4. Abbreviated new drug application
(ANDA)
⢠These are submitted to the FDAâs CDER(center for
drug evaluation and research)
⢠The Office of the Generic drugs (OGD) is located
within the CDER under the office of pharmaceutical
science, to obtain approval to market a generic drug
product.
⢠The OGD ensures the safety and efficacy of generic
drugs by employing a review process that is similar
to the NDA process.
5. ⢠Once approved the applicant may manufacture &
market the generic product to provide a safe, effective
& low cost alternative.
⢠These are termed âAbbreviatedâ because they
generally need not include preclinical & clinical data
to establish safety & effectiveness.
⢠They must scientifically demonstrate that their
product is bioequivalent to the innovator drug.
6. ⢠The primary difference between the generic drug
review process and NDA process is the study
requirements.
⢠For ex , an ANDA generally requires a BE study
between the generic drug product and Reference list
of drugs(RLD )product.
⢠The safety and efficacy of the RLD product were
established previously through animal ,clinical ,BA
studies.SO, no need to repeat for ANDA.
7. STEPS
ďśFilling review
ďśCoordination of generic drug review process.
ďśBioequivalence review process.
ďśChemistry review process.
ďśLabeling review process.
ďśPutting it all together.
8. Filling review
ďźThe process begins when an applicant submits an ANDA
to the OGD.
ďźThe document room staff assigns it an ANDA number
and stamps a received date on the cover letter of ANDA.
ďźIt is sent to a consumer safety technician who reviews
the preliminary sections of ANDA checklist
ďźWith in first 60 days âsubmission , filling review is
completed. Regulatory support branch(RSB) is
responsible for this process.
9. ⢠Once the RSB(REGULATORY SUPPORT BRANCH)completes the filling
review of the ANDA and verifies that the application
contains all the necessary regulatory requirements an
âAcknowledgement â letter is issued to the applicant
indicating its acceptance for filling and the official filling
date
ď§ The application is then assigned to technical reviewers.
ď§ If the ANDA does not met the criteria for filling ,
a â refuse âto-receive â letter is issued with a list of
deficiencies.
10. ďąUpon filling an ANDA ,the RPM(REGULATORY PROGRAM MANEGER)
forwards an establishment evaluation request (EER) to
the office of compliance.
ďąOffice of Compliance are operating in compliance with
current Good Manufacturing Practice( cGMP)
regulations.
ďąCurrently , ANDA can be submitted entirely
electronically.
ďąAll applicants who plan to submit ANDA electronically
should consult CDERâS website for electronic
submissions at www.fda.gov/cder/regulatory
/rsr/default.htm.
11. COORDINATION OF THE GENERIC DRUG
REVIEW PROCESS
ďśNow application enters the review queue,this means
that the application is assigned to a bioequivalence
reviewer , a chemist and a labelling reviewer.
ďśEach chemistry team consists of a team leader , a
project manager and several reviewers .The
chemistry project manager serves as the âApplicant â
project manager(APM),they plan ,organize and
coordinate all of the review activities for the
applications that they manage.
12. BIOEQUIVALENCE REVIEW PROCESS
⢠Bioequivalence project manager( BPM) access list of
pending ANDA assign to individual reviewers
according to âfirst-in ,first-reviewed âpolicy.
⢠The DBEâs responsibilities include BE section of
ANDA, Bio-investigational new drug
applications(Bio-INDs),protocols and controlled
correspondence.
13. ⢠This process establishes BE between a proposed
generic drug and the RLD.
⢠It resolve the regulatory and scientific issues
regarding the BE of drug products submitted for
marketing approval.
14. CHEMISTRY REVIEW PROCESS
ďźThe chemistry ,manufacturing and controls(CMC)
section of the application is assigned to the app
chemistry division and team based on therapeutic
category of the drug product.
ďźThe team leader assigns the application to a reviewer
on his/her team according to the â first-in,first
reviewed policyâ.
ďźThe Chemistry division reviews CMC section Of
ANDA, drug master files , annual reports and
controlled correspondence.
15. LABELLING REVIEW PROCESS
ďąLabeling section of the application is assigned to the
app labeling reviewer based on the therapeutic
category of the drug product.
ďąThe labeling review branch is part of DLPS.
ďąA team leader oversees the work of 4-6 reviewers.
ďąThe basis for the labeling review is to ensure that the
generic drug labeling is the âsame asâ the RLD
labeling.
16. ďśThe labeling reviewer identifies and resolves
concerns about medication errors. Ex: sound alike or
legibility of drug names on a container label.
ďśTo ensure that the proposed labeling in an ANDA is
the âsame asâ the RLD,
a. The reviewer must first identify the RLD
b. Next step is to find the most recently approved
labeling for the RLD.
c. If it is not the recently approves ,it is considered as
discontinued labeling ( so not acceptable for
labeling review).
17. ⢠The applicant may submit four copies of draft
labeling or 12 copies of final printed labeling as
proposed labeling. They are submitted for tentative
approval.
⢠The labeling branch supports the submission of
electronic labeling which is preferred and strongly
encouraged.
⢠As the container label is reviewed , the labeling
reviewer decides of the labeling is easy to read and
positioned in accordance with the regulations.
18. PUTTING IT ALL TOGETHER
⢠After the final office level administrative review and
individual disciplines have resolved their deficiencies
,the application will either receive a full approval or a
tentative letter.
⢠When the review of an ANDA is completed, the
APMs draft the app approval letter and circulate it
with the reviews and application for concurrence.
⢠The APMs communicate with the OGD management
on a weekly basis to update them on the progress of
reviews.
19. ⢠A full approval letter details the conditions of
approval and allows the applicant to market the
generic drug product.
⢠A tentative approval letter is issued if there are
unexpired patents or exclusivities accorded to the
RLD, and delays the marketing of the product .
⢠Once the office director has signed the final approval
letter, APM(APPLICANT PROJECT MANEGER) calls and faxes a
copy of the approval letter to the applicant.
⢠The document room staff then mails the final
approval letter to the applicant.