SEMINAR
ON
HYDRO POWER PLANT
Seminar guided by
Dr. BISWAJIT ACHARYA
Associate Professor
Submitted by
PRADEEP KUMAR YADAV
CRN. 12/561
CONTENTS
1. Introduction
2. Site selection
3. Components
4. Classification of hydro power plant
5. Comparison of Hydro and Thermal and
Nuclear power plant
6. A brief on major dams
7. Conclusions
INTRODUCTION
 In hydroelectric power station kinetic energy of
stored water is converted into electric energy .
 30% of the total power in world is provided by hydro
power plant.
 The world’s hydro power potential is about 2724
MkW
 Total hydro power potential of India is 84 MkW and
22% of this potential is being tapped by various
existing and ongoing power schemes.
 In India 25.32% of total electricity generation capacity is
produced by hydro power plant.
SITE SELECTION FOR A HYDRO POWER PLANT
 Availability of water
 Water storage
 Water head
 Accessibility of site
 Distance from the load centre
 Geological characteristics of site
COMPONENTS
1. Dam and
Reservoir
2. Spillway
3. Fore bay
4. Surge tank
5. Penstock
6. Turbine
7. Power
house
8. Draft tube
DAM AND RESERVOIR
An open-air storage area usually formed by masonry or
earthwork where water is collected and kept in quantity so
that it may be drawn off for use.
 The water reservoir is the place behind the dam where
water is stored.
 The water in the reservoir is located higher than the rest of
the dam structure.
 The height of water in the reservoir decides how much
potential energy the water
 The higher the height of water, the more its potential energy.
 The high position of water in the reservoir also enables it to
move downwards effortlessly.
SPILLWAY
Spillway is
constructed to act as
a safety valve. It
discharge the
overflow water to the
down stream side
when the reservoir is
full. These are
generally
constructed of
concrete and
provided with water
discharge opening.
SURGE TANK
Surge tank acts as a
temporary reservoir.
It helps in stabilizing
the velocity and
pressure in penstock
and thereby saves
penstock from getting
damaged.
It serve as supply
tank to the turbine in
case of increased load
conditions, and
storage tank in case of
low load conditions.
PENSTOCK
The penstock is the long pipe or the
shaft that carries the water flowing
from the reservoir towards the power
generation unit, comprised of the
turbines and generator. The water in
the penstock possesses kinetic energy
due to its motion and potential energy
due to its height.
POWER HOUSE
A power house usually contains following
components:
 Hydraulic turbines
 Electric generators
 Governors
 Water circulation pumps
 Air ducts
 Switch board and instruments
 Storage batteries
 Cranes
TURBINE
Impulse turbine
converts the energy
of fluid in the form of
pressure and
reaction turbine
converts the energy
by reaction on rotor
blades, when the
fluid undergoes a
change in
momentum.
SELECTION OF TURBINE
DRAFT TUBE
Draft Tube is an
empty structure
made beneath the
Turbine.
To reduce the
velocity head losses of
the water
To allow the turbine
to be set above the
tailrace to facilitate
inspection and
maintenance
CLASSIFICATION
1. According to quantity of water
2. According to availability of water head
3. According to load characteristics
4. According to plant capacity
5. According to type of fall
ACCORDING TO QUANTITY OF WATER
1.Run of river plant
Water is diverted from the river, routed through the water.
conductor system and finally water after generation of
power is thrown back to the river at a lower level on down
stream.
Power generation fluctuates with the river flow and the firm
power is considerably low.
2.Storage plant
It increases firm power and total power generation by
regulating the flow.
Providing storage is complicated and costly as it involves
construction of dam.
ACCORDING TO QUANTITY OF WATER(CONT.)
3. Pumped storage plant
Pump storage projects involve reversible turbines, which
can generate power from water of upper reservoir during
peak hours and pump back water from lower reservoir to
the upper reservoir during off peak hours.
4. Tidal plant
A tidal power plant makes use of the daily rise and fall of
ocean water due to tides.
Tidal power is extracted from the Earth's oceanic tides.
ACCORDING TO AVAILABILITY OF WATER HEAD
1. Low head plant
 Head –upto 30m.
 A sideway stream diverges from the river at the dam.
 Vertical shaft Francis or Kaplan turbine are used commonly.
2. Medium head plant
 Head -30-70 m
 Uses Francis Turbine.
 Water is carried in open canals from main reservoir to forebay then
to powerhouse through penstock.
3. High head plants
 Head- 71-500 m
 Water is stored in the lake over the mountain during high rainy
season or when snow melts.
 Pelton Wheel turbine is used.
ACCORDING TO PLANT CAPACITY
1. Micro hydel plants
A micro hydel plant has the capacity less than 5 MW.
2. Medium capacity plants
A medium capacity plant has the capacity between 5MW
and 100 MW.
3. High capacity plants
A plant having a capacity between 101 MW and 1000
MW is usually classified as a high capacity plant.
4. Super hydro plants
A super hydro plant has a capacity greater than 1000
MW.
ACCORDING TO LOAD CHARACTERISTICS
1. Base load plants
They cater to the base load of the system, they need to
supply constant power when connected to the grid.
2. Peak load plants
Some of the plants supply average load but also some peak
load. Other peak load plants are required to work only
during peak load hours.
COMPARISON OF HYDRO AND THERMAL AND
NULCEAR POWER PLANT
JAWAHAR SAGAR
 The concrete gravity dam.
 Power generation is 99 MW(With three units
of 33MW capacity each)
 Francis-type turbine is used.
 height - 45m and
 Length - 393m
RANA PRATAP SAGAR
 It is a gravity masonry dam.
 Construction began1953, Opening date1970
 Construction cost Rs. 4065 million
 Height- 53.8 meters (177 ft)
 Length1,143 meters (3,750 ft)
 power generation is 172 MW (with four units
of 43 MW capacity each)
 Total capacity2,898 million cubic meters
MAHI BAJAJ
 Power generation 140MW (2*25+2*45)
 Construction began 1972
 Opening date 1983
 Type of dam-Masonry with embankment main
sections
 Impounds Mahi River
 Height-43 m (141 ft)
 Length-3,062 m (10,046 ft)
 Francis-type turbine is used
CONCLUSION
 In order to achieve a growth rate of 7-8 % as
envisaged in National policy of India, it is also
required to tap all the small Hydro Power
potential of the country.
 The utilization of small Hydro Power Potential is
especially required in all states where the
utilized potential is very low like in MP and
therefore optimum utilization of the same may
set up an stepping up stone for achieving self
sufficiency in power sector in country.
Hydro power plant

More Related Content

What's hot

Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
Rashmi Nimje
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
vikaspanch
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANT
Nilanjana Sen
 
Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine Generators
Jasjot Singh
 

What's hot (20)

Presentation on thermal power plant
Presentation on thermal power plantPresentation on thermal power plant
Presentation on thermal power plant
 
Working of hydroelectric power plant
Working of hydroelectric power plant Working of hydroelectric power plant
Working of hydroelectric power plant
 
Pumped storage hydro power plant
Pumped storage hydro power plantPumped storage hydro power plant
Pumped storage hydro power plant
 
Micro hydro power plant
Micro hydro power plantMicro hydro power plant
Micro hydro power plant
 
Unit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTSUnit_IV-HYDRO ELECTRIC POWER PLANTS
Unit_IV-HYDRO ELECTRIC POWER PLANTS
 
SMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANTSMALL HYDRO POWER PLANT
SMALL HYDRO POWER PLANT
 
EPG - Unit 04 - Wind Power Plant
EPG - Unit 04 - Wind Power PlantEPG - Unit 04 - Wind Power Plant
EPG - Unit 04 - Wind Power Plant
 
Classification of hydro power plant
Classification of hydro power plantClassification of hydro power plant
Classification of hydro power plant
 
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
PPT ON NON-CONVENTIONAL ENERGY SOURCES (Renewable energy resources)
 
Ppt for power plant
Ppt for power plantPpt for power plant
Ppt for power plant
 
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
Hydroelectric power plant, hydro power plant ppt hydro powerplant pdf, dam wo...
 
PUMPED STORAGE PLANT
PUMPED STORAGE PLANTPUMPED STORAGE PLANT
PUMPED STORAGE PLANT
 
Hydro Electric Power plant
Hydro Electric Power plantHydro Electric Power plant
Hydro Electric Power plant
 
HYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANTHYDRO-ELECTRIC POWER PLANT
HYDRO-ELECTRIC POWER PLANT
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydraulic power plant
Hydraulic power plantHydraulic power plant
Hydraulic power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Wind Turbine Generators
Wind Turbine GeneratorsWind Turbine Generators
Wind Turbine Generators
 
nuclear powerplant ppt
nuclear powerplant pptnuclear powerplant ppt
nuclear powerplant ppt
 

Viewers also liked (7)

Francis turbine
Francis turbineFrancis turbine
Francis turbine
 
Francis turbine
Francis turbine Francis turbine
Francis turbine
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Governing of francis turbine
Governing of francis turbineGoverning of francis turbine
Governing of francis turbine
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro electric power plant
Hydro electric power plantHydro electric power plant
Hydro electric power plant
 
Hydro power ppt
Hydro power pptHydro power ppt
Hydro power ppt
 

Similar to Hydro power plant

Unit-4-POWER FROM RENEWABLE ENERGY.ppt
Unit-4-POWER FROM RENEWABLE ENERGY.pptUnit-4-POWER FROM RENEWABLE ENERGY.ppt
Unit-4-POWER FROM RENEWABLE ENERGY.ppt
dharma raja`
 
orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptx
Johnwil Sunio
 

Similar to Hydro power plant (20)

Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008Hydro power plant presentation project by pratik diyora 100420106008
Hydro power plant presentation project by pratik diyora 100420106008
 
Hydroelectric powerplant
Hydroelectric powerplant Hydroelectric powerplant
Hydroelectric powerplant
 
Hydro Power Plant
Hydro Power PlantHydro Power Plant
Hydro Power Plant
 
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in IndiaHYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
HYDROELECTRIC POWERPLANTS : Major hydroelectric plants operational in India
 
Unit-4-POWER FROM RENEWABLE ENERGY.ppt
Unit-4-POWER FROM RENEWABLE ENERGY.pptUnit-4-POWER FROM RENEWABLE ENERGY.ppt
Unit-4-POWER FROM RENEWABLE ENERGY.ppt
 
waris.pptx
waris.pptxwaris.pptx
waris.pptx
 
Hydroelectric power Plants.ppt
Hydroelectric power Plants.pptHydroelectric power Plants.ppt
Hydroelectric power Plants.ppt
 
Rani awanti bai hydel power plant by vijayendra singh rajput - Bargi Dam Jaba...
Rani awanti bai hydel power plant by vijayendra singh rajput - Bargi Dam Jaba...Rani awanti bai hydel power plant by vijayendra singh rajput - Bargi Dam Jaba...
Rani awanti bai hydel power plant by vijayendra singh rajput - Bargi Dam Jaba...
 
Hydro power
Hydro powerHydro power
Hydro power
 
Hydro
HydroHydro
Hydro
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
Hydroelectric power plant
Hydroelectric power plantHydroelectric power plant
Hydroelectric power plant
 
seminar on hydropower presentation
seminar on hydropower presentationseminar on hydropower presentation
seminar on hydropower presentation
 
Pathri power house report
Pathri power house reportPathri power house report
Pathri power house report
 
Hydro electric power plant ppt
Hydro electric power plant pptHydro electric power plant ppt
Hydro electric power plant ppt
 
Hydro power plants
Hydro power plants Hydro power plants
Hydro power plants
 
orca_share_media1554943191261.pptx
orca_share_media1554943191261.pptxorca_share_media1554943191261.pptx
orca_share_media1554943191261.pptx
 
RRVUN hydro power plant
RRVUN hydro power plantRRVUN hydro power plant
RRVUN hydro power plant
 
Hydro power plant
Hydro power plantHydro power plant
Hydro power plant
 
Hydro power plant
Hydro power plant Hydro power plant
Hydro power plant
 

Recently uploaded

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 

Hydro power plant

  • 1. SEMINAR ON HYDRO POWER PLANT Seminar guided by Dr. BISWAJIT ACHARYA Associate Professor Submitted by PRADEEP KUMAR YADAV CRN. 12/561
  • 2. CONTENTS 1. Introduction 2. Site selection 3. Components 4. Classification of hydro power plant 5. Comparison of Hydro and Thermal and Nuclear power plant 6. A brief on major dams 7. Conclusions
  • 3. INTRODUCTION  In hydroelectric power station kinetic energy of stored water is converted into electric energy .  30% of the total power in world is provided by hydro power plant.  The world’s hydro power potential is about 2724 MkW  Total hydro power potential of India is 84 MkW and 22% of this potential is being tapped by various existing and ongoing power schemes.  In India 25.32% of total electricity generation capacity is produced by hydro power plant.
  • 4. SITE SELECTION FOR A HYDRO POWER PLANT  Availability of water  Water storage  Water head  Accessibility of site  Distance from the load centre  Geological characteristics of site
  • 5. COMPONENTS 1. Dam and Reservoir 2. Spillway 3. Fore bay 4. Surge tank 5. Penstock 6. Turbine 7. Power house 8. Draft tube
  • 6. DAM AND RESERVOIR An open-air storage area usually formed by masonry or earthwork where water is collected and kept in quantity so that it may be drawn off for use.  The water reservoir is the place behind the dam where water is stored.  The water in the reservoir is located higher than the rest of the dam structure.  The height of water in the reservoir decides how much potential energy the water  The higher the height of water, the more its potential energy.  The high position of water in the reservoir also enables it to move downwards effortlessly.
  • 7. SPILLWAY Spillway is constructed to act as a safety valve. It discharge the overflow water to the down stream side when the reservoir is full. These are generally constructed of concrete and provided with water discharge opening.
  • 8. SURGE TANK Surge tank acts as a temporary reservoir. It helps in stabilizing the velocity and pressure in penstock and thereby saves penstock from getting damaged. It serve as supply tank to the turbine in case of increased load conditions, and storage tank in case of low load conditions.
  • 9. PENSTOCK The penstock is the long pipe or the shaft that carries the water flowing from the reservoir towards the power generation unit, comprised of the turbines and generator. The water in the penstock possesses kinetic energy due to its motion and potential energy due to its height.
  • 10. POWER HOUSE A power house usually contains following components:  Hydraulic turbines  Electric generators  Governors  Water circulation pumps  Air ducts  Switch board and instruments  Storage batteries  Cranes
  • 11. TURBINE Impulse turbine converts the energy of fluid in the form of pressure and reaction turbine converts the energy by reaction on rotor blades, when the fluid undergoes a change in momentum.
  • 13. DRAFT TUBE Draft Tube is an empty structure made beneath the Turbine. To reduce the velocity head losses of the water To allow the turbine to be set above the tailrace to facilitate inspection and maintenance
  • 14. CLASSIFICATION 1. According to quantity of water 2. According to availability of water head 3. According to load characteristics 4. According to plant capacity 5. According to type of fall
  • 15. ACCORDING TO QUANTITY OF WATER 1.Run of river plant Water is diverted from the river, routed through the water. conductor system and finally water after generation of power is thrown back to the river at a lower level on down stream. Power generation fluctuates with the river flow and the firm power is considerably low. 2.Storage plant It increases firm power and total power generation by regulating the flow. Providing storage is complicated and costly as it involves construction of dam.
  • 16. ACCORDING TO QUANTITY OF WATER(CONT.) 3. Pumped storage plant Pump storage projects involve reversible turbines, which can generate power from water of upper reservoir during peak hours and pump back water from lower reservoir to the upper reservoir during off peak hours. 4. Tidal plant A tidal power plant makes use of the daily rise and fall of ocean water due to tides. Tidal power is extracted from the Earth's oceanic tides.
  • 17. ACCORDING TO AVAILABILITY OF WATER HEAD 1. Low head plant  Head –upto 30m.  A sideway stream diverges from the river at the dam.  Vertical shaft Francis or Kaplan turbine are used commonly. 2. Medium head plant  Head -30-70 m  Uses Francis Turbine.  Water is carried in open canals from main reservoir to forebay then to powerhouse through penstock. 3. High head plants  Head- 71-500 m  Water is stored in the lake over the mountain during high rainy season or when snow melts.  Pelton Wheel turbine is used.
  • 18. ACCORDING TO PLANT CAPACITY 1. Micro hydel plants A micro hydel plant has the capacity less than 5 MW. 2. Medium capacity plants A medium capacity plant has the capacity between 5MW and 100 MW. 3. High capacity plants A plant having a capacity between 101 MW and 1000 MW is usually classified as a high capacity plant. 4. Super hydro plants A super hydro plant has a capacity greater than 1000 MW.
  • 19. ACCORDING TO LOAD CHARACTERISTICS 1. Base load plants They cater to the base load of the system, they need to supply constant power when connected to the grid. 2. Peak load plants Some of the plants supply average load but also some peak load. Other peak load plants are required to work only during peak load hours.
  • 20. COMPARISON OF HYDRO AND THERMAL AND NULCEAR POWER PLANT
  • 21. JAWAHAR SAGAR  The concrete gravity dam.  Power generation is 99 MW(With three units of 33MW capacity each)  Francis-type turbine is used.  height - 45m and  Length - 393m
  • 22. RANA PRATAP SAGAR  It is a gravity masonry dam.  Construction began1953, Opening date1970  Construction cost Rs. 4065 million  Height- 53.8 meters (177 ft)  Length1,143 meters (3,750 ft)  power generation is 172 MW (with four units of 43 MW capacity each)  Total capacity2,898 million cubic meters
  • 23. MAHI BAJAJ  Power generation 140MW (2*25+2*45)  Construction began 1972  Opening date 1983  Type of dam-Masonry with embankment main sections  Impounds Mahi River  Height-43 m (141 ft)  Length-3,062 m (10,046 ft)  Francis-type turbine is used
  • 24. CONCLUSION  In order to achieve a growth rate of 7-8 % as envisaged in National policy of India, it is also required to tap all the small Hydro Power potential of the country.  The utilization of small Hydro Power Potential is especially required in all states where the utilized potential is very low like in MP and therefore optimum utilization of the same may set up an stepping up stone for achieving self sufficiency in power sector in country.