FSO- Prem Pride –Confined Space Drill
, Entry and other Activities
22nd March 2014
Activities of 22nd March -2014
Tool Box talks conducted for the following activities carried
out :
• Enclosed space rescue drill.
• 3P C.O.T Entry/Inspection
• v/v operation inside of 3P C.O.T
• Renewal of cargo line dresser coupling .
• Hydraulic line maintenance/renewal .
• Securing of 3P cargo tank
• Removal of I.G blank of cargo tanks.
Confined space rescue drill
3 P C.O.T entry ,inspection and operation of cross over valve
Hydraulic line
repairs/renewal
Dresser coupling renewalDresser coupling renewal
Isolation of
no1 and 2
hydraulic
pump carried
out in ECR .
3P cargo tank secured
Removing I.G blanks of cargo tanks

More Related Content

Viewers also liked (8)

Presentacion feminicidio.
Presentacion feminicidio.Presentacion feminicidio.
Presentacion feminicidio.
 
Semio fichas
Semio fichasSemio fichas
Semio fichas
 
Categorias del comercio electronico
Categorias del comercio electronicoCategorias del comercio electronico
Categorias del comercio electronico
 
7.Fórmulas y funciones de excel
7.Fórmulas y funciones de excel7.Fórmulas y funciones de excel
7.Fórmulas y funciones de excel
 
Mahindra KUV100 Brochure
Mahindra KUV100 BrochureMahindra KUV100 Brochure
Mahindra KUV100 Brochure
 
Как открыть Булочную. Подсказка начинающему предпринимателю.
Как открыть Булочную. Подсказка начинающему предпринимателю.Как открыть Булочную. Подсказка начинающему предпринимателю.
Как открыть Булочную. Подсказка начинающему предпринимателю.
 
Online Algorithms - An Introduction
Online Algorithms - An IntroductionOnline Algorithms - An Introduction
Online Algorithms - An Introduction
 
Learning to learn
Learning to learnLearning to learn
Learning to learn
 

Confined Space Drill and other activities -FSO-Prem Pride-22nd March 2014 -

  • 1. FSO- Prem Pride –Confined Space Drill , Entry and other Activities 22nd March 2014
  • 2. Activities of 22nd March -2014 Tool Box talks conducted for the following activities carried out : • Enclosed space rescue drill. • 3P C.O.T Entry/Inspection • v/v operation inside of 3P C.O.T • Renewal of cargo line dresser coupling . • Hydraulic line maintenance/renewal . • Securing of 3P cargo tank • Removal of I.G blank of cargo tanks.
  • 4. 3 P C.O.T entry ,inspection and operation of cross over valve
  • 5. Hydraulic line repairs/renewal Dresser coupling renewalDresser coupling renewal Isolation of no1 and 2 hydraulic pump carried out in ECR .
  • 6. 3P cargo tank secured Removing I.G blanks of cargo tanks