2. Key Components for material handling:
• Safety Fencing • Vertical Conveyors • Palletising Modules
Key Components for material handling:
• Safety Fencing • Vertical Conveyors • Palletising Modules
Benefits of the Highrunner Mk7:
• High speed machine with capacity up to 3500 products per hour. • Low total cost of ownership thanks to
• Placing complete rows or layers on the pallet all at once durable, standard parts
• No changeover times when changing products or stacking pattern • Less energy consumption and wear due
• Infinitely variable positioning with 100% accuracy to optimal control
• Enter almost any stacking pattern via touch screen • Available from only €29,000
800
150 x 100 x 100
500
240
1
6.000
600 x 400 x 400
3.500
450
25
25 kg
3500 / h
10 m²
Máx.Mín.
kg.
p/hour.
p/hour.
L x W x H mm.
mm.
Especificaciones
Infeed
Product
Product capacity
Capacity layers
Peso
600 x 400 x 400
3. Key Components for material handling:
• Safety Fencing • Vertical Conveyors • Palletising Modules
Key Components for material handling:
• Safety Fencing • Vertical Conveyors • Palletising Modules
Benefits of the Highrunner Mk7:
• High speed machine with capacity up to 3500 products per hour. • Low total cost of ownership thanks to
• Placing complete rows or layers on the pallet all at once durable, standard parts
• No changeover times when changing products or stacking pattern • Less energy consumption and wear due
• Infinitely variable positioning with 100% accuracy to optimal control
• Enter almost any stacking pattern via touch screen • Available from only €29,000
800
150 x 100 x 100
500
240
1
6.000
600 x 400 x 400
3.500
450
25
25 kg
3500 / h
10 m²
Máx.Mín.
kg.
p/hour.
p/hour.
L x W x H mm.
mm.
Especificaciones
Infeed
Product
Product capacity
Capacity layers
Peso
600 x 400 x 400