SlideShare a Scribd company logo
1 of 1
Download to read offline
CODE COURSE TITLE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC VENUE
A - 01 AC & Refrigeration: Safety and Control System 05-08 19-22 06-09 Ygy/Bdg
A - 02 Balancing Machine & Total Alignment 12-15 26-29 13-16 Bdg/Ygy
A - 03 Basic Reciprocating Gas Compressor Operation and Maintenance 19-22 03-06 20-23 Ygy/Bali
A - 04 Centrifugal & Sucker Rod Pump : Operation, Maintenance & Trouble Shooting 26-29 10-13 27-30 Bdg/Ygy
A - 05 Centrifugal Gas Compressor: Operation & Maintenance 02-05 17-20 04-07 Ygy/Bdg
A - 06 Control Valve: Principles, Sizing, Selection, Installation & Maintenance 09-12 24-27 11-14 Bdg/Ygy
A - 07 Electric Submersible Pump: Operation & Trouble Shooting 16-19 18-21 Ygy/Bdg
A - 08 Failure Analysis of Mechanical Components 23-26 12-15 25-28 Bdg/Ygy
A - 09 Flanges Fitting & Piping Data 19-22 Ygy/Bdg
A - 10 Gas Compressor: Operation, Maintenance & Troubleshooting 08-11 26-29 08-11 Bdg/Ygy
A - 11 Gas Turbine Operation and Maintenance 15-18 02-05 15-18 Bdg/Ygy
A - 12 Integrated Production Optimization of Oil & Gas Production System 22-25 09-12 22-25 Ygy/Bdg
A - 13 Maintenance Management Advanced 16-19 Bdg/Ygy
PUBLIC COURSE 2016
29-01 29-02
PRODUCTION OPERATION MAINTENANCE & MECHANICAL ENGINEERING
Jln. Tebet Raya No. 48-A Jakarta Selatan 12820, Phone: 021-83705560 (hunting) ; Fax: 021-83705663
01-04
31-03
01-04
PT WISNU INTER SAINS HAKIKI
Email : public@wish.co.id; marketing@wish.co.id; WEB: www.wish.co.id
A - 12 Integrated Production Optimization of Oil & Gas Production System 22-25 09-12 22-25 Ygy/Bdg
A - 13 Maintenance Management Advanced 16-19 Bdg/Ygy
A - 14 Maintenance Planning Scheduling and Coordination 05-08 23-26 06-09 Ygy/Bdg
A - 15 Material Handling for Civil Construction 12-15 13-16 Bdg/Ygy
A - 16 Material Knowledge for Drilling & Production Operation 05-08 19-22 06-09 Ygy/Bdg
A - 17 Mechanical Measurement & Instrumentation 12-15 26-29 13-16 Bdg/Ygy
A - 18 Modern Maintenance Management 19-22 03-06 20-23 Ygy/Bdg
A - 19 Operation Production Optimization in Oil and Gas Field 26-29 10-13 27-30 Ygy/Bdg
A - 20 Pipeline: Design, Testing, Inspection & Maintenance 02-05 17-20 04-07 Bdg/Ygy
A - 21 Piping Process ASME B31.3 09-12 24-27 11-14 Ygy/Bdg
A - 22 Preventive & Predictive Maintenance 16-19 18-21 Bdg/Ygy
A - 23 Production Operation for Production Operators 23-26 12-15 25-28 Ygy/Bdg
A - 24 Production Operation Management 19-22 Bdg/Ygy
A - 25 Production Well Test & Pressure Analysis 08-11 26-29 08-11 Ygy/Bdg
A - 26 Quality Control of Civil Work 15-18 02-05 15-18 Bdg/Ygy
A - 27 Reliability Centered Maintenance (RCM) 22-25 09-12 22-25 Ygy/Bdg
A - 28 Root Cause Failure Analysis (RCFA) 16-19 Bdg/Ygy
A - 29 Steam Generator and Steam Turbine Operation and Maintenance 05-08 23-26 06-09 Ygy/Bdg
A - 30 Total Productive Maintenance 12-15 13-16 Bdg/Ygy30-02
For more information please call: Eva, Amy &Yani
30-02
29-01 29-02
01-04
31-03
01-04
29-01 29-02
For more information please call: Eva, Amy &Yani

More Related Content

What's hot

004 service report 1250 g07020 may 2015
004 service report 1250 g07020 may 2015004 service report 1250 g07020 may 2015
004 service report 1250 g07020 may 2015fargo2015
 
BASE FRAME FOR GIS & 13.8KV SWGR-900MM
BASE FRAME FOR GIS & 13.8KV SWGR-900MMBASE FRAME FOR GIS & 13.8KV SWGR-900MM
BASE FRAME FOR GIS & 13.8KV SWGR-900MMSYED BAKHTIARY
 
Structural Health Monitoring - Real Time Stress Measurement
 Structural Health Monitoring - Real Time Stress Measurement Structural Health Monitoring - Real Time Stress Measurement
Structural Health Monitoring - Real Time Stress MeasurementFrank-Michael Jäger
 

What's hot (6)

Construction Management
Construction Management Construction Management
Construction Management
 
2 l 65z
2 l 65z2 l 65z
2 l 65z
 
004 service report 1250 g07020 may 2015
004 service report 1250 g07020 may 2015004 service report 1250 g07020 may 2015
004 service report 1250 g07020 may 2015
 
025 sds3213 28-toc
025 sds3213 28-toc025 sds3213 28-toc
025 sds3213 28-toc
 
BASE FRAME FOR GIS & 13.8KV SWGR-900MM
BASE FRAME FOR GIS & 13.8KV SWGR-900MMBASE FRAME FOR GIS & 13.8KV SWGR-900MM
BASE FRAME FOR GIS & 13.8KV SWGR-900MM
 
Structural Health Monitoring - Real Time Stress Measurement
 Structural Health Monitoring - Real Time Stress Measurement Structural Health Monitoring - Real Time Stress Measurement
Structural Health Monitoring - Real Time Stress Measurement
 

Viewers also liked

Acm training for maintenance and operation personnel in wind farms
Acm   training for maintenance and operation personnel in wind farmsAcm   training for maintenance and operation personnel in wind farms
Acm training for maintenance and operation personnel in wind farmsJose SanLeandro
 
Mtnw Wc Presentation June 07 Rev4
Mtnw Wc Presentation   June 07 Rev4Mtnw Wc Presentation   June 07 Rev4
Mtnw Wc Presentation June 07 Rev4WashingtonChain
 
Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012swoolway
 
Wind energy I. Lesson 5. Wind turbines general
Wind energy I. Lesson 5. Wind turbines generalWind energy I. Lesson 5. Wind turbines general
Wind energy I. Lesson 5. Wind turbines generalTuong Do
 
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...João Henrique Volpini Mattos
 
Ship handling basics
Ship handling basicsShip handling basics
Ship handling basicsmoney2j
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipGuilherme Azevedo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETSCapt.Vivek Trivedi
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 

Viewers also liked (15)

Acm training for maintenance and operation personnel in wind farms
Acm   training for maintenance and operation personnel in wind farmsAcm   training for maintenance and operation personnel in wind farms
Acm training for maintenance and operation personnel in wind farms
 
Mtnw Wc Presentation June 07 Rev4
Mtnw Wc Presentation   June 07 Rev4Mtnw Wc Presentation   June 07 Rev4
Mtnw Wc Presentation June 07 Rev4
 
Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012Tmsm Oim Fpso Overview June 2012
Tmsm Oim Fpso Overview June 2012
 
Wind energy I. Lesson 5. Wind turbines general
Wind energy I. Lesson 5. Wind turbines generalWind energy I. Lesson 5. Wind turbines general
Wind energy I. Lesson 5. Wind turbines general
 
Apresentação Sesam Estruturas Fixas
Apresentação Sesam Estruturas FixasApresentação Sesam Estruturas Fixas
Apresentação Sesam Estruturas Fixas
 
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...
SUC Brasil 2012 : Optimization of a Floating Platforms Mooring System Based o...
 
Fault tree analysis
Fault tree analysisFault tree analysis
Fault tree analysis
 
Ship handling basics
Ship handling basicsShip handling basics
Ship handling basics
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike Seamanship
 
anchorage Fondeo
anchorage Fondeoanchorage Fondeo
anchorage Fondeo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETS
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
RCM
RCMRCM
RCM
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 

Similar to A - Production Operation Maintenance Mechanical Engineering

Electrical & Instrumentation
Electrical & InstrumentationElectrical & Instrumentation
Electrical & InstrumentationEva Susiani
 
Oil Gas & Petroleum Engineering
Oil Gas & Petroleum EngineeringOil Gas & Petroleum Engineering
Oil Gas & Petroleum EngineeringEva Susiani
 
Health, Safety & Environmental
Health, Safety & EnvironmentalHealth, Safety & Environmental
Health, Safety & EnvironmentalEva Susiani
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfAhmed Mehrem
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docxMohammedSalah424258
 
Geology, Geophysics & Mining
Geology, Geophysics & MiningGeology, Geophysics & Mining
Geology, Geophysics & MiningEva Susiani
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptxPowerMurugan
 
Presentation Report GE Oil & Gas Supplied Materials
Presentation Report GE Oil & Gas Supplied MaterialsPresentation Report GE Oil & Gas Supplied Materials
Presentation Report GE Oil & Gas Supplied MaterialsRetnesh Babu
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
Monthly report of maintenance by Swamina International Ltd.
Monthly report of maintenance by Swamina International Ltd.Monthly report of maintenance by Swamina International Ltd.
Monthly report of maintenance by Swamina International Ltd.TusarKole
 
CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816Manish Shah
 

Similar to A - Production Operation Maintenance Mechanical Engineering (20)

C - Oil Gas & Petroleum Engineering
C - Oil Gas & Petroleum EngineeringC - Oil Gas & Petroleum Engineering
C - Oil Gas & Petroleum Engineering
 
D - Electrical & Instrumentation
D - Electrical & InstrumentationD - Electrical & Instrumentation
D - Electrical & Instrumentation
 
Electrical & Instrumentation
Electrical & InstrumentationElectrical & Instrumentation
Electrical & Instrumentation
 
Oil Gas & Petroleum Engineering
Oil Gas & Petroleum EngineeringOil Gas & Petroleum Engineering
Oil Gas & Petroleum Engineering
 
Health, Safety & Environmental
Health, Safety & EnvironmentalHealth, Safety & Environmental
Health, Safety & Environmental
 
B - Geology, Geophysis & Mining
B - Geology, Geophysis & MiningB - Geology, Geophysis & Mining
B - Geology, Geophysis & Mining
 
E - Health, Safety & Environmental
E - Health, Safety & EnvironmentalE - Health, Safety & Environmental
E - Health, Safety & Environmental
 
Zewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdfZewail B4 Base Line Schedule All Buildings.pdf
Zewail B4 Base Line Schedule All Buildings.pdf
 
2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx2022-01-13-ALALAMEEN 08-WR08.docx
2022-01-13-ALALAMEEN 08-WR08.docx
 
Geology, Geophysics & Mining
Geology, Geophysics & MiningGeology, Geophysics & Mining
Geology, Geophysics & Mining
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
C&I July-2022.pptx
C&I July-2022.pptxC&I July-2022.pptx
C&I July-2022.pptx
 
Presentation Report GE Oil & Gas Supplied Materials
Presentation Report GE Oil & Gas Supplied MaterialsPresentation Report GE Oil & Gas Supplied Materials
Presentation Report GE Oil & Gas Supplied Materials
 
ARB JANADREA 25.01.16 UPDATE PM
ARB JANADREA 25.01.16 UPDATE  PMARB JANADREA 25.01.16 UPDATE  PM
ARB JANADREA 25.01.16 UPDATE PM
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
Monthly report of maintenance by Swamina International Ltd.
Monthly report of maintenance by Swamina International Ltd.Monthly report of maintenance by Swamina International Ltd.
Monthly report of maintenance by Swamina International Ltd.
 
CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816CICPA Updated Schedule Dtd 130816
CICPA Updated Schedule Dtd 130816
 
B727 fuel
B727 fuelB727 fuel
B727 fuel
 
30133242 72-00
30133242 72-0030133242 72-00
30133242 72-00
 
aaa.pptx
aaa.pptxaaa.pptx
aaa.pptx
 

A - Production Operation Maintenance Mechanical Engineering

  • 1. CODE COURSE TITLE JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC VENUE A - 01 AC & Refrigeration: Safety and Control System 05-08 19-22 06-09 Ygy/Bdg A - 02 Balancing Machine & Total Alignment 12-15 26-29 13-16 Bdg/Ygy A - 03 Basic Reciprocating Gas Compressor Operation and Maintenance 19-22 03-06 20-23 Ygy/Bali A - 04 Centrifugal & Sucker Rod Pump : Operation, Maintenance & Trouble Shooting 26-29 10-13 27-30 Bdg/Ygy A - 05 Centrifugal Gas Compressor: Operation & Maintenance 02-05 17-20 04-07 Ygy/Bdg A - 06 Control Valve: Principles, Sizing, Selection, Installation & Maintenance 09-12 24-27 11-14 Bdg/Ygy A - 07 Electric Submersible Pump: Operation & Trouble Shooting 16-19 18-21 Ygy/Bdg A - 08 Failure Analysis of Mechanical Components 23-26 12-15 25-28 Bdg/Ygy A - 09 Flanges Fitting & Piping Data 19-22 Ygy/Bdg A - 10 Gas Compressor: Operation, Maintenance & Troubleshooting 08-11 26-29 08-11 Bdg/Ygy A - 11 Gas Turbine Operation and Maintenance 15-18 02-05 15-18 Bdg/Ygy A - 12 Integrated Production Optimization of Oil & Gas Production System 22-25 09-12 22-25 Ygy/Bdg A - 13 Maintenance Management Advanced 16-19 Bdg/Ygy PUBLIC COURSE 2016 29-01 29-02 PRODUCTION OPERATION MAINTENANCE & MECHANICAL ENGINEERING Jln. Tebet Raya No. 48-A Jakarta Selatan 12820, Phone: 021-83705560 (hunting) ; Fax: 021-83705663 01-04 31-03 01-04 PT WISNU INTER SAINS HAKIKI Email : public@wish.co.id; marketing@wish.co.id; WEB: www.wish.co.id A - 12 Integrated Production Optimization of Oil & Gas Production System 22-25 09-12 22-25 Ygy/Bdg A - 13 Maintenance Management Advanced 16-19 Bdg/Ygy A - 14 Maintenance Planning Scheduling and Coordination 05-08 23-26 06-09 Ygy/Bdg A - 15 Material Handling for Civil Construction 12-15 13-16 Bdg/Ygy A - 16 Material Knowledge for Drilling & Production Operation 05-08 19-22 06-09 Ygy/Bdg A - 17 Mechanical Measurement & Instrumentation 12-15 26-29 13-16 Bdg/Ygy A - 18 Modern Maintenance Management 19-22 03-06 20-23 Ygy/Bdg A - 19 Operation Production Optimization in Oil and Gas Field 26-29 10-13 27-30 Ygy/Bdg A - 20 Pipeline: Design, Testing, Inspection & Maintenance 02-05 17-20 04-07 Bdg/Ygy A - 21 Piping Process ASME B31.3 09-12 24-27 11-14 Ygy/Bdg A - 22 Preventive & Predictive Maintenance 16-19 18-21 Bdg/Ygy A - 23 Production Operation for Production Operators 23-26 12-15 25-28 Ygy/Bdg A - 24 Production Operation Management 19-22 Bdg/Ygy A - 25 Production Well Test & Pressure Analysis 08-11 26-29 08-11 Ygy/Bdg A - 26 Quality Control of Civil Work 15-18 02-05 15-18 Bdg/Ygy A - 27 Reliability Centered Maintenance (RCM) 22-25 09-12 22-25 Ygy/Bdg A - 28 Root Cause Failure Analysis (RCFA) 16-19 Bdg/Ygy A - 29 Steam Generator and Steam Turbine Operation and Maintenance 05-08 23-26 06-09 Ygy/Bdg A - 30 Total Productive Maintenance 12-15 13-16 Bdg/Ygy30-02 For more information please call: Eva, Amy &Yani 30-02 29-01 29-02 01-04 31-03 01-04 29-01 29-02 For more information please call: Eva, Amy &Yani