INCORPORATION
Makati City, Philippines
SUN Cellular/ CERAGON Project: (December 6, 2010- March 6, 2011)
Rigger Installer/ Technician
• Climb and work aloft on poles, tower support structures up to 50M, 70M
• Installation of 3.0 RFS Microwave Transmission and Distribution Antenna
• Installation of Ceragon cabinet and associated hadware
• Remove and install elliptical coaxial cable, connectors, grounding
• Install DC power cable
ARS TECHNOLOGIES CORPORATION
Brgy. San Isidro, Makati City, Philippines
4. DIGICEL Project:
Kingdom of Tonga, Republic of Vanuato South Pacific Island,
(March 24, 2008 – August 12, 2008)
Rigger/ Installer Team Leader
• Climb tower (50M, 70M,) self support, Mast, Monopoles, and Guy Tower
• Installation of BTS Antenna at (48M)
• Installation of Microwave Antenna (0.6, 1.2, 1.8, 2.4, 3.2) at 25M, 35M Elevation
according to instructions.
• Installation of Huawei BSC 6000 cabinet
• Installation of Huawei PCU 6000 cabinet
• Installation of Power cable -48v and PGND cable between the BSC 6000 cabinet and the
PDF.
• Installation of OMUB Boards
• Installation of Inter-GTNU cables for the two subracks
• Installation of Inter-GSCU Ethernet cables. (GTCS configured on the BSC side).
• Installation of trunk cables to the front of the E1/T1 interface board.
• Installation of Y-shaped clock cables 2.2 meter long cable is used to interconnect the
GGCU and the GSCU in one subracks in one cabinet.
• Installation of single mode optical cable.
• Installation of outdoor Huawei BTS 3012AE
• Installation of indoor Huawei BTS 3012
• Installation of Huawei outdoor DBS
• Installation of DC power cable -48 volts
• Installation of AC power cable 220 volts, power tapping (ACPDB)
• Installation of alarm cable
• Setting the dip switch on the CMB, DTMU, DCSU, GTMU on 3012, 3012AE and DBS
• Installation of EMERSON rectifier single phase 220V.
• Installation of outdoor battery.
• Installation of high-gain panel antenna 800 MHz
• Installation of microwave antenna (0.6, 1.2, 1.8, 2.5, 3.2)
GLOBAL TELECONSTRUCTION SPECIALIST, INC (GTSI)
FTI, Taguig City, Philippines
SMART Telecom/ GLOBE Telecom 2G-3G Project:
(March 14, 2005- November 2007)
Rigger Installer/ Technician/ Team Leader
• Climb tower, Self support, Mast and Monopoles (50M)
• Installation of Ericsson RBS 2206 Indoor
• Installation of RBS 2106 Edge Outdoor
• Installation of RBS 2202
• Installation of Ericsson Minilink
• Installation of Microwave Antenna (0.6, 1.2, 1.8, 2.4, 3.2)
• Installation of ELTEK (Flatpack 1500/ 48V rectifier
5. • Installation of Emerson rectifier
• Installation of Siemens Equipment Node B 880/ 881
• Installation of DMR 2000/ DMR 7000
• Installation of NERA Compack Link ODU and IDU
• Installation of NEC PASO Link ODU and IDU
• Installation of Nokia BTS – Indoor 2/2/2 Ultrasite
• Installation of Comtech Satellite Modem CDM – 600
• Installation of 3.8 V-SAT Reflector Dish
• Installation of Kathrien, RFS, COMBA Panel Antenna
• Install 7/8 Coaxial Cable, Elliptical Cable, Connectors, Grounding, install DC Power
Cable, Power tapping
• Installation of One Com Microwave Antenna
• Installation of One Com Indoor, Outdoor Unit
• Installation of Agilis OHT Receiver
• Installation of Grounding System
• Do align Microwave Links.
ADVANCE COMMUNICATION SYSTEM, INC.
Legaspi Village, Makati City, Philippines
SMART Telecom/ GLOBE Telecom Project: (March 15, 2005- September 30, 2004)
Rigger Installer/ Technician
• Climb Tower (50M), Self Support, Monopole, Guy Tower
• Installation of Ericsson 2206 Indoor
• Installation of NERA Compaklink ODU and IDU
• Installation of SIEMENS ODU and IDU
• Installation of Flexihopper FIU 19 Interface
• Installation of Comtech Satellite Modem CDM – 600
• Installation of 3.8 V-SAT Reflector Dish
• Installation of DMR 2000/ DMR 7000
• Installation of Andrew & NERA Microwave Antenna
• Installation of BTS Panel Antenna
• Install 7/8 Coaxial Cable, Elliptical Cable, Connectors, Grounding, Power tapping
• Installation of Ericsson RBS Minilink equipment for 2G
• Installation of Grounding System
• Installation of Ericsson Outdoor equipment microwave and GSM Antenna, Feeder and IF
cables.
• Do align Microwave links.
EXPERCS INTERNATIONAL INC.
Makati City, Philippines
GLOBE Telecom Project: (July 22, 2002- October 31, 2003)
Rigger Installer/ Technician
6. • Climb Tower (50M), Self Support, Monopole
• Installation of ELTEK Flatpack 1500/ 48V Rectifier
• Installation of Nokia Ultrasite Indoor 2/2/2
• Installation of Ericsson 2202
• Installation of V-SAT (Comstream CM 701 Modem)
• Installation of DMR 2000/ DMR 7000
• Installation of Benning L-400/ ASCOM Rectifier
• Installation of ANACOM Outdoor Interface Unit
• Installation of BTS Kathrien Panel Antenna
• Installation of Andrew, RFS, Microwave Antenna
• Installation of 7/88 Coaxial and Elliptical Cable. Grounding, Connector, power tapping
• Installation of Ericsson RBS Minilink equipement for 2G
• Installation of Grounding System
• Do align microwave links
NESIC TELECOM CONSTRUCTION
Makati City, Philippines
DIGITEL Project: (July 1998 – January 1999)
Lineman
• Pole dressing, messengering, cable laying, rectification and cable tensioning
ASIA PACIFIC AND ARGUS CABLE
Taytay, Rizal, Philippines
DIGITEL Project: (August 1997 – February 1998)
Lineman
• Pole dressing, messengering, cable laying and cable tensioning
SPECIAL SKILLS
• Climb and work aloft on poles, towers, ladders or other support structures up to 50M,
70M
• Removes, installs and repairs aerial telecommunication transmission and distribution
antenna, equipment and associated hardware
• Removes, installs and repairs various types and sizes of telecommunication cables,
coaxial, and DC Power
TRAININGS/ SEMINARS ATTENDED:
ALLGON REPEATER TRAINING
Edsa Horizon Hotel, Mandaluyong City, March 4, 2003
7. EDUCATION:
EASTERN VISAYAS STATE UNIVERSITY, 1989 - 1992
Tacloban City, Philippines
Associate in Electrical Technology
JOHN F. KENNEDY MEMORIAL FOUNDATION SCHOOL, 1985 - 1989
San Isidro, Leyte, Philippines
LINAO ELEMENTARY SCHOOL, 1979 - 1985
San Isidro, Leyte, Philippines
CHARACTER REFERENCE:
Mr. DANIEL BASIT III, Telecom Engineer
Abigroup Pty Ltd, Melbourne
Australia
+64108782014
Ms. BENARGIRL CRUZ, Fiscal Examiner
PhilHealth Insurance Corporation, Pasig City
Philippines
+639178071411
Mr. HENRY CALABITASAN, Telecom Commissioner
CitiTel, Pasig City
Philippines
+639164202256
PERSONAL INFORMATION:
Single, born on September 24, 1972 at Tacloban City. 5’5’’ in height and weights 76
kgs. Hardworking, trustworthy and can work with minimal supervision
I hereby declare that the data given above are true and correct.
________________________
ORVILLE R. GENORING