1
See Hong Ong
Integrating Geomechanics with
Operational Practices Improves Extended-
Reach Drilling (ERD) Performances
2
 Industry Drilling Envelope
 ERD Well Drilling Challenges
 ERD Well Geomechanical Challenges
‒ Borehole instability
‒ Lost circulations
‒ Operational considerations
 A Case Study
‒ Offshore Eastern Canada
 Concluding Remarks
Presentation Outline
3
Industry Drilling Envelope
Industry continuously
pushes the ERD envelope
Long reach + high
deviation + ‘trouble zones’
→ directional drilling
difficulties + complex casing
programs
Complex wellbores
present difficult drilling
challenges:
‒ Significant downside risks
‒ Extensive Non-Productive
Time (NPT)
What will the future bring
as we continue to push
the limits?
HD = Horizontal Departure
TVD = True Vertical Depth
MD = Measured Depth
ERD → HD / TVD ≥ 2
Source: K&M Technology
Exxon-Neftgas Z-43 (2013)
(TVD=15,900’, H=38,514’,
MD=41,667’)
4
ERD Well Drilling Challenges
Typical
onshore or
shelf casing
designs
Deepwater or
ultra deep-
water casing
designs
Smith, K. (2009)
Borehole Instability
‒ Overburdens
‒ High deviations
‒ Tangent sections through ‘difficult’
formations and complex geology
Lost Circulations
‒ Narrow/low drilling margins
‒ Long reach wellbore
‒ Difficulty in managing downhole
pressures
Complex Casing Designs
‒ Equivalent Circulating Density (ECD)
management
‒ Well barrier integrity
‒ Production/injection requirements
5
ERD Well Geomechanical Challenges
■Borehole Failures
– Insufficient mud
supports
– Breakouts
• Pack-offs
• Sidetracks
■Lost circulations
– Too high mud pressures
– Fractures
(natural/induced)
• Heavy mud losses
• Formation breathing
Sub-optimal Drilling
Practices
– Tripping
– Hole cleaning
– Barite sag
Wellbore instability refer to certain
patterns and levels of borehole failures
that are unacceptable for continuation
of drilling operations.
6
Borehole Stability (I)
■Effective mud column support is
fundamental
( ) 





+−+=
2
45tan 02'
1
γ
σ pw PPUCS
Mechanical Instability
Gradishar, J. et al (2014)
Abdul Azim, S. et al (2011)
■Long open-hole exposure →
time-dependent failures:
– Chemical
– Thermal
– Hydraulic
■Weak-plane failures (shale):
– Near bed-parallel drilling
– Up-dip vs. down-dip vs. cross-dip
– Mud weight + sealing capacity
7
Borehole Stability (II)
Traversing Faults
■Brittle Failures Near Fault
– Brecciated rock pieces
– ‘Rubble’ zones
■Across Faults
– Stress rotation
– Lithology changes
■Fault Drags
– Bedding dip and dip direction
changes
– Weak plane failures
Normal to bedding
Optimal trajectory
8
Borehole Stability (III)
Chemical Instability (Shale)
■Managing Stability
– Control swelling/pore pressure
van Oort, E. (2003)
■Minimize:
– Pore pressure transmissions
– Loss of mud support
■Mitigation strategies:
– ‘Exploit’ osmotic processes
– Maintain high membrane efficiency
– Seal shale micro-fractures
9
■Geomechanically, severe losses:
– Propagation of fractures
The Basics
– Narrow/low drilling margins:
• High deviations
• Geo-pressured formations
• Severe depletions
‒ Compounded by:
• Cooling
• ECD vs. borehole stability
Lost Circulations (I)
10
Lost Circulations (II)
■FB/fracture charging:
– Simultaneous fracture
initiation + propagation
Formation Breathing (FB)
■Wellbore Strengthening (WS)
– Extend the narrow margin
– WS strategies:
• Isolation
• Hoop stress enhancement
– WS enhances:
• Fracture initiation pressure (FIP)
• Fracture propagation resistance
(FPR)
11
Operational Considerations (I)
■ Borehole instability:
– Mud weight + casing setting depth +
wellbore trajectory
■ ECD managements:
– Circulating/tripping/reaming + mud
rheology + annular x-section
■ Hole cleanings:
– Cuttings bed + large cavings +
enlarging borehole
– Agitation + ROP + surveillance
■ Bit and BHA designs
– Impact on ROP and wellbore quality
– MSE response → vibrations
General
Source: PetroWiki
■ Barite sag:
– Variations in mud density
– Well control, pack-offs, lost circulation
ROP= Rate of Penetration
BHA = Bottom-Hole Assembly
MSE = Mechanical Specific Energy
12
Operational Considerations (II)
■Hole cleaning:
– Pump rate + pipe rotation +
controlled ROP
Gradishar, J. et al (2014)
Best Practices (Gradishar, J. et al)
■Maintain downhole pressure
supports:
– Best monitored by PWD
■Sweeps/short trips:
– Avoid
■Tight hole/over-pulls:
– Tested by hole cleaning cycles
– Avoided back reaming if possible
PWD = Pressure While Drilling
13
Case Study: Offshore Eastern Canada (SPE 140318*)
■HMDC’s OPA2 and ST1:
– Severe enlargements →
12¼” tangent section (800
)
– BHA left in the hole
– P&A for re-evaluation
■Unsuccessful attempts:
− Bed-parallel drilling
− Lithology changes across
faults
− Geological structural
complexity
− Hole cleaning in enlarged
wellbore
*Hibernia Well Overcomes Challenges to Further Extend Worldwide Extended Reach Drilling (ERD) Envelope
Woodfine, M. et al (2011)
Woodfine, M. et al (2011)
14
■Instability problems:
– Correlated well with hole
enlargements and ledges at two
faults
– Severe hole enlargements were
observed in shale drilled near
bed-parallel
Strategies to Minimize Instability
Case Study: Offshore Eastern Canada (SPE 140318*)
Woodfine, M. et al (2011)
■Use highest possible mud weights for
stability
– consistent with no lost returns
■Maximize the attack angle
– Low attack angles in competent rocks
15
■Optimize wellbore
trajectory
– Rocks of similar
mechanical strength on
opposite sides of faults
■Choose a wellbore
trajectory:
– Minimizes the probability of
encountering weak strength
(anisotropic) shales
■Drop angle in 8-½” hole:
– Lower mud weight for
stability (ECD limitations)
Strategies to Minimize Instability
Woodfine, M. et al (2011)
Case Study: Offshore Eastern Canada (SPE 140318*)
16
Concluding Remarks
■Extended reach and high deviation combined with
complex geology (trouble zones) manifest challenging
drilling conditions.
■Besides high NPTs, these challenges often result in
modifications of casing programs.
■New paradigms in well designs must integrate
geomechanical understanding (borehole instability, lost
circulations) with good drilling practices (hole cleaning,
ECD management etc.).
■Geomechanics provide only partial solutions!
Interdisciplinary approach incorporating continual
redesign concepts to systematically overcome drilling
performance limiters is key!
Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl 17
Thank You!
Please contact me with any additional
questions/comments at:
seehong.ong@bakerhughes.com
Society of Petroleum Engineers
Distinguished Lecturer Program
www.spe.org/dl 18
Your Feedback is Important
Enter your section in the DL Evaluation Contest by
completing the evaluation form for this presentation
Visit SPE.org/dl

More Related Content

What's hot

Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
AFATous
 

What's hot (20)

Well drilling design
Well drilling designWell drilling design
Well drilling design
 
Reservoir Geomechanics
Reservoir GeomechanicsReservoir Geomechanics
Reservoir Geomechanics
 
Introduction to manage pressure drilling
Introduction to manage pressure drillingIntroduction to manage pressure drilling
Introduction to manage pressure drilling
 
Q922+de2+l07 v1
Q922+de2+l07 v1Q922+de2+l07 v1
Q922+de2+l07 v1
 
Geomechanics services
Geomechanics servicesGeomechanics services
Geomechanics services
 
Problems during Drilling a Well
Problems during Drilling a WellProblems during Drilling a Well
Problems during Drilling a Well
 
Drilling Problems.pdf
Drilling Problems.pdfDrilling Problems.pdf
Drilling Problems.pdf
 
Well Logging: 02 caliper log
Well Logging: 02 caliper logWell Logging: 02 caliper log
Well Logging: 02 caliper log
 
Drilling and producing well
Drilling and  producing wellDrilling and  producing well
Drilling and producing well
 
Well control intro presentation
Well control intro presentationWell control intro presentation
Well control intro presentation
 
Drillstring & BHA Design
Drillstring & BHA DesignDrillstring & BHA Design
Drillstring & BHA Design
 
Formation pressure (PPFG) based on HW
Formation pressure (PPFG) based on HWFormation pressure (PPFG) based on HW
Formation pressure (PPFG) based on HW
 
Casing design
Casing designCasing design
Casing design
 
Introduction to Reservoir Geomechanics
Introduction to Reservoir GeomechanicsIntroduction to Reservoir Geomechanics
Introduction to Reservoir Geomechanics
 
Drilling Fluids Mud
Drilling Fluids MudDrilling Fluids Mud
Drilling Fluids Mud
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Borehole and Drilling problems
Borehole and Drilling problems  Borehole and Drilling problems
Borehole and Drilling problems
 
Drilling fluids
Drilling fluidsDrilling fluids
Drilling fluids
 
Stuck pipe
Stuck pipeStuck pipe
Stuck pipe
 
Casing
CasingCasing
Casing
 

Similar to Integrating Geomechanics With Operational Practices Improves Extended-Reach Drilling Performance

Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1
John Latilla
 
Rock Mechanics and Rock Cavern Design_ICE HKA
Rock Mechanics and Rock Cavern Design_ICE HKARock Mechanics and Rock Cavern Design_ICE HKA
Rock Mechanics and Rock Cavern Design_ICE HKA
Keith Kong
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2
IDHAMUKI
 

Similar to Integrating Geomechanics With Operational Practices Improves Extended-Reach Drilling Performance (20)

SLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURESLOPE STABILITY AND FAILURE
SLOPE STABILITY AND FAILURE
 
Underground rock reinforcement and support
Underground rock reinforcement and supportUnderground rock reinforcement and support
Underground rock reinforcement and support
 
06 Geomechanics.pdf
06 Geomechanics.pdf06 Geomechanics.pdf
06 Geomechanics.pdf
 
Review of the case study of the Yangcheng Coal Mine in China
Review of the case study of the Yangcheng Coal Mine in ChinaReview of the case study of the Yangcheng Coal Mine in China
Review of the case study of the Yangcheng Coal Mine in China
 
Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1Buffer blasting presentation for Coal 2016.rev1
Buffer blasting presentation for Coal 2016.rev1
 
Geomechanical Modeling Abu Dhabi Comments
Geomechanical Modeling Abu Dhabi CommentsGeomechanical Modeling Abu Dhabi Comments
Geomechanical Modeling Abu Dhabi Comments
 
Introduction to Geotechnical Engineering SU - Fall 2015
Introduction to Geotechnical Engineering   SU - Fall 2015Introduction to Geotechnical Engineering   SU - Fall 2015
Introduction to Geotechnical Engineering SU - Fall 2015
 
PERUMIN 31: Nuevas tendencias de la Minería Subterránea - Planeación, operaci...
PERUMIN 31: Nuevas tendencias de la Minería Subterránea - Planeación, operaci...PERUMIN 31: Nuevas tendencias de la Minería Subterránea - Planeación, operaci...
PERUMIN 31: Nuevas tendencias de la Minería Subterránea - Planeación, operaci...
 
Samiur sany
Samiur sanySamiur sany
Samiur sany
 
International Journal of Engineering Research and Development
International Journal of Engineering Research and DevelopmentInternational Journal of Engineering Research and Development
International Journal of Engineering Research and Development
 
Rock engineering-overview
Rock engineering-overviewRock engineering-overview
Rock engineering-overview
 
Somnath soni (iit ism) dhanbad presentation vphep
Somnath soni (iit ism) dhanbad presentation vphepSomnath soni (iit ism) dhanbad presentation vphep
Somnath soni (iit ism) dhanbad presentation vphep
 
Behaviour Pattern of Slopes Tunnels in Discontinous Rock Media
Behaviour Pattern of Slopes Tunnels in Discontinous Rock MediaBehaviour Pattern of Slopes Tunnels in Discontinous Rock Media
Behaviour Pattern of Slopes Tunnels in Discontinous Rock Media
 
Engineering Geology for Civil Engineering
Engineering Geology for Civil EngineeringEngineering Geology for Civil Engineering
Engineering Geology for Civil Engineering
 
Rock mechanics
Rock mechanicsRock mechanics
Rock mechanics
 
Rock Mechanics and Rock Cavern Design_ICE HKA
Rock Mechanics and Rock Cavern Design_ICE HKARock Mechanics and Rock Cavern Design_ICE HKA
Rock Mechanics and Rock Cavern Design_ICE HKA
 
Lecture 2 basic surface mining practise-2
Lecture 2  basic surface mining practise-2Lecture 2  basic surface mining practise-2
Lecture 2 basic surface mining practise-2
 
Topographic influence on stability for gas wells penetrating longwall mining ...
Topographic influence on stability for gas wells penetrating longwall mining ...Topographic influence on stability for gas wells penetrating longwall mining ...
Topographic influence on stability for gas wells penetrating longwall mining ...
 
Scientific field trip along erbil – shaqlawa main road
Scientific field trip along erbil – shaqlawa main roadScientific field trip along erbil – shaqlawa main road
Scientific field trip along erbil – shaqlawa main road
 
Applications of Vane Shear Test in Geotechnical soil investigations
Applications of Vane Shear Test in Geotechnical soil investigationsApplications of Vane Shear Test in Geotechnical soil investigations
Applications of Vane Shear Test in Geotechnical soil investigations
 

More from Society of Petroleum Engineers

More from Society of Petroleum Engineers (20)

Who Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of UnitizationWho Owns the Oil? The How and Why of Unitization
Who Owns the Oil? The How and Why of Unitization
 
Compositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell JohnsCompositional Simulations that is Truly Compositional - Russell Johns
Compositional Simulations that is Truly Compositional - Russell Johns
 
A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...A performance-based approach for developing upstream professionals - Salam Sa...
A performance-based approach for developing upstream professionals - Salam Sa...
 
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
Asphaltene Gradients, Connectivity and Tar Mats All Treated by Simple Chemist...
 
Thriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van DomelenThriving in a Lower for Longer Environment - Mary Van Domelen
Thriving in a Lower for Longer Environment - Mary Van Domelen
 
The Fracts of Life - Martin Rylance
The Fracts of Life - Martin RylanceThe Fracts of Life - Martin Rylance
The Fracts of Life - Martin Rylance
 
Vulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem LawalVulnerability and Management of Water Injectors - Kazeem Lawal
Vulnerability and Management of Water Injectors - Kazeem Lawal
 
CO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to StorageCO2 in the Subsurface - From EOR to Storage
CO2 in the Subsurface - From EOR to Storage
 
Paul Mitchell
Paul MitchellPaul Mitchell
Paul Mitchell
 
Mark Van Domelen
Mark Van DomelenMark Van Domelen
Mark Van Domelen
 
Srikanta Mishra
Srikanta MishraSrikanta Mishra
Srikanta Mishra
 
Silviu Livescu
Silviu LivescuSilviu Livescu
Silviu Livescu
 
Roberto Aguilera
Roberto AguileraRoberto Aguilera
Roberto Aguilera
 
Robert Hawkes
Robert HawkesRobert Hawkes
Robert Hawkes
 
Leroy Ledgerwood
Leroy LedgerwoodLeroy Ledgerwood
Leroy Ledgerwood
 
John Hedengren
John HedengrenJohn Hedengren
John Hedengren
 
Jim Galford
Jim GalfordJim Galford
Jim Galford
 
Hank Rawlins
Hank RawlinsHank Rawlins
Hank Rawlins
 
George Stosur
George StosurGeorge Stosur
George Stosur
 
Cosan Ayan
Cosan AyanCosan Ayan
Cosan Ayan
 

Recently uploaded

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
amitlee9823
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 

Recently uploaded (20)

AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night StandCall Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
Call Girls In Bangalore ☎ 7737669865 🥵 Book Your One night Stand
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

Integrating Geomechanics With Operational Practices Improves Extended-Reach Drilling Performance

  • 1. Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl 1 See Hong Ong Integrating Geomechanics with Operational Practices Improves Extended- Reach Drilling (ERD) Performances
  • 2. 2  Industry Drilling Envelope  ERD Well Drilling Challenges  ERD Well Geomechanical Challenges ‒ Borehole instability ‒ Lost circulations ‒ Operational considerations  A Case Study ‒ Offshore Eastern Canada  Concluding Remarks Presentation Outline
  • 3. 3 Industry Drilling Envelope Industry continuously pushes the ERD envelope Long reach + high deviation + ‘trouble zones’ → directional drilling difficulties + complex casing programs Complex wellbores present difficult drilling challenges: ‒ Significant downside risks ‒ Extensive Non-Productive Time (NPT) What will the future bring as we continue to push the limits? HD = Horizontal Departure TVD = True Vertical Depth MD = Measured Depth ERD → HD / TVD ≥ 2 Source: K&M Technology Exxon-Neftgas Z-43 (2013) (TVD=15,900’, H=38,514’, MD=41,667’)
  • 4. 4 ERD Well Drilling Challenges Typical onshore or shelf casing designs Deepwater or ultra deep- water casing designs Smith, K. (2009) Borehole Instability ‒ Overburdens ‒ High deviations ‒ Tangent sections through ‘difficult’ formations and complex geology Lost Circulations ‒ Narrow/low drilling margins ‒ Long reach wellbore ‒ Difficulty in managing downhole pressures Complex Casing Designs ‒ Equivalent Circulating Density (ECD) management ‒ Well barrier integrity ‒ Production/injection requirements
  • 5. 5 ERD Well Geomechanical Challenges ■Borehole Failures – Insufficient mud supports – Breakouts • Pack-offs • Sidetracks ■Lost circulations – Too high mud pressures – Fractures (natural/induced) • Heavy mud losses • Formation breathing Sub-optimal Drilling Practices – Tripping – Hole cleaning – Barite sag Wellbore instability refer to certain patterns and levels of borehole failures that are unacceptable for continuation of drilling operations.
  • 6. 6 Borehole Stability (I) ■Effective mud column support is fundamental ( )       +−+= 2 45tan 02' 1 γ σ pw PPUCS Mechanical Instability Gradishar, J. et al (2014) Abdul Azim, S. et al (2011) ■Long open-hole exposure → time-dependent failures: – Chemical – Thermal – Hydraulic ■Weak-plane failures (shale): – Near bed-parallel drilling – Up-dip vs. down-dip vs. cross-dip – Mud weight + sealing capacity
  • 7. 7 Borehole Stability (II) Traversing Faults ■Brittle Failures Near Fault – Brecciated rock pieces – ‘Rubble’ zones ■Across Faults – Stress rotation – Lithology changes ■Fault Drags – Bedding dip and dip direction changes – Weak plane failures Normal to bedding Optimal trajectory
  • 8. 8 Borehole Stability (III) Chemical Instability (Shale) ■Managing Stability – Control swelling/pore pressure van Oort, E. (2003) ■Minimize: – Pore pressure transmissions – Loss of mud support ■Mitigation strategies: – ‘Exploit’ osmotic processes – Maintain high membrane efficiency – Seal shale micro-fractures
  • 9. 9 ■Geomechanically, severe losses: – Propagation of fractures The Basics – Narrow/low drilling margins: • High deviations • Geo-pressured formations • Severe depletions ‒ Compounded by: • Cooling • ECD vs. borehole stability Lost Circulations (I)
  • 10. 10 Lost Circulations (II) ■FB/fracture charging: – Simultaneous fracture initiation + propagation Formation Breathing (FB) ■Wellbore Strengthening (WS) – Extend the narrow margin – WS strategies: • Isolation • Hoop stress enhancement – WS enhances: • Fracture initiation pressure (FIP) • Fracture propagation resistance (FPR)
  • 11. 11 Operational Considerations (I) ■ Borehole instability: – Mud weight + casing setting depth + wellbore trajectory ■ ECD managements: – Circulating/tripping/reaming + mud rheology + annular x-section ■ Hole cleanings: – Cuttings bed + large cavings + enlarging borehole – Agitation + ROP + surveillance ■ Bit and BHA designs – Impact on ROP and wellbore quality – MSE response → vibrations General Source: PetroWiki ■ Barite sag: – Variations in mud density – Well control, pack-offs, lost circulation ROP= Rate of Penetration BHA = Bottom-Hole Assembly MSE = Mechanical Specific Energy
  • 12. 12 Operational Considerations (II) ■Hole cleaning: – Pump rate + pipe rotation + controlled ROP Gradishar, J. et al (2014) Best Practices (Gradishar, J. et al) ■Maintain downhole pressure supports: – Best monitored by PWD ■Sweeps/short trips: – Avoid ■Tight hole/over-pulls: – Tested by hole cleaning cycles – Avoided back reaming if possible PWD = Pressure While Drilling
  • 13. 13 Case Study: Offshore Eastern Canada (SPE 140318*) ■HMDC’s OPA2 and ST1: – Severe enlargements → 12¼” tangent section (800 ) – BHA left in the hole – P&A for re-evaluation ■Unsuccessful attempts: − Bed-parallel drilling − Lithology changes across faults − Geological structural complexity − Hole cleaning in enlarged wellbore *Hibernia Well Overcomes Challenges to Further Extend Worldwide Extended Reach Drilling (ERD) Envelope Woodfine, M. et al (2011) Woodfine, M. et al (2011)
  • 14. 14 ■Instability problems: – Correlated well with hole enlargements and ledges at two faults – Severe hole enlargements were observed in shale drilled near bed-parallel Strategies to Minimize Instability Case Study: Offshore Eastern Canada (SPE 140318*) Woodfine, M. et al (2011) ■Use highest possible mud weights for stability – consistent with no lost returns ■Maximize the attack angle – Low attack angles in competent rocks
  • 15. 15 ■Optimize wellbore trajectory – Rocks of similar mechanical strength on opposite sides of faults ■Choose a wellbore trajectory: – Minimizes the probability of encountering weak strength (anisotropic) shales ■Drop angle in 8-½” hole: – Lower mud weight for stability (ECD limitations) Strategies to Minimize Instability Woodfine, M. et al (2011) Case Study: Offshore Eastern Canada (SPE 140318*)
  • 16. 16 Concluding Remarks ■Extended reach and high deviation combined with complex geology (trouble zones) manifest challenging drilling conditions. ■Besides high NPTs, these challenges often result in modifications of casing programs. ■New paradigms in well designs must integrate geomechanical understanding (borehole instability, lost circulations) with good drilling practices (hole cleaning, ECD management etc.). ■Geomechanics provide only partial solutions! Interdisciplinary approach incorporating continual redesign concepts to systematically overcome drilling performance limiters is key!
  • 17. Society of Petroleum Engineers Distinguished Lecturer Program www.spe.org/dl 17 Thank You! Please contact me with any additional questions/comments at: seehong.ong@bakerhughes.com