Mooring Line
Integrity Monitoring
www.pulse-monitoring.com
Mooring Line Failures
Ref: Underlying causes of Mooring line Failures
24th March 2015
• 107 mooring incidents from 73 facilities across the industry (1997-2012)
• 51 single line failures – 9 multiple line failures
• 38 pre-emptive replacement events – 9 reports of severe degradation
• 150 lines replaced/repaired 2001-2011 (Ref: OTC 24181)
www.pulse-monitoring.com
Failures rate per line per year of exposure (1997 – 2014)
Mooring Line Failures
• Long term Mooring system design life: 15-25yrs
• 1:50 chance of a failure per asset per year
• Considering 25 years of design life: chance of 50% failure
during the lifetime of a mooring line
Ref: Underlying causes of Mooring line Failures
24th March 2015
50% chance of
failure of a
mooring line
www.pulse-monitoring.com
T
H
R
E
A
T
S
T
H
R
E
A
T
S
C
O
N
S
E
Q
U
E
N
C
E
S
C
O
N
S
E
Q
U
E
N
C
E
S
INCIDENTINCIDENT
Enhancing operational safety
Safety Barrier Principle
Fatigue
Corrosion
Overload
Multiple line failure
Loss of production
early detection of
single line failure
Monitoring fatigue
accumulation
N-1 design
Environmental
damage
Monitoring tension & fatigue
Extreme tensions and cumulative
fatigue issue
Detection of single mooring line failure
Preventative action to prevent multiple line
failure
Detection of large
tension events
www.pulse-monitoring.com
Pulse Mooring Monitoring Solutions
Topside tension (Load cells)
In-line tension (Inter-M Pulse)
Mooring line inclination
Excursion monitoring
www.pulse-monitoring.com
Main mooring monitoring technologies - comparison
How to Monitor?
Parameter Inclination In-line Tension Load Cells
Data
Communication
Acoustic Acoustic Hardwired
Data Availability On Demand On Demand Continuous
Direct Tension   
Battery Life
Dependent on
operating mode
Dependent on
operating mode
Unlimited
Reliability High High Low
Serviceable   
Retrofittable   
www.pulse-monitoring.com
Improving reliability
Mooring Integrity Monitoring
• Assist with development of specification
• Early involvement with project
• System redundancy
• Serviceable systems
DesignInstallation
• Robust installation procedure
• Use experience and best practice
• Cable management
• Smart integration
Operation
• Ongoing maintenance & service plan
• Data analysis and reporting
• Not “fit and forget”
www.pulse-monitoring.com 8
Questions on How to
specify a mooring line
monitoring system ?
www.pulse-monitoring.com
Contact Us
info@pulse-monitoring.com
www.pulse-monitoring.com

Contenu connexe

En vedette

Ship handling basics
Ship handling basicsShip handling basics
Ship handling basicsmoney2j
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Engineers Australia
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipGuilherme Azevedo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETSCapt.Vivek Trivedi
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 

En vedette (8)

Ship handling basics
Ship handling basicsShip handling basics
Ship handling basics
 
Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems Design and Analysis of Floating Production Systems
Design and Analysis of Floating Production Systems
 
Lesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike SeamanshipLesson 2 Deck Equipment And Marlinspike Seamanship
Lesson 2 Deck Equipment And Marlinspike Seamanship
 
anchorage Fondeo
anchorage Fondeoanchorage Fondeo
anchorage Fondeo
 
MOORING STATIONS - FOR MARITIME CADETS
MOORING STATIONS -    FOR MARITIME  CADETSMOORING STATIONS -    FOR MARITIME  CADETS
MOORING STATIONS - FOR MARITIME CADETS
 
Floting Production Storage and Offloading
Floting Production Storage  and OffloadingFloting Production Storage  and Offloading
Floting Production Storage and Offloading
 
RCM
RCMRCM
RCM
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 

Dernier

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the weldingMuhammadUzairLiaqat
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptNarmatha D
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfRajuKanojiya4
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 

Dernier (20)

Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
welding defects observed during the welding
welding defects observed during the weldingwelding defects observed during the welding
welding defects observed during the welding
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Industrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.pptIndustrial Safety Unit-IV workplace health and safety.ppt
Industrial Safety Unit-IV workplace health and safety.ppt
 
National Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdfNational Level Hackathon Participation Certificate.pdf
National Level Hackathon Participation Certificate.pdf
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 

Mooring Line Integrity Monitoring Solutions Overview

  • 2. www.pulse-monitoring.com Mooring Line Failures Ref: Underlying causes of Mooring line Failures 24th March 2015 • 107 mooring incidents from 73 facilities across the industry (1997-2012) • 51 single line failures – 9 multiple line failures • 38 pre-emptive replacement events – 9 reports of severe degradation • 150 lines replaced/repaired 2001-2011 (Ref: OTC 24181)
  • 3. www.pulse-monitoring.com Failures rate per line per year of exposure (1997 – 2014) Mooring Line Failures • Long term Mooring system design life: 15-25yrs • 1:50 chance of a failure per asset per year • Considering 25 years of design life: chance of 50% failure during the lifetime of a mooring line Ref: Underlying causes of Mooring line Failures 24th March 2015 50% chance of failure of a mooring line
  • 4. www.pulse-monitoring.com T H R E A T S T H R E A T S C O N S E Q U E N C E S C O N S E Q U E N C E S INCIDENTINCIDENT Enhancing operational safety Safety Barrier Principle Fatigue Corrosion Overload Multiple line failure Loss of production early detection of single line failure Monitoring fatigue accumulation N-1 design Environmental damage Monitoring tension & fatigue Extreme tensions and cumulative fatigue issue Detection of single mooring line failure Preventative action to prevent multiple line failure Detection of large tension events
  • 5. www.pulse-monitoring.com Pulse Mooring Monitoring Solutions Topside tension (Load cells) In-line tension (Inter-M Pulse) Mooring line inclination Excursion monitoring
  • 6. www.pulse-monitoring.com Main mooring monitoring technologies - comparison How to Monitor? Parameter Inclination In-line Tension Load Cells Data Communication Acoustic Acoustic Hardwired Data Availability On Demand On Demand Continuous Direct Tension    Battery Life Dependent on operating mode Dependent on operating mode Unlimited Reliability High High Low Serviceable    Retrofittable   
  • 7. www.pulse-monitoring.com Improving reliability Mooring Integrity Monitoring • Assist with development of specification • Early involvement with project • System redundancy • Serviceable systems DesignInstallation • Robust installation procedure • Use experience and best practice • Cable management • Smart integration Operation • Ongoing maintenance & service plan • Data analysis and reporting • Not “fit and forget”
  • 8. www.pulse-monitoring.com 8 Questions on How to specify a mooring line monitoring system ? www.pulse-monitoring.com Contact Us info@pulse-monitoring.com www.pulse-monitoring.com