SlideShare une entreprise Scribd logo
1  sur  7
Curriculum Vitae – C&I Engineer
PersonalData
Name: Fru
Given names: Peter Neba
Address: Kantershof 613
Place: 1104 HH Amsterdam Zuid-oost
Telephone: (06) 41173635
E-mail: frupeter@hotmail.com
Date of birth: 16 June 1970
Place of birth: Mamfe, Cameroon
Gender: Male
Marital status: Married
Nationality: Netherlander
Academic Profile
2002-2006: Bachelor of Engineering specialized in Mechatronics, Hogeschool
Zeeland in Vlissingen.
Diploma: Yes
2004-2005: Pre-Masters in control systems, Technical University in Delft.
Successful.
2001-2002: Intensive Netherlands course, Friesland College in Leeuwarden.
Diploma: Yes
2000-2001: Marketing Management, Noordelijke Hogeschool in Leeuwarden.
Diploma: Yes
1993-1994: University of Buea Cameroon.
Successful.
1986-1993: Bilingual High school Molyko Buea Cameroon.
Diploma: Yes
Summary
Extensive experience for 12 years in Engineering and Construction related to Offshore
Topside, Unmanned Wellhead platform and Onshore Oil and Gas Industries and Water
Purification Industry.
Knowledgeable in the installation, supervision, inspection, testing and commissioning of
various units, electrical, and telecommunications equipment.
Familiar with International Codes and Standards such as NEN, 93/68/EEC, IEC, ATEX,
Statoil’s TR’s, Norsok Standards, etc.
Working Experience
Aug. 2014 to Present: Lead Instrumentation Control and Automation Engineer,
Heerema Fabrication Group Engineering Zwijndrecht.
Statoil Unmanned Wellhead platform project.
Responsibilities:
 Basis and detailed field instrumentation engineering from Statoil’s design requirement
 Basis and detailed Automation engineering from Statoil’s design requirement for SAS
 Basis and detailed Process control engineering from Statoil’s SIS.
Preparing project deliverable documents like:
 Instrument / Valve datasheets
 Specification for various vendor packages
 Safeguarding Philosophy
 Fire and Gas Philosophy
 Start-up and Shutdown Philosophy
 I/O list
 Instrument index
 Cause and Effect matrices
Oct. 2012 to Aug. 2014: Lead (ICSS) Integrated Control Safety systems Engineer, IV- Oil
and Gas Papendrecht. Shell Leman Uptime Compression Project,
Green field and brown field.
Responsibilities:
 Preparation of requisition for new Yokogawa ICSS for green field.
 Preparation of requisition for all other 3rd party vendors UCS.
 Review of vendor’s documentation
 Check all interface with 3
rd
party vendors.
 Writing of process control narratives.
 Preparation of safety systems Cause and Effect for green field.
 Organized and attend progress meeting with ICSS vendor.
 Organized and attend FAT.
 Organized and attend IFAT between 3rd party vendors and Yokogawa.
Aug. 2011 to Oct. 2012: Integrated Control safety systems and Instrumentation Engineer,
AJS Leiden via Jacobs Leiden. Busy with NAM offshore CAT
and modification projects.
Responsibilities:
 Prepare Requisition for modification of existing and new Control and safety systems.
 Prepare scope of work for DCS, ESD, F&G and FW-PAS vendors.
 Do technical bid evaluation for bids from various DCS, ESD, F&G vendors
 Review/approved vendor documentation
 Prepare Instrumentation (logics, loops, terminations etc.) RFC package including scope
of work.
 Contributes to the writing of control narratives.
 Update of Cause & Effects.
 Attend FAT and SAT
 Modification in DCS and ESD cabinets.
Nov. 2010 to Oct. 2011: Process Control Engineer, Fluor Corporation in Haarlem.
Responsibilities:
 Develops logic diagrams from interlock description, control philosophy and P&ID’s.
 Constant in contact with the client to implement changes relating to process description
and interlock description.
 Develops process data for DCS (Siemens, Honeywell) vendor and develops cause and
effect diagrams.
 Set up and develops ESD and DCS systems for DCS vendors.
March 2010 to June 2010: Simulation of industrial process, control and automation with
PCS7 (WinCC, S7) for Merritt Engineering
May 2009 to March 2010: Instrument Engineer working for HFA Consultancy for
As-Built P&ID Project for the Owner Euro Tank Amsterdam
Responsibilities:
 Check existing P&ID and mark for possible updates.
 Conducts survey of the entire existing plant and prepare work packages for field worker.
 Prepares procedures for Tag-numbering system.
 Prepares Tag-number list, Equipment list, Instrument list and line number list.
 Coordinates and Prepares basis and detail engineering documents like, data sheets,
termination diagrams, process flow diagrams and P&ID’s
 Supervises Instrument carry-over and Hook-up works.
August 2008 to May 2009: Control, Electrical and Instrument Engineer working
for Spie-Controlec for reconstruction Project, Tank-
field H22 Euro Tank Amsterdam.
Responsibilities:
 Prepares photo-log book for all instruments and equipment in Tank field H22
 Prepares prefer vendor list for all instruments and equipment’s to be use during project.
 Coordinates and Prepares basis and details engineering documents like, data sheets,
termination diagrams, process flow diagrams, P&ID’s, etc. using Intergraph intools.
 Assist in designing carry-over and hook-up of instruments.
 Review, generate, supervise the rectification and clear-out of punch items.
 Conduct inspection for the bench calibration and erection of several Instruments such as
Pressure/Differential, Pressure/Level/Temperature Transmitters.
 Pressure Gauges, and Pressure/Differential Pressure Switch.
 Prepares I/O list for instruments and electrical equipment using intools.
 Perform calculations for control valves and pumps.
Feb. 2008 to August 2008: Employed by Spie-Controlec through QPS Posting
Control, Electrical and Instrument Engineer for
ATEX Project Vopak Europoort Terminal
Rotterdam NL
Responsibilities:
 Prepares inventory of all electrical equipment and instruments in the entire plant.
 Assist in preparing a complete Cable list for the entire plant.
 Assemble all available ATEX certificates for instruments, equipment, cables and
barriers.
 Prepares a standard calculation sheet for Loop calculations.
 Identified and get in contact with vendors of instruments and equipment for missing
ATEX certificates.
 Prepares loop diagrams for all available loops in the entire plant using intools.
 Perform loop calculations from basis of ATEX information of instrument/equipment,
cable and barriers.
 Advice customer (Vopak) base on the results of the loop calculation for possible
solutions.
July 2006 to Feb. 2008: Employed by Siemens NL, Instrument and Industrial
Process Control Engineer
Aug. 2007 to Feb. 2008: Commissioning of FPSO (Hummingbird Sevan marine) by
Keppel Verolmw. SIMATIC PCS7 Project.
Responsibilities:
 Review Method Statements, Quality Control Procedures, Inspection and Test Plan (ITP)
of Instrumentation, Electrical, Telecommunications (CCTV, Public Address & General
Alarm System, Security and Access Control System), and Fire and Gas
System/Subsystems and ensure that it’s conform the project specifications, Local and
International codes and standards.
 Supervise and validate the erection, testing and pre-commissioning works of Electrical
items such as: Power transformers, UPS system and Automatic transfer/change over
switches.
 Supervise and validate the calibration, erection, testing, and pre-commissioning works of
various Instruments and Valves including impulse lines/air lines.
 Supervise and validate the erection, testing, pre-commissioning and commissioning
works of various Telecommunication equipment such as: CCTV cabinet and console,
fixed and pan/tilt cameras.
 Review and sign-off Pre-commissioning and Commissioning documentation including
punchlist items.
 Conducting and Reviewing loop testing from the control room (PCS 7 OS – WinCC
Explorer) for all the various systems onboard the FPSO.
 Attends kick-off meeting, coordination meeting, weekly construction progress meeting
for Electrical, Instrumentation, Telecommunications.
May 2007 to Aug. 2007: Tender Phase Schoonebeek Oilfield Redevelopment Project
NAM Assen.
Responsibilities:
 Conducts survey for bidding purposes for instrumentation, electrical and control aspects
of the project.
 Prepares Quotations for instrumentation, electrical and control aspects of the project.
 Check and edit all Quotations applicable to the job estimates.
 Attends weekly Officer’s meeting to discuss the status of all Projects and all matters
affecting the operations.
March 2007 to May 2007: NAM SCADA Replacement Project offshore locations.
SIMATIC PCS7 Project
Responsibilities:
 Conducts I/O testing for FAT and produce a punch-list.
 Solve all punch-list items from FAT.
 Prepares Pre-commissioning and commissioning documents.
 Execution of all tests and inspections for the Mechanical Completion Certificate and
Hand-over Documentation Packages.
 Engineering review of all drawings and documents.
 Handle the Punch-out of installed/rectified work.
Jan. 2007 to May 2007: Fluxys Zelzate Compressor station project in Belgium. SIMATIC
PCS7 Project.
Responsibilities:
 Configured WinCC for visualization of the entire process.
 Design HMI from available customer’s P&ID’s.
 Structured of the PCS 7 OS - WinCC Explorer.
 Interconnect standard faceplates, customized faceplates to S7 software.
 Programming of CFC and SFC charts in their configurations in S7.
 Creation of Custom Symbols for Process Pictures in WinCC Application.
Nov. 2006 to Jan. 2007: Implementation of SWT (USFilter) solutions in oil and gas
industries. Implementation of Siemens total solution in oil and gas
industries.
Responsibilities:
 Prepares PowerPoint Presentations on advantages of SWT to Oil and Gas industry.
 Organized and give PowerPoint Presentations to departmental hands.
 Workout feedback from meetings with division leaders.
July 2006 to Nov. 2006: Tender phase of projects like, the energy center in Delft and
St. Andres sluis complex.
Responsibilities:
 Prepares Quotations for instrumentation, electrical and control aspects of the project.
 Conducts survey for bidding purposes for instrumentation, electrical and control aspects
of the project.
 Check and edit all Quotations applicable to the job estimates.
 Attends weekly Officer’s meeting to discuss the status of all Projects and all matters
affecting the operations.
Courses and Trainings
 Advance ATEX training by Produca, Spie controlec Schiedam.
 Basic Offshore Safety Introduction and Emergency Response Training incl.
 HUET Air pocket (Nogepa 0.5A) by DHTC. NL.
 Safety for operational managers VCA.
 Simatic PCS 7 system curses, Siemens NL in Zoetermeer.
 Engi. S7.400F/H curses, Siemens NL in Zoetermeer.
 Field instrumentation curses for process automation, by IND Siemens NL.
Computer Skills and Software Used
Windows Microsoft Office, intergraph intools, Basic Programmable Logic Controller
Programming, Auto CAD Inventor.
Knowledge of languages
Netherlands, English, French, Russian, Bayange
Hobbies
Official football referee for KNVB, Football, table-tennis, swimming, traveling and walking.
Reference
 Frank van der Heijden, Project Manager, Heerema Fabrication Group
Telephone: +31 786250265, +31 65192471
 Zeljko Karels, Commissioning coordinator, Statoil contractor
Telephone: +31 631943118
 Ronald Uil, E&I Construction Manager, Freelancer contractor
Telephone: +31 651175345
Peter Fru, Curriculum Vitae

Contenu connexe

Tendances

Tendances (19)

Suman Professional
Suman ProfessionalSuman Professional
Suman Professional
 
Vipin Resume new qc
Vipin Resume new qcVipin Resume new qc
Vipin Resume new qc
 
tayssircv_(2)1
tayssircv_(2)1tayssircv_(2)1
tayssircv_(2)1
 
Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
Resume wgb 18 jan 2016
Resume wgb 18 jan 2016Resume wgb 18 jan 2016
Resume wgb 18 jan 2016
 
Epc projects and cad tools
Epc projects and cad toolsEpc projects and cad tools
Epc projects and cad tools
 
Tandur_Poornima_CV
Tandur_Poornima_CVTandur_Poornima_CV
Tandur_Poornima_CV
 
HASSAN ALI CV1
HASSAN ALI CV1HASSAN ALI CV1
HASSAN ALI CV1
 
Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
QC E&I alhassan
QC E&I alhassanQC E&I alhassan
QC E&I alhassan
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
05- Adel Resume
05- Adel Resume05- Adel Resume
05- Adel Resume
 
M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015M.A.Zakout Resume_11_5_2015
M.A.Zakout Resume_11_5_2015
 
Arun das latest resume
Arun das latest resumeArun das latest resume
Arun das latest resume
 
James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-James Nimmo CV -2015-E&I-
James Nimmo CV -2015-E&I-
 
Instrumentation Design Engineer
Instrumentation Design Engineer Instrumentation Design Engineer
Instrumentation Design Engineer
 
CV New 2016
CV New 2016CV New 2016
CV New 2016
 

Similaire à Peter Fru, Curriculum Vitae

Similaire à Peter Fru, Curriculum Vitae (20)

ptsresume[1]
ptsresume[1]ptsresume[1]
ptsresume[1]
 
Jarred Hellon - CV
Jarred Hellon - CVJarred Hellon - CV
Jarred Hellon - CV
 
Dileep Kumar Kaviti
Dileep Kumar KavitiDileep Kumar Kaviti
Dileep Kumar Kaviti
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
Instrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin JacobInstrumentation Engineer - Jibin Jacob
Instrumentation Engineer - Jibin Jacob
 
CV
CVCV
CV
 
SATHISH KUMAR - E&I
SATHISH KUMAR - E&ISATHISH KUMAR - E&I
SATHISH KUMAR - E&I
 
Detailed resume
Detailed resumeDetailed resume
Detailed resume
 
CV-SW-13
CV-SW-13CV-SW-13
CV-SW-13
 
vikram 5+ years Experience
vikram 5+ years Experiencevikram 5+ years Experience
vikram 5+ years Experience
 
Jaime_Navarro_Resume
Jaime_Navarro_ResumeJaime_Navarro_Resume
Jaime_Navarro_Resume
 
Thomas Yates Resume
Thomas Yates ResumeThomas Yates Resume
Thomas Yates Resume
 
Resume 2016 june
Resume 2016 juneResume 2016 june
Resume 2016 june
 
Senior electrical engineer resume
Senior electrical engineer    resumeSenior electrical engineer    resume
Senior electrical engineer resume
 
Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152Bruce Jurgens-CV 20152
Bruce Jurgens-CV 20152
 
Electrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CVElectrical and Instrumentation Engineer- MZameel CV
Electrical and Instrumentation Engineer- MZameel CV
 
ENG ISLAM SAID
ENG ISLAM SAIDENG ISLAM SAID
ENG ISLAM SAID
 
Manu Mohan_resume
Manu Mohan_resumeManu Mohan_resume
Manu Mohan_resume
 
My new cv
My new cvMy new cv
My new cv
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 

Peter Fru, Curriculum Vitae

  • 1. Curriculum Vitae – C&I Engineer PersonalData Name: Fru Given names: Peter Neba Address: Kantershof 613 Place: 1104 HH Amsterdam Zuid-oost Telephone: (06) 41173635 E-mail: frupeter@hotmail.com Date of birth: 16 June 1970 Place of birth: Mamfe, Cameroon Gender: Male Marital status: Married Nationality: Netherlander Academic Profile 2002-2006: Bachelor of Engineering specialized in Mechatronics, Hogeschool Zeeland in Vlissingen. Diploma: Yes 2004-2005: Pre-Masters in control systems, Technical University in Delft. Successful. 2001-2002: Intensive Netherlands course, Friesland College in Leeuwarden. Diploma: Yes 2000-2001: Marketing Management, Noordelijke Hogeschool in Leeuwarden. Diploma: Yes 1993-1994: University of Buea Cameroon. Successful. 1986-1993: Bilingual High school Molyko Buea Cameroon. Diploma: Yes Summary Extensive experience for 12 years in Engineering and Construction related to Offshore Topside, Unmanned Wellhead platform and Onshore Oil and Gas Industries and Water Purification Industry. Knowledgeable in the installation, supervision, inspection, testing and commissioning of various units, electrical, and telecommunications equipment. Familiar with International Codes and Standards such as NEN, 93/68/EEC, IEC, ATEX, Statoil’s TR’s, Norsok Standards, etc.
  • 2. Working Experience Aug. 2014 to Present: Lead Instrumentation Control and Automation Engineer, Heerema Fabrication Group Engineering Zwijndrecht. Statoil Unmanned Wellhead platform project. Responsibilities:  Basis and detailed field instrumentation engineering from Statoil’s design requirement  Basis and detailed Automation engineering from Statoil’s design requirement for SAS  Basis and detailed Process control engineering from Statoil’s SIS. Preparing project deliverable documents like:  Instrument / Valve datasheets  Specification for various vendor packages  Safeguarding Philosophy  Fire and Gas Philosophy  Start-up and Shutdown Philosophy  I/O list  Instrument index  Cause and Effect matrices Oct. 2012 to Aug. 2014: Lead (ICSS) Integrated Control Safety systems Engineer, IV- Oil and Gas Papendrecht. Shell Leman Uptime Compression Project, Green field and brown field. Responsibilities:  Preparation of requisition for new Yokogawa ICSS for green field.  Preparation of requisition for all other 3rd party vendors UCS.  Review of vendor’s documentation  Check all interface with 3 rd party vendors.  Writing of process control narratives.  Preparation of safety systems Cause and Effect for green field.  Organized and attend progress meeting with ICSS vendor.  Organized and attend FAT.  Organized and attend IFAT between 3rd party vendors and Yokogawa. Aug. 2011 to Oct. 2012: Integrated Control safety systems and Instrumentation Engineer, AJS Leiden via Jacobs Leiden. Busy with NAM offshore CAT and modification projects. Responsibilities:  Prepare Requisition for modification of existing and new Control and safety systems.  Prepare scope of work for DCS, ESD, F&G and FW-PAS vendors.  Do technical bid evaluation for bids from various DCS, ESD, F&G vendors  Review/approved vendor documentation  Prepare Instrumentation (logics, loops, terminations etc.) RFC package including scope of work.  Contributes to the writing of control narratives.  Update of Cause & Effects.  Attend FAT and SAT  Modification in DCS and ESD cabinets.
  • 3. Nov. 2010 to Oct. 2011: Process Control Engineer, Fluor Corporation in Haarlem. Responsibilities:  Develops logic diagrams from interlock description, control philosophy and P&ID’s.  Constant in contact with the client to implement changes relating to process description and interlock description.  Develops process data for DCS (Siemens, Honeywell) vendor and develops cause and effect diagrams.  Set up and develops ESD and DCS systems for DCS vendors. March 2010 to June 2010: Simulation of industrial process, control and automation with PCS7 (WinCC, S7) for Merritt Engineering May 2009 to March 2010: Instrument Engineer working for HFA Consultancy for As-Built P&ID Project for the Owner Euro Tank Amsterdam Responsibilities:  Check existing P&ID and mark for possible updates.  Conducts survey of the entire existing plant and prepare work packages for field worker.  Prepares procedures for Tag-numbering system.  Prepares Tag-number list, Equipment list, Instrument list and line number list.  Coordinates and Prepares basis and detail engineering documents like, data sheets, termination diagrams, process flow diagrams and P&ID’s  Supervises Instrument carry-over and Hook-up works. August 2008 to May 2009: Control, Electrical and Instrument Engineer working for Spie-Controlec for reconstruction Project, Tank- field H22 Euro Tank Amsterdam. Responsibilities:  Prepares photo-log book for all instruments and equipment in Tank field H22  Prepares prefer vendor list for all instruments and equipment’s to be use during project.  Coordinates and Prepares basis and details engineering documents like, data sheets, termination diagrams, process flow diagrams, P&ID’s, etc. using Intergraph intools.  Assist in designing carry-over and hook-up of instruments.  Review, generate, supervise the rectification and clear-out of punch items.  Conduct inspection for the bench calibration and erection of several Instruments such as Pressure/Differential, Pressure/Level/Temperature Transmitters.  Pressure Gauges, and Pressure/Differential Pressure Switch.  Prepares I/O list for instruments and electrical equipment using intools.  Perform calculations for control valves and pumps. Feb. 2008 to August 2008: Employed by Spie-Controlec through QPS Posting Control, Electrical and Instrument Engineer for ATEX Project Vopak Europoort Terminal Rotterdam NL Responsibilities:  Prepares inventory of all electrical equipment and instruments in the entire plant.  Assist in preparing a complete Cable list for the entire plant.
  • 4.  Assemble all available ATEX certificates for instruments, equipment, cables and barriers.  Prepares a standard calculation sheet for Loop calculations.  Identified and get in contact with vendors of instruments and equipment for missing ATEX certificates.  Prepares loop diagrams for all available loops in the entire plant using intools.  Perform loop calculations from basis of ATEX information of instrument/equipment, cable and barriers.  Advice customer (Vopak) base on the results of the loop calculation for possible solutions. July 2006 to Feb. 2008: Employed by Siemens NL, Instrument and Industrial Process Control Engineer Aug. 2007 to Feb. 2008: Commissioning of FPSO (Hummingbird Sevan marine) by Keppel Verolmw. SIMATIC PCS7 Project. Responsibilities:  Review Method Statements, Quality Control Procedures, Inspection and Test Plan (ITP) of Instrumentation, Electrical, Telecommunications (CCTV, Public Address & General Alarm System, Security and Access Control System), and Fire and Gas System/Subsystems and ensure that it’s conform the project specifications, Local and International codes and standards.  Supervise and validate the erection, testing and pre-commissioning works of Electrical items such as: Power transformers, UPS system and Automatic transfer/change over switches.  Supervise and validate the calibration, erection, testing, and pre-commissioning works of various Instruments and Valves including impulse lines/air lines.  Supervise and validate the erection, testing, pre-commissioning and commissioning works of various Telecommunication equipment such as: CCTV cabinet and console, fixed and pan/tilt cameras.  Review and sign-off Pre-commissioning and Commissioning documentation including punchlist items.  Conducting and Reviewing loop testing from the control room (PCS 7 OS – WinCC Explorer) for all the various systems onboard the FPSO.  Attends kick-off meeting, coordination meeting, weekly construction progress meeting for Electrical, Instrumentation, Telecommunications. May 2007 to Aug. 2007: Tender Phase Schoonebeek Oilfield Redevelopment Project NAM Assen. Responsibilities:  Conducts survey for bidding purposes for instrumentation, electrical and control aspects of the project.  Prepares Quotations for instrumentation, electrical and control aspects of the project.  Check and edit all Quotations applicable to the job estimates.  Attends weekly Officer’s meeting to discuss the status of all Projects and all matters affecting the operations. March 2007 to May 2007: NAM SCADA Replacement Project offshore locations. SIMATIC PCS7 Project Responsibilities:  Conducts I/O testing for FAT and produce a punch-list.  Solve all punch-list items from FAT.  Prepares Pre-commissioning and commissioning documents.
  • 5.  Execution of all tests and inspections for the Mechanical Completion Certificate and Hand-over Documentation Packages.  Engineering review of all drawings and documents.  Handle the Punch-out of installed/rectified work. Jan. 2007 to May 2007: Fluxys Zelzate Compressor station project in Belgium. SIMATIC PCS7 Project. Responsibilities:  Configured WinCC for visualization of the entire process.  Design HMI from available customer’s P&ID’s.  Structured of the PCS 7 OS - WinCC Explorer.  Interconnect standard faceplates, customized faceplates to S7 software.  Programming of CFC and SFC charts in their configurations in S7.  Creation of Custom Symbols for Process Pictures in WinCC Application. Nov. 2006 to Jan. 2007: Implementation of SWT (USFilter) solutions in oil and gas industries. Implementation of Siemens total solution in oil and gas industries. Responsibilities:  Prepares PowerPoint Presentations on advantages of SWT to Oil and Gas industry.  Organized and give PowerPoint Presentations to departmental hands.  Workout feedback from meetings with division leaders. July 2006 to Nov. 2006: Tender phase of projects like, the energy center in Delft and St. Andres sluis complex. Responsibilities:  Prepares Quotations for instrumentation, electrical and control aspects of the project.  Conducts survey for bidding purposes for instrumentation, electrical and control aspects of the project.  Check and edit all Quotations applicable to the job estimates.  Attends weekly Officer’s meeting to discuss the status of all Projects and all matters affecting the operations.
  • 6. Courses and Trainings  Advance ATEX training by Produca, Spie controlec Schiedam.  Basic Offshore Safety Introduction and Emergency Response Training incl.  HUET Air pocket (Nogepa 0.5A) by DHTC. NL.  Safety for operational managers VCA.  Simatic PCS 7 system curses, Siemens NL in Zoetermeer.  Engi. S7.400F/H curses, Siemens NL in Zoetermeer.  Field instrumentation curses for process automation, by IND Siemens NL. Computer Skills and Software Used Windows Microsoft Office, intergraph intools, Basic Programmable Logic Controller Programming, Auto CAD Inventor. Knowledge of languages Netherlands, English, French, Russian, Bayange Hobbies Official football referee for KNVB, Football, table-tennis, swimming, traveling and walking. Reference  Frank van der Heijden, Project Manager, Heerema Fabrication Group Telephone: +31 786250265, +31 65192471  Zeljko Karels, Commissioning coordinator, Statoil contractor Telephone: +31 631943118  Ronald Uil, E&I Construction Manager, Freelancer contractor Telephone: +31 651175345