Ce diaporama a bien été signalé.
Nous utilisons votre profil LinkedIn et vos données d’activité pour vous proposer des publicités personnalisées et pertinentes. Vous pouvez changer vos préférences de publicités à tout moment.

CV_SATYA PRAKASH

  • Soyez le premier à commenter

  • Soyez le premier à aimer ceci

CV_SATYA PRAKASH

  1. 1. CURRICULUM VITAE SATYA PRAKASH RAI C-11A, First Floor, Shiv Vihar Colony Gurgaon Mobile: 09899871495, 9717437010 E-mail: sprai82@yahoo.co.in OBJECTIVE 12+ years professional who can make a qualitative difference with leading professional company and to dispatch my potential, initiative & entrepreneurial abilities for the achievements of organizational goals. JOB PROFILE  Hands on experience in SP3D Modeling (Junction box, LCP, Transmitter, Trench)  Hands on experience in PDS 3D Modeling (Junction box, LCP, Analyzer, Transmitter, F&G Detector, Tray, Trench)  Preparation of Instrumentation Design Deliverables like Instrumentation Location Plans, Layouts  Preparation of Junction box Grouping  Preparation of Cable Tray / Trench Sizing Calculations  Preparation of Loop Drawings  Preparation of Instrument Connection List  Preparation of Instrument Hook-up & Typical Details  Preparation of Bill Of Material/ MTO of (Cables, Cable Trays, Ducts, Fittings etc.)  Experienced in INTOOLS in Index Modules, Wiring Modules PRESENT EMPLOYER  Working as a Designer in Instrumentation Department of SK E&C India Pvt. Ltd., Gurgaon, India Since Jun 2008 SK E&C is one of the world’s best qualified Engineering, Procurement, Construction and Maintenance service organization in the field of Oil, Gas, Refinery and Petrochemical Projects. Major Projects : 1. Clean Fuels Project (KNPC) – Owner : Mina AL – Ahmadi Refinery, Kuwait National Petroleum Company (K.S.C), Duration : Dec 15 to till date
  2. 2. Modeler Responsible for SP3D Modeling (LCP, Trans., JB, Trench) Design Deliverables like Trench Layout, Instrument Location Plans, Air Piping Layouts, 2. NSRP Complex Project – Nghi Son Refinery and Petrochemical, Vietnam Owner : Nghi Son Refinery and Petrochemical Limited Liability Company, Vietnam Duration : May 14 to Nov 15 Responsible for all Design and PDS 3D Modeling Modeler Responsible for 3D Modeling (Analyzer, LCP, Trans., JB, Tray and Trench) Design Deliverables like Trench/Tray Sizing, Process & Piping Hookups, Instrument Location Plans, Air Piping Layouts, Main Cable Layout, Trench and Tray Layout and F&G Layout, MTO (Material Take-off) of the Project. Reviewed Vendor Print for Instrument Junction Box Also Involved in IN-Tools wiring. 3. IRPC UHV Plant Project Owner : IRPC Public Company Limited Rayong, Thailand Duration : Mar. 13 to May 14 As Deputy Design Supervisor, Responsible for all Design Activities including 3D Modeling in PDS. Checking straight length requirement for orifice. Achievement: Awarded & Recognized as Star Performer in the Project 2. Jurang Aromatics Complex (JAC) Project. Owner : Jurong Aromatics Corporation Pte. Ltd. (Singapore) Duration : Aug. 11 to Mar. 13. Deputy Design Supervisor, Responsible for all Design Activities including 3D Modeling in PDS. Also involved in Design Deliverables like Cable Tray Sizing, Process & Piping Hookups, Typical Installation Details, Cable Schedule including Drum Schedule, MTO (Material Take-off) of the Project. Actively involved in Layouts like Instrument Location Plans, Air Piping Layouts, Main Cable Layout Achievement: Awarded & Recognized as Star Performer in the Project 3. NEW BOOSTER STATION BS-132 Owner : KUWAIT OIL COMPANY (K.S.C.) Duration : Feb. 11 to Aug. 11 Modeler Responsible for 3D Modeling in PDS. Actively involved in Layouts like Instrument Air Piping & Tubing Layouts, Main Cable Layout, F&G Layout
  3. 3. 4. Clean Fuel Project Owner : PTT Aromatics & Refining Company Ltd. (Map Ta Phut, Thailand). Duration : Jan 09 to Feb 11 Modeler Responsible for 3D Modeling in PDS. Also involved in Design Deliverables like Trench/Duct Sizing, Process & Piping Hookups, Typical Installation Details, MTO (Material Take-off) of the Project. Actively involved in Layouts like Instrument Location Plans, Air Piping Layouts, Main Cable Layout 5. THPP#3 Project Owner : SCG (SIAM CEMENT GROUP) Rayong, Thailand. Duration: June 08 to Jan. 09. As a Designer Actively involved in Layouts like Instrument Location Plans, Air Piping Layouts 6. 1 X 75MW Power Plant Owner : Gujarat State Electricity Corporation Ltd. (Kutch) Duration: 2005 to 2007 Actively involved in Layouts drawings like Main Cable Layout, Trench Layout, Control Room Layout, Switchgear Room Layout 7. 2 X 135MW, Power Plant Owner : Jindal Steel & Power Ltd. Duration: 2005 to 2007 Actively involved in Layouts drawings like Main Cable Layout, Main Cable Tray Layout Control Room Layout 8. 370 MW Gas Based Power Plant Owner : Gujarat State Electricity Corporation Ltd. Duration: 2007 to 2008 Actively involved in Layouts drawings like Main Cable Layout, Main Cable Tray Layout Control Room Layout PREVIOUS EMPLOYER  Worked as a Designer in Doosan Engineering, Gurgaon from Dec. 2007 to June 2008  Worked as a Designer in Alstom Project India Ltd., New Delhi from Jun 2007 to Dec. 2007  Worked as a Draughtsman in Desein Indure Group Pvt. Ltd., New Delhi from Jan. 2006 to Jun. 2007
  4. 4.  Worked as a Draughtsman in Asiatic Electronic Pvt. Ltd., Delhi from Aug. 2003 to Jan. 2006 SKILLS AND SOFTWARE PROFICIENCY  SP3D  PDS  3D – SPR  Naviswork  Auto Cad  Micro-station  Intools  MS Office, Excel, Word DETAILS OF EDUCATIONAL QUALIFICATION  Completed Mechanical Draughtsman ship I.T.I (Industrial Training Institute) in 2003 from I.T.I.-Rajkiya Audhyogik Prashikshan Sansthan Chargawa Gorakhpur.  Graduation passed in 2003 from Den Dayal Upadhya University Gorakhpur (U.P.) PERSONAL INFORMATION Date of Birth 05-Jan-1982 Total Experience 11 Years 6 Months Languages Known English, Hindi Nationality Indian Passport No. H-9711854 Marital Status Married DECLARATION
  5. 5. I hereby declare that all the above information furnished by me are true and correct to the best of my knowledge and belief. Date: Place: Gurgaon SATYA PRAKASH RAI
  6. 6. I hereby declare that all the above information furnished by me are true and correct to the best of my knowledge and belief. Date: Place: Gurgaon SATYA PRAKASH RAI

×