SlideShare a Scribd company logo
1 of 8
Download to read offline
Executive’s Guide to the
Next-generation Data Center
The Brands You Trust.
^
Business-wise, Future-driven.TM
Schneider Electric Global Marketing - Low-Res PDF
Schneider Electric Global Marketing - Low-Res PDF
Schneider Electric Global Marketing - Low-Res PDF
Schneider Electric Global Marketing - Low-Res PDF
998-1173006_US.indd 1 12/17/2012 2:07:35 PM
Data Centers
Schneider Electric Table of Contents
Executive’s Guide to the Data Center Business-wise, Future-driven.
Introduction..................................................................3
The Next-generation Data Center.................................4
Virtualization.............................................................4
Bridging the IT/Facilities Gap....................................5
Extending the Life of Your Data Center.....................6
Conclusion...................................................................7
Table of Contents
998-1173006_US.indd 2 12/17/2012 2:07:35 PM
Business-wise, Future-driven.
Schneider Electric 3
Data Centers
Executive’s Guide to the Data Center
One of the looming challenges in today’s data center is the rapid data
growth. One study finds that the amount of data is growing between
25 – 50 percent annually, and by the end of 2015 we are predicted to
cross the zettabyte threshold. For reference, one zettabyte is equal to
about 250 billion DVDs-worth of data!
File sharing, streaming high-definition video, and social media are in part
responsible for such rapid growth, but the digitization of everything from
medical records to bank transactions means every business owner will
have to prepare their data center for higher densities and more computing
capacity.
The problem is, most traditional,
“brick-and-mortar” data centers are already
approaching the limits to their power,
cooling, and space capacity. So what can
you do to prepare? Here are three big trends
that many businesses are adopting in order
to adapt to increasing computing demands:
1. Virtualization
2. Bridging the IT/Facilities Gap
3. Extending the Life of Your Data Center
Although these trends are not new, there are
some important things to consider before
applying them to your data center.
Read on to find out!
Figure 1: Data Growth, Virtualization and Consolidation
Introduction
1
Dines, Rachel A., “Build or Buy? The Economics of Data Center Facilities,”
Forrester Research, June 27, 2011. Pg. 2
2
Barnett, Thomas, “The Dawn of the Zettabyte Era,” June 23, 2011.
http://blogs.cisco.com/news/the-dawn-of-the-zettabyte-era-infographic/
998-1173006_US.indd 3 12/17/2012 2:07:36 PM
Business-wise, Future-driven.
Schneider Electric 4
Data Centers
Executive’s Guide to the Data Center
Embarking on a virtualization project, using DCIM software to bridge the
IT/Facilities gap, and extending the life of your data center with a modular
approach not only expands your data center’s capacity, ensures more
uptime, and enhances performance — it also saves you money. In some
cases, these three trends dovetail and synergize with one another, since
they’re all part of the high-density, next-generation data center. Here are
some important considerations that you may not already know about
virtualization, bridging the IT/facilities gap, and extending the life of your
data center.
What to consider with Virtualization:
1.	 Servers on average operate at just 15 percent of their capacity.
Virtualization can increase server utilization by fourfold or more,3
and
can save about $7,680 on the total 10-year TCO cost per server
eliminated.4
2.	 In order to see the significant energy savings, pairing virtualization with
dynamic data center physical infrastructure (DCPI) managed with DCIM
software is absolutely necessary. If power and cooling systems are not
scaled to accommodate fewer servers, you can actually degrade your
PUE.
3.	 In a virtualized environment, the cooling system needs to be dynamic
and accurate, with row cooling and variable speed fans that can handle
high densities and migrating virtual machines (VMs). DCIM software
is at the core of capacity management in a dynamic, high-density
environment, because migrating VMs are constantly changing the power
and cooling requirements.
4.	 When DCIM is included in a virtualization project, it can often increase
electricity savings by double or more compared with the savings
achieved by virtualization alone.5
The Next-generation Data Center
3
“Server Consolidation” VMware. http://www.vmware.com/solutions/
consolidation/consolidate.html
4
Rasmussen, Neil, “Implementing Energy Efficient Data Centers,”
APC by Schneider Electric White Paper #113, pg.6
5
Niles, Suzanne, “Virtualization: Optimized Power and Cooling to Maximize
Benefits,” APC by Schneider Electric White Paper #118, pg.3
Figure 2: Savings of virtualization
998-1173006_US.indd 4 12/17/2012 2:07:36 PM
Business-wise, Future-driven.
Schneider Electric 5
Data Centers
Executive’s Guide to the Data Center
What to consider with Bridging the IT/Facilities Gap:
1.	 Traditional data centers often waste at least 50 percent of infrastructure
capacity because they aren’t engineered to scale and don’t have
overarching management capabilities.6
Bridging the IT/facilities gap
has been talked about for a while as a solution, but until all-in-one data
center infrastructure management (DCIM) software entered the picture,
there wasn’t a catalyst capable of uniting the two historically disparate
domains.
2.	 Integrated DCPI and DCIM software make bridging the IT/facilities gap
possible. Integrated DCPI is composed of modular, scalable supporting
infrastructure managed via all-in-one DCIM software. It’s easier to make
managerial improvements so that facilities and IT managers talk to one
another and work collaboratively, but the major benefits of bridging
the gap — right-sized DCPI, improved availability, 30 percent energy
savings, a PUE of 1.22 or better — are very difficult to achieve without
using modular architecture and DCIM software.
3.	 With IT refresh cycles of 18 – 24 months and facilities refreshes every
10 – 15 years, it’s difficult to imagine these two entities working together
coherently without DCIM management software.
Figure 3: Bridging the IT/Facilities Gap
The Next-generation Data Center
6
Torell, Wendy. “Data Center Physical Infrastructure: Optimizing Business
Value,” APC by Schneider Electric White Paper #117, pg. 8
998-1173006_US.indd 5 12/17/2012 2:07:36 PM
Business-wise, Future-driven.
Schneider Electric 6
Data Centers
Executive’s Guide to the Data Center
What to consider with Extending the Life of Your Data Center:
1.	 The primary issues with aging data centers are a lack of floor space,
outdated, low-density IT equipment, and rigid infrastructure that cannot
adapt to changing business needs and, in turn, might even hold back
your business.
2.	 IT equipment life is now measured in months instead of years, and to
the only way that DCPI can adapt to the demands of increasingly high
density IT equipment is to use modular, scalable infrastructure managed
via DCIM software. Modularity allows you to scale capacity “on-
demand,” and makes upgrades and repairs much easier than custom
arrangements.
3.	 Floor space limitations are solved by well-executed consolidation/
virtualization projects using modular infrastructure, which can reduce the
number of servers by 10 – 30 percent, in turn reducing OpEx expenses.
Remember that virtualization must be paired with integrated DCPI and
DCIM software in order to realize the full savings potential and avoid
equipment failures caused by hot spots.
4.	 New data center designs can result in a 30 percent reduction in cost, a
50 percent reduction in space requirements, a 60 percent reduction in
power requirements, and can more than double the life span of a data
center.
Figure 4: An integrated DCPI system
The Next-generation Data Center
998-1173006_US.indd 6 12/17/2012 2:07:36 PM
Business-wise, Future-driven.
Schneider Electric 7
Data Centers
Executive’s Guide to the Data Center
The traditional “brick-and-mortar” data center is not going to be able to
handle the coming explosion in data growth. Businesses with outdated
data centers will have to make some upgrades to their data center — a
virtualization project, bridging the IT/facilities gap through integrated DCPI
and DCIM software, and/or extending the life of their data center with a
modular approach — or else face a severe uphill battle to stay competitive.
Conclusion
Check out this astonishing infographic, “The
Internet in 2015: The Dawn of the Zettabyte
Era” to learn more about the approaching
zettabyte threshold.
998-1173006_US.indd 7 12/17/2012 2:07:36 PM
Business-wise, Future-driven.
Schneider Electric 8
Data Centers
Executive’s Guide to the Data Center
132 Fairgrounds Rd. - West Kingston, RI 02892 - 800-800-4272 - www.schneider-electric.com
Theglobalspecialistin
energymanagement™
©2012 Schneider Electric. All Rights Reserved. All trademarks are owned by Schneider Electric Industries SAS or its affiliated companies. 998-1173006_US
998-1173006_US.indd 8 12/17/2012 2:07:36 PM

More Related Content

Viewers also liked

Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.Ankita Mahajan
 
Multi tiered hybrid data center design
Multi tiered hybrid data center designMulti tiered hybrid data center design
Multi tiered hybrid data center designMehmet Cetin
 
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...Vincent Pelly
 
Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...The University of Texas (UTRGV)
 
Wp data center standards (final)
Wp   data center standards (final)Wp   data center standards (final)
Wp data center standards (final)Sri Chalasani
 

Viewers also liked (6)

Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.Virtualization in 4-4 1-4 Data Center Network.
Virtualization in 4-4 1-4 Data Center Network.
 
IT Guy's Journey Through the New IT World
IT Guy's Journey Through the New IT WorldIT Guy's Journey Through the New IT World
IT Guy's Journey Through the New IT World
 
Multi tiered hybrid data center design
Multi tiered hybrid data center designMulti tiered hybrid data center design
Multi tiered hybrid data center design
 
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...
Data Center Critical Infrastructure Risk and Vulnerabilities- Impact to Capit...
 
Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...Building an Enterprise Fiber Network for a Local Government, An Architectural...
Building an Enterprise Fiber Network for a Local Government, An Architectural...
 
Wp data center standards (final)
Wp   data center standards (final)Wp   data center standards (final)
Wp data center standards (final)
 

Recently uploaded

一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理pyhepag
 
Formulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfFormulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfRobertoOcampo24
 
Generative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdfGenerative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdfEmmanuel Dauda
 
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证dq9vz1isj
 
The Significance of Transliteration Enhancing
The Significance of Transliteration EnhancingThe Significance of Transliteration Enhancing
The Significance of Transliteration Enhancingmohamed Elzalabany
 
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...Valters Lauzums
 
NOAM AAUG Adobe Summit 2024: Summit Slam Dunks
NOAM AAUG Adobe Summit 2024: Summit Slam DunksNOAM AAUG Adobe Summit 2024: Summit Slam Dunks
NOAM AAUG Adobe Summit 2024: Summit Slam Dunksgmuir1066
 
How I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prisonHow I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prisonPayment Village
 
Artificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdfArtificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdfscitechtalktv
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证acoha1
 
2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Call2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Calllward7
 
一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理cyebo
 
一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理cyebo
 
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证ju0dztxtn
 
Seven tools of quality control.slideshare
Seven tools of quality control.slideshareSeven tools of quality control.slideshare
Seven tools of quality control.slideshareraiaryan448
 
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一fztigerwe
 
edited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfedited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfgreat91
 
What is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationWhat is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationmuqadasqasim10
 

Recently uploaded (20)

一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理一比一原版阿德莱德大学毕业证成绩单如何办理
一比一原版阿德莱德大学毕业证成绩单如何办理
 
Formulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdfFormulas dax para power bI de microsoft.pdf
Formulas dax para power bI de microsoft.pdf
 
Generative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdfGenerative AI for Trailblazers_ Unlock the Future of AI.pdf
Generative AI for Trailblazers_ Unlock the Future of AI.pdf
 
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证
1:1原版定制伦敦政治经济学院毕业证(LSE毕业证)成绩单学位证书留信学历认证
 
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotecAbortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
Abortion pills in Dammam Saudi Arabia// +966572737505 // buy cytotec
 
The Significance of Transliteration Enhancing
The Significance of Transliteration EnhancingThe Significance of Transliteration Enhancing
The Significance of Transliteration Enhancing
 
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
Data Analytics for Digital Marketing Lecture for Advanced Digital & Social Me...
 
NOAM AAUG Adobe Summit 2024: Summit Slam Dunks
NOAM AAUG Adobe Summit 2024: Summit Slam DunksNOAM AAUG Adobe Summit 2024: Summit Slam Dunks
NOAM AAUG Adobe Summit 2024: Summit Slam Dunks
 
How I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prisonHow I opened a fake bank account and didn't go to prison
How I opened a fake bank account and didn't go to prison
 
Artificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdfArtificial_General_Intelligence__storm_gen_article.pdf
Artificial_General_Intelligence__storm_gen_article.pdf
 
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(WashU毕业证书)圣路易斯华盛顿大学毕业证成绩单本科硕士学位证留信学历认证
 
2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Call2024 Q1 Tableau User Group Leader Quarterly Call
2024 Q1 Tableau User Group Leader Quarterly Call
 
一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理一比一原版纽卡斯尔大学毕业证成绩单如何办理
一比一原版纽卡斯尔大学毕业证成绩单如何办理
 
一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理一比一原版麦考瑞大学毕业证成绩单如何办理
一比一原版麦考瑞大学毕业证成绩单如何办理
 
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
如何办理英国卡迪夫大学毕业证(Cardiff毕业证书)成绩单留信学历认证
 
123.docx. .
123.docx.                                 .123.docx.                                 .
123.docx. .
 
Seven tools of quality control.slideshare
Seven tools of quality control.slideshareSeven tools of quality control.slideshare
Seven tools of quality control.slideshare
 
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
如何办理哥伦比亚大学毕业证(Columbia毕业证)成绩单原版一比一
 
edited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdfedited gordis ebook sixth edition david d.pdf
edited gordis ebook sixth edition david d.pdf
 
What is Insertion Sort. Its basic information
What is Insertion Sort. Its basic informationWhat is Insertion Sort. Its basic information
What is Insertion Sort. Its basic information
 

Executive's Guide to the Next Gen Datacenter

  • 1. Executive’s Guide to the Next-generation Data Center The Brands You Trust. ^ Business-wise, Future-driven.TM Schneider Electric Global Marketing - Low-Res PDF Schneider Electric Global Marketing - Low-Res PDF Schneider Electric Global Marketing - Low-Res PDF Schneider Electric Global Marketing - Low-Res PDF 998-1173006_US.indd 1 12/17/2012 2:07:35 PM
  • 2. Data Centers Schneider Electric Table of Contents Executive’s Guide to the Data Center Business-wise, Future-driven. Introduction..................................................................3 The Next-generation Data Center.................................4 Virtualization.............................................................4 Bridging the IT/Facilities Gap....................................5 Extending the Life of Your Data Center.....................6 Conclusion...................................................................7 Table of Contents 998-1173006_US.indd 2 12/17/2012 2:07:35 PM
  • 3. Business-wise, Future-driven. Schneider Electric 3 Data Centers Executive’s Guide to the Data Center One of the looming challenges in today’s data center is the rapid data growth. One study finds that the amount of data is growing between 25 – 50 percent annually, and by the end of 2015 we are predicted to cross the zettabyte threshold. For reference, one zettabyte is equal to about 250 billion DVDs-worth of data! File sharing, streaming high-definition video, and social media are in part responsible for such rapid growth, but the digitization of everything from medical records to bank transactions means every business owner will have to prepare their data center for higher densities and more computing capacity. The problem is, most traditional, “brick-and-mortar” data centers are already approaching the limits to their power, cooling, and space capacity. So what can you do to prepare? Here are three big trends that many businesses are adopting in order to adapt to increasing computing demands: 1. Virtualization 2. Bridging the IT/Facilities Gap 3. Extending the Life of Your Data Center Although these trends are not new, there are some important things to consider before applying them to your data center. Read on to find out! Figure 1: Data Growth, Virtualization and Consolidation Introduction 1 Dines, Rachel A., “Build or Buy? The Economics of Data Center Facilities,” Forrester Research, June 27, 2011. Pg. 2 2 Barnett, Thomas, “The Dawn of the Zettabyte Era,” June 23, 2011. http://blogs.cisco.com/news/the-dawn-of-the-zettabyte-era-infographic/ 998-1173006_US.indd 3 12/17/2012 2:07:36 PM
  • 4. Business-wise, Future-driven. Schneider Electric 4 Data Centers Executive’s Guide to the Data Center Embarking on a virtualization project, using DCIM software to bridge the IT/Facilities gap, and extending the life of your data center with a modular approach not only expands your data center’s capacity, ensures more uptime, and enhances performance — it also saves you money. In some cases, these three trends dovetail and synergize with one another, since they’re all part of the high-density, next-generation data center. Here are some important considerations that you may not already know about virtualization, bridging the IT/facilities gap, and extending the life of your data center. What to consider with Virtualization: 1. Servers on average operate at just 15 percent of their capacity. Virtualization can increase server utilization by fourfold or more,3 and can save about $7,680 on the total 10-year TCO cost per server eliminated.4 2. In order to see the significant energy savings, pairing virtualization with dynamic data center physical infrastructure (DCPI) managed with DCIM software is absolutely necessary. If power and cooling systems are not scaled to accommodate fewer servers, you can actually degrade your PUE. 3. In a virtualized environment, the cooling system needs to be dynamic and accurate, with row cooling and variable speed fans that can handle high densities and migrating virtual machines (VMs). DCIM software is at the core of capacity management in a dynamic, high-density environment, because migrating VMs are constantly changing the power and cooling requirements. 4. When DCIM is included in a virtualization project, it can often increase electricity savings by double or more compared with the savings achieved by virtualization alone.5 The Next-generation Data Center 3 “Server Consolidation” VMware. http://www.vmware.com/solutions/ consolidation/consolidate.html 4 Rasmussen, Neil, “Implementing Energy Efficient Data Centers,” APC by Schneider Electric White Paper #113, pg.6 5 Niles, Suzanne, “Virtualization: Optimized Power and Cooling to Maximize Benefits,” APC by Schneider Electric White Paper #118, pg.3 Figure 2: Savings of virtualization 998-1173006_US.indd 4 12/17/2012 2:07:36 PM
  • 5. Business-wise, Future-driven. Schneider Electric 5 Data Centers Executive’s Guide to the Data Center What to consider with Bridging the IT/Facilities Gap: 1. Traditional data centers often waste at least 50 percent of infrastructure capacity because they aren’t engineered to scale and don’t have overarching management capabilities.6 Bridging the IT/facilities gap has been talked about for a while as a solution, but until all-in-one data center infrastructure management (DCIM) software entered the picture, there wasn’t a catalyst capable of uniting the two historically disparate domains. 2. Integrated DCPI and DCIM software make bridging the IT/facilities gap possible. Integrated DCPI is composed of modular, scalable supporting infrastructure managed via all-in-one DCIM software. It’s easier to make managerial improvements so that facilities and IT managers talk to one another and work collaboratively, but the major benefits of bridging the gap — right-sized DCPI, improved availability, 30 percent energy savings, a PUE of 1.22 or better — are very difficult to achieve without using modular architecture and DCIM software. 3. With IT refresh cycles of 18 – 24 months and facilities refreshes every 10 – 15 years, it’s difficult to imagine these two entities working together coherently without DCIM management software. Figure 3: Bridging the IT/Facilities Gap The Next-generation Data Center 6 Torell, Wendy. “Data Center Physical Infrastructure: Optimizing Business Value,” APC by Schneider Electric White Paper #117, pg. 8 998-1173006_US.indd 5 12/17/2012 2:07:36 PM
  • 6. Business-wise, Future-driven. Schneider Electric 6 Data Centers Executive’s Guide to the Data Center What to consider with Extending the Life of Your Data Center: 1. The primary issues with aging data centers are a lack of floor space, outdated, low-density IT equipment, and rigid infrastructure that cannot adapt to changing business needs and, in turn, might even hold back your business. 2. IT equipment life is now measured in months instead of years, and to the only way that DCPI can adapt to the demands of increasingly high density IT equipment is to use modular, scalable infrastructure managed via DCIM software. Modularity allows you to scale capacity “on- demand,” and makes upgrades and repairs much easier than custom arrangements. 3. Floor space limitations are solved by well-executed consolidation/ virtualization projects using modular infrastructure, which can reduce the number of servers by 10 – 30 percent, in turn reducing OpEx expenses. Remember that virtualization must be paired with integrated DCPI and DCIM software in order to realize the full savings potential and avoid equipment failures caused by hot spots. 4. New data center designs can result in a 30 percent reduction in cost, a 50 percent reduction in space requirements, a 60 percent reduction in power requirements, and can more than double the life span of a data center. Figure 4: An integrated DCPI system The Next-generation Data Center 998-1173006_US.indd 6 12/17/2012 2:07:36 PM
  • 7. Business-wise, Future-driven. Schneider Electric 7 Data Centers Executive’s Guide to the Data Center The traditional “brick-and-mortar” data center is not going to be able to handle the coming explosion in data growth. Businesses with outdated data centers will have to make some upgrades to their data center — a virtualization project, bridging the IT/facilities gap through integrated DCPI and DCIM software, and/or extending the life of their data center with a modular approach — or else face a severe uphill battle to stay competitive. Conclusion Check out this astonishing infographic, “The Internet in 2015: The Dawn of the Zettabyte Era” to learn more about the approaching zettabyte threshold. 998-1173006_US.indd 7 12/17/2012 2:07:36 PM
  • 8. Business-wise, Future-driven. Schneider Electric 8 Data Centers Executive’s Guide to the Data Center 132 Fairgrounds Rd. - West Kingston, RI 02892 - 800-800-4272 - www.schneider-electric.com Theglobalspecialistin energymanagement™ ©2012 Schneider Electric. All Rights Reserved. All trademarks are owned by Schneider Electric Industries SAS or its affiliated companies. 998-1173006_US 998-1173006_US.indd 8 12/17/2012 2:07:36 PM