SAFETY
ASSIGNMENT
Roman Man Shrestha st120294
Thae Nu San st120432
Shwe Yee Oo st120321
Kaung Wunna Kyaw st120332
Y.D. Gopal Rayadu st120357
We Assumed a 4 Storey Building for
Working in a Height
SAFETY CRITERIA SAFE UNSAFE % SAFE
1. GUARD RAILS SYSTEM
 Top rails
• Height of top rails should be 42 inches (1.1 m) plus or minus
3 inches (8cm) above the walking/working level.
1926.502(b)(1)
 Mid rails
• Mid rails should be installed between the top edge of the guard
rail system and walking/working surface when there is no wall
or parapet wall at least 21 inches (53cm) high. 1926.502(b)(2)
 Toe boards
• Toe boards should be at a minimum of 3.5 inches (9 cm) in
vertical height from their top edge to the level of the
walking/working surface. They shall have not more than 1/4
inch (0.6 cm) clearance above the walking/working surface.
1926.502(j)(3)
75%
88%
75%
SAFETY CRITERIA SAFE UNSAFE % SAFE
2. PERSONAL FALLARREST SYSTEM
 Anchorage connector
• Connector shall have a corrosion-resistant finish and all
surfaces and edges shall be smooth to prevent damage to
interfacing part of the system. 1926.502(d)(2)
• Connectors should be pressed or formed steel or made of
equivalent materials. 1926.502(d)(1)
63%
SAFETY CRITERIA SAFE UNSAFE % SAFE
 Body belts
• Body belts shall be at least one and five-eight(1 5/8) inches
(4.1 cm) wide. 1926.502(d)(22)
 Connecting devices
• Lanyards and vertical lifelines shall have a minimum breaking
strength of 5000 pounds (22.2KN). 1926.502(e)(5)
• Lifelines shall be protected against being cut or abraded. 1926.
502(d)(11)
63%
38%
SAFETY CRITERIA SAFE UNSAFE % SAFE
3. SAFETY NET SYSTEM
 Safety net shall be installed as close as practicable under the walking
/working surface on which employees are walking.1926.502(c)(1)
 Safety net shall extend outward from the outermost projection of wo
rk surface. 1926.502(c)(2)
50%
Score sheet used in 4 Storey Building as trial
CRITERIA CORRECT TOTAL INCORRECT TOTAL %SAFE
1 GUARD RAILS SYSTEM
i. Top Rail
6 2 75%
ii. Mid Rail 7 1
iii.Toe Board 6 2 75%
2. PERSONAL FALL
ARREST SYSTEM
i. Anchorage connector 5 3 63%
ii. Body belts 5 3 63%
iii. Connecting Devices 3 5 38%
3. SAFETY NET SYSTEM 4 4 50%
Total Correct 36 Total Incorrect 20
Safety Score:
Total "correct
Total "correct" + Total "Incorrect"
X 100 = 64.28%
• Inspect before each use. Fall protection exhibiting any of these faults shall be removed from service and destro
yed.
• Take photo of unsafe behavior and condition during construction.
• Record these files in the documents.
• Explain worker about unsafe activities by showing the record.
• Apply Fall Protection Training.
• A fall arrest occurs on site, personnel, using an articulating man lift or ladders where feasible, will rescue all em
ployees. Alternate rescue would be through local emergency services.
• All fall investigations will be conducted by (insert the title{s} or name{s} of person).
• Evaluate the fall protection program to determine its effectiveness.
• Staff feedback and interviews.
• To follow the guidelines set forth in this fall protection program.
Corrective Actions should be taken by safety supervisor
Risk assesment of 4 storey building

More Related Content

Similar to Risk assesment of 4 storey building

Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252zul husni
 
working at height
working at heightworking at height
working at heightJYOTHISHKT
 
National Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptNational Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptDavidWhitlock17
 
9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.pptIslamMarzoky1
 
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016Michael Odiase
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolitionHni Amiera
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppthossam74752
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - LaddersFFSafety
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction siteNMRD Ltd
 
Working at Heights
Working at Heights Working at Heights
Working at Heights FTERIESW
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptxShijo25
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxDavidNanda3
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingWilliam York
 

Similar to Risk assesment of 4 storey building (20)

Ladders 5 31 11
Ladders 5 31 11Ladders 5 31 11
Ladders 5 31 11
 
Construction safety pocket guide osha3252
Construction safety pocket guide osha3252Construction safety pocket guide osha3252
Construction safety pocket guide osha3252
 
osha3252.pdf
osha3252.pdfosha3252.pdf
osha3252.pdf
 
working at height
working at heightworking at height
working at height
 
National Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.pptNational Safety Fall_protection_Presentation.ppt
National Safety Fall_protection_Presentation.ppt
 
9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt9 Fall Protection at conestruction work.ppt
9 Fall Protection at conestruction work.ppt
 
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
 
OSHA demolition
OSHA demolitionOSHA demolition
OSHA demolition
 
Scaffolding2. CO3.ppt
Scaffolding2. CO3.pptScaffolding2. CO3.ppt
Scaffolding2. CO3.ppt
 
Working_At_Height_01.ppt
Working_At_Height_01.pptWorking_At_Height_01.ppt
Working_At_Height_01.ppt
 
Lifting practices for engineers
Lifting practices for engineersLifting practices for engineers
Lifting practices for engineers
 
Working at-heights
Working at-heightsWorking at-heights
Working at-heights
 
Subpart X - Ladders
Subpart X -  LaddersSubpart X -  Ladders
Subpart X - Ladders
 
Safety at construction site
Safety at construction siteSafety at construction site
Safety at construction site
 
Safety while working at height
Safety while working at heightSafety while working at height
Safety while working at height
 
Unirail designers guide eng
Unirail designers guide engUnirail designers guide eng
Unirail designers guide eng
 
Working at Heights
Working at Heights Working at Heights
Working at Heights
 
Module 3.pptx
Module 3.pptxModule 3.pptx
Module 3.pptx
 
WORKING AT HEIGHT pptx
WORKING AT HEIGHT pptxWORKING AT HEIGHT pptx
WORKING AT HEIGHT pptx
 
SCAFFOLDING Safety Training
SCAFFOLDING Safety TrainingSCAFFOLDING Safety Training
SCAFFOLDING Safety Training
 

More from Roman Shrestha

RM Roman man shrestha.pptx
RM Roman man shrestha.pptxRM Roman man shrestha.pptx
RM Roman man shrestha.pptxRoman Shrestha
 
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeStrategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeRoman Shrestha
 
Brand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxBrand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxRoman Shrestha
 
Informatics college week 2.pptx
Informatics college week 2.pptxInformatics college week 2.pptx
Informatics college week 2.pptxRoman Shrestha
 
Boo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxBoo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxRoman Shrestha
 
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Roman Shrestha
 
FRC final presentation
FRC final presentationFRC final presentation
FRC final presentationRoman Shrestha
 
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxBUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxRoman Shrestha
 
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxBANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxRoman Shrestha
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong Roman Shrestha
 
AIT Indoor Gaming Center.
AIT Indoor Gaming Center.AIT Indoor Gaming Center.
AIT Indoor Gaming Center.Roman Shrestha
 
INTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLINTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLRoman Shrestha
 
Modified nepali chulo
Modified nepali chulo Modified nepali chulo
Modified nepali chulo Roman Shrestha
 
Writing research paper
Writing research paperWriting research paper
Writing research paperRoman Shrestha
 
Project selection and report writing
Project selection and report writingProject selection and report writing
Project selection and report writingRoman Shrestha
 
Water movement in kathmandu
Water movement in kathmanduWater movement in kathmandu
Water movement in kathmanduRoman Shrestha
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in heightRoman Shrestha
 

More from Roman Shrestha (20)

RM Roman man shrestha.pptx
RM Roman man shrestha.pptxRM Roman man shrestha.pptx
RM Roman man shrestha.pptx
 
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management CollegeStrategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
Strategic Marketing Plan for Sitaljyoti Academy: A +2 Hotel Management College
 
Eco homes in Nepal
Eco homes in NepalEco homes in Nepal
Eco homes in Nepal
 
Brand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptxBrand Positioning of Nepali Carpet.pptx
Brand Positioning of Nepali Carpet.pptx
 
Informatics college week 2.pptx
Informatics college week 2.pptxInformatics college week 2.pptx
Informatics college week 2.pptx
 
Boo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptxBoo hoo – learning from the largest European.pptx
Boo hoo – learning from the largest European.pptx
 
Research-Cycle-Group
Research-Cycle-GroupResearch-Cycle-Group
Research-Cycle-Group
 
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
Analysis-of-Accommodation-Facility-Service-Quality-Aspects-and-Students-Satis...
 
FRC final presentation
FRC final presentationFRC final presentation
FRC final presentation
 
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptxBUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
BUSINESS PERFORMANCE OF SMALL SIZE ENTERPRISES IN NEPAL.pptx
 
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptxBANCHAK COMPETITION WASTE FOR THE BEST.pptx
BANCHAK COMPETITION WASTE FOR THE BEST.pptx
 
IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong  IPD using BIM BY Pisut Aunwong
IPD using BIM BY Pisut Aunwong
 
AIT Indoor Gaming Center.
AIT Indoor Gaming Center.AIT Indoor Gaming Center.
AIT Indoor Gaming Center.
 
INTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROLINTEGRATED PROJECT PLANNING AND CONTROL
INTEGRATED PROJECT PLANNING AND CONTROL
 
Modified nepali chulo
Modified nepali chulo Modified nepali chulo
Modified nepali chulo
 
Writing research paper
Writing research paperWriting research paper
Writing research paper
 
Project selection and report writing
Project selection and report writingProject selection and report writing
Project selection and report writing
 
Water movement in kathmandu
Water movement in kathmanduWater movement in kathmandu
Water movement in kathmandu
 
Safety Procedures while working in height
Safety Procedures while working in heightSafety Procedures while working in height
Safety Procedures while working in height
 
Waste for the best
Waste for the bestWaste for the best
Waste for the best
 

Recently uploaded

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesPrabhanshu Chaturvedi
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Recently uploaded (20)

Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Glass Ceramics: Processing and Properties
Glass Ceramics: Processing and PropertiesGlass Ceramics: Processing and Properties
Glass Ceramics: Processing and Properties
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
NFPA 5000 2024 standard .
NFPA 5000 2024 standard                                  .NFPA 5000 2024 standard                                  .
NFPA 5000 2024 standard .
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

Risk assesment of 4 storey building

  • 1. SAFETY ASSIGNMENT Roman Man Shrestha st120294 Thae Nu San st120432 Shwe Yee Oo st120321 Kaung Wunna Kyaw st120332 Y.D. Gopal Rayadu st120357
  • 2. We Assumed a 4 Storey Building for Working in a Height
  • 3. SAFETY CRITERIA SAFE UNSAFE % SAFE 1. GUARD RAILS SYSTEM  Top rails • Height of top rails should be 42 inches (1.1 m) plus or minus 3 inches (8cm) above the walking/working level. 1926.502(b)(1)  Mid rails • Mid rails should be installed between the top edge of the guard rail system and walking/working surface when there is no wall or parapet wall at least 21 inches (53cm) high. 1926.502(b)(2)  Toe boards • Toe boards should be at a minimum of 3.5 inches (9 cm) in vertical height from their top edge to the level of the walking/working surface. They shall have not more than 1/4 inch (0.6 cm) clearance above the walking/working surface. 1926.502(j)(3) 75% 88% 75%
  • 4. SAFETY CRITERIA SAFE UNSAFE % SAFE 2. PERSONAL FALLARREST SYSTEM  Anchorage connector • Connector shall have a corrosion-resistant finish and all surfaces and edges shall be smooth to prevent damage to interfacing part of the system. 1926.502(d)(2) • Connectors should be pressed or formed steel or made of equivalent materials. 1926.502(d)(1) 63%
  • 5. SAFETY CRITERIA SAFE UNSAFE % SAFE  Body belts • Body belts shall be at least one and five-eight(1 5/8) inches (4.1 cm) wide. 1926.502(d)(22)  Connecting devices • Lanyards and vertical lifelines shall have a minimum breaking strength of 5000 pounds (22.2KN). 1926.502(e)(5) • Lifelines shall be protected against being cut or abraded. 1926. 502(d)(11) 63% 38%
  • 6. SAFETY CRITERIA SAFE UNSAFE % SAFE 3. SAFETY NET SYSTEM  Safety net shall be installed as close as practicable under the walking /working surface on which employees are walking.1926.502(c)(1)  Safety net shall extend outward from the outermost projection of wo rk surface. 1926.502(c)(2) 50%
  • 7. Score sheet used in 4 Storey Building as trial CRITERIA CORRECT TOTAL INCORRECT TOTAL %SAFE 1 GUARD RAILS SYSTEM i. Top Rail 6 2 75% ii. Mid Rail 7 1 iii.Toe Board 6 2 75% 2. PERSONAL FALL ARREST SYSTEM i. Anchorage connector 5 3 63% ii. Body belts 5 3 63% iii. Connecting Devices 3 5 38% 3. SAFETY NET SYSTEM 4 4 50% Total Correct 36 Total Incorrect 20 Safety Score: Total "correct Total "correct" + Total "Incorrect" X 100 = 64.28%
  • 8. • Inspect before each use. Fall protection exhibiting any of these faults shall be removed from service and destro yed. • Take photo of unsafe behavior and condition during construction. • Record these files in the documents. • Explain worker about unsafe activities by showing the record. • Apply Fall Protection Training. • A fall arrest occurs on site, personnel, using an articulating man lift or ladders where feasible, will rescue all em ployees. Alternate rescue would be through local emergency services. • All fall investigations will be conducted by (insert the title{s} or name{s} of person). • Evaluate the fall protection program to determine its effectiveness. • Staff feedback and interviews. • To follow the guidelines set forth in this fall protection program. Corrective Actions should be taken by safety supervisor