Ppt on road construction

Télécharger pour lire hors ligne

In this project we will learn about the project under the road construction department Muzaffarpur division 1 and also in same condition we will deal in that case

In this project we will learn about the project under the road construction department Muzaffarpur division 1 and also in same condition we will deal in that case

Publicité
Publicité

Plus De Contenu Connexe

Plus récents (20)

Publicité

Ppt on road construction

  1. 1. PRESENTED BY:- MOHD DANISH (1100100056) AT BHEL RANIPUR HARIDWAR
  2. 2. INTRODUCTION Type of Road :: Private Road Project :: BHEL Scheme Length :: 6.5 km Location :: Ranipur ,Haridwar(U.K.) at HARIDWAR
  3. 3. What is Road ? Roads are defined as routes or paths that begin at one destination and lead to another.
  4. 4. CARRIAGEWAY PAVEMENT KERB SHOULDER SIDEWALKS/FOOTPATH ROADWAY CONSTRUCTION
  5. 5. CARRIAGEWAY The part of a road used by vehicular traffic is called carriageway.
  6. 6. LAYERS OF CARRIAGEWAY EARTH WORK GRANULAR SUB BASE(GSB) WET MIX MACADAM(WMM) BITUMINOUS MACADAM(BM) BITUMINOUS CONCRETE(BC) TACK COAT
  7. 7. EARTH WORK SOIL FILLING SPREADING & LEVELING COMPACTION
  8. 8. COMPATION OF SUBGRADE I LAYER :200mm II ,III LAYER :150mm
  9. 9. GRANULAR SUB BASE MATERIAL LAYERS DEPTH COMPACTION
  10. 10. Sub Base Layer
  11. 11. It is a road base material consisting of crushed rock/slag usually premixed with controlled amount of water sufficient for adequate compaction.
  12. 12. BITUMINOUS MACADAM > Bituminous macadam consists of aggregate and appropriate binder, mixed in a hot mix plant and laid with a mechanized paver. > It is an open graded mixture suitable for base course and is laid in a single course or in multiple layers on a previously prepared base.
  13. 13. FINISHING OF SURFACE(ROLLING)
  14. 14. AGGREGATE COARSE AGGREGATE The coarse aggregate consists of crushed rock, crushed gravel or other gravel or other hard material retained on 2.36mm sieve. FINE AGGREGATE Fine Aggregate consist of crushed or naturally occuring material or their combination passing 2.36 mm sieve and retained on 75 micron sieve.
  15. 15. BITUMINUS CONCRETE MATERIAL MIXING SPREADING
  16. 16. CAMBER PERCENTAGE OF CAMBER- 2% PURPOSE OF CAMBER A slight downward curve from the middle to the sides of a surface (such as a road)
  17. 17. KERB KERB A line of stone or concrete forming an edge between a pavement and a roadway, so that the pavement is some 15 cm above the level of the road.
  18. 18. SHOULDER It is the side of the road. Sometimes it is paved. Sometimes it is gravel. Sometimes it is dirt or grass.