Sample PMP Exam
Questions
Sample PMP Exam Questions
Q1-) Which of the following is NOT true for a project?
A-) Projects are constrained by limited resources
B-) Projects are planned, executed, and controlled
C-) Projects create a unique product or service
D-) Projects are ongoing and repetitive
Sample PMP Exam Questions
Q1-) Which of the following is NOT true for a project?
A-) Projects are constrained by limited resources
B-) Projects are planned, executed, and controlled
C-) Projects create a unique product or service
D-) Projects are ongoing and repetitive
A project is a temporary endeavor undertaken to create a unique product, service,
or result. The temporary nature of projects indicates a definite beginning and
ending.
Reference: PMBOK Guide Fifth Edition, Page 3, Knowledge Area: N/A
(Introduction)
Sample PMP Exam Questions
Q2-) Which of the following documents include code of account identifier,
description of work, responsible organization, and list of schedule
milestones?
A-) PERT/CPM Charts
B-) WBS
C-) WBS Dictionary
D-) Roles and Responsibilities Matrix
Visit:
http://masterofproject.com/cours
es/realistic-pmp-exam-math-rev-
readiness-check-for-real-exam
for full PMP Exams
Sample PMP Exam Questions
Q2-) Which of the following documents include code of account identifier, description
of work, responsible organization, and list of schedule milestones?
A-) PERT/CPM Charts
B-) WBS
C-) WBS Dictionary
D-) Roles and Responsibilities Matrix
The WBS dictionary is a document that provides detailed deliverable, activity, and scheduling
information about each component in the WBS. WBS dictionary may include, but is not limited
to, code of account identifier, description of work, responsible organization, list of schedule
milestones, etc.
Reference: PMBOK Guide Fifth Edition, Page 132, Knowledge Area: Scope Management
Sample PMP Exam Questions
Q3-) All the following statements relating to the project management team and the
project team are correct EXCEPT:
A-)The project team is responsible for activities like planning, executing, and closing.
B-) The project management team can be called as the core, executive, or leadership
team.
C-) The project management team is also a part of the project team.
D-) In a small project, the project management responsibilities can be shared by team
members instead of a project manager.
Visit: http://masterofproject.com/courses/realistic-pmp-exam-math-rev-
readiness-check-for-real-exam for full PMP Exams
Sample PMP Exam Questions
Q3-) All the following statements relating to the project management team and the
project team are correct EXCEPT:
A-)The project team is responsible for activities like planning, executing, and closing.
B-) The project management team can be called as the core, executive, or leadership
team.
C-) The project management team is also a part of the project team.
D-) In a small project, the project management responsibilities can be shared by team
members instead of a project manager.
The project management team is a subset of the project team and is responsible for the Project management and
leadership activities such as initiating, planning, executing, monitoring, controlling, and closing the various project
phases. This group can also be referred to as the core, executive, or leadership team. For smaller projects, the project
management responsibilities can be shared by the entire team or administered solely by the project manager.
Reference: PMBOK Guide Fifth Edition, Page 256, Knowledge Area: Human Resource Management
Sample PMP Exam Questions
Q4-) You are a project manager trying to decide whether to buy or make a testing tool for your project.
If you want to buy, the cost of the tool is $60,000, and the proceeding the procurement, additional cost
of integration of the tool in your company is $ 1,000. If you build it yourself, the tool will be developed
by eight engineers working for two months. The salary of each software engineer is $4,000 per month. If
you build it yourself, the other related various costs will be $2,000.
Which option will you prefer?
A-) Buying the testing tool
B-) Building the testing tool
C-) Neither build nor buy testing tool
D-) Need more information on costs to take a further decision
Visit:
http://masterofproject.com/courses/realistic
-pmp-exam-math-rev-readiness-check-for-
real-exam for full PMP Exams
Sample PMP Exam Questions
Q4-) You are a project manager trying to decide whether to buy or make a testing tool for your project.
If you want to buy, the cost of the tool is $60,000, and the proceeding the procurement, additional cost
of integration of the tool in your company is $ 1,000. If you build it yourself, the tool will be developed
by eight engineers working for two months. The salary of each software engineer is $4,000 per month. If
you build it yourself, the other related various costs will be $2,000.
Which option will you prefer?
A-) Buying the testing tool
B-) Building the testing tool
C-) Neither build nor buy testing tool
D-) Need more information on costs to take a further decision
Sample PMP Exam Questions
Budget constraints may influence make -or-buy decisions. If a buy decision is to be made,
then a further decision of whether to purchase or lease is also made. A make -or- buy
analysis should consider all related costs -both direct costs as well as indirect costs.
For example, the buy side of the analysis includes both the actual out -of- pocket costs to
purchase the product, as well as the indirect costs of supporting the purchasing process
and purchased item.
Cost of buying the tool: $60,000 + $1000 = $61,000
Cost of building the tool: $4,000x8x2 + $2,000 = $66,000
So, buying is cheaper than building. Buying is preferable
Reference: PMBOK Guide Fifth Edition, Page 365, Knowledge Area: Procurement
Management
Sample PMP Exam Questions
Q5-) When referring to inputs for Develop Schedule process,
responsibility (i.e., who will perform the work), activity type (i.e.,
summary or detailed), and WBS lassification are belonging to:
A-) Risks
B-) Account identifier
C-) Activity attributes
D-) Activity estimations
Visit:
http://masterofproject.com/courses/realistic
-pmp-exam-math-rev-readiness-check-for-
real-exam for full PMP Exams
Sample PMP Exam Questions
Q5-) When referring to inputs for Develop Schedule process,
responsibility (i.e., who will perform the work), activity type (i.e.,
summary or detailed), and WBS lassification are belonging to:
A-) Risks
B-) Account identifier
C-) Activity attributes
D-) Activity estimations
Activity attributes can be used to identify the person responsible for executing the work, geographic area, or place
where the work has to be performed, and activity type such as level of effort (LOE), discrete effort, and apportioned
effort (AE). Activity attributes are used for schedule
development and for selecting, ordering, and sorting the planned schedule activities in various ways within
reports.
Reference: PMBOK Guide Fifth Edition, Page 153,Knowledge Area: Time Management
Visit:
http://masterofproject.com/courses/realistic
-pmp-exam-math-rev-readiness-check-for-
real-exam for full PMP Exams

More Related Content

What's hot

Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)Anand Subramaniam
 
PMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project OnlinePMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project OnlineGonzague PATINIER
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management OfficeJosh Folgado
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewAnand Bobade
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive DashboardMatt Angerer
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1Anand Bobade
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)Shamil Habet
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Saad Merie
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)Anand Bobade
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementAnand Bobade
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)PM Majik
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkAnand Bobade
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Managementproject management
 

What's hot (20)

Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Project Management Office (PMO)
Project Management Office (PMO)Project Management Office (PMO)
Project Management Office (PMO)
 
PMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project OnlinePMO Setup with Microsoft Project Online
PMO Setup with Microsoft Project Online
 
Proposed Project Management Office
Proposed Project Management OfficeProposed Project Management Office
Proposed Project Management Office
 
PMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 QuestionsPMP Exam Preparation - 200 Questions
PMP Exam Preparation - 200 Questions
 
Pmo Why?
Pmo Why?Pmo Why?
Pmo Why?
 
Chap 4.0 Project integration management Overview
Chap 4.0 Project integration management OverviewChap 4.0 Project integration management Overview
Chap 4.0 Project integration management Overview
 
PMO View Interactive Dashboard
PMO View Interactive DashboardPMO View Interactive Dashboard
PMO View Interactive Dashboard
 
PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?PMBOK 7th Edition What is Changing?
PMBOK 7th Edition What is Changing?
 
PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1PMP Chap 4 - Project Integration Management - Part1
PMP Chap 4 - Project Integration Management - Part1
 
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)PMP Chapter 1 of 6  introduction (Based on PMBOK 6th edition)
PMP Chapter 1 of 6 introduction (Based on PMBOK 6th edition)
 
Pmp exam questions
Pmp exam questionsPmp exam questions
Pmp exam questions
 
Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7Pmp presentation chapter 1 to 7
Pmp presentation chapter 1 to 7
 
PMP Exam Prep 2021 free sample module 1
PMP Exam Prep 2021  free sample module 1PMP Exam Prep 2021  free sample module 1
PMP Exam Prep 2021 free sample module 1
 
PMP chap 1 - PMP Introduction (PMBOK 6)
PMP chap 1 - PMP  Introduction (PMBOK 6)PMP chap 1 - PMP  Introduction (PMBOK 6)
PMP chap 1 - PMP Introduction (PMBOK 6)
 
PMO Frameworks
PMO FrameworksPMO Frameworks
PMO Frameworks
 
PMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality ManagementPMP Chap 8 - Project Quality Management
PMP Chap 8 - Project Quality Management
 
How to set up a project management office (PMO)
How to set up a project management office (PMO)How to set up a project management office (PMO)
How to set up a project management office (PMO)
 
Chap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project WorkChap 4.5 Monitor and Control Project Work
Chap 4.5 Monitor and Control Project Work
 
Chap 1 Modern Project Management
Chap 1 Modern Project ManagementChap 1 Modern Project Management
Chap 1 Modern Project Management
 

Similar to Sample PMP Exam Questions

Pega Certified Business Architect (PCBA) Exam | Top 5 Tips
Pega Certified Business Architect (PCBA) Exam | Top 5 TipsPega Certified Business Architect (PCBA) Exam | Top 5 Tips
Pega Certified Business Architect (PCBA) Exam | Top 5 TipsMeghna Arora
 
ServiceNow CIS-PPM Exam | Sample Questions & Answers
ServiceNow CIS-PPM Exam | Sample Questions & AnswersServiceNow CIS-PPM Exam | Sample Questions & Answers
ServiceNow CIS-PPM Exam | Sample Questions & AnswersMeghna Arora
 
Session 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM CertificationsSession 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
Start Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamStart Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamMeghna Arora
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docxjeffreye3
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...JustAcademy
 
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...JustAcademy
 
project management entrance exam content.pdf
project management entrance exam content.pdfproject management entrance exam content.pdf
project management entrance exam content.pdfbaabaadur
 
pmp-examination-content-outline.pdf
pmp-examination-content-outline.pdfpmp-examination-content-outline.pdf
pmp-examination-content-outline.pdfssuserffe62d
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and schedulingsmumbahelp
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.comUOPCourseHelp
 
Session 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSession 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSeshne Govender
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management FrameworkRahul Sudame
 
PMI Project Management Associate (CAPM) Certification | Study Guide
PMI Project Management Associate (CAPM) Certification | Study GuidePMI Project Management Associate (CAPM) Certification | Study Guide
PMI Project Management Associate (CAPM) Certification | Study GuideMeghna Arora
 
Certification exams pmi 001
Certification exams pmi 001Certification exams pmi 001
Certification exams pmi 001adam_jhon
 

Similar to Sample PMP Exam Questions (20)

Pega Certified Business Architect (PCBA) Exam | Top 5 Tips
Pega Certified Business Architect (PCBA) Exam | Top 5 TipsPega Certified Business Architect (PCBA) Exam | Top 5 Tips
Pega Certified Business Architect (PCBA) Exam | Top 5 Tips
 
ServiceNow CIS-PPM Exam | Sample Questions & Answers
ServiceNow CIS-PPM Exam | Sample Questions & AnswersServiceNow CIS-PPM Exam | Sample Questions & Answers
ServiceNow CIS-PPM Exam | Sample Questions & Answers
 
Session 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM CertificationsSession 8 Everything You Should Know About PMP & CAPM Certifications
Session 8 Everything You Should Know About PMP & CAPM Certifications
 
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
Understanding 15 pmi question types by adekunle adeniyi taskmodes_march 2017
 
Start Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP ExamStart Your Preparation for PMI-CP Exam
Start Your Preparation for PMI-CP Exam
 
Section-1 250 words Subject Initiating the ProjectR.docx
Section-1 250 words  Subject Initiating the ProjectR.docxSection-1 250 words  Subject Initiating the ProjectR.docx
Section-1 250 words Subject Initiating the ProjectR.docx
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
Free PMP Notes based on PMBOK guide and covers latest PMP changes after 11 Ja...
 
PMP Sample Questions Set 5
PMP Sample Questions Set 5PMP Sample Questions Set 5
PMP Sample Questions Set 5
 
project management entrance exam content.pdf
project management entrance exam content.pdfproject management entrance exam content.pdf
project management entrance exam content.pdf
 
pmp-examination-content-outline.pdf
pmp-examination-content-outline.pdfpmp-examination-content-outline.pdf
pmp-examination-content-outline.pdf
 
PMP certification
PMP certificationPMP certification
PMP certification
 
Pm0011 project planning and scheduling
Pm0011   project planning and schedulingPm0011   project planning and scheduling
Pm0011 project planning and scheduling
 
PMP Five Sample Questions
PMP Five Sample QuestionsPMP Five Sample Questions
PMP Five Sample Questions
 
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service   uopstudy.comCmgt 410 cmgt410 cmgt 410 education for service   uopstudy.com
Cmgt 410 cmgt410 cmgt 410 education for service uopstudy.com
 
Session 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM CertificationsSession 6 Everything You Should Know About PMP & CAPM Certifications
Session 6 Everything You Should Know About PMP & CAPM Certifications
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
PMI Project Management Associate (CAPM) Certification | Study Guide
PMI Project Management Associate (CAPM) Certification | Study GuidePMI Project Management Associate (CAPM) Certification | Study Guide
PMI Project Management Associate (CAPM) Certification | Study Guide
 
Certification exams pmi 001
Certification exams pmi 001Certification exams pmi 001
Certification exams pmi 001
 
PMP Exam Sample Questions Set 6
PMP Exam Sample Questions Set 6PMP Exam Sample Questions Set 6
PMP Exam Sample Questions Set 6
 

Recently uploaded

An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfSanaAli374401
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Shubhangi Sonawane
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.christianmathematics
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.MateoGardella
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterMateoGardella
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfAdmir Softic
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin ClassesCeline George
 

Recently uploaded (20)

An Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdfAn Overview of Mutual Funds Bcom Project.pdf
An Overview of Mutual Funds Bcom Project.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.This PowerPoint helps students to consider the concept of infinity.
This PowerPoint helps students to consider the concept of infinity.
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.Gardella_Mateo_IntellectualProperty.pdf.
Gardella_Mateo_IntellectualProperty.pdf.
 
Gardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch LetterGardella_PRCampaignConclusion Pitch Letter
Gardella_PRCampaignConclusion Pitch Letter
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 

Sample PMP Exam Questions

  • 2. Sample PMP Exam Questions Q1-) Which of the following is NOT true for a project? A-) Projects are constrained by limited resources B-) Projects are planned, executed, and controlled C-) Projects create a unique product or service D-) Projects are ongoing and repetitive
  • 3. Sample PMP Exam Questions Q1-) Which of the following is NOT true for a project? A-) Projects are constrained by limited resources B-) Projects are planned, executed, and controlled C-) Projects create a unique product or service D-) Projects are ongoing and repetitive A project is a temporary endeavor undertaken to create a unique product, service, or result. The temporary nature of projects indicates a definite beginning and ending. Reference: PMBOK Guide Fifth Edition, Page 3, Knowledge Area: N/A (Introduction)
  • 4. Sample PMP Exam Questions Q2-) Which of the following documents include code of account identifier, description of work, responsible organization, and list of schedule milestones? A-) PERT/CPM Charts B-) WBS C-) WBS Dictionary D-) Roles and Responsibilities Matrix Visit: http://masterofproject.com/cours es/realistic-pmp-exam-math-rev- readiness-check-for-real-exam for full PMP Exams
  • 5. Sample PMP Exam Questions Q2-) Which of the following documents include code of account identifier, description of work, responsible organization, and list of schedule milestones? A-) PERT/CPM Charts B-) WBS C-) WBS Dictionary D-) Roles and Responsibilities Matrix The WBS dictionary is a document that provides detailed deliverable, activity, and scheduling information about each component in the WBS. WBS dictionary may include, but is not limited to, code of account identifier, description of work, responsible organization, list of schedule milestones, etc. Reference: PMBOK Guide Fifth Edition, Page 132, Knowledge Area: Scope Management
  • 6. Sample PMP Exam Questions Q3-) All the following statements relating to the project management team and the project team are correct EXCEPT: A-)The project team is responsible for activities like planning, executing, and closing. B-) The project management team can be called as the core, executive, or leadership team. C-) The project management team is also a part of the project team. D-) In a small project, the project management responsibilities can be shared by team members instead of a project manager. Visit: http://masterofproject.com/courses/realistic-pmp-exam-math-rev- readiness-check-for-real-exam for full PMP Exams
  • 7. Sample PMP Exam Questions Q3-) All the following statements relating to the project management team and the project team are correct EXCEPT: A-)The project team is responsible for activities like planning, executing, and closing. B-) The project management team can be called as the core, executive, or leadership team. C-) The project management team is also a part of the project team. D-) In a small project, the project management responsibilities can be shared by team members instead of a project manager. The project management team is a subset of the project team and is responsible for the Project management and leadership activities such as initiating, planning, executing, monitoring, controlling, and closing the various project phases. This group can also be referred to as the core, executive, or leadership team. For smaller projects, the project management responsibilities can be shared by the entire team or administered solely by the project manager. Reference: PMBOK Guide Fifth Edition, Page 256, Knowledge Area: Human Resource Management
  • 8. Sample PMP Exam Questions Q4-) You are a project manager trying to decide whether to buy or make a testing tool for your project. If you want to buy, the cost of the tool is $60,000, and the proceeding the procurement, additional cost of integration of the tool in your company is $ 1,000. If you build it yourself, the tool will be developed by eight engineers working for two months. The salary of each software engineer is $4,000 per month. If you build it yourself, the other related various costs will be $2,000. Which option will you prefer? A-) Buying the testing tool B-) Building the testing tool C-) Neither build nor buy testing tool D-) Need more information on costs to take a further decision Visit: http://masterofproject.com/courses/realistic -pmp-exam-math-rev-readiness-check-for- real-exam for full PMP Exams
  • 9. Sample PMP Exam Questions Q4-) You are a project manager trying to decide whether to buy or make a testing tool for your project. If you want to buy, the cost of the tool is $60,000, and the proceeding the procurement, additional cost of integration of the tool in your company is $ 1,000. If you build it yourself, the tool will be developed by eight engineers working for two months. The salary of each software engineer is $4,000 per month. If you build it yourself, the other related various costs will be $2,000. Which option will you prefer? A-) Buying the testing tool B-) Building the testing tool C-) Neither build nor buy testing tool D-) Need more information on costs to take a further decision
  • 10. Sample PMP Exam Questions Budget constraints may influence make -or-buy decisions. If a buy decision is to be made, then a further decision of whether to purchase or lease is also made. A make -or- buy analysis should consider all related costs -both direct costs as well as indirect costs. For example, the buy side of the analysis includes both the actual out -of- pocket costs to purchase the product, as well as the indirect costs of supporting the purchasing process and purchased item. Cost of buying the tool: $60,000 + $1000 = $61,000 Cost of building the tool: $4,000x8x2 + $2,000 = $66,000 So, buying is cheaper than building. Buying is preferable Reference: PMBOK Guide Fifth Edition, Page 365, Knowledge Area: Procurement Management
  • 11. Sample PMP Exam Questions Q5-) When referring to inputs for Develop Schedule process, responsibility (i.e., who will perform the work), activity type (i.e., summary or detailed), and WBS lassification are belonging to: A-) Risks B-) Account identifier C-) Activity attributes D-) Activity estimations Visit: http://masterofproject.com/courses/realistic -pmp-exam-math-rev-readiness-check-for- real-exam for full PMP Exams
  • 12. Sample PMP Exam Questions Q5-) When referring to inputs for Develop Schedule process, responsibility (i.e., who will perform the work), activity type (i.e., summary or detailed), and WBS lassification are belonging to: A-) Risks B-) Account identifier C-) Activity attributes D-) Activity estimations Activity attributes can be used to identify the person responsible for executing the work, geographic area, or place where the work has to be performed, and activity type such as level of effort (LOE), discrete effort, and apportioned effort (AE). Activity attributes are used for schedule development and for selecting, ordering, and sorting the planned schedule activities in various ways within reports. Reference: PMBOK Guide Fifth Edition, Page 153,Knowledge Area: Time Management Visit: http://masterofproject.com/courses/realistic -pmp-exam-math-rev-readiness-check-for- real-exam for full PMP Exams