SlideShare une entreprise Scribd logo
1  sur  3
1
Rao Muhammad Behram Khan
Assistant Manager (Turbine Operations)
Email raohamza1223@gmail.com
Cell # 03346225121
OBJECTIVE
To apply professional and academic knowledge for development of the organization
along with career advancement in the field of mechanical technology and to seek a
challenging career oriented position in the ever changing world of technology.
Summery
Behram Khan having strong experience of erection, installation, commissioning and
operation of back pressure, condenser, extraction steam turbine and its auxiliaries on PLC
and DCS system.
Also have Working experience as Assistant Manager of Project.
Having Effective role during erection of structure ,equipment installation, high pressure
piping installation, installation of boiler parts and accessories.
Installation , Commissioning & Operation of,
Bag filters.
Coal handing systems.
Ash handling systems.
Lime stone system.
Pumps including high pressure and low pressure.
Boiler fans.
Highlighted plants are below:
Cogeneration: 1
 Wartsila Engine 12v32 DF (3x4.1MW)
 WHRB 1x3Ton
Cogeneration: 2
 Kawasaki Gas Turbine GPB70(4x7.1MW)
 HRSG 15TPH
 Gas Compressor Austcold
Cogeneration: 3
 Boiler 2x65T ph JBC (5.29Mpa at 485C)
 Steam Turbine HTC (Extraction Condensing) 18MW
 Coal Handling System Shijiazhuang Gongbe (55 T ph)
 Dust Collection System Zhejiang Feida (165000M3)
 Ash Handling System Changzhou Shikejian Electric
2
 Lime Stone System Wuxi Huaxing Electric
 Cooling tower 2 x 2600M3/h
FIELD EXPERIENCES
Organization: Century Papers And Board Mills
Designation: Assistant Manager (Turbine Operations)
Tenure: October 2014 – Present
Performed very effective role on coal based 18MW CFBC power plant.
Responsible areas during erection and installation are below,
(I) Installation of 65x2Tph coal based boilers on 5.29Mpa and 485c`.
(II) Installation of 2 Nos bag filters with 3 air chamber.
(III)Installation of lime stone handling system.
(IV) Installation of coal handling system including crushers and separation system.
(V) Installation of 2500M3 x2 cooling towers.
(VI) Installation of All boiler auxiliaries including fans , and feed water pumps.
Prepared Boqs ,isometric drawings, construction drawings ,punch lists and all important
documents as per plant requirements.
After completion project working very efficiently for earlier completion of
commissioning of whole project.
Above mentioned equipments are operational and working very smoothly.
FIELD EXPERIENCES
Organization: 20 Years Turbines Installation, Operation & Maintenance
in Sugar Industry.
CONCIOUS, TRAINING, SAFETY, 5S, KIZEN, AND FIRST AID
Training for personal safety as well as plant safety, 5S standard and KIZEN
implementation for better improvement in O&M. We followed SHE standards and try to
serve best parallels with these standards safe working procedure (according to work
permits) having special training on safety topics like housekeeping, fire fighting use of
personal protective equipment (PPE’s)
ACADEMIC PROFILE
Sr.
# CERTIFICATE/DEGREE BOARD/UNIVERSITY DIVISION
1 Matriculation (Science) Board of intermediate &
Secondary Education
Lahore
1stDivision
2 Diploma of Associate
Engineer in Mechanical
Punjab Board of Technical
Education Lahore
2ndDivision
3 Bachelor of Arts Allama Iqbal Open
University Islamabad
2nd Division
3
TECHNICAL EXPERTIES
 Having credible technical skills about.
 Steam Turbine and their Auxiliaries Operation according to defined Standard
parameters for safe and efficient Operation..
 Machinery troubleshooting, Maintenance and Monitoring.
 Water treatment plant.( RO and Water softening Units).
ABILITIES
 Energetic, Punctual & dedicated towards work..
 Technical Skills.
 Team player & good communication skill
 Goal oriented & highly motivated
PERSONAL DATA
 Father’s Name Rao Muhammad Aman Khan
 Adress Street # 1 House # 2 Javed Town Okara
 Date of Birth 17-12-1967
 C.N.I.C # 35402-1934019-5
 Cell # 03007538995

Contenu connexe

Tendances (12)

vaibhResume
vaibhResumevaibhResume
vaibhResume
 
boiler operator cv
boiler operator cvboiler operator cv
boiler operator cv
 
ABDUL HAMEED DCS (1)
ABDUL HAMEED DCS (1)ABDUL HAMEED DCS (1)
ABDUL HAMEED DCS (1)
 
Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC Executive Engineer with 5 Years Exp. in Maintenance & PPC
Executive Engineer with 5 Years Exp. in Maintenance & PPC
 
Wasif Tahir 1
Wasif Tahir 1Wasif Tahir 1
Wasif Tahir 1
 
Prashant Chinchkhede
Prashant ChinchkhedePrashant Chinchkhede
Prashant Chinchkhede
 
Turbine and Auxillaries
Turbine and AuxillariesTurbine and Auxillaries
Turbine and Auxillaries
 
RESUME
RESUMERESUME
RESUME
 
VPI-CO-0001
VPI-CO-0001VPI-CO-0001
VPI-CO-0001
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).Pioneer of thermal power(o&m).
Pioneer of thermal power(o&m).
 
Resume
ResumeResume
Resume
 

Similaire à Experienced turbine operator seeks new role

Similaire à Experienced turbine operator seeks new role (20)

khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
khizar hayat cv.
khizar hayat cv.khizar hayat cv.
khizar hayat cv.
 
jsw resume
jsw resumejsw resume
jsw resume
 
Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)Naushad Bhatti (CV) (1)
Naushad Bhatti (CV) (1)
 
RAJENDRA SHARMA CV
RAJENDRA SHARMA CVRAJENDRA SHARMA CV
RAJENDRA SHARMA CV
 
pronay CV 08052016
pronay CV 08052016pronay CV 08052016
pronay CV 08052016
 
2016 CV
2016 CV2016 CV
2016 CV
 
ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)ICS ENGINEER CV WITH IMAGE (doc)
ICS ENGINEER CV WITH IMAGE (doc)
 
Resume
ResumeResume
Resume
 
Suprotim dey LATEST CV
Suprotim dey  LATEST CVSuprotim dey  LATEST CV
Suprotim dey LATEST CV
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
TPCIL VIVEK
TPCIL VIVEKTPCIL VIVEK
TPCIL VIVEK
 
sharu resume new
sharu resume newsharu resume new
sharu resume new
 
AZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisorAZHAR ZAHOOR mech supervisor
AZHAR ZAHOOR mech supervisor
 
HOSAM CV
HOSAM CVHOSAM CV
HOSAM CV
 
cv
cvcv
cv
 
parveer
parveerparveer
parveer
 
Dino_with_photodoc1
Dino_with_photodoc1Dino_with_photodoc1
Dino_with_photodoc1
 
Resume iif 2020
Resume iif 2020Resume iif 2020
Resume iif 2020
 
Imran
ImranImran
Imran
 

Experienced turbine operator seeks new role

  • 1. 1 Rao Muhammad Behram Khan Assistant Manager (Turbine Operations) Email raohamza1223@gmail.com Cell # 03346225121 OBJECTIVE To apply professional and academic knowledge for development of the organization along with career advancement in the field of mechanical technology and to seek a challenging career oriented position in the ever changing world of technology. Summery Behram Khan having strong experience of erection, installation, commissioning and operation of back pressure, condenser, extraction steam turbine and its auxiliaries on PLC and DCS system. Also have Working experience as Assistant Manager of Project. Having Effective role during erection of structure ,equipment installation, high pressure piping installation, installation of boiler parts and accessories. Installation , Commissioning & Operation of, Bag filters. Coal handing systems. Ash handling systems. Lime stone system. Pumps including high pressure and low pressure. Boiler fans. Highlighted plants are below: Cogeneration: 1  Wartsila Engine 12v32 DF (3x4.1MW)  WHRB 1x3Ton Cogeneration: 2  Kawasaki Gas Turbine GPB70(4x7.1MW)  HRSG 15TPH  Gas Compressor Austcold Cogeneration: 3  Boiler 2x65T ph JBC (5.29Mpa at 485C)  Steam Turbine HTC (Extraction Condensing) 18MW  Coal Handling System Shijiazhuang Gongbe (55 T ph)  Dust Collection System Zhejiang Feida (165000M3)  Ash Handling System Changzhou Shikejian Electric
  • 2. 2  Lime Stone System Wuxi Huaxing Electric  Cooling tower 2 x 2600M3/h FIELD EXPERIENCES Organization: Century Papers And Board Mills Designation: Assistant Manager (Turbine Operations) Tenure: October 2014 – Present Performed very effective role on coal based 18MW CFBC power plant. Responsible areas during erection and installation are below, (I) Installation of 65x2Tph coal based boilers on 5.29Mpa and 485c`. (II) Installation of 2 Nos bag filters with 3 air chamber. (III)Installation of lime stone handling system. (IV) Installation of coal handling system including crushers and separation system. (V) Installation of 2500M3 x2 cooling towers. (VI) Installation of All boiler auxiliaries including fans , and feed water pumps. Prepared Boqs ,isometric drawings, construction drawings ,punch lists and all important documents as per plant requirements. After completion project working very efficiently for earlier completion of commissioning of whole project. Above mentioned equipments are operational and working very smoothly. FIELD EXPERIENCES Organization: 20 Years Turbines Installation, Operation & Maintenance in Sugar Industry. CONCIOUS, TRAINING, SAFETY, 5S, KIZEN, AND FIRST AID Training for personal safety as well as plant safety, 5S standard and KIZEN implementation for better improvement in O&M. We followed SHE standards and try to serve best parallels with these standards safe working procedure (according to work permits) having special training on safety topics like housekeeping, fire fighting use of personal protective equipment (PPE’s) ACADEMIC PROFILE Sr. # CERTIFICATE/DEGREE BOARD/UNIVERSITY DIVISION 1 Matriculation (Science) Board of intermediate & Secondary Education Lahore 1stDivision 2 Diploma of Associate Engineer in Mechanical Punjab Board of Technical Education Lahore 2ndDivision 3 Bachelor of Arts Allama Iqbal Open University Islamabad 2nd Division
  • 3. 3 TECHNICAL EXPERTIES  Having credible technical skills about.  Steam Turbine and their Auxiliaries Operation according to defined Standard parameters for safe and efficient Operation..  Machinery troubleshooting, Maintenance and Monitoring.  Water treatment plant.( RO and Water softening Units). ABILITIES  Energetic, Punctual & dedicated towards work..  Technical Skills.  Team player & good communication skill  Goal oriented & highly motivated PERSONAL DATA  Father’s Name Rao Muhammad Aman Khan  Adress Street # 1 House # 2 Javed Town Okara  Date of Birth 17-12-1967  C.N.I.C # 35402-1934019-5  Cell # 03007538995