“A Business Process is a collection of linked tasks which find their end in the
delivery of a service or product to a client. A business process has also been
defined as a set of activities and tasks that, once completed, will accomplish an
organization goal.”
Business Process evolved in the past
decades…
… and became more mature
Why do we need
Process
Improvement?
Let’s talk about Process Thinking
Customers want more, better, faster
and pay less for products and services
Shareholders determine new directions
and expect more efficiency
Changes happen all the time
Resources are not always available
And people don’t have time…
The best alternative is to look inside
We know how to do things. We have all
the pieces.
Results can be achieved if we put the
“pieces” in the right place
This becomes a
Process
We also need Consistency
Optimize our resources
Measure and control our progress
and improve Continually
What kind of problems we solve with
Process?
Waste of TIME
Waste of MONEY
Waste of RESOURCES
It is possible to do it FASTER
CHEAPER
and.. BETTER
How?
5 STEPS
1. Define and Understand the
problem
2. Collect Data, Historical information,
insights, past experience, etc.
3. Identify opportunities, assess
risk/impact/cost, and prioritize initiatives
4. Implement your Quick Wins and then
your best opportunity
5. See the results… and be ready to
make it even better!
We just need 3
things:
1.Processes
2.People
3.Tools
What are other companies
doing???
http://www.youtube.com/watch?v=IEmEY4yGWuw&feature=player_embedded
http://www.youtube.com/watch?v=YIuF_QmRyh8
You showed me good examples in Health and Education…
What about Public sector, Utilities, Energy??
1 Opportunity
• “Energy Efficiency”
• Energy and dollar savings
• Incentives to shorten customer
payback periods.
0
10
20
30
40
50
60
70
80
90
Residential Commercial Industrial
Customer vs. Electricity sold (%)
Customer (%) Electricity sold (%)
2 Analysis (AS-IS) 3 Objectives
• Annual Energy reduction of
2,400 GWh (5%) over 10
years
• To make full use of existing
facilities prior to developing
new hydro generation
projects
4 Process Improvement Work
• Leverage customer awareness
• Start more than 10,000 improvement projects
• New Marketing Strategy (customer
workshops and seminars)
• New technologies for energy savings measure
5 Results
0
200
400
600
800
1000
1200
Year 1 Year 2 Year 3 Year 4 Year 5
Annual Energy Savings (GWh)
Annual Energy Savings (GWh)
• Total =
2,088 GWh
reduction
over 5
years
• New goals
But this was
20 years
ago!
1 Opportunity
• Deliver consistent professional
service to customers
• Improve performance across
different departments
reflecting
customer, compliance and
operational excellence.
2 Objectives
• Cost saving
• Consistency
• Compliance
• Reduce level of customer
complaints
• Adapt to new regulatory
changes
3 Process Improvement Work
• Define the context:
• Right standards + right level of service = balanced
commercial outcomes
• Improve performance reflects in
customer, compliance and operational excellence
• Prioritize by identifying where the biggest savings
may exist
• Interview people within the business to collect info
and opportunities
• Perform risk/cost analysis
• Perform benefit analysis and obtain Senior
Management “buy-in”
• Have rigor in relation to communications and
engagement
• Monitor implementation
4 Results (so far)
• High engagement of stakeholders for common goals
• Strong interfaces in place with key customers
1 Opportunity
• Budget cuts
• Increased demand
• Stretched infrastructure
capabilities
2 Objectives
• “Optimize resources”
• Be more agile
• Be more efficient
4 Process Improvement Work
• Identify the problem by quantifying the cost or risk
(e.g. for Health and Safety the risk severity and
probability have been measured)
• Get Senior Management “buy-in”
• Review training and business plans
• Estimate effort (cost and time) to fill those gaps
• Determine impacts after superannuation laws
changed the anticipated retirement ages
• Find the best solution and sell it internally before
implementing
• Measure support and engagement
• Communicate progress
• Deal with Union
5 Results (so far)
• Alignment with Union
• Increase engagement
• Prioritized list of initiatives based on cost-risk-benefit analysis
Analysis3
• Reduction from 3000 people to 400 in production
centre
• Increase of production output from 67% to 90%
• Massive turnaround
• Significant issues with staffing levels in the future
What can I expect for the Future?
Process Utility Industry
1. Customer-focused
2. Fast & Agile
3. Strategically Aligned
PROCESS
Trend #1: Increasingly
Customer-Focused
• Business growth plans
• Changing customer expectations
• Competitive threats
“In an economy where capital is tight, the way you
can fund growth is by driving efficiency and
effectiveness.”
“We have to be more aware of what customers want
and be flexible and agile to meet the greater
variation of requirements.”
Trend #2: Fast & Agile
• Average length of a process improvement
project: 3-6 months
• Shorter projects that deliver benefits quickly
• Flexibility and adapting to changing
circumstances
• No time to view process as static entities to be
documented
• Process playing greater role in IT
“…service and lead time are becoming more critical
regardless of what industry you’re in.”
“…pushing improvement tools out enterprise-wide so
that individuals can make smaller, incremental
improvements within their area of work.”
“We need technology aligned to process to build
agility to change…”
• Improve Efficiency
• Reduce Costs
• Improve Customer Satisfaction
• Increase Market Share and Revenue
• Reduce Operational Risk
• Interest in Process is expanding
• (challenge 1) Link process improvement with top
level business strategy
• (challenge 2) Sustaining change
“…we have to do continuous improvement or process
improvement or some form of operational
excellence.”
“…to be less adherent to labels and more focused on
capabilities and competencies.”
Trend #3: Strategically
Aligned
“Sometimes process professionals don’t know how to
relate process to clear business objectives.”
1. The Aging Workforce
2. Environmental Concerns
3. Reliability
4. The Smart Grid
UTILITY INDUSTRY
Trend #1: The Aging
Workforce
• Reduce overall staffing by leveraging technology and making staff more productive
• Reducing hiring creates a generation gap
• Lack of younger replacements (companies need to be more attractive)
• Issues to be addressed: retaining the knowledge, and attracting, enlisting and educating a new
workforce. Implication: increase demand for skilled staff (engineering disciplines)
• Look for ways to reduce costs (e.g. lower overall administrative costs)
• Automate internal processes
• Impasses in middle and upper-management positions. Implication: alternative career paths
• Leverage technology to drive performance
• Atmospheric CO2 concentrations will reach 450ppm (“critical”). Implication: dangerous climate change
• Governments are attempting to address energy sustainability
• Several countries are backing off their commitments to nuclear power
• Clear conflict between energy demand needs and potential environment impact
• Countries will need to ramp renewable sources to meet carbon reduction goals
• (recommendation 1) Prepare for an increased percentage of renewable generation in your portfolio, and
make sure that your IT can cope with intricacies of renewable sources
• (recommendation 2) IT must work closely with regulatory and energy trading functions
Trend #2:
Environmental Concerns
• Customers’ perceptions of reliability are changing
• Failures in utility reliability receive more publicity than in the past
• Asset management and operations organizations need IT support to expand reliability models and
establish new business processes
• Utilities are often not prepared to deliver coordinated messages across multiple channels
• Business Processes support reliability forecasts, monitor systems for abnormal
patterns, and provide more detailed modeling (predictive reliability assessment
using historical info)
• IT plays a critical role in helping business to acquire and retain the information needed for modeling
Trend #3: Reliability
• Rapid smart grid adoption due to Government sponsorship to address energy sustainability concerns
• Utilities are forced to raise end-user tariffs to fund smart grid investments due to costly environmental
regulation
• Increase of the need to enhance network resilience and to improve asset use
• Transmission-level improvements require wide-area monitoring and P&C infrastructure
• Distribution-level improvements require advanced distribution management system (optimize feeder
voltage, automate fault detection, isolation and restoration)
• Smart grid development will increase data quantity (different variety)
Trend #4: The Smart
Grid
Introduction to Process Thinking (for Energy company)

More Related Content

What's hot

Sessione 6_Business Process Management pt.2
Sessione 6_Business Process Management pt.2Sessione 6_Business Process Management pt.2
Sessione 6_Business Process Management pt.2
The Qube
 
Sessione 6_ Business process Management pt.1
Sessione 6_ Business process Management pt.1Sessione 6_ Business process Management pt.1
Sessione 6_ Business process Management pt.1
The Qube
 

What's hot (18)

Operation management
Operation managementOperation management
Operation management
 
IT Strategy Tools
IT Strategy ToolsIT Strategy Tools
IT Strategy Tools
 
Betsol Introduction- 2017
Betsol Introduction- 2017Betsol Introduction- 2017
Betsol Introduction- 2017
 
Business-Oriented Trends in IT Outsourcing
Business-Oriented Trends in IT OutsourcingBusiness-Oriented Trends in IT Outsourcing
Business-Oriented Trends in IT Outsourcing
 
Supply Chain Strategy Assessment
Supply Chain Strategy AssessmentSupply Chain Strategy Assessment
Supply Chain Strategy Assessment
 
02 operations performance_Operations Management
02 operations performance_Operations Management02 operations performance_Operations Management
02 operations performance_Operations Management
 
SQL Saturday STL 2016 Presentation
SQL Saturday STL 2016 PresentationSQL Saturday STL 2016 Presentation
SQL Saturday STL 2016 Presentation
 
Sessione 6_Business Process Management pt.2
Sessione 6_Business Process Management pt.2Sessione 6_Business Process Management pt.2
Sessione 6_Business Process Management pt.2
 
Supply Chain Management
Supply Chain ManagementSupply Chain Management
Supply Chain Management
 
FM Cost Savings It’s Crucial Sanjay C
FM Cost Savings   It’s Crucial   Sanjay CFM Cost Savings   It’s Crucial   Sanjay C
FM Cost Savings It’s Crucial Sanjay C
 
Dimensions Of Change
Dimensions Of ChangeDimensions Of Change
Dimensions Of Change
 
Performance objectives
Performance objectivesPerformance objectives
Performance objectives
 
CHAPTER 2 MANAGEMENT ACCOUNTING.docx
CHAPTER 2 MANAGEMENT ACCOUNTING.docxCHAPTER 2 MANAGEMENT ACCOUNTING.docx
CHAPTER 2 MANAGEMENT ACCOUNTING.docx
 
Re engineering a business process
Re engineering a business processRe engineering a business process
Re engineering a business process
 
Developing IT strategy
Developing IT strategyDeveloping IT strategy
Developing IT strategy
 
Sessione 6_ Business process Management pt.1
Sessione 6_ Business process Management pt.1Sessione 6_ Business process Management pt.1
Sessione 6_ Business process Management pt.1
 
Operations Management Assignment Help
Operations Management Assignment HelpOperations Management Assignment Help
Operations Management Assignment Help
 
BPR- An Introduction
BPR- An IntroductionBPR- An Introduction
BPR- An Introduction
 

Viewers also liked

Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
Patrick VanSchijndel
 
Dec 6 renewable nonrenewable energy
Dec 6 renewable nonrenewable energyDec 6 renewable nonrenewable energy
Dec 6 renewable nonrenewable energy
christinachrsty
 

Viewers also liked (15)

Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
Exergy analysis as a tool for energy efficiency improvements in the Tanzanian...
 
Energy Technology Perspectives 2012
Energy Technology Perspectives 2012Energy Technology Perspectives 2012
Energy Technology Perspectives 2012
 
Nuclear Energy
Nuclear EnergyNuclear Energy
Nuclear Energy
 
Exergy
ExergyExergy
Exergy
 
Dec 6 renewable nonrenewable energy
Dec 6 renewable nonrenewable energyDec 6 renewable nonrenewable energy
Dec 6 renewable nonrenewable energy
 
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy SystemEnergy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
Energy Technology Perspectives 2016 - Towards Sustainable Urban Energy System
 
Ash handling system
Ash handling systemAsh handling system
Ash handling system
 
Exergy analysis of Power Plants
Exergy analysis of Power PlantsExergy analysis of Power Plants
Exergy analysis of Power Plants
 
General Systems Theory and Systems Analysis
General Systems Theory and Systems AnalysisGeneral Systems Theory and Systems Analysis
General Systems Theory and Systems Analysis
 
Ash Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power PlantAsh Handling System of a Thermal Power Plant
Ash Handling System of a Thermal Power Plant
 
Sustainable development
Sustainable developmentSustainable development
Sustainable development
 
Sustainable development 4
Sustainable development 4Sustainable development 4
Sustainable development 4
 
Sustainable development
Sustainable developmentSustainable development
Sustainable development
 
System analysis
System analysisSystem analysis
System analysis
 
System Analysis and Design
System Analysis and DesignSystem Analysis and Design
System Analysis and Design
 

Similar to Introduction to Process Thinking (for Energy company)

Business Change and Transformation Services V4
Business Change and Transformation Services V4Business Change and Transformation Services V4
Business Change and Transformation Services V4
Robert Topley
 
Tata steel ideation contest
Tata steel ideation contestTata steel ideation contest
Tata steel ideation contest
ashwinikumar1424
 

Similar to Introduction to Process Thinking (for Energy company) (20)

Game Changing Quality Strategies that Drive Organizational Excellence
Game Changing Quality Strategies that Drive Organizational ExcellenceGame Changing Quality Strategies that Drive Organizational Excellence
Game Changing Quality Strategies that Drive Organizational Excellence
 
Business Change and Transformation Services V4
Business Change and Transformation Services V4Business Change and Transformation Services V4
Business Change and Transformation Services V4
 
Sinoptix faster business through application management outsourcing
Sinoptix   faster business through application management outsourcingSinoptix   faster business through application management outsourcing
Sinoptix faster business through application management outsourcing
 
krm_om10_ch01_ge.pptx
krm_om10_ch01_ge.pptxkrm_om10_ch01_ge.pptx
krm_om10_ch01_ge.pptx
 
Tata steel ideation contest
Tata steel ideation contestTata steel ideation contest
Tata steel ideation contest
 
Price Optimization PowerPoint Presentation Slides
Price Optimization PowerPoint Presentation SlidesPrice Optimization PowerPoint Presentation Slides
Price Optimization PowerPoint Presentation Slides
 
Tata steel ideation contest
Tata steel ideation contestTata steel ideation contest
Tata steel ideation contest
 
Tata steel ideation
Tata steel ideationTata steel ideation
Tata steel ideation
 
Lean vs six sigma -jk
Lean vs six sigma  -jkLean vs six sigma  -jk
Lean vs six sigma -jk
 
fkiQuality overview 2014 09
fkiQuality overview 2014 09fkiQuality overview 2014 09
fkiQuality overview 2014 09
 
Product Cost Management PowerPoint Presentation Slides
Product Cost Management PowerPoint Presentation Slides Product Cost Management PowerPoint Presentation Slides
Product Cost Management PowerPoint Presentation Slides
 
The Performance Measurement in Operations
The Performance Measurement in OperationsThe Performance Measurement in Operations
The Performance Measurement in Operations
 
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhhOM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
OM2_Lecture 11vvvhhbbjjbjdjjeebjrhvhuuhh
 
Six sigma it_service_delivery
Six sigma it_service_deliverySix sigma it_service_delivery
Six sigma it_service_delivery
 
OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1OPERATIONS MANAGEMENT chapter 1
OPERATIONS MANAGEMENT chapter 1
 
201306 IASA Conference-Session 602: Operational Efficiency
201306 IASA Conference-Session 602: Operational Efficiency201306 IASA Conference-Session 602: Operational Efficiency
201306 IASA Conference-Session 602: Operational Efficiency
 
Case Studies
Case StudiesCase Studies
Case Studies
 
Enterprise benefit planning
Enterprise benefit planningEnterprise benefit planning
Enterprise benefit planning
 
Business Process Re engineering
Business Process Re engineering Business Process Re engineering
Business Process Re engineering
 
Introduction to operations management
Introduction to operations managementIntroduction to operations management
Introduction to operations management
 

Recently uploaded

Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
daisycvs
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
lizamodels9
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
lizamodels9
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
amitlee9823
 

Recently uploaded (20)

Cracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptxCracking the Cultural Competence Code.pptx
Cracking the Cultural Competence Code.pptx
 
Falcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in indiaFalcon Invoice Discounting platform in india
Falcon Invoice Discounting platform in india
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
Quick Doctor In Kuwait +2773`7758`557 Kuwait Doha Qatar Dubai Abu Dhabi Sharj...
 
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
Russian Call Girls In Gurgaon ❤️8448577510 ⊹Best Escorts Service In 24/7 Delh...
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Famous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st CenturyFamous Olympic Siblings from the 21st Century
Famous Olympic Siblings from the 21st Century
 
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service AvailableCall Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
Call Girls Ludhiana Just Call 98765-12871 Top Class Call Girl Service Available
 
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
Call Girls Electronic City Just Call 👗 7737669865 👗 Top Class Call Girl Servi...
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 

Introduction to Process Thinking (for Energy company)

  • 2.
  • 3. “A Business Process is a collection of linked tasks which find their end in the delivery of a service or product to a client. A business process has also been defined as a set of activities and tasks that, once completed, will accomplish an organization goal.”
  • 4.
  • 5. Business Process evolved in the past decades…
  • 6. … and became more mature
  • 7.
  • 8. Why do we need Process Improvement?
  • 9.
  • 10. Let’s talk about Process Thinking
  • 11. Customers want more, better, faster and pay less for products and services
  • 12. Shareholders determine new directions and expect more efficiency
  • 13. Changes happen all the time
  • 14. Resources are not always available
  • 15. And people don’t have time…
  • 16. The best alternative is to look inside
  • 17. We know how to do things. We have all the pieces.
  • 18. Results can be achieved if we put the “pieces” in the right place
  • 20.
  • 21. We also need Consistency
  • 23. Measure and control our progress
  • 25. What kind of problems we solve with Process?
  • 26.
  • 30. It is possible to do it FASTER
  • 33. How?
  • 34.
  • 36. 1. Define and Understand the problem
  • 37. 2. Collect Data, Historical information, insights, past experience, etc.
  • 38. 3. Identify opportunities, assess risk/impact/cost, and prioritize initiatives
  • 39. 4. Implement your Quick Wins and then your best opportunity
  • 40. 5. See the results… and be ready to make it even better!
  • 41. We just need 3 things: 1.Processes 2.People 3.Tools
  • 42. What are other companies doing???
  • 43.
  • 46. You showed me good examples in Health and Education… What about Public sector, Utilities, Energy??
  • 47. 1 Opportunity • “Energy Efficiency” • Energy and dollar savings • Incentives to shorten customer payback periods. 0 10 20 30 40 50 60 70 80 90 Residential Commercial Industrial Customer vs. Electricity sold (%) Customer (%) Electricity sold (%) 2 Analysis (AS-IS) 3 Objectives • Annual Energy reduction of 2,400 GWh (5%) over 10 years • To make full use of existing facilities prior to developing new hydro generation projects 4 Process Improvement Work • Leverage customer awareness • Start more than 10,000 improvement projects • New Marketing Strategy (customer workshops and seminars) • New technologies for energy savings measure 5 Results 0 200 400 600 800 1000 1200 Year 1 Year 2 Year 3 Year 4 Year 5 Annual Energy Savings (GWh) Annual Energy Savings (GWh) • Total = 2,088 GWh reduction over 5 years • New goals
  • 48. But this was 20 years ago!
  • 49. 1 Opportunity • Deliver consistent professional service to customers • Improve performance across different departments reflecting customer, compliance and operational excellence. 2 Objectives • Cost saving • Consistency • Compliance • Reduce level of customer complaints • Adapt to new regulatory changes 3 Process Improvement Work • Define the context: • Right standards + right level of service = balanced commercial outcomes • Improve performance reflects in customer, compliance and operational excellence • Prioritize by identifying where the biggest savings may exist • Interview people within the business to collect info and opportunities • Perform risk/cost analysis • Perform benefit analysis and obtain Senior Management “buy-in” • Have rigor in relation to communications and engagement • Monitor implementation 4 Results (so far) • High engagement of stakeholders for common goals • Strong interfaces in place with key customers
  • 50. 1 Opportunity • Budget cuts • Increased demand • Stretched infrastructure capabilities 2 Objectives • “Optimize resources” • Be more agile • Be more efficient 4 Process Improvement Work • Identify the problem by quantifying the cost or risk (e.g. for Health and Safety the risk severity and probability have been measured) • Get Senior Management “buy-in” • Review training and business plans • Estimate effort (cost and time) to fill those gaps • Determine impacts after superannuation laws changed the anticipated retirement ages • Find the best solution and sell it internally before implementing • Measure support and engagement • Communicate progress • Deal with Union 5 Results (so far) • Alignment with Union • Increase engagement • Prioritized list of initiatives based on cost-risk-benefit analysis Analysis3 • Reduction from 3000 people to 400 in production centre • Increase of production output from 67% to 90% • Massive turnaround • Significant issues with staffing levels in the future
  • 51. What can I expect for the Future?
  • 52.
  • 54. 1. Customer-focused 2. Fast & Agile 3. Strategically Aligned PROCESS
  • 55. Trend #1: Increasingly Customer-Focused • Business growth plans • Changing customer expectations • Competitive threats “In an economy where capital is tight, the way you can fund growth is by driving efficiency and effectiveness.” “We have to be more aware of what customers want and be flexible and agile to meet the greater variation of requirements.”
  • 56. Trend #2: Fast & Agile • Average length of a process improvement project: 3-6 months • Shorter projects that deliver benefits quickly • Flexibility and adapting to changing circumstances • No time to view process as static entities to be documented • Process playing greater role in IT “…service and lead time are becoming more critical regardless of what industry you’re in.” “…pushing improvement tools out enterprise-wide so that individuals can make smaller, incremental improvements within their area of work.” “We need technology aligned to process to build agility to change…”
  • 57. • Improve Efficiency • Reduce Costs • Improve Customer Satisfaction • Increase Market Share and Revenue • Reduce Operational Risk • Interest in Process is expanding • (challenge 1) Link process improvement with top level business strategy • (challenge 2) Sustaining change “…we have to do continuous improvement or process improvement or some form of operational excellence.” “…to be less adherent to labels and more focused on capabilities and competencies.” Trend #3: Strategically Aligned “Sometimes process professionals don’t know how to relate process to clear business objectives.”
  • 58. 1. The Aging Workforce 2. Environmental Concerns 3. Reliability 4. The Smart Grid UTILITY INDUSTRY
  • 59. Trend #1: The Aging Workforce • Reduce overall staffing by leveraging technology and making staff more productive • Reducing hiring creates a generation gap • Lack of younger replacements (companies need to be more attractive) • Issues to be addressed: retaining the knowledge, and attracting, enlisting and educating a new workforce. Implication: increase demand for skilled staff (engineering disciplines) • Look for ways to reduce costs (e.g. lower overall administrative costs) • Automate internal processes • Impasses in middle and upper-management positions. Implication: alternative career paths • Leverage technology to drive performance
  • 60. • Atmospheric CO2 concentrations will reach 450ppm (“critical”). Implication: dangerous climate change • Governments are attempting to address energy sustainability • Several countries are backing off their commitments to nuclear power • Clear conflict between energy demand needs and potential environment impact • Countries will need to ramp renewable sources to meet carbon reduction goals • (recommendation 1) Prepare for an increased percentage of renewable generation in your portfolio, and make sure that your IT can cope with intricacies of renewable sources • (recommendation 2) IT must work closely with regulatory and energy trading functions Trend #2: Environmental Concerns
  • 61. • Customers’ perceptions of reliability are changing • Failures in utility reliability receive more publicity than in the past • Asset management and operations organizations need IT support to expand reliability models and establish new business processes • Utilities are often not prepared to deliver coordinated messages across multiple channels • Business Processes support reliability forecasts, monitor systems for abnormal patterns, and provide more detailed modeling (predictive reliability assessment using historical info) • IT plays a critical role in helping business to acquire and retain the information needed for modeling Trend #3: Reliability
  • 62. • Rapid smart grid adoption due to Government sponsorship to address energy sustainability concerns • Utilities are forced to raise end-user tariffs to fund smart grid investments due to costly environmental regulation • Increase of the need to enhance network resilience and to improve asset use • Transmission-level improvements require wide-area monitoring and P&C infrastructure • Distribution-level improvements require advanced distribution management system (optimize feeder voltage, automate fault detection, isolation and restoration) • Smart grid development will increase data quantity (different variety) Trend #4: The Smart Grid

Editor's Notes

  1. And that was 20 years ago!