SlideShare a Scribd company logo
1 of 21
Solar Systems in Practice
Alan Kiff CEng MCIBSE
Managing Director
Portsmouth SBN Meeting – 25th November 2010
Contents
• CASE STUDY - Solar Thermal Installation
• CASE STUDY - Solar PV Installation
• Conclusions
Solar Thermal
• Generation of Hot Water by absorbtion of solar
radiation
Collector
Pump
Tank
With only 3 components what can go wrong???
Solar Thermal - Tank
• What’s wrong with this
picture?
– Blue tank is the new
solar tank
– Other tank is existing
• Integration into existing
systems
• Storage capacity
– Matched to load?
Solar Thermal - Pump
• Is the pump powerful
enough?
• How fast is the solar fluid
moving?
• Has the system been
correctly commissioned?
PUMP
Flow Meter
Solar Thermal - Collector
• Orientation
– Taken at lunchtime so
why is the sun on the
other side of the roof?
• Type
– Overheating
– Stagnation
• Number
– Too Few / Too many
• Does Collection profile
match usage profile?
What’s wrong with this picture?
Solar Thermal – Case Study
• System purchased direct from installer
• No evidence of design calculations
• Client questions system performance after 18
months
• 5 evacuated tube collectors on exposed South
facing roof at 35° pitch.
• Good quality pump and control station
Solar Thermal – Case Study
• Collector selection and location
– Good quality tubes
– Correct orientation and pitch
– Right number of tubes
BUT
• three storeys between collector and tank and
VERY long poorly insulated pipe run
• Collector had overheated due to poor location of
expansion tank
Solar Thermal – Case Study
• Pump
– Flow rate set to 5 litres / minute – too fast
– Pump slightly undersized for “head”
• Tank size
– 315l tank used for preheat of existing 400l tank
– House has 4 bathrooms but typically only 2 occupants
– Any solar heat collected will never get to the tap!
Solar Thermal – Case Study
• How we proved the system wasn’t working
– Data-logging of flow-rates and temperatures
– Collector had hydraulic locked – fluid short circuiting
through expansion loop
– Proved no heat transfer between collector and tank
• How we fixed it
– Removed original cylinder and used solar cylinder as
intended
– Re-commissioned flow rates and pump speeds
– Installed Auto air-vent and relocated expansion
vessels
Solar Thermal - Conclusions
• Insist on seeing design calculations
– Collector type and sizes
– Tank sizes
• Insist on a formal commissioning report
USE AN INDEPENDENT CONSULTANT !!
Unless the installation is small scale domestic
DON’T rely on the installer.
Photo-Voltaic
• Client considering PV as an investment
• Maximise payments under FIT
• Installation on an outbuilding rather than main
house
Key Features
• Own electricity meter
• South facing, 45° roof pitch
• Room in roof
• 5000 kWh/yr electricity use
PV –Stage 1- Simulation
• Different panels (makes and models) and
inverters
• Different numbers of panels
Transient Simulation
(TRNSYS16)
• Product specific performance
data
• NASA Weather data
•10 min time steps
PV – Stage 1 – Simulation (Results)
PV – Stage 2 Financial Analysis
“Benefit” from the panel =
Feed In Tariff + Export Tariff + Electricity Offset
41.3 + 3 + 12.5
Electricity Use = 5000 kWh per year
PV output = max. 1910 kWh per year
Therefore
Export = 0 kWh, Offset = 1910 kWh, FIT based on 1910 kWh
Majority of income is due to FIT
PV – Stage 2 Financial Analysis
• Done for each panel / inverter combination
• Costs based on manufacturer prices +
installation costs
• Lifetime analysis includes panel degradation in
accordance with manufacturer warranty
PV – Stage 2 Financial Analysis
-£30,000.00
-£20,000.00
-£10,000.00
£-
£10,000.00
£20,000.00
£30,000.00
£40,000.00
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Cumulative Cash Flow - Yingli with SMA inveter
Yingli 8
Yingli 6
Yingli 4
PV – Stage 3 – Technical Feasibility
STRUCTURAL SURVEY
• Each panel weighs around 20kg
• Mounting frames weigh around 10kg per
panel
• Survey revealed that the structure could
support the additional weight BUT only if the
joist fixing bolts were replaced.
PV – Stage 4 - Quotes
• To qualify for FIT the system must be installed
by MCS accredited installer.
• Specify the exact makes and models
• Quotes obtained for installation + remedial work
to roof.
• Recalculate the payback period
PV - Conclusions
• Selection of the panels is critical to project success
• Inverter losses must be factored in
• Panel degradation must be factored in
• Modelling should be accurate – don’t use SBEM
– Initial feasibilty should be done in RETScreen
– Detailed simulation (TRNSYS) is worthwhile
• Panels and frames are
– Heavy
– Increase wind sheer
have a structural survey done!
CONCLUSIONS
• There are poorly installed Solar Thermal
Systems
• There are accurate modelling tools
• The FIT and RHI are significant
• Do you trust your installer to act as consultant?

More Related Content

What's hot

Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Ground Source Heat Installations - Learning Experiences
Ground Source Heat Installations - Learning ExperiencesGround Source Heat Installations - Learning Experiences
Ground Source Heat Installations - Learning Experiencesphancock346
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewStatybos Akademija
 
Enhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recoveryEnhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recoveryATMOsphere Conferences & Events
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookDaniel Coakley
 
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and EngineersEnergy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and Engineersenergytrustor
 
Warmer Homes Scheme - TGD L Major Renovation Requirements
Warmer Homes Scheme - TGD L Major Renovation RequirementsWarmer Homes Scheme - TGD L Major Renovation Requirements
Warmer Homes Scheme - TGD L Major Renovation RequirementsSustainableEnergyAut
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...energytrustor
 
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)ATMOsphere Conferences & Events
 
BER Non-Domestic Webinar #2 -Checking your work
BER Non-Domestic Webinar #2 -Checking your workBER Non-Domestic Webinar #2 -Checking your work
BER Non-Domestic Webinar #2 -Checking your workSustainableEnergyAut
 
2015 x472 class 10 - lcca
2015 x472 class 10 - lcca2015 x472 class 10 - lcca
2015 x472 class 10 - lccamichaeljmack
 
Performance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi SystemsPerformance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi SystemsCenter for Energy and Environment
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralEMEX
 
cooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbertcooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. HerbertJohn A Herbert
 

What's hot (20)

Maximize subcritical hours with adiabatic technology
Maximize subcritical hours with adiabatic technologyMaximize subcritical hours with adiabatic technology
Maximize subcritical hours with adiabatic technology
 
resume12.12.2016
resume12.12.2016resume12.12.2016
resume12.12.2016
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
Ground Source Heat Installations - Learning Experiences
Ground Source Heat Installations - Learning ExperiencesGround Source Heat Installations - Learning Experiences
Ground Source Heat Installations - Learning Experiences
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
 
Enhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recoveryEnhancing performance of transcritical CO2 heat pumps with heat recovery
Enhancing performance of transcritical CO2 heat pumps with heat recovery
 
Envelope Design Training
Envelope Design TrainingEnvelope Design Training
Envelope Design Training
 
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research OutlookModelling Natural Ventilation in IES-VE: Case studies & Research Outlook
Modelling Natural Ventilation in IES-VE: Case studies & Research Outlook
 
INVISTA
INVISTAINVISTA
INVISTA
 
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and EngineersEnergy Trust New Buildings: Technical Updates for Modelers and Engineers
Energy Trust New Buildings: Technical Updates for Modelers and Engineers
 
Bahniuk Utility Job
Bahniuk Utility JobBahniuk Utility Job
Bahniuk Utility Job
 
Warmer Homes Scheme - TGD L Major Renovation Requirements
Warmer Homes Scheme - TGD L Major Renovation RequirementsWarmer Homes Scheme - TGD L Major Renovation Requirements
Warmer Homes Scheme - TGD L Major Renovation Requirements
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
 
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
Eric Smith, International Institute of Ammonia Refrigeration (IIAR)
 
RLS Logistics futureproofs with CO2
RLS Logistics futureproofs with CO2 RLS Logistics futureproofs with CO2
RLS Logistics futureproofs with CO2
 
BER Non-Domestic Webinar #2 -Checking your work
BER Non-Domestic Webinar #2 -Checking your workBER Non-Domestic Webinar #2 -Checking your work
BER Non-Domestic Webinar #2 -Checking your work
 
2015 x472 class 10 - lcca
2015 x472 class 10 - lcca2015 x472 class 10 - lcca
2015 x472 class 10 - lcca
 
Performance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi SystemsPerformance and Optimization of Residential Condensing Combi Systems
Performance and Optimization of Residential Condensing Combi Systems
 
Heating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s CathedralHeating and Hot Water Refurbishment at St Paul’s Cathedral
Heating and Hot Water Refurbishment at St Paul’s Cathedral
 
cooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbertcooling tower annual audit process by John A. Herbert
cooling tower annual audit process by John A. Herbert
 

Similar to "Solar Systems in Practise" - Alan Kiff, ARK Specialist Services

Energy Systems & Maintenance - Class Presentation
Energy Systems & Maintenance - Class PresentationEnergy Systems & Maintenance - Class Presentation
Energy Systems & Maintenance - Class PresentationTahaUzair2
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do WellTony Sweet
 
CE - Technology Overview
CE - Technology OverviewCE - Technology Overview
CE - Technology OverviewBen Glancy
 
Convert Energy - PV-T basics
Convert Energy - PV-T basicsConvert Energy - PV-T basics
Convert Energy - PV-T basicsDavid Browne
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsWIGreenBuilding
 
Commercial presentation jan 2013
Commercial presentation   jan 2013Commercial presentation   jan 2013
Commercial presentation jan 2013Solmatix Renewables
 
Solar Water Heater ERU revised standar version (1).pptx
Solar Water Heater ERU revised standar version (1).pptxSolar Water Heater ERU revised standar version (1).pptx
Solar Water Heater ERU revised standar version (1).pptxAlianMustafa
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeJISC's Green ICT Programme
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slidesSWITCHOntario
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioenergytrustor
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow AssurancePaul McDermott
 
Building Energy 2014: PV and SHW Design basics by Fortunat Mueller
Building Energy 2014: PV and SHW Design basics by Fortunat MuellerBuilding Energy 2014: PV and SHW Design basics by Fortunat Mueller
Building Energy 2014: PV and SHW Design basics by Fortunat Muellerfortunatmueller
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpointWilliam Wallace
 

Similar to "Solar Systems in Practise" - Alan Kiff, ARK Specialist Services (20)

Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Energy Systems & Maintenance - Class Presentation
Energy Systems & Maintenance - Class PresentationEnergy Systems & Maintenance - Class Presentation
Energy Systems & Maintenance - Class Presentation
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Condensing Boiler Optimization
Condensing Boiler OptimizationCondensing Boiler Optimization
Condensing Boiler Optimization
 
Calorex. What We do, We Do Well
Calorex. What We do, We Do WellCalorex. What We do, We Do Well
Calorex. What We do, We Do Well
 
Project review
Project reviewProject review
Project review
 
CE - Technology Overview
CE - Technology OverviewCE - Technology Overview
CE - Technology Overview
 
Convert Energy - PV-T basics
Convert Energy - PV-T basicsConvert Energy - PV-T basics
Convert Energy - PV-T basics
 
Retrocommissioning of Existing Buildings
Retrocommissioning of Existing BuildingsRetrocommissioning of Existing Buildings
Retrocommissioning of Existing Buildings
 
Commercial presentation jan 2013
Commercial presentation   jan 2013Commercial presentation   jan 2013
Commercial presentation jan 2013
 
DEAP Heat Pump Webinar 2
DEAP Heat Pump Webinar 2DEAP Heat Pump Webinar 2
DEAP Heat Pump Webinar 2
 
Solar Water Heater ERU revised standar version (1).pptx
Solar Water Heater ERU revised standar version (1).pptxSolar Water Heater ERU revised standar version (1).pptx
Solar Water Heater ERU revised standar version (1).pptx
 
Energy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of CambridgeEnergy Efficient Server Rooms at the University of Cambridge
Energy Efficient Server Rooms at the University of Cambridge
 
Combi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the FieldCombi Systems: Lessons Learned from the Field
Combi Systems: Lessons Learned from the Field
 
March3 2009-workshop-slides
March3 2009-workshop-slidesMarch3 2009-workshop-slides
March3 2009-workshop-slides
 
Whole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudioWhole Building Modeling Using OpenStudio
Whole Building Modeling Using OpenStudio
 
14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance14OTC 25107-Active Heating for Life of Field Flow Assurance
14OTC 25107-Active Heating for Life of Field Flow Assurance
 
Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?Condensing Boilers: Are they cost effective?
Condensing Boilers: Are they cost effective?
 
Building Energy 2014: PV and SHW Design basics by Fortunat Mueller
Building Energy 2014: PV and SHW Design basics by Fortunat MuellerBuilding Energy 2014: PV and SHW Design basics by Fortunat Mueller
Building Energy 2014: PV and SHW Design basics by Fortunat Mueller
 
Solar photovoltaic powerpoint
Solar photovoltaic powerpointSolar photovoltaic powerpoint
Solar photovoltaic powerpoint
 

More from Sustainable Business Partnership

Spring / Summer 2011 Legal Update; John Mitchell, Blake Lapthorn
Spring / Summer 2011 Legal Update; John Mitchell, Blake LapthornSpring / Summer 2011 Legal Update; John Mitchell, Blake Lapthorn
Spring / Summer 2011 Legal Update; John Mitchell, Blake LapthornSustainable Business Partnership
 
GENERATION Project; Alan Kiff, Ark Specialist Services Limited
GENERATION Project; Alan Kiff, Ark Specialist Services LimitedGENERATION Project; Alan Kiff, Ark Specialist Services Limited
GENERATION Project; Alan Kiff, Ark Specialist Services LimitedSustainable Business Partnership
 
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...Sustainable Business Partnership
 
What is STEM? John Charnock-Wilson, Charnock Environmental
What is STEM? John Charnock-Wilson, Charnock EnvironmentalWhat is STEM? John Charnock-Wilson, Charnock Environmental
What is STEM? John Charnock-Wilson, Charnock EnvironmentalSustainable Business Partnership
 
Highbury College Courses Avaliable to Businesses; Alan Harbord
Highbury College Courses Avaliable to Businesses; Alan HarbordHighbury College Courses Avaliable to Businesses; Alan Harbord
Highbury College Courses Avaliable to Businesses; Alan HarbordSustainable Business Partnership
 
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...Sustainable Business Partnership
 
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"John Mitchell, Blake Lapthorn - "Environmental Legislation Update"
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"Sustainable Business Partnership
 
Phil Duddell, Olive - "Workshop: How to Work Out Your Travel Carbon Footprint"
Phil Duddell, Olive -  "Workshop: How to Work Out Your Travel Carbon Footprint"Phil Duddell, Olive -  "Workshop: How to Work Out Your Travel Carbon Footprint"
Phil Duddell, Olive - "Workshop: How to Work Out Your Travel Carbon Footprint"Sustainable Business Partnership
 
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...Sustainable Business Partnership
 
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...Sustainable Business Partnership
 
Gary Wilburn, HPW Architects - "Working Together Case Study"
Gary Wilburn, HPW Architects - "Working Together Case Study"Gary Wilburn, HPW Architects - "Working Together Case Study"
Gary Wilburn, HPW Architects - "Working Together Case Study"Sustainable Business Partnership
 
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Sustainable Business Partnership
 

More from Sustainable Business Partnership (20)

Sony's CSR Case Study; Graham Thomasson
Sony's CSR Case Study; Graham ThomassonSony's CSR Case Study; Graham Thomasson
Sony's CSR Case Study; Graham Thomasson
 
Adrienne Marsden, The Marden Consultancy.
Adrienne Marsden, The Marden Consultancy.Adrienne Marsden, The Marden Consultancy.
Adrienne Marsden, The Marden Consultancy.
 
Spring / Summer 2011 Legal Update; John Mitchell, Blake Lapthorn
Spring / Summer 2011 Legal Update; John Mitchell, Blake LapthornSpring / Summer 2011 Legal Update; John Mitchell, Blake Lapthorn
Spring / Summer 2011 Legal Update; John Mitchell, Blake Lapthorn
 
Funding Solar Panels; Lee Adams, Anesco
Funding Solar Panels; Lee Adams, AnescoFunding Solar Panels; Lee Adams, Anesco
Funding Solar Panels; Lee Adams, Anesco
 
GENERATION Project; Alan Kiff, Ark Specialist Services Limited
GENERATION Project; Alan Kiff, Ark Specialist Services LimitedGENERATION Project; Alan Kiff, Ark Specialist Services Limited
GENERATION Project; Alan Kiff, Ark Specialist Services Limited
 
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...
What is UPEN (University of Portsmouth Environmental Network)? David Hutchins...
 
What is STEM? John Charnock-Wilson, Charnock Environmental
What is STEM? John Charnock-Wilson, Charnock EnvironmentalWhat is STEM? John Charnock-Wilson, Charnock Environmental
What is STEM? John Charnock-Wilson, Charnock Environmental
 
Autumn 2011 Legal Update; John Mitchell, Blake Lapthorn
Autumn 2011 Legal Update; John Mitchell, Blake LapthornAutumn 2011 Legal Update; John Mitchell, Blake Lapthorn
Autumn 2011 Legal Update; John Mitchell, Blake Lapthorn
 
Highbury College Courses Avaliable to Businesses; Alan Harbord
Highbury College Courses Avaliable to Businesses; Alan HarbordHighbury College Courses Avaliable to Businesses; Alan Harbord
Highbury College Courses Avaliable to Businesses; Alan Harbord
 
"Apprenticeships"; Jodi Fair, NAS
"Apprenticeships"; Jodi Fair, NAS"Apprenticeships"; Jodi Fair, NAS
"Apprenticeships"; Jodi Fair, NAS
 
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...
Siobhan Thomasson, Holiday Inn Winchester - "Communicating Sustainability Iss...
 
Kevin Muldoon, Denplan - "Case Study of Denplan"
Kevin Muldoon, Denplan - "Case Study of Denplan"Kevin Muldoon, Denplan - "Case Study of Denplan"
Kevin Muldoon, Denplan - "Case Study of Denplan"
 
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"John Mitchell, Blake Lapthorn - "Environmental Legislation Update"
John Mitchell, Blake Lapthorn - "Environmental Legislation Update"
 
Phil Duddell, Olive - "Workshop: How to Work Out Your Travel Carbon Footprint"
Phil Duddell, Olive -  "Workshop: How to Work Out Your Travel Carbon Footprint"Phil Duddell, Olive -  "Workshop: How to Work Out Your Travel Carbon Footprint"
Phil Duddell, Olive - "Workshop: How to Work Out Your Travel Carbon Footprint"
 
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...
Marc Morgan-Huws, Southern Vectis - "How a Travel Firm Has Embedded Sustainab...
 
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...
Chris Gregory, New Forest National Park Authority - "Sustainable Transport Op...
 
Gary Wilburn, HPW Architects - "Working Together Case Study"
Gary Wilburn, HPW Architects - "Working Together Case Study"Gary Wilburn, HPW Architects - "Working Together Case Study"
Gary Wilburn, HPW Architects - "Working Together Case Study"
 
Jo Saady, AECB - "Real World Perspective"
Jo Saady, AECB - "Real World Perspective"Jo Saady, AECB - "Real World Perspective"
Jo Saady, AECB - "Real World Perspective"
 
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
Steve Charter, Green Gauge Trust - "Introduction to Sustainable Construction:...
 
SBN Portsmouth - Marriott Hotel our recycling story
SBN Portsmouth - Marriott Hotel our recycling storySBN Portsmouth - Marriott Hotel our recycling story
SBN Portsmouth - Marriott Hotel our recycling story
 

Recently uploaded

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetDenis Gagné
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Tina Ji
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 

Recently uploaded (20)

MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature SetCreating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
Creating Low-Code Loan Applications using the Trisotech Mortgage Feature Set
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
Russian Faridabad Call Girls(Badarpur) : ☎ 8168257667, @4999
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 

"Solar Systems in Practise" - Alan Kiff, ARK Specialist Services

  • 1. Solar Systems in Practice Alan Kiff CEng MCIBSE Managing Director Portsmouth SBN Meeting – 25th November 2010
  • 2. Contents • CASE STUDY - Solar Thermal Installation • CASE STUDY - Solar PV Installation • Conclusions
  • 3. Solar Thermal • Generation of Hot Water by absorbtion of solar radiation Collector Pump Tank With only 3 components what can go wrong???
  • 4. Solar Thermal - Tank • What’s wrong with this picture? – Blue tank is the new solar tank – Other tank is existing • Integration into existing systems • Storage capacity – Matched to load?
  • 5. Solar Thermal - Pump • Is the pump powerful enough? • How fast is the solar fluid moving? • Has the system been correctly commissioned? PUMP Flow Meter
  • 6. Solar Thermal - Collector • Orientation – Taken at lunchtime so why is the sun on the other side of the roof? • Type – Overheating – Stagnation • Number – Too Few / Too many • Does Collection profile match usage profile? What’s wrong with this picture?
  • 7. Solar Thermal – Case Study • System purchased direct from installer • No evidence of design calculations • Client questions system performance after 18 months • 5 evacuated tube collectors on exposed South facing roof at 35° pitch. • Good quality pump and control station
  • 8. Solar Thermal – Case Study • Collector selection and location – Good quality tubes – Correct orientation and pitch – Right number of tubes BUT • three storeys between collector and tank and VERY long poorly insulated pipe run • Collector had overheated due to poor location of expansion tank
  • 9. Solar Thermal – Case Study • Pump – Flow rate set to 5 litres / minute – too fast – Pump slightly undersized for “head” • Tank size – 315l tank used for preheat of existing 400l tank – House has 4 bathrooms but typically only 2 occupants – Any solar heat collected will never get to the tap!
  • 10. Solar Thermal – Case Study • How we proved the system wasn’t working – Data-logging of flow-rates and temperatures – Collector had hydraulic locked – fluid short circuiting through expansion loop – Proved no heat transfer between collector and tank • How we fixed it – Removed original cylinder and used solar cylinder as intended – Re-commissioned flow rates and pump speeds – Installed Auto air-vent and relocated expansion vessels
  • 11. Solar Thermal - Conclusions • Insist on seeing design calculations – Collector type and sizes – Tank sizes • Insist on a formal commissioning report USE AN INDEPENDENT CONSULTANT !! Unless the installation is small scale domestic DON’T rely on the installer.
  • 12. Photo-Voltaic • Client considering PV as an investment • Maximise payments under FIT • Installation on an outbuilding rather than main house Key Features • Own electricity meter • South facing, 45° roof pitch • Room in roof • 5000 kWh/yr electricity use
  • 13. PV –Stage 1- Simulation • Different panels (makes and models) and inverters • Different numbers of panels Transient Simulation (TRNSYS16) • Product specific performance data • NASA Weather data •10 min time steps
  • 14. PV – Stage 1 – Simulation (Results)
  • 15. PV – Stage 2 Financial Analysis “Benefit” from the panel = Feed In Tariff + Export Tariff + Electricity Offset 41.3 + 3 + 12.5 Electricity Use = 5000 kWh per year PV output = max. 1910 kWh per year Therefore Export = 0 kWh, Offset = 1910 kWh, FIT based on 1910 kWh Majority of income is due to FIT
  • 16. PV – Stage 2 Financial Analysis • Done for each panel / inverter combination • Costs based on manufacturer prices + installation costs • Lifetime analysis includes panel degradation in accordance with manufacturer warranty
  • 17. PV – Stage 2 Financial Analysis -£30,000.00 -£20,000.00 -£10,000.00 £- £10,000.00 £20,000.00 £30,000.00 £40,000.00 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Cumulative Cash Flow - Yingli with SMA inveter Yingli 8 Yingli 6 Yingli 4
  • 18. PV – Stage 3 – Technical Feasibility STRUCTURAL SURVEY • Each panel weighs around 20kg • Mounting frames weigh around 10kg per panel • Survey revealed that the structure could support the additional weight BUT only if the joist fixing bolts were replaced.
  • 19. PV – Stage 4 - Quotes • To qualify for FIT the system must be installed by MCS accredited installer. • Specify the exact makes and models • Quotes obtained for installation + remedial work to roof. • Recalculate the payback period
  • 20. PV - Conclusions • Selection of the panels is critical to project success • Inverter losses must be factored in • Panel degradation must be factored in • Modelling should be accurate – don’t use SBEM – Initial feasibilty should be done in RETScreen – Detailed simulation (TRNSYS) is worthwhile • Panels and frames are – Heavy – Increase wind sheer have a structural survey done!
  • 21. CONCLUSIONS • There are poorly installed Solar Thermal Systems • There are accurate modelling tools • The FIT and RHI are significant • Do you trust your installer to act as consultant?