INTRODUCTION
 Theodolite is used to measure the horizontal and
vertical angles.
 Theodolite is more precise than magnetic compass.
 Magnetic compass measures the angle up to as
accuracy of 30’. However a vernier theodolite
measures the angles up to and accuracy of 10’’, 20”.
 There are variety of theodolite vernier, optic,
electronic etc.
TYPE OF THEODOLITE
VERNIER THEODOLITE
 Vernier theodolite is
also known and transit.
 A transit theodolite is
one in which the
telescope can be
rotated in a vertical
plane.
Alidade assembly
Horizontal circle
assembly
Levelling head assembly
Line of Sight
Traverse/horizontal axis
Vertical circle rigidly fixed to
the telescope
Vertical axis
Three assemblies of Theodolite
 Main parts of a theodolite
 Levelling head (7): Levelling head
is used to attach the instrument to
tripod and attach the plumb bob
along the vertical axis of the
instrument.
MAIN PARTS-2
 Lower plate/circle plate (18): an annular
horizontal plate with the graduations provided
all around, from 0 to 360°, in a clockwise
direction. The graduations are in degree
divided in to 3 parts so that each division
equals to 20 min.
 Horizontal angles are measured with this plate.
 The size of the theodolite is defined by the
diameter of horizontal circle.
 Upper plate (17): Horizontal plate of smaller
diameter provided with two verniers. on
diametrically opposite parts of its
circumference. These verniers are designated
as A and B. They are used to read fractions of
the horizontal circle plate graduations. The
verniers are graduated in 20 min and each
minute is divided in 3 to 5 parts making least
count 20” or 10”.
MAIN PARTS-3
 Clamps and tangent screws (15, 19):
 There are two clamps and associated tangent
screws with the plate. These screws facilitate
the motion of the instruments in horizontal
plane.
 Lower clamp screw locks or releases the
lower plate. When this screw is unlocked both
upper and lower plates move together. The
associated lower tangent screw allows small
motion of the plate in locked position.
 The upper clamp screw locks or releases the
upper vernier plate. When this clamp is
released the lower plate does not move but
the upper vernier plate moves with the
instrument. This causes the change in the
reading. The upper tangent screw allows the
fine adjustment.
MAIN PARTS-4
 Plate level (5):
 Spirit level with the bubble and
graduation on glass cover.
 A single level or two levels fixed in
perpendicular direction may be provided.
 The spirit level can be adjusted with the
foot screw (21) of the levelling head (7).
 Telescope (10): The essential parts of the
telescopes are eye-piece, diaphragm with
cross hairs, object lens and arrangements to
focus the telescope.
MAIN PARTS-5
 Vertical circle (1): circular plate
supported on horizontal axis of the
instrument between the A-frames.
Vertical circle has graduation 0-90 in
four quadrants. Vertical circle moves
with the telescope when it is rotated in
the vertical plane.
 Vertical circle clamp and tangent
screw (11): Clamping the vertical circle
restrict the movement of telescope in
vertical plane.
 Altitude level (2): A highly sensitive
bubble is used for levelling particularly
when taking the vertical angle
observations.
Reading a
theodolite
Vernier scale graduation
Important Definition
Changing face
 Revolving the telescope by 180° in vertical plane
about horizontal axis
 Again revolving the telescope in horizontal plane
about vertical axis.
Adjustment of the theodolite
 Temporary Adjustment
 Setting up the theodolite
Measurement of horizontal angle
 Measurement of Angle ABC
 The instrument is set over B.
 The lower clamp is kept fixed and upper clamp is
loosened.
 Turn the telescope clockwise set vernier A to 0° and
vernier B to approximately 180°.
 Upper clamp is tightened and using the upper tangent
screw the vernier A and B are exactly set to 0° and 180°.
 Upper clamp is tightly fixed, lower one is loosened and
telescope is directed towards A and bisect the ranging rod
at A.
 Tightened the lower clamp and turn the lower tangent
screw to perfectly bisect ranging rod at A.
 Loose the upper clamp and turn the telescope clockwise to
bisect the ranging rod at C tightened the upper clamp and
do the fine adjustment with upper tangent screw.
 The reading on vernier A and B are noted. Vernier A gives
the angle directly and vernier B gives the reading by
subtracting the initial reading (180°) from final reading
 Read these two method
 Repetition method
 Reiteration method
Vertical angle measurement-1
Vertical angle measurement-2
 Measurements of
 Deflection angle
 magnetic bearing
A
B
C
P
A
B
N


 Read assignment (N. N. Basak, S. K. Duggal)
 Ranging and extending a line
 Method of traversing
 Included angle method
 Deflection angle method
 Fast angle (or magnetic bearing method)
Computation of latitude and departure
 Latitude of a line is the distances measured parallel
to the north south of the North-South direction
 Departure of the line is the distance measured
parallel to the east-west direction
Computing latitude and departure
PROBLEM-1
 While making survey through the woods, a surveyor with the hand compass
started from point A and walked a thousand steps in the direction S67⁰W and
reached a point B. then he changed his direction and walked 512 steps in the
direction N10⁰E and reached a point C then again he changed his direction
and walked 15 04 steps in the direction S65⁰E and reached a point D as
shown in Figure Now the surveyor wants to return to the starting point A. In
which direction should he move and how many steps should he take.
Sources of errors in theodolite
 Instrumental errors
 Non adjustment of plate bubble
 Line of collimation not being perpendicular to horizontal
axis
 Horizontal axis not being perpendicular to vertical axis
 Line of collimation not being parallel to axis of telescope
 Eccentricity of inner and outer axes
 Graduation not being uniform
 Verniers being eccentric
 . Personal errors
 Natural errors
 High temperature causes error due to irregular refraction.
 High winds cause vibration in the instrument, and this may lead to
wrong readings on verniers
 Closing error
Balancing of traverse
 Bowditch’s rule:
 Total error is distributed in proportion to the lengths of the
traverse legs.
Calculation of traverse area
PROBLEM
 Calculate the latitudes, departures and closing error
for the following traverse conducted at allahabad.
Adjust also the traverse using Bowditch’s rule.
Line Length WCB
AB 89.31 45⁰ 10’
BC 219.76 72⁰ 05’
CD 151.18 161⁰ 52’
DE 159.10 228⁰ 43’
EA 232.26 300⁰ 42’
ASU(CE4G)-Theodolite (1).ppt

Contenu connexe

Similaire à ASU(CE4G)-Theodolite (1).ppt

Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work bookTalha Hussain
 
Theodolite & measurment
Theodolite  & measurmentTheodolite  & measurment
Theodolite & measurmentMahendra meena
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.pptsivaganesan23
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Bahzad5
 
Theodolite and its working mechanism
Theodolite and its working mechanismTheodolite and its working mechanism
Theodolite and its working mechanismBinabh Devkota
 
micro-optic-theodolite.pdf
micro-optic-theodolite.pdfmicro-optic-theodolite.pdf
micro-optic-theodolite.pdfFaizanSolanki
 
Theodolites
TheodolitesTheodolites
Theodolitesillpa
 
fdocuments.in_angular-measurement-2014.ppt
fdocuments.in_angular-measurement-2014.pptfdocuments.in_angular-measurement-2014.ppt
fdocuments.in_angular-measurement-2014.pptDivyaPriya700213
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station Agriculture Journal IJOEAR
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptxADCET, Ashta
 
Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2Gulfam Akram
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptUjasPandya2
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptNITINSURESH30
 

Similaire à ASU(CE4G)-Theodolite (1).ppt (20)

Theodolite survey
Theodolite surveyTheodolite survey
Theodolite survey
 
Surveying practical work book
Surveying practical work bookSurveying practical work book
Surveying practical work book
 
Theodolite & measurment
Theodolite  & measurmentTheodolite  & measurment
Theodolite & measurment
 
Theodolite_surveying.ppt
Theodolite_surveying.pptTheodolite_surveying.ppt
Theodolite_surveying.ppt
 
Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part Introduction About Theodolite Instrument Theoretical part
Introduction About Theodolite Instrument Theoretical part
 
Surveying Lab II Manual
Surveying Lab II ManualSurveying Lab II Manual
Surveying Lab II Manual
 
Theodolite and its working mechanism
Theodolite and its working mechanismTheodolite and its working mechanism
Theodolite and its working mechanism
 
micro-optic-theodolite.pdf
micro-optic-theodolite.pdfmicro-optic-theodolite.pdf
micro-optic-theodolite.pdf
 
Theodolites
TheodolitesTheodolites
Theodolites
 
fdocuments.in_angular-measurement-2014.ppt
fdocuments.in_angular-measurement-2014.pptfdocuments.in_angular-measurement-2014.ppt
fdocuments.in_angular-measurement-2014.ppt
 
To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station To Experimental Study for Comparison Theodolite and Total Station
To Experimental Study for Comparison Theodolite and Total Station
 
Unit No 2 Theodolite Surveying and Traversing.pptx
Unit No 2  Theodolite Surveying and Traversing.pptxUnit No 2  Theodolite Surveying and Traversing.pptx
Unit No 2 Theodolite Surveying and Traversing.pptx
 
Surveying and leveling-2
Surveying and leveling-2Surveying and leveling-2
Surveying and leveling-2
 
The theodolite
The theodoliteThe theodolite
The theodolite
 
The usage of the theodolite
The usage of the theodolite The usage of the theodolite
The usage of the theodolite
 
Theodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.pptTheodolite Survey basic in civil engineering.ppt
Theodolite Survey basic in civil engineering.ppt
 
Theodolite Surveying
Theodolite Surveying Theodolite Surveying
Theodolite Surveying
 
Mass diagram and its characeristics .ppt
Mass diagram and its characeristics .pptMass diagram and its characeristics .ppt
Mass diagram and its characeristics .ppt
 
PRESENTATION 01.docx
PRESENTATION 01.docxPRESENTATION 01.docx
PRESENTATION 01.docx
 
chapter 4angle.pdf
chapter 4angle.pdfchapter 4angle.pdf
chapter 4angle.pdf
 

Plus de RESHMAFEGADE

23.3.d sedimentary rocks ppt.ppt
23.3.d sedimentary rocks ppt.ppt23.3.d sedimentary rocks ppt.ppt
23.3.d sedimentary rocks ppt.pptRESHMAFEGADE
 
23.3.c MINERAlOGY.pptx
23.3.c MINERAlOGY.pptx23.3.c MINERAlOGY.pptx
23.3.c MINERAlOGY.pptxRESHMAFEGADE
 
dimensional analysis
dimensional analysisdimensional analysis
dimensional analysisRESHMAFEGADE
 
23.3.a igneous rocks ppt.ppt
23.3.a igneous rocks ppt.ppt23.3.a igneous rocks ppt.ppt
23.3.a igneous rocks ppt.pptRESHMAFEGADE
 
23.3.b metamarphic rock.ppt
23.3.b metamarphic rock.ppt23.3.b metamarphic rock.ppt
23.3.b metamarphic rock.pptRESHMAFEGADE
 
Unit 4 Class Notes -2019 pat..pptx
Unit 4 Class Notes -2019 pat..pptxUnit 4 Class Notes -2019 pat..pptx
Unit 4 Class Notes -2019 pat..pptxRESHMAFEGADE
 
Unit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxUnit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxRESHMAFEGADE
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfRESHMAFEGADE
 
ASU(CE4G)-Contouring.ppt
ASU(CE4G)-Contouring.pptASU(CE4G)-Contouring.ppt
ASU(CE4G)-Contouring.pptRESHMAFEGADE
 
Unit wise question bank.docx
Unit wise question bank.docxUnit wise question bank.docx
Unit wise question bank.docxRESHMAFEGADE
 
railway and bridge engineering.pdf
railway and bridge engineering.pdfrailway and bridge engineering.pdf
railway and bridge engineering.pdfRESHMAFEGADE
 
railway and bridge engineering.pdf
railway and bridge engineering.pdfrailway and bridge engineering.pdf
railway and bridge engineering.pdfRESHMAFEGADE
 
railway and bridge engineering ppt.pptx
railway and bridge engineering ppt.pptxrailway and bridge engineering ppt.pptx
railway and bridge engineering ppt.pptxRESHMAFEGADE
 
pavement materials.pptx
pavement materials.pptxpavement materials.pptx
pavement materials.pptxRESHMAFEGADE
 

Plus de RESHMAFEGADE (15)

23.3.d sedimentary rocks ppt.ppt
23.3.d sedimentary rocks ppt.ppt23.3.d sedimentary rocks ppt.ppt
23.3.d sedimentary rocks ppt.ppt
 
23.3.c MINERAlOGY.pptx
23.3.c MINERAlOGY.pptx23.3.c MINERAlOGY.pptx
23.3.c MINERAlOGY.pptx
 
dimensional analysis
dimensional analysisdimensional analysis
dimensional analysis
 
23.3.a igneous rocks ppt.ppt
23.3.a igneous rocks ppt.ppt23.3.a igneous rocks ppt.ppt
23.3.a igneous rocks ppt.ppt
 
23.3.b metamarphic rock.ppt
23.3.b metamarphic rock.ppt23.3.b metamarphic rock.ppt
23.3.b metamarphic rock.ppt
 
Unit 4 Class Notes -2019 pat..pptx
Unit 4 Class Notes -2019 pat..pptxUnit 4 Class Notes -2019 pat..pptx
Unit 4 Class Notes -2019 pat..pptx
 
Unit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptxUnit 1 Class Notes-2019 pat..pptx
Unit 1 Class Notes-2019 pat..pptx
 
Transportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdfTransportation-Engg.-LABORATORY_MANUAL.pdf
Transportation-Engg.-LABORATORY_MANUAL.pdf
 
ASU(CE4G)-Contouring.ppt
ASU(CE4G)-Contouring.pptASU(CE4G)-Contouring.ppt
ASU(CE4G)-Contouring.ppt
 
Unit wise question bank.docx
Unit wise question bank.docxUnit wise question bank.docx
Unit wise question bank.docx
 
railway and bridge engineering.pdf
railway and bridge engineering.pdfrailway and bridge engineering.pdf
railway and bridge engineering.pdf
 
railway and bridge engineering.pdf
railway and bridge engineering.pdfrailway and bridge engineering.pdf
railway and bridge engineering.pdf
 
railway and bridge engineering ppt.pptx
railway and bridge engineering ppt.pptxrailway and bridge engineering ppt.pptx
railway and bridge engineering ppt.pptx
 
tre ppt.pptx
tre ppt.pptxtre ppt.pptx
tre ppt.pptx
 
pavement materials.pptx
pavement materials.pptxpavement materials.pptx
pavement materials.pptx
 

Dernier

Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfDrew Moseley
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating SystemRashmi Bhat
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdfAkritiPradhan2
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating SystemRashmi Bhat
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProRay Yuan Liu
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labsamber724300
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfisabel213075
 

Dernier (20)

Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
Stork Webinar | APM Transformational planning, Tool Selection & Performance T...
 
Immutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdfImmutable Image-Based Operating Systems - EW2024.pdf
Immutable Image-Based Operating Systems - EW2024.pdf
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Virtual memory management in Operating System
Virtual memory management in Operating SystemVirtual memory management in Operating System
Virtual memory management in Operating System
 
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdfDEVICE DRIVERS AND INTERRUPTS  SERVICE MECHANISM.pdf
DEVICE DRIVERS AND INTERRUPTS SERVICE MECHANISM.pdf
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Input Output Management in Operating System
Input Output Management in Operating SystemInput Output Management in Operating System
Input Output Management in Operating System
 
A brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision ProA brief look at visionOS - How to develop app on Apple's Vision Pro
A brief look at visionOS - How to develop app on Apple's Vision Pro
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Secure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech LabsSecure Key Crypto - Tech Paper JET Tech Labs
Secure Key Crypto - Tech Paper JET Tech Labs
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 
List of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdfList of Accredited Concrete Batching Plant.pdf
List of Accredited Concrete Batching Plant.pdf
 

ASU(CE4G)-Theodolite (1).ppt

  • 1. INTRODUCTION  Theodolite is used to measure the horizontal and vertical angles.  Theodolite is more precise than magnetic compass.  Magnetic compass measures the angle up to as accuracy of 30’. However a vernier theodolite measures the angles up to and accuracy of 10’’, 20”.  There are variety of theodolite vernier, optic, electronic etc.
  • 3. VERNIER THEODOLITE  Vernier theodolite is also known and transit.  A transit theodolite is one in which the telescope can be rotated in a vertical plane. Alidade assembly Horizontal circle assembly Levelling head assembly Line of Sight Traverse/horizontal axis Vertical circle rigidly fixed to the telescope Vertical axis Three assemblies of Theodolite
  • 4.  Main parts of a theodolite  Levelling head (7): Levelling head is used to attach the instrument to tripod and attach the plumb bob along the vertical axis of the instrument.
  • 5. MAIN PARTS-2  Lower plate/circle plate (18): an annular horizontal plate with the graduations provided all around, from 0 to 360°, in a clockwise direction. The graduations are in degree divided in to 3 parts so that each division equals to 20 min.  Horizontal angles are measured with this plate.  The size of the theodolite is defined by the diameter of horizontal circle.  Upper plate (17): Horizontal plate of smaller diameter provided with two verniers. on diametrically opposite parts of its circumference. These verniers are designated as A and B. They are used to read fractions of the horizontal circle plate graduations. The verniers are graduated in 20 min and each minute is divided in 3 to 5 parts making least count 20” or 10”.
  • 6. MAIN PARTS-3  Clamps and tangent screws (15, 19):  There are two clamps and associated tangent screws with the plate. These screws facilitate the motion of the instruments in horizontal plane.  Lower clamp screw locks or releases the lower plate. When this screw is unlocked both upper and lower plates move together. The associated lower tangent screw allows small motion of the plate in locked position.  The upper clamp screw locks or releases the upper vernier plate. When this clamp is released the lower plate does not move but the upper vernier plate moves with the instrument. This causes the change in the reading. The upper tangent screw allows the fine adjustment.
  • 7. MAIN PARTS-4  Plate level (5):  Spirit level with the bubble and graduation on glass cover.  A single level or two levels fixed in perpendicular direction may be provided.  The spirit level can be adjusted with the foot screw (21) of the levelling head (7).  Telescope (10): The essential parts of the telescopes are eye-piece, diaphragm with cross hairs, object lens and arrangements to focus the telescope.
  • 8. MAIN PARTS-5  Vertical circle (1): circular plate supported on horizontal axis of the instrument between the A-frames. Vertical circle has graduation 0-90 in four quadrants. Vertical circle moves with the telescope when it is rotated in the vertical plane.  Vertical circle clamp and tangent screw (11): Clamping the vertical circle restrict the movement of telescope in vertical plane.  Altitude level (2): A highly sensitive bubble is used for levelling particularly when taking the vertical angle observations.
  • 9.
  • 11. Important Definition Changing face  Revolving the telescope by 180° in vertical plane about horizontal axis  Again revolving the telescope in horizontal plane about vertical axis.
  • 12. Adjustment of the theodolite  Temporary Adjustment  Setting up the theodolite
  • 13.
  • 14.
  • 15.
  • 16. Measurement of horizontal angle  Measurement of Angle ABC  The instrument is set over B.  The lower clamp is kept fixed and upper clamp is loosened.  Turn the telescope clockwise set vernier A to 0° and vernier B to approximately 180°.  Upper clamp is tightened and using the upper tangent screw the vernier A and B are exactly set to 0° and 180°.  Upper clamp is tightly fixed, lower one is loosened and telescope is directed towards A and bisect the ranging rod at A.  Tightened the lower clamp and turn the lower tangent screw to perfectly bisect ranging rod at A.  Loose the upper clamp and turn the telescope clockwise to bisect the ranging rod at C tightened the upper clamp and do the fine adjustment with upper tangent screw.  The reading on vernier A and B are noted. Vernier A gives the angle directly and vernier B gives the reading by subtracting the initial reading (180°) from final reading
  • 17.  Read these two method  Repetition method  Reiteration method
  • 20.  Measurements of  Deflection angle  magnetic bearing A B C P A B N  
  • 21.  Read assignment (N. N. Basak, S. K. Duggal)  Ranging and extending a line  Method of traversing  Included angle method  Deflection angle method  Fast angle (or magnetic bearing method)
  • 22. Computation of latitude and departure  Latitude of a line is the distances measured parallel to the north south of the North-South direction  Departure of the line is the distance measured parallel to the east-west direction
  • 24. PROBLEM-1  While making survey through the woods, a surveyor with the hand compass started from point A and walked a thousand steps in the direction S67⁰W and reached a point B. then he changed his direction and walked 512 steps in the direction N10⁰E and reached a point C then again he changed his direction and walked 15 04 steps in the direction S65⁰E and reached a point D as shown in Figure Now the surveyor wants to return to the starting point A. In which direction should he move and how many steps should he take.
  • 25.
  • 26. Sources of errors in theodolite  Instrumental errors  Non adjustment of plate bubble  Line of collimation not being perpendicular to horizontal axis  Horizontal axis not being perpendicular to vertical axis  Line of collimation not being parallel to axis of telescope  Eccentricity of inner and outer axes  Graduation not being uniform  Verniers being eccentric
  • 27.  . Personal errors  Natural errors  High temperature causes error due to irregular refraction.  High winds cause vibration in the instrument, and this may lead to wrong readings on verniers  Closing error
  • 28. Balancing of traverse  Bowditch’s rule:  Total error is distributed in proportion to the lengths of the traverse legs.
  • 30. PROBLEM  Calculate the latitudes, departures and closing error for the following traverse conducted at allahabad. Adjust also the traverse using Bowditch’s rule. Line Length WCB AB 89.31 45⁰ 10’ BC 219.76 72⁰ 05’ CD 151.18 161⁰ 52’ DE 159.10 228⁰ 43’ EA 232.26 300⁰ 42’