SlideShare a Scribd company logo
1 of 15
www.auditstructures.in
Type Of Building Construction
A. Based On Construction Method
B. Based On Design & Supervision
www.auditstructures.in
RED CEDAR
A. Based On Construction Method
 Load Bearing Wall With Step/Strip Footing
 R.C.C. Frame Work
 Precast Structural Frame Work
www.auditstructures.in
Redesigning existing structure for nature forces
It is a comprehensive task & require planning which
include following Information gathering.
 Field investigations including details of sub strata,
foundation details, extent of damage
 Type of Existing structure & its members stability
 Design Data Collection
 Identification of components required to be
strengthened
 Cost Estimates (it is feasible up to 60% of new
construction)
 Method or Procedure to be followed.
www.auditstructures.in
Crack Investigation
 Location
 Profile (vertical, Horizontal, Diagonal)
 Crack Size (Depth & length)
www.auditstructures.in
Crack Location In Structure
 Foundation:
1. Cracks Travel vertical in step footing in case of unequal
settlement.
 Flooring:
1. It is circular, Linear.
 Column:
1. Generally at 1/3rd height from bottom & top depending
on fixing conditions of column ends.
2. At laps location ,if laps are not staggered or not
sufficient length.
www.auditstructures.in
 Brick Work:
 In wall at ends of lintel in Diagonal upward
directions.
1. Horizontal, generally at slab wall joint , when
whole wall sink.
2. Vertical, in case of unequal settlement
 Beam:
1. Near Support ,visible on both face of beam &
bottom.
2. At centre of beam in its bottom
www.auditstructures.in
 Slab :
1. At centre of Span in ceiling (slab bottom)
2. At top & bottom face of slab near the
supporting wall or at top surface in case of
cantilever
 Plaster:
1. At joints with R.C.C & brick work
2. At localized locations in wall due to different
reasons
3. Locations as briefed in cracks in B.W.
www.auditstructures.in
 Make structure floor, roof lighter as much as possible.
 Avoid Un- symmetry of structure as much as possible.
For this purpose structure can be divided.
 Sand Pilling ,Stabilization of weak soil, sandy soil
having high water level must be taken care off.
 Proper Connections of building Elements.
 Use steel to strengthen laterally for load bearing wall
as per code requirement.
 Provide adequate plinth protection.
 Avoid to built Rigid masonry Building freely resting on
rock in Earth Quack porn area.
www.auditstructures.in
 Avoid keeping shallow foundation on Black Cotton
Soil.
 Use one type of foundation in a whole building to
avoid differential settlement.
 Physical quality check on material should me
periodic.
 An addition of room, which is structurally
independent from an existing building should be
designed & constructed in accordance with the
seismic requirements of new compiled structures.
www.auditstructures.in
 Any existing seismic resistance building if
occupied for school building then the building
has to be rechecked for seismic resistance for
building importance factor of 1.5.
 Projecting parts like cornices, facia stones,
parapets etc. should be avoided as for as
possible, otherwise they should be properly
reinforced and firmly tied to the main structure
Refer IS 1893 CLAUSE -7.12.2
 Ceiling plaster should be avoided as possible.
www.auditstructures.in
 Whenever one un symmetrical building is divided
into two or more building by separation walls the
structure of the divided building up to plinth level
is generally monolithic. Refer code IS 4326 5.1 to
5.2
 Even Where calculations based on code- based
seismic coefficients may not indicate tension steel
requirements, the reinforcement suggested in the
form of seismic bands & vertical steel bars at
corners & junction of walls & jambs of openings
must be provided since these are safe guard for
probable maximum earthquake.
www.auditstructures.in
 Corrosion resistance precautions should also be
taken in ductility detailing of cyclone prone &
tsunami prone coastal areas.
 IS 456 does not allow R.C.C. below M20 grade.
www.auditstructures.in
 An addition of new structure which is not structurally
independent should be designed & constructed such
that the entire building conforms to the seismic
resistance requirements for new building configuration.
The addition should not increase the seismic force
in any structural elements of the existing building by
more than 5% unless the capacity of the element
subject to the increased force is still in compliance
with the standard.
The addition should not decrease the seismic
resistance of any structural element of the existing
building below that required by the design codes.
www.auditstructures.in
For more details
Red Cedar Consultancy services
At
www.auditstructures.in
Cell – 8879 33 55 31
Email: rajeshb08@gmail.com
www.auditstructures.in

More Related Content

What's hot

B tech individual report
B tech individual reportB tech individual report
B tech individual report
ong93
 

What's hot (19)

Measurements in construction
Measurements in constructionMeasurements in construction
Measurements in construction
 
Design of Precast Elements
Design of Precast ElementsDesign of Precast Elements
Design of Precast Elements
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 
Week 4
Week 4Week 4
Week 4
 
Total precase concrete structure for multi storey
Total precase concrete structure for multi storeyTotal precase concrete structure for multi storey
Total precase concrete structure for multi storey
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Precast-concrete Details
Precast-concrete DetailsPrecast-concrete Details
Precast-concrete Details
 
Analysis of precast shear wall connection state of the art review
Analysis of precast shear wall connection  state of the art reviewAnalysis of precast shear wall connection  state of the art review
Analysis of precast shear wall connection state of the art review
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Precast modular structures
Precast modular structuresPrecast modular structures
Precast modular structures
 
Provisions for non -structural fastenings
Provisions for non -structural fasteningsProvisions for non -structural fastenings
Provisions for non -structural fastenings
 
Ppt supersstructure
Ppt supersstructurePpt supersstructure
Ppt supersstructure
 
Prefabricated components
Prefabricated componentsPrefabricated components
Prefabricated components
 
RCC Floor
RCC FloorRCC Floor
RCC Floor
 
Precast concrete construction
Precast concrete constructionPrecast concrete construction
Precast concrete construction
 
B tech individual report
B tech individual reportB tech individual report
B tech individual report
 
Classification based on structure
Classification based on structureClassification based on structure
Classification based on structure
 
Building Economics
Building EconomicsBuilding Economics
Building Economics
 
Portal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building SystemPortal Frame Construction & Pre Engineered Building System
Portal Frame Construction & Pre Engineered Building System
 

Similar to Construction with structural restoration methods of working

Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
hlksd
 
Basic designn criteria for highrise buildings
Basic designn criteria for highrise buildingsBasic designn criteria for highrise buildings
Basic designn criteria for highrise buildings
ysuranga
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
ChandanLawrence
 
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.pptSEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
pravin45743
 
Building technology report
Building technology reportBuilding technology report
Building technology report
Chong Yi Hui
 

Similar to Construction with structural restoration methods of working (20)

Basic principles krishnamraju
Basic principles krishnamrajuBasic principles krishnamraju
Basic principles krishnamraju
 
Basic principles of design for rcc building
Basic principles of design for rcc buildingBasic principles of design for rcc building
Basic principles of design for rcc building
 
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGSSHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
SHEAR WALL ANALYSIS & DESIGN OPTIMIZATION IN HIGH RISE BUILDINGS
 
What measures are adequate for the safety of land and building?
What measures are adequate for the safety of land and building?What measures are adequate for the safety of land and building?
What measures are adequate for the safety of land and building?
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt36405231_seismic_design_steps_153.ppt
36405231_seismic_design_steps_153.ppt
 
SEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.pptSEISMIC DESIGN STEPS.ppt
SEISMIC DESIGN STEPS.ppt
 
Seismic design steps
Seismic design stepsSeismic design steps
Seismic design steps
 
Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)Overview of IS 16700:2023 (by priyansh verma)
Overview of IS 16700:2023 (by priyansh verma)
 
Basic design criteria for high rise buildings
Basic design criteria for high rise buildings Basic design criteria for high rise buildings
Basic design criteria for high rise buildings
 
Basic designn criteria for highrise buildings
Basic designn criteria for highrise buildingsBasic designn criteria for highrise buildings
Basic designn criteria for highrise buildings
 
Earth resistant design philosophy
Earth resistant design philosophyEarth resistant design philosophy
Earth resistant design philosophy
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
STRUCTURAL COST COMPARISON OF LOW RISE BUILDING HAVING MOMENT RESISTING FRAME...
 
Retrofitting
Retrofitting Retrofitting
Retrofitting
 
TECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptxTECH_SEMINAR_sachith_gowda[1].pptx
TECH_SEMINAR_sachith_gowda[1].pptx
 
PRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptxPRE-CAST-CONSTRUCTION.pptx
PRE-CAST-CONSTRUCTION.pptx
 
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.pptSEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
SEISMIC EVALUATION OF EXISTING RC BUILDING BY PRAVIN PISE.ppt
 
IRJET- Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET-  	  Study of Behaviour of Multi-Storey Building with Shear WallsIRJET-  	  Study of Behaviour of Multi-Storey Building with Shear Walls
IRJET- Study of Behaviour of Multi-Storey Building with Shear Walls
 
Building technology report
Building technology reportBuilding technology report
Building technology report
 

Recently uploaded

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 

Recently uploaded (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 

Construction with structural restoration methods of working

  • 2. Type Of Building Construction A. Based On Construction Method B. Based On Design & Supervision www.auditstructures.in RED CEDAR
  • 3. A. Based On Construction Method  Load Bearing Wall With Step/Strip Footing  R.C.C. Frame Work  Precast Structural Frame Work www.auditstructures.in
  • 4. Redesigning existing structure for nature forces It is a comprehensive task & require planning which include following Information gathering.  Field investigations including details of sub strata, foundation details, extent of damage  Type of Existing structure & its members stability  Design Data Collection  Identification of components required to be strengthened  Cost Estimates (it is feasible up to 60% of new construction)  Method or Procedure to be followed. www.auditstructures.in
  • 5. Crack Investigation  Location  Profile (vertical, Horizontal, Diagonal)  Crack Size (Depth & length) www.auditstructures.in
  • 6. Crack Location In Structure  Foundation: 1. Cracks Travel vertical in step footing in case of unequal settlement.  Flooring: 1. It is circular, Linear.  Column: 1. Generally at 1/3rd height from bottom & top depending on fixing conditions of column ends. 2. At laps location ,if laps are not staggered or not sufficient length. www.auditstructures.in
  • 7.  Brick Work:  In wall at ends of lintel in Diagonal upward directions. 1. Horizontal, generally at slab wall joint , when whole wall sink. 2. Vertical, in case of unequal settlement  Beam: 1. Near Support ,visible on both face of beam & bottom. 2. At centre of beam in its bottom www.auditstructures.in
  • 8.  Slab : 1. At centre of Span in ceiling (slab bottom) 2. At top & bottom face of slab near the supporting wall or at top surface in case of cantilever  Plaster: 1. At joints with R.C.C & brick work 2. At localized locations in wall due to different reasons 3. Locations as briefed in cracks in B.W. www.auditstructures.in
  • 9.  Make structure floor, roof lighter as much as possible.  Avoid Un- symmetry of structure as much as possible. For this purpose structure can be divided.  Sand Pilling ,Stabilization of weak soil, sandy soil having high water level must be taken care off.  Proper Connections of building Elements.  Use steel to strengthen laterally for load bearing wall as per code requirement.  Provide adequate plinth protection.  Avoid to built Rigid masonry Building freely resting on rock in Earth Quack porn area. www.auditstructures.in
  • 10.  Avoid keeping shallow foundation on Black Cotton Soil.  Use one type of foundation in a whole building to avoid differential settlement.  Physical quality check on material should me periodic.  An addition of room, which is structurally independent from an existing building should be designed & constructed in accordance with the seismic requirements of new compiled structures. www.auditstructures.in
  • 11.  Any existing seismic resistance building if occupied for school building then the building has to be rechecked for seismic resistance for building importance factor of 1.5.  Projecting parts like cornices, facia stones, parapets etc. should be avoided as for as possible, otherwise they should be properly reinforced and firmly tied to the main structure Refer IS 1893 CLAUSE -7.12.2  Ceiling plaster should be avoided as possible. www.auditstructures.in
  • 12.  Whenever one un symmetrical building is divided into two or more building by separation walls the structure of the divided building up to plinth level is generally monolithic. Refer code IS 4326 5.1 to 5.2  Even Where calculations based on code- based seismic coefficients may not indicate tension steel requirements, the reinforcement suggested in the form of seismic bands & vertical steel bars at corners & junction of walls & jambs of openings must be provided since these are safe guard for probable maximum earthquake. www.auditstructures.in
  • 13.  Corrosion resistance precautions should also be taken in ductility detailing of cyclone prone & tsunami prone coastal areas.  IS 456 does not allow R.C.C. below M20 grade. www.auditstructures.in
  • 14.  An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes. www.auditstructures.in
  • 15. For more details Red Cedar Consultancy services At www.auditstructures.in Cell – 8879 33 55 31 Email: rajeshb08@gmail.com www.auditstructures.in

Editor's Notes

  1. This presentation should be read in continuation of presentation 1 & 2 which were on low strength masonry building , building of higher strength of masonry & R.C.C.
  2. Major task is to redesign an existing old structure for functional & earthquake, cyclone or more than one reasons without having any design & drawing of existing structures. Information are gathered & investigated by surveyor, architect ,designer, estimator to decide feasibility of retrofitting as per SSA norms.
  3. Cracks investigations. we have already dealt in our earlier presentations & which are on SSA website .Those cracks which are stable & non increasing are easiest to repair.& those cracks which are expanding or changing in shape need further investigations for cause & then elimination of cause & then off course repair of cracks is carried out.
  4. There are three slides which may help to identify some of major important cracks & its cause. For all cracks please refer earlier presentation of TSG in SSA web site. Some time we may find crack at corner in joint of two load bearing wall & cracks also in floor. In such case we should also check verticality of walls. In my view When wall is out of plumb by more than 10mm in 3.0 m then it is better to re built the wall from foundation after foundation soil stabilization. If wall is vertical then two wall can be connected as per slides shown, latter on in this presentation.
  5. I again repeat that I have already dealt on cracks in detail in my earlier presentations. Please refer those presentation . next
  6. This is third slide on structural & non structural crack locations.
  7. These are some of tips for school building planning, designing & executions.
  8. Avoid keeping shallow foundation on Black Cotton Soil. Use one type of foundation in a whole building to avoid differential settlement. Physical quality check on material should me periodic. An addition of room, which is structurally independent from an existing building should be designed & constructed in accordance with the seismic requirements of new compiled structures
  9. Any existing seismic resistance building if occupied for school building then the building has to be rechecked for seismic resistance for building importance factor of 1.5. Projecting parts like cornices, fascia stones, parapets etc. should be avoided as for as possible, otherwise they should be properly reinforced and firmly tied to the main structure Refer IS 1893 CLAUSE -7.12.2 Ceiling plaster should be avoided as possible
  10. Whenever one un symmetrical building is divided into two or more building by separation walls the structure of the divided building up to plinth level is generally monolithic. Refer code IS 4326 5.1 to 5.2 Codes says that Even Where calculations based on code- based seismic coefficients may not indicate tension steel requirements, the reinforcement suggested in the form of seismic bands & vertical steel bars at corners & junction of walls & jambs of openings must be provided since these are safe guard for probable maximum earthquake.
  11. Corrosion is reduced by proper selection of cement, aggregate, water & cover around bar. There are cement which are acid & alkaline resistant as per requirement. Aggregate should be chemically passive i.e. inert & Cover should be as per code IS 456 requirement.
  12. This slide show designing information but we as a engineer should know that An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes.
  13. This slide show designing information but we as a engineer should know that An addition of new structure which is not structurally independent should be designed & constructed such that the entire building conforms to the seismic resistance requirements for new building configuration. The addition should not increase the seismic force in any structural elements of the existing building by more than 5% unless the capacity of the element subject to the increased force is still in compliance with the standard. The addition should not decrease the seismic resistance of any structural element of the existing building below that required by the design codes.