Shop Attachment Program
Assembly Shop
5th December 2016 – 12th December 2016
Redza Bin Amin Suggun
Trainee DEP 4th (Group 6)
719186
Manufacturing Process Flow
Press
Shop
Body Shop Paint Shop Assembly
Quality
Control
Pre-
Delivery
Distribution
Dealer &
Branch
Customers
Logistic CMK Shop
Assembly Layout A2 Line
Trim Line
Final Line
Chassis
Line
S/A Radiator
PBS
Door Line
Quality
Inspection
Station
12
Station
13
OK
OK
NG
NG
Mission & Vision
• Mission
– Develop professional people which are able to
respecting the rules, sustain the machine, creating
effective method and securing the materials.
• Vision
– Assemble the car with the highest quality, within
the time period and at a lower cost.
Key Elements
Safety
•Wear
appropriate
PPE
•Use the
correct
method or
technique
(ergonomic)
•Kiken Yochi
•Use Stop, Call,
Wait
Quality
•Follow the
rule and S.O.P.
•PokaYoke –
Mistake
Proofing
•SIIP
•Quality
Classification
•Defect Control
Rule
•BIQ Forms
Cost
•Eliminate or
reduce 7
Muda
Delivery
•Deliver OK
products for
customers.
•Timely
delivery
•Ensuring the
sequence are
correct
Moral
•Follow 9
PERODUA
ethic codes
•Obey BEN 10
Person In Charge
• Supervisor: Abdul Halim Nyan
• Team Leader: Mohd Sharil
• Team Member: Mohd Hafeez
Station / Process
• Process: Tyre LH
• Station : STN – 14
Process Involved
• Myvi
i. Take and install 4 pcs grommet for upper and lower S/Radiator (SS
no 2, 3 & 4)
ii. Detach 4 pcs bolt upper support Radiator (SS no 5)
iii. Take and install tyre RR LH (SS no 12 & 13)
iv. Install 4 pcs Nut to Tyre RR LH (SS no 14)
v. Push Complete button (SS no 18)
• Alza
i. Take and install 4 pcs grommet for upper and lower S/Radiator
(SS no 2, 3 & 4)
ii. Detach 4 pcs bolt upper support Radiator (SS no 5)
iii. Take and install tyre RR LH (SS no 12 & 13)
iv. Install 4 pcs Nut to Tyre RR LH (SS no 14)
v. Push Complete button (SS no 19)
Abnormalities
•Talking during process
•Sign of back painMan
•Space between nut runner and conveyor is small
•Tyre machine is low
•Nut runner wire is not covered properly
Machine
•The compartment is too far.
•Handling of impact.Material
•Method of lifting the tyres.
•Did not follow sequence for nuts attachmentMethod
Counter Measure
• Frequent supervision from TL is needed.
• Enforcement of wearing back supportMan
• Increase platform width for the team member to roam / move.
• Increase the height and inclination of the machine
• Refurbish the wire cover.
Machine
• Rearrange the compartment.
• Provide mobile impact holder.Material
• Follow the correct S.O.P, method and sequence.
• Frequent supervision is needed.Method
Conclusion
• Knowledge & Experiences gained through this
shop attachment:
– Process involved in assembly shop
– Qualities demand by assembly shop (SQCDM)
– How does TM operate during process.
– Abnormalities findings (Observation & Experience)
– Presenting ideas & Proposal for countermeasure.

More Related Content

What's hot (20)

David Resume
David ResumeDavid Resume
David Resume
 
BHickman Rev1 (1)
BHickman Rev1 (1)BHickman Rev1 (1)
BHickman Rev1 (1)
 
Resume
ResumeResume
Resume
 
NEWDeeJayresume
NEWDeeJayresumeNEWDeeJayresume
NEWDeeJayresume
 
Shaamar-Quawiy-Bey(1) (5)
Shaamar-Quawiy-Bey(1) (5)Shaamar-Quawiy-Bey(1) (5)
Shaamar-Quawiy-Bey(1) (5)
 
Tony Hayes Resume4.6
Tony Hayes Resume4.6Tony Hayes Resume4.6
Tony Hayes Resume4.6
 
daves cv 2015 3-2-15
daves cv 2015 3-2-15daves cv 2015 3-2-15
daves cv 2015 3-2-15
 
Kevin Guess Resume
Kevin Guess ResumeKevin Guess Resume
Kevin Guess Resume
 
Kumar Selvam Resume
Kumar Selvam ResumeKumar Selvam Resume
Kumar Selvam Resume
 
Vision and Mission
Vision and MissionVision and Mission
Vision and Mission
 
11
1111
11
 
Russell Reid Up To Date
Russell Reid Up To DateRussell Reid Up To Date
Russell Reid Up To Date
 
stanley scott resume
stanley scott resumestanley scott resume
stanley scott resume
 
Jackie Hutchison CV 4 March 2015
Jackie Hutchison CV 4 March 2015 Jackie Hutchison CV 4 March 2015
Jackie Hutchison CV 4 March 2015
 
Micah_Destler_Resume_9_14_16
Micah_Destler_Resume_9_14_16Micah_Destler_Resume_9_14_16
Micah_Destler_Resume_9_14_16
 
Howo brand 8 ton truck with crane Price Introduction
Howo brand 8 ton truck with crane Price IntroductionHowo brand 8 ton truck with crane Price Introduction
Howo brand 8 ton truck with crane Price Introduction
 
Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2Brian Woolery Resume (10) - 2
Brian Woolery Resume (10) - 2
 
Ryan Ali resume
Ryan Ali resumeRyan Ali resume
Ryan Ali resume
 
Resume 1
Resume 1Resume 1
Resume 1
 
Elasto proxy - Custom made solutions for your sealing needs
Elasto proxy - Custom made solutions for your sealing needsElasto proxy - Custom made solutions for your sealing needs
Elasto proxy - Custom made solutions for your sealing needs
 

Similar to Presentation Tyre LH

Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptxAminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
Aminullah Assagaf
 
MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)
Viralkumar Jayswal
 
Om quality dimensions process
Om quality dimensions processOm quality dimensions process
Om quality dimensions process
Karthik Yadav
 
Work Experience Presentation version 1
Work Experience Presentation version 1Work Experience Presentation version 1
Work Experience Presentation version 1
Karambir Sidhu
 

Similar to Presentation Tyre LH (20)

Lean Manufacturign Simulator
Lean Manufacturign SimulatorLean Manufacturign Simulator
Lean Manufacturign Simulator
 
Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85% Moving The OEE Needle -Tips for Surpassing 85%
Moving The OEE Needle -Tips for Surpassing 85%
 
Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.Facility Layout and operations efficiency optimization.
Facility Layout and operations efficiency optimization.
 
Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptxAminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
Aminullah Assagaf_P13-Ch.16_Lean Systems-32.pptx
 
Part one of project brown field for operational excellencies in scm integert...
Part one of project brown field for operational excellencies in scm  integert...Part one of project brown field for operational excellencies in scm  integert...
Part one of project brown field for operational excellencies in scm integert...
 
Ravindra pingale
Ravindra pingaleRavindra pingale
Ravindra pingale
 
8 Steps to Success
8 Steps to Success8 Steps to Success
8 Steps to Success
 
2017 intro to transportation steps 1-8
2017 intro to transportation steps 1-82017 intro to transportation steps 1-8
2017 intro to transportation steps 1-8
 
MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)MSE 507 San Fernando Valley Lattet_ (5S)
MSE 507 San Fernando Valley Lattet_ (5S)
 
Om quality dimensions process
Om quality dimensions processOm quality dimensions process
Om quality dimensions process
 
Master slides
Master slidesMaster slides
Master slides
 
Work Experience Presentation version 1
Work Experience Presentation version 1Work Experience Presentation version 1
Work Experience Presentation version 1
 
UDI-Nex Concept Brief
UDI-Nex Concept BriefUDI-Nex Concept Brief
UDI-Nex Concept Brief
 
Lean six sigma introduction
Lean six sigma   introductionLean six sigma   introduction
Lean six sigma introduction
 
Lean Improvement Simulation
Lean Improvement SimulationLean Improvement Simulation
Lean Improvement Simulation
 
Lean and 5 s
Lean and 5 sLean and 5 s
Lean and 5 s
 
Method study
Method studyMethod study
Method study
 
Slewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon SourcingSlewing Bearings Case Study by Dragon Sourcing
Slewing Bearings Case Study by Dragon Sourcing
 
BCS-Presentations.pptx
BCS-Presentations.pptxBCS-Presentations.pptx
BCS-Presentations.pptx
 
Process flow and process chart
Process flow and process chartProcess flow and process chart
Process flow and process chart
 

Presentation Tyre LH

  • 1. Shop Attachment Program Assembly Shop 5th December 2016 – 12th December 2016 Redza Bin Amin Suggun Trainee DEP 4th (Group 6) 719186
  • 2. Manufacturing Process Flow Press Shop Body Shop Paint Shop Assembly Quality Control Pre- Delivery Distribution Dealer & Branch Customers Logistic CMK Shop
  • 3. Assembly Layout A2 Line Trim Line Final Line Chassis Line S/A Radiator PBS Door Line Quality Inspection Station 12 Station 13 OK OK NG NG
  • 4. Mission & Vision • Mission – Develop professional people which are able to respecting the rules, sustain the machine, creating effective method and securing the materials. • Vision – Assemble the car with the highest quality, within the time period and at a lower cost.
  • 5. Key Elements Safety •Wear appropriate PPE •Use the correct method or technique (ergonomic) •Kiken Yochi •Use Stop, Call, Wait Quality •Follow the rule and S.O.P. •PokaYoke – Mistake Proofing •SIIP •Quality Classification •Defect Control Rule •BIQ Forms Cost •Eliminate or reduce 7 Muda Delivery •Deliver OK products for customers. •Timely delivery •Ensuring the sequence are correct Moral •Follow 9 PERODUA ethic codes •Obey BEN 10
  • 6. Person In Charge • Supervisor: Abdul Halim Nyan • Team Leader: Mohd Sharil • Team Member: Mohd Hafeez Station / Process • Process: Tyre LH • Station : STN – 14
  • 7. Process Involved • Myvi i. Take and install 4 pcs grommet for upper and lower S/Radiator (SS no 2, 3 & 4) ii. Detach 4 pcs bolt upper support Radiator (SS no 5) iii. Take and install tyre RR LH (SS no 12 & 13) iv. Install 4 pcs Nut to Tyre RR LH (SS no 14) v. Push Complete button (SS no 18) • Alza i. Take and install 4 pcs grommet for upper and lower S/Radiator (SS no 2, 3 & 4) ii. Detach 4 pcs bolt upper support Radiator (SS no 5) iii. Take and install tyre RR LH (SS no 12 & 13) iv. Install 4 pcs Nut to Tyre RR LH (SS no 14) v. Push Complete button (SS no 19)
  • 8. Abnormalities •Talking during process •Sign of back painMan •Space between nut runner and conveyor is small •Tyre machine is low •Nut runner wire is not covered properly Machine •The compartment is too far. •Handling of impact.Material •Method of lifting the tyres. •Did not follow sequence for nuts attachmentMethod
  • 9. Counter Measure • Frequent supervision from TL is needed. • Enforcement of wearing back supportMan • Increase platform width for the team member to roam / move. • Increase the height and inclination of the machine • Refurbish the wire cover. Machine • Rearrange the compartment. • Provide mobile impact holder.Material • Follow the correct S.O.P, method and sequence. • Frequent supervision is needed.Method
  • 10. Conclusion • Knowledge & Experiences gained through this shop attachment: – Process involved in assembly shop – Qualities demand by assembly shop (SQCDM) – How does TM operate during process. – Abnormalities findings (Observation & Experience) – Presenting ideas & Proposal for countermeasure.