 Calculo de las toneladas de concentrado de Pb
PUNTO 1: 1=3 + 12
Los números denotan distintos puntos en los cuales se
determina el balance
 Calculo de las toneladas de Relave
PUNTO 3: 12=1 – 3
Relave = 85 – 8.213 = 76.78 TMS
 Calculo del tonelaje del primer scavenger
PUNTO 10: 10 = 12 + 11
Tonelaje del primer relave scavenger = a la cabeza del
segundo scavenger.
Pb que ingresa es igual al Pb que sale en espuma y relave.
1.2(X) = 1.0 (76.78) + 10 (X – 76.78)
X = 78.55 TMS
 Calculo del tonelaje de las espumas del segundo scavenger
PUNTO 11: 11 = 10 - 12
Tons Espuma SCV2 = Ton. Alimento – Ton. Relave
Tons. Espuma SCV2 = 78.55 – 76.8
Tons. Espuma SCV2 = 1.75 TM.
 Calculo del tonelaje del alimento al primer scavenger
PUNTO 8: 8 = 10 + 9
Cab. SCV1: Rel Scv1 + Esp Scv1
2.5 (X) = 78.55 (1.2) + 18 (X – 78.55)
X = 85.10 TMS.
 Calculo del tonelaje de espumas del segundo Rougher
PUNTO 9: 9 = 8 – 10
Esp. SCV1 = 85.10 – 78.55 = 6.6 TMS
 Calculo del tonelaje de alimentación al segundo Rougher
PUNTO 2: 2 = 8 – 9 + 6 – 11 o 2 = 8 – 9 -11 + 6
3X = (85.10)2.5 – (6.6)18 – 10(1.75) + 25(X Ton. + 6.6 + 1.75
– 85.10)
X = 83.67 TMS
 Calculo del tonelaje de las espumas del segundo Rougher
PUNTO 6: 6 = 2 + 9 – 11
83.67 + 6.6 + 1.75 – 85.10 = 6.92 TMS.
 Calculo del agua que circula en cada punto
 Calculo del flujo de pulpa
𝑇𝑜𝑛 𝐻2𝑂 =
83.67 𝑥 74.5
25.5
= 244.45

More Related Content

What's hot

Maquinaria pesada y movimientos de tierras. Problemas de rendimiento
Maquinaria pesada y movimientos de tierras. Problemas de rendimientoMaquinaria pesada y movimientos de tierras. Problemas de rendimiento
Maquinaria pesada y movimientos de tierras. Problemas de rendimiento
DerekRamos8
 
Bad Ass Math Powerpoint
Bad Ass Math PowerpointBad Ass Math Powerpoint
Bad Ass Math Powerpoint
deroyanks
 

What's hot (19)

W3 Example 1 Answers
W3 Example 1 AnswersW3 Example 1 Answers
W3 Example 1 Answers
 
Kuzey soğutma kulesi̇ basinç kaybi
Kuzey soğutma kulesi̇ basinç kaybiKuzey soğutma kulesi̇ basinç kaybi
Kuzey soğutma kulesi̇ basinç kaybi
 
Solucion taller 1_q_x_
Solucion taller 1_q_x_Solucion taller 1_q_x_
Solucion taller 1_q_x_
 
Carding process
Carding processCarding process
Carding process
 
Taller semana 3 segunda parte
Taller semana 3 segunda parteTaller semana 3 segunda parte
Taller semana 3 segunda parte
 
Metalicas
MetalicasMetalicas
Metalicas
 
Maquinaria pesada y movimientos de tierras. Problemas de rendimiento
Maquinaria pesada y movimientos de tierras. Problemas de rendimientoMaquinaria pesada y movimientos de tierras. Problemas de rendimiento
Maquinaria pesada y movimientos de tierras. Problemas de rendimiento
 
Cargador frontal
Cargador frontalCargador frontal
Cargador frontal
 
16343 - Baloquinhas
16343 - Baloquinhas16343 - Baloquinhas
16343 - Baloquinhas
 
radar plotting- multiple targets
radar plotting- multiple targetsradar plotting- multiple targets
radar plotting- multiple targets
 
Practica física II Estática de fluidos
Practica física II Estática de fluidosPractica física II Estática de fluidos
Practica física II Estática de fluidos
 
Bad Ass Math Powerpoint
Bad Ass Math PowerpointBad Ass Math Powerpoint
Bad Ass Math Powerpoint
 
Second vector
Second vectorSecond vector
Second vector
 
Cfd study of cstr
Cfd study of cstrCfd study of cstr
Cfd study of cstr
 
Pdf integrales
Pdf integralesPdf integrales
Pdf integrales
 
Lecture 04 bernouilli's principle
Lecture 04   bernouilli's principleLecture 04   bernouilli's principle
Lecture 04 bernouilli's principle
 
W2 Example 2 Answers
W2 Example 2 AnswersW2 Example 2 Answers
W2 Example 2 Answers
 
Analysis of an Impulse turbine
Analysis of an Impulse turbineAnalysis of an Impulse turbine
Analysis of an Impulse turbine
 
Fluid Dynamics
Fluid DynamicsFluid Dynamics
Fluid Dynamics
 

More from Ramiro Siuce

More from Ramiro Siuce (10)

Balance por nodos.pdf
Balance por nodos.pdfBalance por nodos.pdf
Balance por nodos.pdf
 
Dimensionamiento de celdas de flotación
Dimensionamiento de celdas de flotaciónDimensionamiento de celdas de flotación
Dimensionamiento de celdas de flotación
 
Dimensionamiento de la pila
Dimensionamiento de la pilaDimensionamiento de la pila
Dimensionamiento de la pila
 
Dimensionamiento de ciclones
Dimensionamiento de ciclonesDimensionamiento de ciclones
Dimensionamiento de ciclones
 
Diseño de tolvas
Diseño de tolvasDiseño de tolvas
Diseño de tolvas
 
Sistematica de silicatos
Sistematica de silicatosSistematica de silicatos
Sistematica de silicatos
 
Petrologia
PetrologiaPetrologia
Petrologia
 
Introducción a los procesos industriales
Introducción a los procesos industrialesIntroducción a los procesos industriales
Introducción a los procesos industriales
 
Geología
GeologíaGeología
Geología
 
OXIDOS DE MINERALES
OXIDOS DE MINERALESOXIDOS DE MINERALES
OXIDOS DE MINERALES
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 

Recently uploaded (20)

Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 

Balance de materia en los bancos de flotacion

  • 1. BALANCE DE MATERIA EN LOS BANCOS DE FLOTACION
  • 2.
  • 3.  Calculo de las toneladas de concentrado de Pb PUNTO 1: 1=3 + 12 Los números denotan distintos puntos en los cuales se determina el balance
  • 4.  Calculo de las toneladas de Relave PUNTO 3: 12=1 – 3 Relave = 85 – 8.213 = 76.78 TMS
  • 5.  Calculo del tonelaje del primer scavenger PUNTO 10: 10 = 12 + 11 Tonelaje del primer relave scavenger = a la cabeza del segundo scavenger. Pb que ingresa es igual al Pb que sale en espuma y relave. 1.2(X) = 1.0 (76.78) + 10 (X – 76.78) X = 78.55 TMS
  • 6.  Calculo del tonelaje de las espumas del segundo scavenger PUNTO 11: 11 = 10 - 12 Tons Espuma SCV2 = Ton. Alimento – Ton. Relave Tons. Espuma SCV2 = 78.55 – 76.8 Tons. Espuma SCV2 = 1.75 TM.
  • 7.  Calculo del tonelaje del alimento al primer scavenger PUNTO 8: 8 = 10 + 9 Cab. SCV1: Rel Scv1 + Esp Scv1 2.5 (X) = 78.55 (1.2) + 18 (X – 78.55) X = 85.10 TMS.
  • 8.  Calculo del tonelaje de espumas del segundo Rougher PUNTO 9: 9 = 8 – 10 Esp. SCV1 = 85.10 – 78.55 = 6.6 TMS  Calculo del tonelaje de alimentación al segundo Rougher PUNTO 2: 2 = 8 – 9 + 6 – 11 o 2 = 8 – 9 -11 + 6 3X = (85.10)2.5 – (6.6)18 – 10(1.75) + 25(X Ton. + 6.6 + 1.75 – 85.10) X = 83.67 TMS
  • 9.  Calculo del tonelaje de las espumas del segundo Rougher PUNTO 6: 6 = 2 + 9 – 11 83.67 + 6.6 + 1.75 – 85.10 = 6.92 TMS.
  • 10.
  • 11.  Calculo del agua que circula en cada punto
  • 12.  Calculo del flujo de pulpa 𝑇𝑜𝑛 𝐻2𝑂 = 83.67 𝑥 74.5 25.5 = 244.45