SlideShare a Scribd company logo
1 of 5
Download to read offline
Robert P. Cummings, LEEDap, EIT! ! ! ! ! ! !
!Senior Mechanical Design Engineer / MEP Construction Coordinator !! ! ! (322) 560.7079!
LEED Commissioning Agent! ! ! ! ! ! ! ! ! cmgs4@msn.com!
!256 N. Glade Ave!
Elmhurst, IL 60126-2514! ! ! ! ! ! ! ! ! !
! ! ! ! ! ! ! ! ! ! ! !
!Professional Profile:!
!• Extensive experience in documentation for Commercial, Industrial and Institutional projects from start
through construction finish.!
• Years of experience accrued working in large, mid sizes and small consulting firms as well as being a princi-
ple in my own firm.!
• Writing proposals, pricing contracts, scheduling work assignments, quality control and selection of appro-
bate designs to achieve client’s expectations.!
• Inter-discipline MEP/FP integrated coordination, document production and deliverables.!
• Complete project & office management. !
• MEP Construction Coordinator polished and knowledgable on all of the major components of an efficient
operational system which meets the manufacturer’s installation recommendations. !
• I regard myself as a professional that is respected for providing intelligent designs / simple but effective !
solutions.!
• Exceptional verbal and written communication skills, with strong Leadership and Organizational skills.!
• Willing to travel 25% time of the year.!
!!Education:!
! ▪ Southern Illinois University – Carbondale, IL
Bachelor of Science – Thermal & Environmental Engineering, 1983, EIT!
!!Professional Areas of Expertise:!
!Engineering:

!▪ High and Low Pressure Steam, Process piping, Chilled Water and Central Plant Engineering.!
▪ Hydronic and air side system engineering using software selection software for heat exchangers, pumps, fans
and associated specialties.!
▪ Calculating Energy Efficiency Modeling using Trane “Trace 700”, Carrier HAP and eQuest for to establish !
! energy efficiencies.!
▪ HVAC and Plumbing Engineering Designs and CSI Division 22 & 23 specification editing.!
▪ Provide Developers / Owners with V/E construct ability options which do not compromise the !
! project’s design intent.!
▪ Energy focused high efficiency engineering including closed loop ground and water source heat pumps, 97%
EFF. condensing boilers and Photovoltaic systems.!
▪ Extensive experience in writing sequences of operation and BAS integration AI /DI matrixes.!
▪ Field assessment report documentation for code, energy and design compliance. !
!!!!!!!
!Design:!
!▪ Reading and interpreting MEP construction documents.!
▪ Strong knowledge of The City of Chicago, ASME, CDB, ASHRAE, and City of Chicago School District Codes.!
▪ Knowledgeable experience with coordination Mechanical, Electrical Plumbing, Fire Protection, Architectural and
Structural documents required for critical time lined construction sequencing.!
▪ Analyze problem areas within a facility to provide cost effective out of the box solutions.!
▪ Dedication towards completing inter-discipline coordinated construction documents through strong leadership
initiative.!
▪ Proficient in Auto Cad and working knowledge of REVIT.!
!!Project Management:!
!▪ MEP/FP construction integration with Architectural/General Contractor teams.!
▪ Estimating and negotiating change orders generated by contractor’s RFI’s.!
▪ Coordination of MEP/FP documentation and installations.!
▪ Review of Bid Package and Vendor qualifications for compliance with the project’s contract documents and
specifications.!
▪ Documentation of Field Observation Reports (FOR) of MEP/FP systems and punch lists which depict installa-
tion deficiencies.!
▪ Detailed attention to client relations !
▪ Effective communication skills with clients and other disciplines.!
▪ Ability to multi-task and prioritize critical path construction deadlines.!
▪ Strong working knowledge of MS Office, Windows and Excel.!
!!Commissioning:!
!▪ LEEDap Certified and LEEDap Commissioning Agent!
!!Sales Experience:!
!▪ Strong experience in Sales, man hour estimating and proposal documentation.!
!!Project Experience:!
!Commercial Projects:!
! ▪ Masdar ! Abu Dhabi Engineering for a 160,000 sqft, 11 building !
residential community. !
!▪ Charles Schwab! Austin Texas Engineering for corporate offices of a 5 story !
189,000 sqft. facility. A traditional chilled water!
fan powered VAV system with electric reheat.!
! ▪ Oak Brook Marriott ! Oak Brook, IL! ! Replacement of the pool and spa steam !
! ! ! ! ! ! ! ! shell & tube heat exchangers. The project!
! ! ! ! ! ! ! ! sold for $32,000 with a 17% gross margin.!
!! ▪ First Bank of Avon! ! Avon, CO! ! 25,000 sqft. Commercial Bank and office space.!
! ! ! ! ! ! ! ! HVAC systems modifications by rezoning with fan !
! ! ! ! ! ! ! ! powered VAV boxes with HW reheat coils.!
! ▪ Elgin Regional ! ! Elgin, IL! ! Engineering and Construction Coordination!
! ! ! ! ! ! ! ! ! for the CDB to replace antiquated (2) 500 Hp!
! ! ! ! ! ! ! ! ! steam boilers and (3) large air handling units,!
! ! ! ! ! ! ! ! ! and reconnect into existing distribution ductwork !
! ! ! ! ! ! ! ! ! systems and install new 15 lb steam piping within!
! ! ! ! ! ! ! all within the mechanical room.!
! ▪ Vail Resorts ! Vail, CO! ! Primary MEP Consulting firm for the majority of the!
! Development Co.! ! ! ! ! VRDC’s facility projects.!
! ▪ Harper Court Chicago, IL Engineering for a 36 story tall office building using!
! Development traditional built up air handling units, 97% high efficiency!
boilers with fan powered VAV boxes with HW Reheat.!
!
▪ McHenry Hospital Crystal Lake, IL HVAC engineering and drafting.!
!! !
▪ Michael Reese Health! Chicago Land! ! HVAC engineering for numerous facilities.! !
! Care Facilities! ! Locations!
▪ Chicago Board ! ! Chicago, IL! ! New 400,000 sqft. Trading Floor.!
! of Trade!
! ▪ Chicago Title & Trust! Chicago, IL! ! New 30 story Corporate Office Facility!
!!Industrial Projects:!
! ▪ Parker Hannifin Woodridge, IL Engineering for a 60,000 sqft. facility, makeup /!
! ! ! ! ! ! ! ! air conditioning, heat relief and dust collection !
! ! ! ! ! ! ! ! systems. The project sold for $650,000 at gross!
! ! ! ! ! ! ! ! 30% margin.!
! ▪ Poly Air ! ! Chicago, IL! ! Engineering for a 35,000 sqft. facility, ! ! !
! ! ! ! ! ! ! process chiller and roof mounted condenser!
! replacement. The project sold for $135,000!
! ! ! ! ! ! ! ! with a 27% gross margin.!
! ▪ Golden Eagle ! ! Chicago, IL! ! Engineering for a 18,000 sqft. facility, makeup air !
! ! ! ! ! ! ! ! air conditioning and fork lift exhaust systems retrofit. !
! ! ! ! ! ! ! ! The project sold for $127,000 with a 24% gross margin. !
! ▪ Akers Packaging !! Chicago, IL! ! Engineering for a 35,000 sqft. facility, makeup air !
! ! ! ! ! ! ! ! air conditioning with duct collection for the by- !!
! ! ! ! ! ! ! ! products associated with card board manufacturing. !
! ! ! ! ! ! ! ! The project sold for $235,000 with a 22% gross margin.!
! ▪ Kraft Foods!! ! Waukegan, IL! ! Process steam piping modifications to the central!
! ! ! ! ! ! ! steam boiler plant installed in the utility tunnels!
! ! ! ! ! ! ! for five buildings of the campus, approximately !
! ! ! ! ! ! ! ! 50,000 sqft.!
! ▪ Kraft Foods!! ! Waukegan, IL! ! Replacement of a roof mounted multi-zone ! !
! ! ! ! ! ! ! air handling unit which served the cafeteria.!
!!!
Institutional Projects:!
!▪ Edgewater Library! ! Chicago, IL! ! Engineering and MEP Construction Coordination !
! ! ! ! ! ! ! ! for a 30,000 sqft. Library. The HVAC system !
! ! ! ! ! ! ! ! consisted of high efficiency condensing boilers!
! ! ! ! ! ! ! ! to supplement the closed loop ground source !
! ! ! ! ! ! ! ! geothermal heat pump system.!
! ▪ Richard J. Daley ! Chicago, IL! ! Engineering and MEP Construction Coordination !
! Library! ! ! ! ! ! for a 32,000 sqft. Library. The HVAC system !
! ! ! ! ! ! ! ! consisted of high efficiency condensing boilers!
! ! ! ! ! ! ! ! to supplement the closed loop ground source !
! ! ! ! ! ! ! ! geothermal heat pump system.!
! ▪ Bud Werner!! ! Steamboat ! ! MEP Engineering and LEEDap Gold Certification!
! Memorial Library! ! Springs, CO! ! of a new 30,000 sqft. Community Library!
! ▪ VA North Chicago! ! Waukegan, IL! ! Engineering and Construction Coordination!
! ! ! ! ! ! ! ! for multiple senior residential housing facilities. !
! ! ! ! ! ! ! ! The HVAC system consisted of VRF fan coil units.!
! ▪ Chicago Public Schools! Chicago, IL! ! Engineering and Construction Coordination!
! ! ! ! ! ! ! ! to retrofit air conditioning into Elementary Schools!
! ! ! ! ! ! ! ! during the summer of 2012.!
!!Commissioning Projects:!
! ▪ Edgewater Library! ! Chicago, IL LEED Silver!
!! ▪ Richard J. Daley ! Chicago, IL LEED Silver!
! ▪ Harper Court Chicago, IL LEED Gold!
Development!
! ▪ Bud Werner!! ! Steamboat LEED Gold!
Memorial Library! ! Springs, CO!
!!Temperature Control Projects:!
! ▪ Oakton Community College! Skokie and! ! Engineering and Construction Coordination!
! T/C Consolidation! ! Des Plaines! ! to consolidate both campuses’ BAS systems! !
! ! ! ! ! Campuses! ! from pneumatics to a DDC control system.!
!!!!!!!!!!!!
Employment History:!
! ▪ Environmental Systems Design– Chicago, IL!
! Senior Mechanical Project Engineer – 11/2015 – 02/01/2016!
▪ Edwards Engineering – Elk Grove Village, IL!
! Senior Mechanical Project Engineer – 05/2013 – 10/2015 !
▪ Henneman Engineering, Inc – Chicago, IL!
! Senior Mechanical Project Engineer – 09/2011 – 02/2013!
▪ R & H Mechanical – Eagle, CO
Sales Engineer - 11/2009 – 09/2011!
▪ Architectural Engineering Consultants – Vail, CO!
! Principal - 05/2003 - 11/2009!
▪ Robinson Mechanical – Vail, CO!
Design / Build Mechanical Engineer - 07/2001 – 05/2003!
▪ Yoder Consulting Engineers – Vail, CO!
! HVAC Consulting Engineer - 06/1998 – 05/2001!
▪ Environmental Systems Design – Chicago, IL!
HVAC Consulting Engineer, Senior Associate - 08/1991 – 06/1998!
▪ Chase Associates – Palatine, IL!
! HVAC Consulting Engineer - 09/1983 – 08/1991!
▪ Altoff Industries – Crystal Lake, IL !
! Mechanical Estimator – 05/1983 – 09/1983!
!!!Professional References:!
!Todd Dunn! ! Vice President!! Syska Hennessy! tdunn@syska.com ! 972.638.5398!
Jim Brody! ! Senior Associate! Henneman Engineering jimbrody23@gmail.com ! 312.286.3592!
Ryan Cusick! Senior Project! ! Lohan Anderson! rcusick@landerson.com ! 630.309.1436!
! ! ! Architect! ! Architects!
!
Respectively submitted, !
Robert P. Cummings LEEDap
Senior Mechanical Design Engineer / MEP Construction Coordinator!
!C: 312.560.7079 E: cmgs4@msn.com!
!!!

More Related Content

Viewers also liked

Viewers also liked (11)

BEST - Certificate
BEST - CertificateBEST - Certificate
BEST - Certificate
 
Sms
SmsSms
Sms
 
Present
PresentPresent
Present
 
161223 def versie tweedekamer uitgebreide-reactie-evaluatie-deltawet
161223 def versie tweedekamer uitgebreide-reactie-evaluatie-deltawet161223 def versie tweedekamer uitgebreide-reactie-evaluatie-deltawet
161223 def versie tweedekamer uitgebreide-reactie-evaluatie-deltawet
 
Neotex Profile V4.LQ
Neotex Profile V4.LQNeotex Profile V4.LQ
Neotex Profile V4.LQ
 
Bbc video ppt
Bbc video pptBbc video ppt
Bbc video ppt
 
EU_ Evaluation of Rural Development Policy
EU_ Evaluation  of Rural Development PolicyEU_ Evaluation  of Rural Development Policy
EU_ Evaluation of Rural Development Policy
 
Middleton School
Middleton SchoolMiddleton School
Middleton School
 
WurdUp Wrocław #5
WurdUp Wrocław #5WurdUp Wrocław #5
WurdUp Wrocław #5
 
Inbound Certification
Inbound CertificationInbound Certification
Inbound Certification
 
Ictericia
IctericiaIctericia
Ictericia
 

Robert P. Cummings CummingsResume 12-31-2016.docx

  • 1. Robert P. Cummings, LEEDap, EIT! ! ! ! ! ! ! !Senior Mechanical Design Engineer / MEP Construction Coordinator !! ! ! (322) 560.7079! LEED Commissioning Agent! ! ! ! ! ! ! ! ! cmgs4@msn.com! !256 N. Glade Ave! Elmhurst, IL 60126-2514! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !Professional Profile:! !• Extensive experience in documentation for Commercial, Industrial and Institutional projects from start through construction finish.! • Years of experience accrued working in large, mid sizes and small consulting firms as well as being a princi- ple in my own firm.! • Writing proposals, pricing contracts, scheduling work assignments, quality control and selection of appro- bate designs to achieve client’s expectations.! • Inter-discipline MEP/FP integrated coordination, document production and deliverables.! • Complete project & office management. ! • MEP Construction Coordinator polished and knowledgable on all of the major components of an efficient operational system which meets the manufacturer’s installation recommendations. ! • I regard myself as a professional that is respected for providing intelligent designs / simple but effective ! solutions.! • Exceptional verbal and written communication skills, with strong Leadership and Organizational skills.! • Willing to travel 25% time of the year.! !!Education:! ! ▪ Southern Illinois University – Carbondale, IL Bachelor of Science – Thermal & Environmental Engineering, 1983, EIT! !!Professional Areas of Expertise:! !Engineering:
 !▪ High and Low Pressure Steam, Process piping, Chilled Water and Central Plant Engineering.! ▪ Hydronic and air side system engineering using software selection software for heat exchangers, pumps, fans and associated specialties.! ▪ Calculating Energy Efficiency Modeling using Trane “Trace 700”, Carrier HAP and eQuest for to establish ! ! energy efficiencies.! ▪ HVAC and Plumbing Engineering Designs and CSI Division 22 & 23 specification editing.! ▪ Provide Developers / Owners with V/E construct ability options which do not compromise the ! ! project’s design intent.! ▪ Energy focused high efficiency engineering including closed loop ground and water source heat pumps, 97% EFF. condensing boilers and Photovoltaic systems.! ▪ Extensive experience in writing sequences of operation and BAS integration AI /DI matrixes.! ▪ Field assessment report documentation for code, energy and design compliance. ! !!!!!!!
  • 2. !Design:! !▪ Reading and interpreting MEP construction documents.! ▪ Strong knowledge of The City of Chicago, ASME, CDB, ASHRAE, and City of Chicago School District Codes.! ▪ Knowledgeable experience with coordination Mechanical, Electrical Plumbing, Fire Protection, Architectural and Structural documents required for critical time lined construction sequencing.! ▪ Analyze problem areas within a facility to provide cost effective out of the box solutions.! ▪ Dedication towards completing inter-discipline coordinated construction documents through strong leadership initiative.! ▪ Proficient in Auto Cad and working knowledge of REVIT.! !!Project Management:! !▪ MEP/FP construction integration with Architectural/General Contractor teams.! ▪ Estimating and negotiating change orders generated by contractor’s RFI’s.! ▪ Coordination of MEP/FP documentation and installations.! ▪ Review of Bid Package and Vendor qualifications for compliance with the project’s contract documents and specifications.! ▪ Documentation of Field Observation Reports (FOR) of MEP/FP systems and punch lists which depict installa- tion deficiencies.! ▪ Detailed attention to client relations ! ▪ Effective communication skills with clients and other disciplines.! ▪ Ability to multi-task and prioritize critical path construction deadlines.! ▪ Strong working knowledge of MS Office, Windows and Excel.! !!Commissioning:! !▪ LEEDap Certified and LEEDap Commissioning Agent! !!Sales Experience:! !▪ Strong experience in Sales, man hour estimating and proposal documentation.! !!Project Experience:! !Commercial Projects:! ! ▪ Masdar ! Abu Dhabi Engineering for a 160,000 sqft, 11 building ! residential community. ! !▪ Charles Schwab! Austin Texas Engineering for corporate offices of a 5 story ! 189,000 sqft. facility. A traditional chilled water! fan powered VAV system with electric reheat.! ! ▪ Oak Brook Marriott ! Oak Brook, IL! ! Replacement of the pool and spa steam ! ! ! ! ! ! ! ! ! shell & tube heat exchangers. The project! ! ! ! ! ! ! ! ! sold for $32,000 with a 17% gross margin.! !! ▪ First Bank of Avon! ! Avon, CO! ! 25,000 sqft. Commercial Bank and office space.! ! ! ! ! ! ! ! ! HVAC systems modifications by rezoning with fan ! ! ! ! ! ! ! ! ! powered VAV boxes with HW reheat coils.!
  • 3. ! ▪ Elgin Regional ! ! Elgin, IL! ! Engineering and Construction Coordination! ! ! ! ! ! ! ! ! ! for the CDB to replace antiquated (2) 500 Hp! ! ! ! ! ! ! ! ! ! steam boilers and (3) large air handling units,! ! ! ! ! ! ! ! ! ! and reconnect into existing distribution ductwork ! ! ! ! ! ! ! ! ! ! systems and install new 15 lb steam piping within! ! ! ! ! ! ! ! all within the mechanical room.! ! ▪ Vail Resorts ! Vail, CO! ! Primary MEP Consulting firm for the majority of the! ! Development Co.! ! ! ! ! VRDC’s facility projects.! ! ▪ Harper Court Chicago, IL Engineering for a 36 story tall office building using! ! Development traditional built up air handling units, 97% high efficiency! boilers with fan powered VAV boxes with HW Reheat.! ! ▪ McHenry Hospital Crystal Lake, IL HVAC engineering and drafting.! !! ! ▪ Michael Reese Health! Chicago Land! ! HVAC engineering for numerous facilities.! ! ! Care Facilities! ! Locations! ▪ Chicago Board ! ! Chicago, IL! ! New 400,000 sqft. Trading Floor.! ! of Trade! ! ▪ Chicago Title & Trust! Chicago, IL! ! New 30 story Corporate Office Facility! !!Industrial Projects:! ! ▪ Parker Hannifin Woodridge, IL Engineering for a 60,000 sqft. facility, makeup /! ! ! ! ! ! ! ! ! air conditioning, heat relief and dust collection ! ! ! ! ! ! ! ! ! systems. The project sold for $650,000 at gross! ! ! ! ! ! ! ! ! 30% margin.! ! ▪ Poly Air ! ! Chicago, IL! ! Engineering for a 35,000 sqft. facility, ! ! ! ! ! ! ! ! ! ! process chiller and roof mounted condenser! ! replacement. The project sold for $135,000! ! ! ! ! ! ! ! ! with a 27% gross margin.! ! ▪ Golden Eagle ! ! Chicago, IL! ! Engineering for a 18,000 sqft. facility, makeup air ! ! ! ! ! ! ! ! ! air conditioning and fork lift exhaust systems retrofit. ! ! ! ! ! ! ! ! ! The project sold for $127,000 with a 24% gross margin. ! ! ▪ Akers Packaging !! Chicago, IL! ! Engineering for a 35,000 sqft. facility, makeup air ! ! ! ! ! ! ! ! ! air conditioning with duct collection for the by- !! ! ! ! ! ! ! ! ! products associated with card board manufacturing. ! ! ! ! ! ! ! ! ! The project sold for $235,000 with a 22% gross margin.! ! ▪ Kraft Foods!! ! Waukegan, IL! ! Process steam piping modifications to the central! ! ! ! ! ! ! ! steam boiler plant installed in the utility tunnels! ! ! ! ! ! ! ! for five buildings of the campus, approximately ! ! ! ! ! ! ! ! ! 50,000 sqft.! ! ▪ Kraft Foods!! ! Waukegan, IL! ! Replacement of a roof mounted multi-zone ! ! ! ! ! ! ! ! ! air handling unit which served the cafeteria.! !!!
  • 4. Institutional Projects:! !▪ Edgewater Library! ! Chicago, IL! ! Engineering and MEP Construction Coordination ! ! ! ! ! ! ! ! ! for a 30,000 sqft. Library. The HVAC system ! ! ! ! ! ! ! ! ! consisted of high efficiency condensing boilers! ! ! ! ! ! ! ! ! to supplement the closed loop ground source ! ! ! ! ! ! ! ! ! geothermal heat pump system.! ! ▪ Richard J. Daley ! Chicago, IL! ! Engineering and MEP Construction Coordination ! ! Library! ! ! ! ! ! for a 32,000 sqft. Library. The HVAC system ! ! ! ! ! ! ! ! ! consisted of high efficiency condensing boilers! ! ! ! ! ! ! ! ! to supplement the closed loop ground source ! ! ! ! ! ! ! ! ! geothermal heat pump system.! ! ▪ Bud Werner!! ! Steamboat ! ! MEP Engineering and LEEDap Gold Certification! ! Memorial Library! ! Springs, CO! ! of a new 30,000 sqft. Community Library! ! ▪ VA North Chicago! ! Waukegan, IL! ! Engineering and Construction Coordination! ! ! ! ! ! ! ! ! for multiple senior residential housing facilities. ! ! ! ! ! ! ! ! ! The HVAC system consisted of VRF fan coil units.! ! ▪ Chicago Public Schools! Chicago, IL! ! Engineering and Construction Coordination! ! ! ! ! ! ! ! ! to retrofit air conditioning into Elementary Schools! ! ! ! ! ! ! ! ! during the summer of 2012.! !!Commissioning Projects:! ! ▪ Edgewater Library! ! Chicago, IL LEED Silver! !! ▪ Richard J. Daley ! Chicago, IL LEED Silver! ! ▪ Harper Court Chicago, IL LEED Gold! Development! ! ▪ Bud Werner!! ! Steamboat LEED Gold! Memorial Library! ! Springs, CO! !!Temperature Control Projects:! ! ▪ Oakton Community College! Skokie and! ! Engineering and Construction Coordination! ! T/C Consolidation! ! Des Plaines! ! to consolidate both campuses’ BAS systems! ! ! ! ! ! ! Campuses! ! from pneumatics to a DDC control system.! !!!!!!!!!!!!
  • 5. Employment History:! ! ▪ Environmental Systems Design– Chicago, IL! ! Senior Mechanical Project Engineer – 11/2015 – 02/01/2016! ▪ Edwards Engineering – Elk Grove Village, IL! ! Senior Mechanical Project Engineer – 05/2013 – 10/2015 ! ▪ Henneman Engineering, Inc – Chicago, IL! ! Senior Mechanical Project Engineer – 09/2011 – 02/2013! ▪ R & H Mechanical – Eagle, CO Sales Engineer - 11/2009 – 09/2011! ▪ Architectural Engineering Consultants – Vail, CO! ! Principal - 05/2003 - 11/2009! ▪ Robinson Mechanical – Vail, CO! Design / Build Mechanical Engineer - 07/2001 – 05/2003! ▪ Yoder Consulting Engineers – Vail, CO! ! HVAC Consulting Engineer - 06/1998 – 05/2001! ▪ Environmental Systems Design – Chicago, IL! HVAC Consulting Engineer, Senior Associate - 08/1991 – 06/1998! ▪ Chase Associates – Palatine, IL! ! HVAC Consulting Engineer - 09/1983 – 08/1991! ▪ Altoff Industries – Crystal Lake, IL ! ! Mechanical Estimator – 05/1983 – 09/1983! !!!Professional References:! !Todd Dunn! ! Vice President!! Syska Hennessy! tdunn@syska.com ! 972.638.5398! Jim Brody! ! Senior Associate! Henneman Engineering jimbrody23@gmail.com ! 312.286.3592! Ryan Cusick! Senior Project! ! Lohan Anderson! rcusick@landerson.com ! 630.309.1436! ! ! ! Architect! ! Architects! ! Respectively submitted, ! Robert P. Cummings LEEDap Senior Mechanical Design Engineer / MEP Construction Coordinator! !C: 312.560.7079 E: cmgs4@msn.com! !!!