SlideShare a Scribd company logo
1 of 15
Background
Work Experience
Projects
 Aim: Develop skills for automation and manufacturing leading to process
improvement. Learn at least one new skill each year related to automation.
 Hometown: Mumbai, India
 Bachelors in Electronics Engineering, NMIMS University, Mumbai.
 Masters in Mechanical Engineering, Purdue University, Indianapolis.
Track Concentration – Mechatronics.
 Hobbies: Cricket, watch documentaries, cooking.
2
 Intern, NML Automation Pvt LTD, Mumbai, India
 Dates: June 2013 – July 2013
Design automotive parts on solid works (training module).
Hands on experience with fatek, delta PLC programming.
Performed onsite startup and troubleshooting.
3
 Bosch Rexroth Lab, NMIMS University, Mumbai, India
 Dates: Jan 2014 – April 2014
Theory classes for various BOSCH industrial automation components.
Learn and Understand various hydraulics, Pneumatic symbols and principles.
Performed practical ladder logic examples on Indralogic PLC software
Performed practical exercises on electrical engineering, pneumatic and hydraulics.
4
 Energy Engineer, Industrial Assessment Center, Indianapolis.
 Dates: Sep 2014 – Current
Developed spreadsheet by understanding utility rate structures and use them to
calculate energy usage.
Created energy reduction plans and cost savings analysis showing different energy
conservation measures (ECMs).
Lead and conducted (8) ASHRAE level II energy audits with approximate energy
savings of $2.5 million and average payback period of 16 months.
5
 Certified Automation Engineer, SMEC labs, Mumbai , India
 Dates: January 2016
Hands on training for Allen Bradley Micrologix 1400, Wonderware Intouch SCADA,
Schneider Vijeologix HMI.
Performed practical exercises and interfacing of PLC, SCADA and HMI.
Understood and implemented various instructions, script writing and design of
HMI and SCADA screens.
6
 Automation of Bottle filling plant, May 2014
 Cause: Increase in production and shortage of labor
7
Developed iron frame with rubber conveyor.
Developed ladder logic on Fatek eco series PLC.
Reduction in Human Interface by 70%.
Learnt about capacitive sensors and few other sensors.
 Automation of Extraction of molten aluminum from sludge.
 Cause: Operator Injury risk and increase productivity.
8
Understand operation to be automated.
Research of robots for respective operations.
Comparison of robots on AHP technique.
Design of Robotic simulation in KUKA SimPro.
 Engine and Blower Assembly & Manufacturing
 Cause : Learn ProE software
9
Designed parts of engine, blower,
Apply various elements of software.
Performed simulation in PTC Creo 2.0.
Simulated manufacturing sequence for CNC machining.
 International Space station (ISS) observatory module .
 Cause: Learn Systems engineering and project management
Chief Engineer for development for CUPOLA design to Launch process.
Apply various systems engineering principles for tasks such as resource allocation,
requirements, work breakdown structure (WBS).
Present progress presentation to stakeholders for permission to progress to next stage.
10
 Assembly Line Simulation and Ergonomics for paper manufacturing
 Cause: Identify Machine Usage
11
 Performed time study for the different process in the production flow.
 Remodel the facility in Siemens Tecnomatix – Plant simulation.
 Identify bottle neck in the process and perform machine usage analysis.
 Develop a report regarding current process and recommendation for scope of
improvement.
12
 Structured text language for PLC
Stage: Beginner.
Aim: Learn syntax and integration of Structured text for plc programming.
 ABB RobotStudio 6.03
Stage: Beginner
Aim: Learn various tools and design constraints for robot programming
13
14
15

More Related Content

What's hot

What's hot (18)

RESUME 3(2) (1)
RESUME 3(2) (1)RESUME 3(2) (1)
RESUME 3(2) (1)
 
PRABEER CV
PRABEER CVPRABEER CV
PRABEER CV
 
Ulhas S Wankhade.
Ulhas S Wankhade.Ulhas S Wankhade.
Ulhas S Wankhade.
 
ahmed Yamany
ahmed Yamanyahmed Yamany
ahmed Yamany
 
RESUME
RESUMERESUME
RESUME
 
RESUME
RESUMERESUME
RESUME
 
CV_-jibran sher -1-
CV_-jibran sher -1-CV_-jibran sher -1-
CV_-jibran sher -1-
 
Rajnish Kumar
Rajnish KumarRajnish Kumar
Rajnish Kumar
 
Shubham_Tiwari_Resume
Shubham_Tiwari_ResumeShubham_Tiwari_Resume
Shubham_Tiwari_Resume
 
Resume
ResumeResume
Resume
 
waqas ahmed siddique
waqas ahmed siddiquewaqas ahmed siddique
waqas ahmed siddique
 
Curriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s ExperienceCurriculum Vitae_Sudhan R with 2Yr`s Experience
Curriculum Vitae_Sudhan R with 2Yr`s Experience
 
Shaun Humes’ Projects And Leadership
Shaun Humes’ Projects And LeadershipShaun Humes’ Projects And Leadership
Shaun Humes’ Projects And Leadership
 
Resume
ResumeResume
Resume
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
Resume Ranbir Singh2
Resume Ranbir Singh2Resume Ranbir Singh2
Resume Ranbir Singh2
 
mechanical engineer-CV-yazan tarazi
mechanical engineer-CV-yazan tarazimechanical engineer-CV-yazan tarazi
mechanical engineer-CV-yazan tarazi
 
kunal_resume
kunal_resumekunal_resume
kunal_resume
 

Viewers also liked

Muhammad Hoque CV July 2016
Muhammad Hoque CV July 2016Muhammad Hoque CV July 2016
Muhammad Hoque CV July 2016Muhammad Hoque
 
Alles wat je moet weten over de zorgverzekering
Alles wat je moet weten over de zorgverzekeringAlles wat je moet weten over de zorgverzekering
Alles wat je moet weten over de zorgverzekeringZorgverzekeringslijn
 
Интегрированные коммуникации в интернет-пространстве для ВШЭ
Интегрированные коммуникации в интернет-пространстве для ВШЭИнтегрированные коммуникации в интернет-пространстве для ВШЭ
Интегрированные коммуникации в интернет-пространстве для ВШЭGedocorp | Гедокорп
 
In Toto Marketing Services
In Toto Marketing ServicesIn Toto Marketing Services
In Toto Marketing Servicesintotomarket
 
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...Muhammad Taheruzzaman
 
Khumo Seema - Social media analytics
Khumo Seema - Social media analyticsKhumo Seema - Social media analytics
Khumo Seema - Social media analyticsKhumo Seema
 
вологда лыжный поход 2015
вологда лыжный поход 2015вологда лыжный поход 2015
вологда лыжный поход 2015Vlad Safianov
 
Innovate Chattanooga - Measuring the Success of the Innovation DIstrict
Innovate Chattanooga - Measuring the Success of the Innovation DIstrictInnovate Chattanooga - Measuring the Success of the Innovation DIstrict
Innovate Chattanooga - Measuring the Success of the Innovation DIstrictJack Amoroso
 
English project
English projectEnglish project
English projectAisiko
 
Sullivan Masters Paper
Sullivan Masters PaperSullivan Masters Paper
Sullivan Masters PaperTessa Sullivan
 
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....Gedocorp | Гедокорп
 

Viewers also liked (16)

Muhammad Hoque CV July 2016
Muhammad Hoque CV July 2016Muhammad Hoque CV July 2016
Muhammad Hoque CV July 2016
 
Alles wat je moet weten over de zorgverzekering
Alles wat je moet weten over de zorgverzekeringAlles wat je moet weten over de zorgverzekering
Alles wat je moet weten over de zorgverzekering
 
Интегрированные коммуникации в интернет-пространстве для ВШЭ
Интегрированные коммуникации в интернет-пространстве для ВШЭИнтегрированные коммуникации в интернет-пространстве для ВШЭ
Интегрированные коммуникации в интернет-пространстве для ВШЭ
 
M.Alamrawy's CV
M.Alamrawy's CVM.Alamrawy's CV
M.Alamrawy's CV
 
In Toto Marketing Services
In Toto Marketing ServicesIn Toto Marketing Services
In Toto Marketing Services
 
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...
Renewable Energy Integrated Microgrid for Rural Electrification and Productiv...
 
Khumo Seema - Social media analytics
Khumo Seema - Social media analyticsKhumo Seema - Social media analytics
Khumo Seema - Social media analytics
 
Blog Post #1
Blog Post #1Blog Post #1
Blog Post #1
 
вологда лыжный поход 2015
вологда лыжный поход 2015вологда лыжный поход 2015
вологда лыжный поход 2015
 
ieeeTemplateWImax1Lab08196366(1)
ieeeTemplateWImax1Lab08196366(1)ieeeTemplateWImax1Lab08196366(1)
ieeeTemplateWImax1Lab08196366(1)
 
Innovate Chattanooga - Measuring the Success of the Innovation DIstrict
Innovate Chattanooga - Measuring the Success of the Innovation DIstrictInnovate Chattanooga - Measuring the Success of the Innovation DIstrict
Innovate Chattanooga - Measuring the Success of the Innovation DIstrict
 
English project
English projectEnglish project
English project
 
Presentation1
Presentation1Presentation1
Presentation1
 
Sullivan Masters Paper
Sullivan Masters PaperSullivan Masters Paper
Sullivan Masters Paper
 
My Dissertation PDF
My Dissertation PDFMy Dissertation PDF
My Dissertation PDF
 
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....
Федеральная программа «Ты – предприниматель» (Самарская область). Модуль-3....
 

Similar to ABOUT ME

Rohit_Bhagat_resume1_new
Rohit_Bhagat_resume1_newRohit_Bhagat_resume1_new
Rohit_Bhagat_resume1_newRohit Bhagat
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang
 
Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Swapnil Shewalkar
 
Embedded project list
Embedded project listEmbedded project list
Embedded project listSenthil Kumar
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Ajay Late
 
Tom_Osborne_Resume
Tom_Osborne_ResumeTom_Osborne_Resume
Tom_Osborne_ResumeTom Osborne
 
Electronics engineering CDR Sample
Electronics engineering CDR  Sample Electronics engineering CDR  Sample
Electronics engineering CDR Sample Neha Bania
 
Rhapsody and mechatronics, multi-domain simulation
Rhapsody and mechatronics, multi-domain simulationRhapsody and mechatronics, multi-domain simulation
Rhapsody and mechatronics, multi-domain simulationGraham Bleakley
 
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...Aberla
 
Electronics Engineer Resume Foramt
Electronics Engineer Resume ForamtElectronics Engineer Resume Foramt
Electronics Engineer Resume ForamtMohammed Irshad S K
 

Similar to ABOUT ME (20)

Rohit_Bhagat_resume1_new
Rohit_Bhagat_resume1_newRohit_Bhagat_resume1_new
Rohit_Bhagat_resume1_new
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 
Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)
 
Biodata_VishweshBehere
Biodata_VishweshBehereBiodata_VishweshBehere
Biodata_VishweshBehere
 
Resume - Merwyn Cheruvathur
Resume - Merwyn CheruvathurResume - Merwyn Cheruvathur
Resume - Merwyn Cheruvathur
 
Embedded project list
Embedded project listEmbedded project list
Embedded project list
 
Cv murugesan alagar
Cv murugesan alagarCv murugesan alagar
Cv murugesan alagar
 
PUNIT_GUPTA
PUNIT_GUPTAPUNIT_GUPTA
PUNIT_GUPTA
 
Resume_Ajay_24-9-15
Resume_Ajay_24-9-15Resume_Ajay_24-9-15
Resume_Ajay_24-9-15
 
Tom_Osborne_Resume
Tom_Osborne_ResumeTom_Osborne_Resume
Tom_Osborne_Resume
 
RahulSingh_CV
RahulSingh_CVRahulSingh_CV
RahulSingh_CV
 
Electronics engineering CDR Sample
Electronics engineering CDR  Sample Electronics engineering CDR  Sample
Electronics engineering CDR Sample
 
Rhapsody and mechatronics, multi-domain simulation
Rhapsody and mechatronics, multi-domain simulationRhapsody and mechatronics, multi-domain simulation
Rhapsody and mechatronics, multi-domain simulation
 
Ayush _CV
Ayush _CVAyush _CV
Ayush _CV
 
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
ESEconf2011 - Hanin Makram: "Embedding Performance into Continuous Integratio...
 
ShashankResume
ShashankResumeShashankResume
ShashankResume
 
Electronics Engineer Resume Foramt
Electronics Engineer Resume ForamtElectronics Engineer Resume Foramt
Electronics Engineer Resume Foramt
 
Standard dme sop
Standard dme sopStandard dme sop
Standard dme sop
 
张祁_简历
张祁_简历张祁_简历
张祁_简历
 

ABOUT ME

  • 2.  Aim: Develop skills for automation and manufacturing leading to process improvement. Learn at least one new skill each year related to automation.  Hometown: Mumbai, India  Bachelors in Electronics Engineering, NMIMS University, Mumbai.  Masters in Mechanical Engineering, Purdue University, Indianapolis. Track Concentration – Mechatronics.  Hobbies: Cricket, watch documentaries, cooking. 2
  • 3.  Intern, NML Automation Pvt LTD, Mumbai, India  Dates: June 2013 – July 2013 Design automotive parts on solid works (training module). Hands on experience with fatek, delta PLC programming. Performed onsite startup and troubleshooting. 3
  • 4.  Bosch Rexroth Lab, NMIMS University, Mumbai, India  Dates: Jan 2014 – April 2014 Theory classes for various BOSCH industrial automation components. Learn and Understand various hydraulics, Pneumatic symbols and principles. Performed practical ladder logic examples on Indralogic PLC software Performed practical exercises on electrical engineering, pneumatic and hydraulics. 4
  • 5.  Energy Engineer, Industrial Assessment Center, Indianapolis.  Dates: Sep 2014 – Current Developed spreadsheet by understanding utility rate structures and use them to calculate energy usage. Created energy reduction plans and cost savings analysis showing different energy conservation measures (ECMs). Lead and conducted (8) ASHRAE level II energy audits with approximate energy savings of $2.5 million and average payback period of 16 months. 5
  • 6.  Certified Automation Engineer, SMEC labs, Mumbai , India  Dates: January 2016 Hands on training for Allen Bradley Micrologix 1400, Wonderware Intouch SCADA, Schneider Vijeologix HMI. Performed practical exercises and interfacing of PLC, SCADA and HMI. Understood and implemented various instructions, script writing and design of HMI and SCADA screens. 6
  • 7.  Automation of Bottle filling plant, May 2014  Cause: Increase in production and shortage of labor 7 Developed iron frame with rubber conveyor. Developed ladder logic on Fatek eco series PLC. Reduction in Human Interface by 70%. Learnt about capacitive sensors and few other sensors.
  • 8.  Automation of Extraction of molten aluminum from sludge.  Cause: Operator Injury risk and increase productivity. 8 Understand operation to be automated. Research of robots for respective operations. Comparison of robots on AHP technique. Design of Robotic simulation in KUKA SimPro.
  • 9.  Engine and Blower Assembly & Manufacturing  Cause : Learn ProE software 9 Designed parts of engine, blower, Apply various elements of software. Performed simulation in PTC Creo 2.0. Simulated manufacturing sequence for CNC machining.
  • 10.  International Space station (ISS) observatory module .  Cause: Learn Systems engineering and project management Chief Engineer for development for CUPOLA design to Launch process. Apply various systems engineering principles for tasks such as resource allocation, requirements, work breakdown structure (WBS). Present progress presentation to stakeholders for permission to progress to next stage. 10
  • 11.  Assembly Line Simulation and Ergonomics for paper manufacturing  Cause: Identify Machine Usage 11
  • 12.  Performed time study for the different process in the production flow.  Remodel the facility in Siemens Tecnomatix – Plant simulation.  Identify bottle neck in the process and perform machine usage analysis.  Develop a report regarding current process and recommendation for scope of improvement. 12
  • 13.  Structured text language for PLC Stage: Beginner. Aim: Learn syntax and integration of Structured text for plc programming.  ABB RobotStudio 6.03 Stage: Beginner Aim: Learn various tools and design constraints for robot programming 13
  • 14. 14
  • 15. 15

Editor's Notes

  1. just put hometown: Mumbai, india