1. CURRICULUM VITAE
T.PARAMARTHALINGOM
SINGAPORE PR(S8063456J)
BLK-420,#02-106,
Bedok north street -1,
Singapore - 460420,
: tsplingam@gmail.com
: 65- 94350341.
: 65- 85552568.
Residential status: Indian and Permanent residence in Singapore.
Date of availability : Immediately
ACADEMIC QUALIFICATION
DIPLOMA MECHANICAL ENGINEERING.
G.A POLYTECHNIC (FIRST CLASS)
TECHNICAL QUALIFICATION
CSWIP 3.1 Welding Inspector (Cert No -73193)
ASNT- Level-II Certifications.
Radiographic Film Interpretation (RI)
Ultrasonic Testing (UT)
Radiographic Testing (RT)
Magnetic particle Testing (MPT)
Penetrant Testing (PT)
SAFETY
Basic Offshore Safety Induction & Emergency Training (BOSIET)
Shipyard safety supervisor in confined space.
COMPUTER KNOWLEDGE
M.S. Office, Auto cad 2000.
EXPERIENCE SUMMARY
SHELL SERAYA
SMPO-2 PROJECT
SHUT DOWN JOB.
QA/QC INSPECTOR
(EQUIPMENT &
TESTING)
Sep 2014 to Nov 2014
2. ENSCO5005 SEMI SUBMERSIBLE &
KUKULKAN JACK UP RIG GL NOBLE
DENTON
At KEPPEL FELS.
SHELL PROJECT
ETHYLENE GLYCOLS (S) PTE LTD
SHUT DOWN JOB.
CIDADE DE PARATY
FESO CONVERSION
From HI-TECH INSPECTION
SERVICE.
STRUCTURAL & PIPING
INSPECTOR
QA/QC INSPECTOR
(PIPING)
QA/QC INSPECTOR
&
NDT Multi TECHNICIAN
July 2013 to Sep 2014
April 2013 to July
June 2009 to Jan 2012
NOV,CAMERON MACHANICAL JOBS
INSPECTIONS
PERFECT TEAM ENG PTE LTD
MECHANICAL
QC INSPECTOR
Mar 2007 to Mar 2009
STORAGE TANK HEAT EXCHANGER
COMPANY.
PROGEN SYSTEMS
TECHNOLOGIES LTD
INDIA.
PRODUCTION
QC INSPECTOR
Mar 2002 to April 2006
REFERENCE KNOWLEDGE OF CODES & STANDARDS:
ASME SEC II, V, VIII DIV I, IX, B31.1, B31.3.
ASTM.
API STANDARDS.
DEP Standards of SHELL.
Shut down job experience:
Review and study Project specifications, procedures and Contractor approved Q.C.P.,
Method statement requirements for different jobs.
Performing Hold, Witness, Random and Surveillance / Monitoring activities of Quality
inspections and tests at manufacturing facilities/workshops, construction sites.
2013
JACKUP RIG (1104),
NOBLE at JURONG SHIPYARD
From RENU INSPECTION PTE LED
QA/QC INSPECTOR
(PIPING)
Dec 2012 to April 2013
GAS COMBINED CLCLE POWER
PLANT
ALSTOM POWER
TUAS POWER STATION.
From RENU INSPECTION PTE LED
QA/QC INSPECTOR
(PIPING)
Mar 2012 to Nov 2012
3. Inspecting materials as per applicable code & specification requirements and to ensure
complaints with client requirements.
Reviewing and evaluating Contractors Quality document submission. (PQR,WPS,WQT,
NDT Procedures, Mechanical Test Reports, Method Statements, Hydro t est, calibration &
Batch Certificates, radiographic and other NDT reports related to this job.
Verify calibration status of inspection and testing equipment is valid.
Chec k the Equipment’s blind list loc ation as per blind P&ID drawing with operation
Department.
Pre-cleaning inspection, static inspection and Final & Boxed up inspection.
Daily progress update for all equipment work status report.
To check all the piping, welding, Ethylene line and insulation (Hot & Cold) to inspect as
per specification of P&ID & ISO drawing.
Witness & interpret test results accurately. Maintain inspection test status at every stage
of inspection.
Check Fit-up and Weld visual inspection.
Inspection of mechanical equipment installation.
To prepare pre-inspection, post inspection & final inspection report
To prepare final shutdown summary document.
WORK EXPERIENCE
NAME OF
ORGANIZATION : AV ENGINEERING SERVICE PTE LTD
DESIGNATION : QA / QC INSPECTOR (STRUCTURAL/PIPING)
PROJECT : ENSCO5005 SEMI SUBMERSIBLE & GL NOBEL DENTON
JACK-UP RIG
COMPANY : KEPPEL FELS YARD
CLASS : BV & ABS
DURATION : July 2013 to Sep 2014.
Piping :
Pipe material certificate review for all High pressure & Low pressure pipe line,
preliminary WPS approval, PQR preparation (Review all related Documents), As per
applicable Codes and standards DTL & NDT test witness and certificate review, Pipe
stringing report review, During welding on site inspection, As per WPS fit up- Inspection,
preheat, heat input & inter pass temperature checking, after welding Visual inspection,X
ray film review, Tie- in joint, UT & Cut bevel MPI test witness at site. Before hydro
testing check the scope of work completion as per the purchase order, Prepare punch list
before hydro test, Accumulate the all documents & verified after then issue the hydro
test clearance. During hydro test witness at site, commissioning the line and hand over
to the client, before hand over punch list to be cleared. Test pack to be submitted for
client approval.
4. Outfitting :
Carry out fabrication and installat ion inspection of high thickness gauge and Low
thickness Ducting, louver box for comportment and Living quarters.
Installation of fire damper, fan and louver box.
Carry out Insulation inspection on A60, Thermal and acoustic insulation on living
quarters and Engine room, Electrical and mechanical work shop.
Installation of Wall panel inspection and deck under alignment celling panel close
up.
Carry out Galley room and Mess room Equipment installation inspection.
Carry out cabin close out inspection.
Mechanical :
Carry out Equipment installation and tie down inspection as per standard and
specification.
Coordinating and Testing of drill floor and marine equipment .
Liaise with Class, Vendors and shipyard related to all technical aspects of System
piping, piping Support modification, Drilling Equipment and marine equipment
installation.
Coordinating Installation and Pre Commissioning activities of marine system.
Coordinating and monitoring the installation of high pressure piping and marine
system.
Wideness load test on Crane, Life boat David, Utility winch, Trolley beam and Pad
eye etc.
NAME OF
ORGANIZATION : ROTARY IMC SINGAPORE PTE LTD
DESIGNATION : QA / QC INSPECTOR
PROJECT : ETHYLENE GLYCOLS SINGAPORE PTE LTD (EGS- SHUT
DOWN JOB)
CLIENT : SHELL
DURATION : April 2013 to July 2013
NAME OF
ORGANIZATION : RENU ENGINEERING CONSULTANTS PTE LTD
DESIGNATION : QA / QC INSPECTOR (PIPING)
5. DESIGNATION : QA / QC INSPECTOR (PIPING)
COMPANY : JURONG SHIP YARD
PROJECT : JACK UP RIG (1104)
CLIENT : NOBLE
CLASS : ABS
PROJECT : CCP5 (Gas Combined Cycle Power Plant)
OWNER : ALSTOM POWER
CLIENT : TUAS POWER STATION
DURATION : March 2012 November 2013
NAME OF
ORGANIZATION : HI-TECH INSPECTION SERVICES(S) PTE LTD.
DESIGNATION : QA / QC INSPECTOR @ NDT INSPECTOR
PROJECT : CIDADE DE PARATY (FPSO CONVERSION)
OWNER : SBM (SINGLE BUOY MOORING)
CLIENT : PETROBRAS
CLASS : ABS
DURATION : June 2009 to January 2012
JOB RESPONSIBLITIES:
Knowledge of hull construction and engineering, good exposure in
engineering drawing, fabrication drawing and weld map.
Preparation of Inspection Testing Plan as per Specification, Codes,
Scope of work and client requirement.
Welding Consumable Control - ensuring the proper storage and
handling of welding consumables.
Review /approval of Preheat, PWHT, Procedures for welding.
Carrying out WQT for Similar and Dissimilar materials of Pipes and
Plates as per AWS D1.1& ASME Sec IX and applicable codes.
Preparing / Carrying out PQR and WPS for Welding.
6. Generating weld map, Cutting Plan, as per Isometric drawing.
Monitoring welding Work, Welders techniques during the in process
and ensuring the Quality in the project.
Conducting fit up and Visual Inspection on the welded Joints and
Maintaining the Traceability and Updating the weld map of
relevant Isometric drawing.
Verify/Review QC documents related Pre-fabrication works including
weld history, NDT reports, painting reports as per
Recommendation & repair procedure.
Witnessing NDT methods suc h as "RT, UT, MT, PT,” and reviewing the
reports.
Preparing the Project weld status, Project Weld Repair Status, Welder
Performance Report on weekly basis and reporting to client.
Witnessing the PMI on Weld metal, Parent metal, ferrite content
inspection.
Witnessing PWHT and reviewing the charts.
Raising and Follow up of Punch list and discussing about daily quality
issues.
Witnessing the field testing including the visual test, vacuum test and
air test.
In raising NCR/STQ and follow up activities.
Experienced in confined space, live line tie in, Hanging Stage
Inspection.
In the Knowledge about international standards API 1104,ASME- Sec
IX,AWS D1.1 etc.
Handle the test packages
Working with Base materials Stainless Steel, Carbon Steel & LTCS.
PERFECT TEAM ENGINEERING PTE LTD(OIL FIELD)
Duration : March 2007 to March 2009
Role : Production QC Inspector
Responsibilities : 1. Inspection of Oil field jobs.
2. Inspection of precision jobs and use all type of Quality
7. instruments.
3. Preparation of Process capability report.
4. Corrective & Preventive Action.
PROGEN SYSTEMS AND TECHNOLOGIES LTD.
Duration : March 2002 to April 2006
Role : Production QC Inspector
Projects Handled:
Largest de-aerator and storage tank of length 45 meters and inner dia.
4800mm for LMZ.
Spiral fin welded Tubes - M/s. ABCO - ABELINE, U.S.A.
Carbon steel and stainless steel pressure vessels for IOCL-BARAUNI -
Through Samsung Engg. Co. Ltd., Korea. Inspec tion by LRS.
De aerator & Storage tank for Egypt Elec tric ity Board Thro’ Borsig Babc oc k.
De aerator for NLC (ID 3.8m x L: 19m) with design background from
cocrahine Inc, USA.
Waste Heat Recovery units for BAYU-UNDAN, AUSTRALIA, and for
DALMIETTA POWER PROJECT, EGYPT through ALSTOM ENERGY SYSTEMS
U.K., and Inspection by M/s. MOODY International & LRS.
Pressure vessels, Piping Spools & Skids 60mm thk for ONGC – Kesanapally &
Pasaralapudi.
Main Air Tank 115mm thk shell (U stamp). From Mitusi Japan.
Heat Exchanger of length 1200mm & dia 400mm with copper tubes & tube
sheet for CPCL.
PERSONAL PROFILE:
Father’s Name : T.PARAMARTHALINGOM.
Date of Birth : 09.03.1980
Nationality : Indian
Marital Status : Single
Languages Known : English & Tamil
Contact Address : Blk-420
02#106, Bedok north Street -1
Singapore 460420.
Passport No. : K9305749.
DECLARATION:
I hereby declare that the information furnished above is true, complete, and correct
to best of my knowledge.
PARAMARTHALINGOM. T