Peter Cramer
c/o 2A The Wend, Coulsdon, Surrey, CR5 2AX, UK
Mob: + (971) 508 250 254
Tel: + (44) 208 660 5012
Email: petercramer01@gmail.com
Professional Profile
Lead Estimator/Senior Estimator with 25 years of experience demonstrated in the global onshore
& offshore oil & gas, chemical processing, mining & metallurgical sectors. Key areas of expertise
include: preparation & review of cost estimates (FEL, Conceptual, FEED & EPC) across all
engineering disciplines to required degree of accuracy (Class 1 to Class 5) for lump sum & cost-
reimbursable projects; cost control; project control; change trend/management; contingency
planning; contractor management; claims defence, commercial analysis; compliance; contractual
risks & earned value analysis. Capable of building and developing trusted relationships with key
project stakeholders (including clients, contractors, subcontractors and project teams) to secure
successful outcomes. Strong leadership skills; politically astute; capable of inspiring teams to
succeed and achieve best possible business outcomes. Currently seeking a career-enhancing
opportunity where skill set and experience can be used to make a valuable contribution.
Key Achievements
 Led delivery of Cold Eyes Review for cost estimate & construction schedule for proposed
project within Ras Laffan complex (Qatar) in 2013 on behalf of RasGas. Recommended
solution to shorten construction schedule & revise capital costs (downwards). Project
completed with revised schedule and with significantly lower costs.
 Reviewed & evaluated cost proposal prepared by Petronas FEED Consultant for build of
new refinery & downstream petrochem complex in Malaysia on behalf of the owner &
secured savings of $1.1b US. Identified allowances for bulk materials and high man hour
rates which could not be justified and were subsequently addressed by the owner.
 Reviewed & evaluated cost proposal & schedule prepared by consultant at RasGas &
QatarGas (Owner-Operators) for project to extend life of subsea wells. Identified risks with
“rounding up” of quantities & large contingencies for unknown scopes. Considerably
reduced cost estimate by removing unnecessary allowances (saving of $3b US).
 Received award from RasGas for Common Offplots Project (COP) in 2006 for reduction of
excessive claims for additional works (>$20m savings) and following in-depth analysis of
contracts. Award usually reserved for internal RasGas team.
Employment Experience
Lead Estimator, Kentz Overseas Ltd (SNCLavalin) Oct 2015 – Current
Exxon-Iraqi JV, Early Facilities in Iraq, based in UAE
 Provision of estimating services to Client as part of integrated management team
 Preparation of Class 3, 4 & 5 estimates using first principle methodology
 Assistance with data formats used in ITT bids
 Benchmarking of estimating data against in-house and other sources
 Prepared Estimating Procedure. Work to these guidelines for Compliance – validated by
audits
 Supervise staff. Liaise with discipline leads on scope definition, MTOs, progress.
 Estimate man-hours from 1st principles, developed composite man-hour rates,
productivity factors for all disciplines.
 Develop costs for all Direct and Indirect activities plus Overheads and allowances.
 Prepare Cost estimate Reports for management.
Lead Estimator, Rider Hunt International Feb 2015 – Apr 2015
Shell LNGC JV Project, Kuala Lumpur, Malaysia
 Provided lead estimating services for independent verification of FEED estimates prepared
by FEED consultants (Chiyoda/Foster Wheeler/Saipem/Worley [CFSW]) for proposed
multibillion $ new 2 Train LNGC Plant in Kitimat, British Columbia, Canada.
 Prepared Estimate Basis of Memorandum (estimating methodologies); estimated man-hour
allowances & rates, incl. productivity factors across disciplines and various locations.
 Estimated costs for major equipment based on client’s main equipment list, costs of bulks
based on BOM (bill of materials) and indirect costs for office & field staff at module
fabricators yards & on site in Canada. Developed metrics for benchmarking against in-
house norms & industry norms.
 Prepared project execution plan (PEP). Analysed risks for computation of contingencies.
Prepared presentations of estimate workflow and detailed functions for client in Canada
and for FEED contractor in Japan, ensuring compliance.
Senior Cost Estimator, AMEC Apr 2014 – Oct 2014
ZADCO UZ750 Project, UAE
 Evaluated FEED contractor estimates for capacity enhancement project (Offshore Islands)
including substantial involvement with ITT process and bid evaluations.
 Estimated equipment costs from in-house engineers’ equipment list. Estimated bulk
materials costs from bill of materials (BOM). Determined costs for direct & indirect labour
with focus on labour productivity at fabricator yards and for offshore installation activities
by specialist offshore contractors with consideration for standby allowances. Evaluated EPC
contractors’ claims for additional works as part of change management process.
Lead Estimator, Rider Hunt International Oct 2013 – Mar 2014
PETRONAS RAPID Project, Kuala Lumpur, Malaysia
 Provided lead estimating services; worked as part of a team for the independent
verification of FEED estimates for proposed multibillion $ new build refinery &
petrochemical complex project in Malaysia. Prepared independent estimate for offsites &
utilities based on BOM and BOQ prepared by FEED Consultant.
 Prepared estimate basis & analysis of risks (scope/cost/schedule) for calculation of
contingency.
Senior Engineer (Cost Estimating), RasGas Ltd Apr 2012 – May 2013
Operator (Exxon Mobil), Qatar
 Evaluated, reviewed & conditioned contractor EPC estimates for offshore/onshore mega-
project. Prepared estimates for gate reviews & presentation documents for funding stages.
Conduced analysis/review of multiple contractors’ EPC cost proposals for direct & indirect
man-hours, materials & equipment costs, incl. owners’ costs with risk & contingency for
different types of projects (EPC/EPIC/EPCm).
 Compared contractors’ proposals against corporate benchmarks, metrics (equip, bulks &
man hour) norms. Developed benchmarks/metrics from recent offshore & onshore projects
for operator (RasGas). Estimated project costs using various approaches: first principles/
parametric estimating /factored.
 Evaluated EPC schedule Levels I & II for logic, applied schedule reserves as applicable.
Developed new unit rates for works not specified in original contracts (all disciplines).
PMC Lead Estimator/Cost Engineer, Fluor Mideast Ltd Dec 2011 – Feb 2012
Shah Gas Development, Occidental Petroleum, Korea
 Estimated & evaluated LSTK contractor cost proposals as part of change management
process. Prepared, reviewed and issued weekly & monthly construction progress reports,
man hour progress & cost reports (used for invoicing the client).
Estimating Manager, McConnell Dowell, Singapore May 2011 – Nov 2011
 Prepared, compiled & reviewed tenders to meet client requirements prior to approval by
senior management. Developed benchmarks for future estimates for competitive tendering.
 Managed effective use of available estimating resources to ensure compliance with
corporate and client work practices, norms and procedures.
 Identified, developed & continually updated cost norms, metrics & factors for the
estimating dept. Supervised 2 estimators and managed 6 others in tender preparation
matrix.
FLUOR, RasGas and QatarGas Jul 2006 – Apr 2011
Lead Estimator/Lead QS, QatarGas Jetty Boil Off Gas Project
Senior Estimator, QatarGas LNG Loading Facility (Exxon Mobil)
Senior Estimator, RasGas Common Offplots Project (COP)
 Managed & coordinated estimating activities across multiple projects (including evaluation
of change management proposals for cost & schedule, impact & risk); analysed contractors’
cost proposals; compared contractors’ proposals against industry benchmarks, metrics &
corporate man hour norms.
 Developed new unit rates for works not specified in original contracts (all disciplines).
 Supervised 8 Quantity Surveyors for verification of MTOs, BOMs, BOQs installed on major
contracts. Liaised with client, colleagues & subcontractors on scope changes, cost &
schedule changes. Challenged contractors’ proposals. Prepared estimating reports to
support evaluations of proposals; offered advice/suggestions incl. cost studies for
alternative solutions.
 Evaluated contractors’ claims for additional costs due to delays/extensions, assessed cost
proposals from various contractors for changes to scope, proposed alternative solutions.
Ensured compliance for safe working practices and procedures (using international
standards & client requirements).
 Interpreted contractual terms to confirm Method of Measurement used for payment.
Explained contractual terms with contractors' staff for clarity & agreement w.r.t. payment
 Effected considerable savings for client on reimbursable project.
Estimating Specialist/Lead Estimator, AMEC Jan 2006 – Jun 2006
(Seconded to Kuwait Oil Company)
 Led estimating team with development of budget proposals, AFEs & tender check
estimates. Conducted analysis of contractor claims incl. verification and resolution.
Secured alternative cost proposals.
 Liaised and coordinated activities of estimating with other cost engineering disciplines,
senior engineers and senior managers for timely completion of various estimates.
Supervising Estimator/Senior Estimator, BECHTEL Oct 2002 – Jan 2006
Saudi Arabia, UAE, Kuwait, Eastern Siberia & Qatar
 Delivered multiple global projects as required. Monitored, evaluated & reported trends
(scope deviations) during reimbursable & LSTK phases for JV Khursaniyah Gas Plant
Project, Saudi Arabia. Project value > $2b.
 Developed mechanical equipment & indirect cost estimates for FEED & EPC estimates with
overall TIC of $3.8b for Gasco OGDIII / AGDII FEED/Ruwais Projects in UAE.
 Produced mechanical equipment & indirects estimate for PIC Aromatics Project, Kuwait.
 Produced mechanical estimate, bulks, indirect costs, risk assessment for 20% FEED
estimate with overall TIC of >$8 b for Yukos Phase 1 & 2 (Eastern Siberia)
 Supported LSTK estimate for mechanical equipment for Dolphin Project Proposal, Qatar.
 Delivered multiple claims/estimate validations for projects incl. Hannibal Amines Unit &
CTRL (Channel Tunnel Rail Link) & Simian Sapphyr, Sakhalin Island.
Loss Adjuster, GAB Robins Chartered Loss Adjusters May 2000 – Sep 2002
 Responsible for estimating and validation of costs in construction and engineering
industries (chemical/power/electrical/rail/telecoms) in pre-loss and post-loss situations.
 Calculated replacement costs of damaged process equipment. Cost calculations to re-
instate process plant to former operational capability. Costs included Process Equipment
and associated Bulk Materials.
 Negotiated with contractors re scope of work, costs, responsibilities and scheduling.
Senior Estimator, BICC CABLES (UK) Jul 1998 – Apr 2000
 Produced cost proposals/tenders for worldwide HV power cable installations (incl.
Telecommunications) with associated civil, structural & mechanical works. Liaised with
contractors worldwide for resources, materials & plant requirements.
Earlier Career
Estimating Engineer (Contract), John Brown/Davy (KVAERNER UK) 1996 – 1998
Valuation Engineer, Thomas Howell Group (London) 1995 – 1996
Senior Cost Engineer, Sentrachem (South Africa) 1989 – 1995
Estimator/Cost Engineer Gencor (South Africa) 1982 – 1989
Education
Bachelor of Business Administration (BBA) degree
Higher National Certificate – HNC
Diploma in Production Management
Professional Memberships
AACE Int’l (Assn for Advancement of Cost Engineering Int’l)
Association of Cost Engineers (MA CostE, UK)
Dutch Association of Cost Engineers (DACE)
Additional Information
Key IT Skills: MS Office: Advanced Excel, Word and PowerPoint. Aspentech ACCE, KBase &
CAPCost software
References are available on request

More Related Content

What's hot

Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu, CIPM/CrtPRM
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMansoor Ali
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015Suresha Rao
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07Khalid Alismail
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Dr Sabih Laham
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievementsJoseph Bracic
 
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014Bob DeHart
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry CampbellHarry Campbell
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5Ramiz Siddiq
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy
 
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...Bob DeHart
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop GuptaAnoop Gupta
 

What's hot (20)

Cameron
CameronCameron
Cameron
 
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ PetrochemicalArun Sahu_ Project Management _ Oil & Gas _ Petrochemical
Arun Sahu_ Project Management _ Oil & Gas _ Petrochemical
 
MANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QCMANSOOR_ALI_CV -QA QC
MANSOOR_ALI_CV -QA QC
 
A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015A_suresha_rao_Jan_2015
A_suresha_rao_Jan_2015
 
Khalid alismail new resume rev07
Khalid alismail  new resume rev07Khalid alismail  new resume rev07
Khalid alismail new resume rev07
 
Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015Sabih Laham CV Mar 2015
Sabih Laham CV Mar 2015
 
Operation & intervention engineer achievements
Operation & intervention engineer achievementsOperation & intervention engineer achievements
Operation & intervention engineer achievements
 
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014
SHES MS in BARZAN FINAL-TAMU Intl Process Saf Symposium_oct 28 2014
 
MOHAMMAD Updated CV
MOHAMMAD Updated CV MOHAMMAD Updated CV
MOHAMMAD Updated CV
 
2016 07 Henry Campbell
2016 07 Henry Campbell2016 07 Henry Campbell
2016 07 Henry Campbell
 
SSNair-CV-Latest-2016
SSNair-CV-Latest-2016SSNair-CV-Latest-2016
SSNair-CV-Latest-2016
 
RESUME=
RESUME=RESUME=
RESUME=
 
uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015uanraju inst cv 9 sep 2015
uanraju inst cv 9 sep 2015
 
PMM CV Jan 2016 - Copy
PMM CV Jan 2016 - CopyPMM CV Jan 2016 - Copy
PMM CV Jan 2016 - Copy
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Gary Clancy CV - November 2016
Gary Clancy CV - November 2016Gary Clancy CV - November 2016
Gary Clancy CV - November 2016
 
CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015CV ABHIJIT 04-03-2015
CV ABHIJIT 04-03-2015
 
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
IPTC-18322-MS_SHE&S Improvement of a Major Subcontractor on the RG Barzan Ons...
 
Resume final(17.11.16) of Anoop Gupta
Resume  final(17.11.16) of Anoop GuptaResume  final(17.11.16) of Anoop Gupta
Resume final(17.11.16) of Anoop Gupta
 

Similar to PETER CRAMER CV April 2016

Similar to PETER CRAMER CV April 2016 (20)

Resume - Nermeen Atef sam
Resume - Nermeen Atef samResume - Nermeen Atef sam
Resume - Nermeen Atef sam
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Sarmad CV_Oct'16
Sarmad CV_Oct'16Sarmad CV_Oct'16
Sarmad CV_Oct'16
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
CV_KAD_PMP+BDM
CV_KAD_PMP+BDMCV_KAD_PMP+BDM
CV_KAD_PMP+BDM
 
CV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning EngineerCV - S.Sankarasubramanian - Senior Planning Engineer
CV - S.Sankarasubramanian - Senior Planning Engineer
 
Cv s.sankarasubramanian - senior planning engineer
Cv   s.sankarasubramanian - senior planning engineerCv   s.sankarasubramanian - senior planning engineer
Cv s.sankarasubramanian - senior planning engineer
 
CV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh ParmarCV for civil engineer (Updated)--- Alpesh Parmar
CV for civil engineer (Updated)--- Alpesh Parmar
 
N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016N.V.VAIDYA-05-06-2016
N.V.VAIDYA-05-06-2016
 
kiran Planning sche engineer CV
kiran Planning sche engineer CVkiran Planning sche engineer CV
kiran Planning sche engineer CV
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
JAYANT KUMAR
JAYANT KUMARJAYANT KUMAR
JAYANT KUMAR
 
Oman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendationsOman EPC 2015 summary and recommendations
Oman EPC 2015 summary and recommendations
 
MARTY_PATE
MARTY_PATEMARTY_PATE
MARTY_PATE
 
Ahmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdullaAhmed Mostafa kamel Mohamed abdulla
Ahmed Mostafa kamel Mohamed abdulla
 
Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!Save USD 25 billion thru new project management practices!
Save USD 25 billion thru new project management practices!
 
RESUME
RESUMERESUME
RESUME
 
Estimation Engineer
Estimation EngineerEstimation Engineer
Estimation Engineer
 
Project Careers Oil&Gas
Project Careers Oil&Gas Project Careers Oil&Gas
Project Careers Oil&Gas
 
Prudhivi__Rushi_CV
Prudhivi__Rushi_CVPrudhivi__Rushi_CV
Prudhivi__Rushi_CV
 

PETER CRAMER CV April 2016

  • 1. Peter Cramer c/o 2A The Wend, Coulsdon, Surrey, CR5 2AX, UK Mob: + (971) 508 250 254 Tel: + (44) 208 660 5012 Email: petercramer01@gmail.com Professional Profile Lead Estimator/Senior Estimator with 25 years of experience demonstrated in the global onshore & offshore oil & gas, chemical processing, mining & metallurgical sectors. Key areas of expertise include: preparation & review of cost estimates (FEL, Conceptual, FEED & EPC) across all engineering disciplines to required degree of accuracy (Class 1 to Class 5) for lump sum & cost- reimbursable projects; cost control; project control; change trend/management; contingency planning; contractor management; claims defence, commercial analysis; compliance; contractual risks & earned value analysis. Capable of building and developing trusted relationships with key project stakeholders (including clients, contractors, subcontractors and project teams) to secure successful outcomes. Strong leadership skills; politically astute; capable of inspiring teams to succeed and achieve best possible business outcomes. Currently seeking a career-enhancing opportunity where skill set and experience can be used to make a valuable contribution. Key Achievements  Led delivery of Cold Eyes Review for cost estimate & construction schedule for proposed project within Ras Laffan complex (Qatar) in 2013 on behalf of RasGas. Recommended solution to shorten construction schedule & revise capital costs (downwards). Project completed with revised schedule and with significantly lower costs.  Reviewed & evaluated cost proposal prepared by Petronas FEED Consultant for build of new refinery & downstream petrochem complex in Malaysia on behalf of the owner & secured savings of $1.1b US. Identified allowances for bulk materials and high man hour rates which could not be justified and were subsequently addressed by the owner.  Reviewed & evaluated cost proposal & schedule prepared by consultant at RasGas & QatarGas (Owner-Operators) for project to extend life of subsea wells. Identified risks with “rounding up” of quantities & large contingencies for unknown scopes. Considerably reduced cost estimate by removing unnecessary allowances (saving of $3b US).  Received award from RasGas for Common Offplots Project (COP) in 2006 for reduction of excessive claims for additional works (>$20m savings) and following in-depth analysis of contracts. Award usually reserved for internal RasGas team. Employment Experience Lead Estimator, Kentz Overseas Ltd (SNCLavalin) Oct 2015 – Current Exxon-Iraqi JV, Early Facilities in Iraq, based in UAE  Provision of estimating services to Client as part of integrated management team  Preparation of Class 3, 4 & 5 estimates using first principle methodology  Assistance with data formats used in ITT bids  Benchmarking of estimating data against in-house and other sources  Prepared Estimating Procedure. Work to these guidelines for Compliance – validated by audits  Supervise staff. Liaise with discipline leads on scope definition, MTOs, progress.  Estimate man-hours from 1st principles, developed composite man-hour rates, productivity factors for all disciplines.  Develop costs for all Direct and Indirect activities plus Overheads and allowances.  Prepare Cost estimate Reports for management. Lead Estimator, Rider Hunt International Feb 2015 – Apr 2015 Shell LNGC JV Project, Kuala Lumpur, Malaysia  Provided lead estimating services for independent verification of FEED estimates prepared by FEED consultants (Chiyoda/Foster Wheeler/Saipem/Worley [CFSW]) for proposed multibillion $ new 2 Train LNGC Plant in Kitimat, British Columbia, Canada.  Prepared Estimate Basis of Memorandum (estimating methodologies); estimated man-hour allowances & rates, incl. productivity factors across disciplines and various locations.  Estimated costs for major equipment based on client’s main equipment list, costs of bulks based on BOM (bill of materials) and indirect costs for office & field staff at module
  • 2. fabricators yards & on site in Canada. Developed metrics for benchmarking against in- house norms & industry norms.  Prepared project execution plan (PEP). Analysed risks for computation of contingencies. Prepared presentations of estimate workflow and detailed functions for client in Canada and for FEED contractor in Japan, ensuring compliance. Senior Cost Estimator, AMEC Apr 2014 – Oct 2014 ZADCO UZ750 Project, UAE  Evaluated FEED contractor estimates for capacity enhancement project (Offshore Islands) including substantial involvement with ITT process and bid evaluations.  Estimated equipment costs from in-house engineers’ equipment list. Estimated bulk materials costs from bill of materials (BOM). Determined costs for direct & indirect labour with focus on labour productivity at fabricator yards and for offshore installation activities by specialist offshore contractors with consideration for standby allowances. Evaluated EPC contractors’ claims for additional works as part of change management process. Lead Estimator, Rider Hunt International Oct 2013 – Mar 2014 PETRONAS RAPID Project, Kuala Lumpur, Malaysia  Provided lead estimating services; worked as part of a team for the independent verification of FEED estimates for proposed multibillion $ new build refinery & petrochemical complex project in Malaysia. Prepared independent estimate for offsites & utilities based on BOM and BOQ prepared by FEED Consultant.  Prepared estimate basis & analysis of risks (scope/cost/schedule) for calculation of contingency. Senior Engineer (Cost Estimating), RasGas Ltd Apr 2012 – May 2013 Operator (Exxon Mobil), Qatar  Evaluated, reviewed & conditioned contractor EPC estimates for offshore/onshore mega- project. Prepared estimates for gate reviews & presentation documents for funding stages. Conduced analysis/review of multiple contractors’ EPC cost proposals for direct & indirect man-hours, materials & equipment costs, incl. owners’ costs with risk & contingency for different types of projects (EPC/EPIC/EPCm).  Compared contractors’ proposals against corporate benchmarks, metrics (equip, bulks & man hour) norms. Developed benchmarks/metrics from recent offshore & onshore projects for operator (RasGas). Estimated project costs using various approaches: first principles/ parametric estimating /factored.  Evaluated EPC schedule Levels I & II for logic, applied schedule reserves as applicable. Developed new unit rates for works not specified in original contracts (all disciplines). PMC Lead Estimator/Cost Engineer, Fluor Mideast Ltd Dec 2011 – Feb 2012 Shah Gas Development, Occidental Petroleum, Korea  Estimated & evaluated LSTK contractor cost proposals as part of change management process. Prepared, reviewed and issued weekly & monthly construction progress reports, man hour progress & cost reports (used for invoicing the client). Estimating Manager, McConnell Dowell, Singapore May 2011 – Nov 2011  Prepared, compiled & reviewed tenders to meet client requirements prior to approval by senior management. Developed benchmarks for future estimates for competitive tendering.  Managed effective use of available estimating resources to ensure compliance with corporate and client work practices, norms and procedures.  Identified, developed & continually updated cost norms, metrics & factors for the estimating dept. Supervised 2 estimators and managed 6 others in tender preparation matrix. FLUOR, RasGas and QatarGas Jul 2006 – Apr 2011 Lead Estimator/Lead QS, QatarGas Jetty Boil Off Gas Project Senior Estimator, QatarGas LNG Loading Facility (Exxon Mobil) Senior Estimator, RasGas Common Offplots Project (COP)  Managed & coordinated estimating activities across multiple projects (including evaluation of change management proposals for cost & schedule, impact & risk); analysed contractors’ cost proposals; compared contractors’ proposals against industry benchmarks, metrics & corporate man hour norms.  Developed new unit rates for works not specified in original contracts (all disciplines).
  • 3.  Supervised 8 Quantity Surveyors for verification of MTOs, BOMs, BOQs installed on major contracts. Liaised with client, colleagues & subcontractors on scope changes, cost & schedule changes. Challenged contractors’ proposals. Prepared estimating reports to support evaluations of proposals; offered advice/suggestions incl. cost studies for alternative solutions.  Evaluated contractors’ claims for additional costs due to delays/extensions, assessed cost proposals from various contractors for changes to scope, proposed alternative solutions. Ensured compliance for safe working practices and procedures (using international standards & client requirements).  Interpreted contractual terms to confirm Method of Measurement used for payment. Explained contractual terms with contractors' staff for clarity & agreement w.r.t. payment  Effected considerable savings for client on reimbursable project. Estimating Specialist/Lead Estimator, AMEC Jan 2006 – Jun 2006 (Seconded to Kuwait Oil Company)  Led estimating team with development of budget proposals, AFEs & tender check estimates. Conducted analysis of contractor claims incl. verification and resolution. Secured alternative cost proposals.  Liaised and coordinated activities of estimating with other cost engineering disciplines, senior engineers and senior managers for timely completion of various estimates. Supervising Estimator/Senior Estimator, BECHTEL Oct 2002 – Jan 2006 Saudi Arabia, UAE, Kuwait, Eastern Siberia & Qatar  Delivered multiple global projects as required. Monitored, evaluated & reported trends (scope deviations) during reimbursable & LSTK phases for JV Khursaniyah Gas Plant Project, Saudi Arabia. Project value > $2b.  Developed mechanical equipment & indirect cost estimates for FEED & EPC estimates with overall TIC of $3.8b for Gasco OGDIII / AGDII FEED/Ruwais Projects in UAE.  Produced mechanical equipment & indirects estimate for PIC Aromatics Project, Kuwait.  Produced mechanical estimate, bulks, indirect costs, risk assessment for 20% FEED estimate with overall TIC of >$8 b for Yukos Phase 1 & 2 (Eastern Siberia)  Supported LSTK estimate for mechanical equipment for Dolphin Project Proposal, Qatar.  Delivered multiple claims/estimate validations for projects incl. Hannibal Amines Unit & CTRL (Channel Tunnel Rail Link) & Simian Sapphyr, Sakhalin Island. Loss Adjuster, GAB Robins Chartered Loss Adjusters May 2000 – Sep 2002  Responsible for estimating and validation of costs in construction and engineering industries (chemical/power/electrical/rail/telecoms) in pre-loss and post-loss situations.  Calculated replacement costs of damaged process equipment. Cost calculations to re- instate process plant to former operational capability. Costs included Process Equipment and associated Bulk Materials.  Negotiated with contractors re scope of work, costs, responsibilities and scheduling. Senior Estimator, BICC CABLES (UK) Jul 1998 – Apr 2000  Produced cost proposals/tenders for worldwide HV power cable installations (incl. Telecommunications) with associated civil, structural & mechanical works. Liaised with contractors worldwide for resources, materials & plant requirements. Earlier Career Estimating Engineer (Contract), John Brown/Davy (KVAERNER UK) 1996 – 1998 Valuation Engineer, Thomas Howell Group (London) 1995 – 1996 Senior Cost Engineer, Sentrachem (South Africa) 1989 – 1995 Estimator/Cost Engineer Gencor (South Africa) 1982 – 1989 Education Bachelor of Business Administration (BBA) degree Higher National Certificate – HNC Diploma in Production Management Professional Memberships AACE Int’l (Assn for Advancement of Cost Engineering Int’l)
  • 4. Association of Cost Engineers (MA CostE, UK) Dutch Association of Cost Engineers (DACE) Additional Information Key IT Skills: MS Office: Advanced Excel, Word and PowerPoint. Aspentech ACCE, KBase & CAPCost software References are available on request