SlideShare une entreprise Scribd logo
1  sur  58
Corporate Update, June 16, 2016
Forward Looking Information
2
This presentation contains "forward-looking information" within the meaning of Canadian securities legislation. This information and these statements, referred to herein as “forward-looking statements”, are made as of the date of this presentation and the Corporation does
not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law. These forward-looking statements include, among others, statements with respect to our beliefs, plans, objectives, expectations, anticipations, estimates
and intentions. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect.
Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of Mineral Reserves, Mineral Resources and exploration
targets; (ii) the amount of future production over any period; (iii) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the March 2016 Updated Renard Mine Plan and Mineral Reserve
Estimate; (iv) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the 2016 Updated Renard Mine Plan and Mineral Reserve Estimate; (v) mine expansion potential and expected mine life; (vi) the expected time frames for the
completion of construction, start of mining and commercial production at the Renard Diamond Project and the financial obligations or costs incurred by Stornoway in connection with such mine development; (vii) the expected time frames for the completion of the open pit
and underground mine at the Renard Diamond Project; (viii) future market prices for rough diamonds; and (ix) future market prices for liquefied natural gas and diesel. All statements, other than statements of historical fact regarding Stornoway or the Renard Diamond Project,
are forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”,
“anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “schedule” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of
any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements.
Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results,
performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business prospects and strategies and the environment in which Stornoway will operate in the future,
including the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals, regulatory developments, development plans, exploration, development and mining activities and commitments. Although management considers its assumptions on such matters to
be reasonable based on information currently available to it, they may prove to be incorrect. Certain important assumptions by Stornoway or its consultants in making forward-looking statements include, but are not limited to: (i) required capital investment; (ii) the amount of
future production over any period; (iii) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the March 2016 Updated Renard Mine Plan and Mineral Reserve Estimate ; (iv) assumptions relating
to gross revenues, operating cash flow and other revenue metrics set out in the 2016 Updated Renard Mine Plan and Mineral Reserve Estimate ; (v) estimates of net present value; (vi) anticipated timelines for completion of construction, commencement of mine production
and development of an open pit and underground mine at the Renard Diamond Project, (vii) anticipated geological formations; (viii) Stornoway’s interpretation of the geological drill data collected and its potential impact on stated Mineral Resources, Mineral Reserves, and
mine life; and (ix) Stornoway’s ability to draw on the financing elements of the Renard Diamond Project Financing Transactions closed on July 8th, 2014.
By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future
experience. We caution readers not to place undue reliance on these forward- looking statements as a number of important risk factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions
and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, including the assumption in many forward-looking statements that other forward-looking
statements will be correct, but specifically include, without limitation: (i) risks relating to variations in the grade, kimberlite lithologies and country rock content within the material identified as Mineral Resources from that predicted; (ii) variations in rates of recovery and
breakage; (iii) changes in development or mining plans due to changes in other factors or exploration results; (iv) slower increases in diamond valuations than assumed; (v) risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar; (vi)
increases in the costs of proposed capital and operating expenditures; (vii) increases in financing costs or adverse changes to the terms of available financing, if any; (viii) tax rates or royalties being greater than assumed; (ix) risks relating to the receipt of regulatory approvals;
and (x) the additional risks described in Stornoway's most recently filed Annual Information Form, annual and interim MD&A and Stornoway's anticipation of and success in managing the foregoing risks. Stornoway cautions that the foregoing list of factors that may affect future
results is not exhaustive, and new, unforeseeable risks may arise from time to time.
Readers are referred to the technical report dated as of March 30, 2016 entitled “Updated Renard Diamond Project Mine Plan and Mineral Reserve Estimate, Québec, Canada” in respect of the March 2016 Updated Mine Plan and Mineral Reserve Estimate, and the technical
report dated January 11, 2016 and press release dated September 24, 2015 in respect of the September 2015 Mineral Resource estimate for further details and assumptions relating to the project.
The Qualified Persons that prepared the technical reports and press releases that form the basis for the presentation are listed in the Company’s AIF dated March 30, 2016. Disclosure of a scientific or technical nature in this presentation was prepared under the supervision of
Patrick Godin, P.Eng. (Québec), Chief Operating Officer and Robin Hopkins, P.Geol. (NT/NU), Vice President, Exploration, both “qualified persons” under NI 43-101. Darrell Farrow, PrSciNat, P.Geo.(BC), Ordre des geologues du Quebec (Special Authorisation # 332) of GeoStrat
Consulting Services Inc. is the independent Qualified Person responsible for preparation of the mineral resource estimate for the Renard Diamond Project. GeoStrat Consulting Services Inc, a mineral resources consultancy, focuses on client interaction and involvement in
developing resource models, and has experience in exploration, geological modeling, resource evaluation, production, resource reconciliation and accounting of diamond deposits around the globe. GeoStrat has verified the results disclosed herein with respect to the mineral
resources, and has conducted appropriate verification on the underlying data, including visitations to the Renard site and the primary process laboratories.
Stornoway Diamond Corporation (TSX: SWY)
3
100% Ownership in Renard,
Québec’s First Diamond Mine
Road Accessible; Strong Social License; Fully Financed;
Fully Permitted; First Production 2016
Construction Progress
Ahead of Schedule; Reduced Forecast Cost to Complete
Strong Balance Sheet
Fully Financed from July 2014 C$946m Project Financing
Transaction; Excess Financing Capacity due to Subsequent
F/X Gains on US$ Funds; COF Undrawn; Potential for
Additional C$85m from In-the-Money Warrants
KPIs
As of May 31st, 2016
4
Construction
96% complete (compared to 90% plan, 82% initial plan)
Budget
Forecast cost to complete of C$775m (compared to
C$811m initial plan)
Mining
8.9 mTonnes from R2, R3 and R65 open pits (101% of
plan). 697,895 tonnes ore stockpiled (148% of plan).
1,635m of ramp development (82% of plan).
Schedule
On track for first ore processing by end-September 2016,
and commercial production by end-December, 2016.
First Production Guidance
March 30, 2016 Updated Mine Plan
Diamond Production
0.22 Mcarats in FY2016 and 1.71 Mcarats in FY2017
Diamond Sales
1.36 Mcarats in FY2017
Capital Structure & Balance Sheet
5
Balance Sheet(2)
Cash and Equivalents $219 million
Total Debt $255 million
Undrawn Financing Commitments(3) $109 million
Project Finance Sponsors
Investissement Québec, Orion Mine Finance, CDPQ,
Blackstone Tactical Opportunities
1. As of June 14, 2016.
2. As of March 31, 2016. Unaudited
3. Assuming a C$:US$ conversion rate of C$1.10. Does not include $48 million Cost Overrun Facility.
4. Fully Diluted
Capital Structure
Recent Share Price (TSX)(1) $1.02
52 week range $0.65 – $1.08
Market Capitalization(1) $756 million
Shares Outstanding 740.9 million
Warrants 114.7 million
Employee Options 31.6 million
50.2%
38.5%
11.3%
Project Finance
Sponsors
Institutional Retail and Insiders
Share Ownership(4)
Institutional Shareholders
Publicly Listed Diamond Producers, Developers and Explorers
Consensus Analyst Views on Value
Ticker
Price
(14/6/16)
Shares
O/S (mm)
Market
Cap($mm)
NAV/sh(1) Current
P/NAV(1) Target (1) % Return to
Target
Annual
Dividend
Diamond Producers
ALROSA ALRS:M ₽70.00 7,365.0 ₽515,547 (n/a) (n/a) ₽86.59 26% ₽1.47/sh
Dominion Diamonds DDC:T $12.57 85.1 $1,070.1 $23.63 0.5x $22.47 83% US$0.40/sh
Gem GEMD:LN £1.38 138.3 £190.5 £1.97 0.7x £1.73 28% US$0.05/sh
Lucara LUC:T $4.09 381.3 $1,559.5 $3.17 1.3x $3.92 -3% $0.06/sh
Petra PDL:LN £1.11 512.1 £565.9 £1.71 0.6x £1.47 35% £0.02/sh
Diamond Developers
Firestone FDI:LN £0.305 309.0 £94.2 £0.48 0.6x £0.37 22% (n/a)
Mountain Province MPV:T $6.20 159.7 $990.0 $6.64 0.9x $6.42 4% (n/a)
Stornoway SWY:T $1.02 740.9 $755.7 $1.41 0.7x $1.35 33% (n/a)
Diamond Explorers
Kennady Diamonds KDI:V $4.10 46.3 $189.6 (n/a) (n/a) (n/a) (n/a) (n/a)
North Arrow Minerals NAR:V $0.21 54.0 $11.3 (n/a) (n/a) (n/a) (n/a) (n/a)
Peregrine Diamonds PGD:T $0.205 339.1 $69.5 (n/a) (n/a) (n/a) (n/a) (n/a)
Shore Gold SGF:T $0.18 248.7 $44.8 (n/a) (n/a) (n/a) (n/a) (n/a)
1. Bloomberg and Thomson One Analyst Consensus. All Currencies in C$ unless specified
6
Mine Plan
Plan and Guidance as of March 30, 2016
7
Renard Diamond Project – Québec, Canada
The Canadian Diamond Mine Connected by Permanent Road Access
8
Updated Mine Plan
Mineral Reserve Case Only, March 30, 2016
9
1. Estimated average price per carat of the Mineral Reserve in Renards 2, 3, 4 & 65 expressed in March 2016 terms.
2. Expressed in nominal terms, and excluding Renard Mine Road capital of $69.4 million. Initial Capital Cost in the January 2013 Optimization Study was estimated at $793 million based on $752 million of cost and contingency plus $41 million escalation allowance. In April
2014, prior to the commencement of construction, Initial Capital was estimated at $811 million based on $754 million of cost and contingency plus $57 million of escalation. The estimate of $775 million of Initial Capital in the March 2016 Updated Mine Plan includes all
costs, contingencies and escalation allowances and represents a reduction of $36 million on the April 2014 estimate.
3. Expressed in real terms.
4. Expressed in real terms. Assumes a 2.5% escalation in diamond prices between 2016 and 2017 and a US$ exchange rate of C$1.35
5. Net of all royalties, costs incurred under the Mecheshoo Agreement (IBA) and the effective revenue impairment associated with the Renard diamond streaming agreement. For further information see the Stornoway AIF dated March 30, 2016.
6. After tax.
Reserve and Resource categories are
compliant with the "CIM Definition
Standards on Mineral Resources and
Reserves". Mineral resources that are not
mineral reserves do not have
demonstrated economic viability. The
potential quantity and grade of any
Exploration Target (previously referred to
as a “Potential Mineral Deposit”) is
conceptual in nature, and it is uncertain if
further exploration will result in the
target being delineated as a mineral
resource.
30 Mcarat Indicated Mineral Resource
13 Mcarat Inferred Mineral Resource
33-71 Mcarat TFFE
Mineral Resource Estimate Effective
September 24, 2015 (NI 43-101)
Renard 65
Renard 9
Renard 4
Renard 3Renard 2Reserve Carats (M) 22.3
Processing Rate (Mtonnes/annum) 2.2 to 2.5
Mine Life (years) 14
Average Diamond Production Years 1-10 (Mcarats) 1.8
Average Diamond Price (US$/carat)1 $155
Initial Cap-ex (C$M)2 $775
LOM Cap-ex (C$M)2 $1,045
LOM Op-ex (C$/tonne)3 $56.20
LOM Op-ex (C$/carat)3 $84.37
Gross Revenue (C$M)4 $5,565
Net Revenue (C$M)5 $4,555
Cash Operating Margin (C$M)5,6 $2,677 or 59%
NPV7% (C$M, unlevered, effective Jan.1, 2016)5,6 $974
Plant Commissioning Commences Oct. 1 2016
Commercial Production Declared Dec. 31 2016
Updated Mine Plan
Compared to the January 2013 Optimization Study
Increased Reserves; Longer Mine Life
24% increase in Probable Mineral Reserves to 22.3 Mcarats (33.4 Mt at 67 cpht);
Increase in Mineral Reserve based mine life to 14 years
Increased Average Diamond Production; Increased Early Diamond Production
Average diamond production in Years 1 to 10 1.8 Mcarats/a compared to 1.6 Mcarats/a previously
Guidance of 1.9 Mcarats produced and 1.4 Mcarats sold by end 2017, increases of 24% and 57% resp.
Processing Expansion
Scheduled increase in processing rate from 2.2 Mt/a (6,000 tpd) to 2.5 Mt/a (7,000 tpd) starting in 2018.
Updated Op-ex Estimate based on First Year’s Operating Data
LOM average operating costs of $56.20/tonne, or $84.37/carat.
Updated Project Valuation, After-Stream, Spot Diamond Price, Spot F/X
Real terms cash operating margin of 59% ($120 per carat), after royalties, taxes and stream.
Unlevered, stream affected, after tax NPV (7%) of $974 million (real terms, as of January 1st 2016)
10
RENARD 65
RENARD 4
RENARD 9
RENARD 2
RENARD 3
RETURN AIR
RAISE FRESH AIR
RAISE
PORTAL
BACKFILL RAISES IN
CROWN PILLAR
410L
270L
710L
590L
470L
290L
400L
250L
860L
VENTILATION
RAISE
MAIN
RAMP
Underground Mining Sequence
Mineral Reserve Case Only, March 30, 2016
Combined open pit and underground mining
2015-2018 Open pit R2, R3
2014-2029 Open pit R65
2018-2027 Underground R2, blasthole shrink stoppage with panel
retreat
2026-2029 Underground R3, R4, longhole stoping and blasthole
stoppage respectively
11
1
4
2
3
6
5
R3 OPEN PIT
R2 OPEN PITR65 OPEN PIT
Reserve and Resource categories are compliant with
the "CIM Definition Standards on Mineral Resources
and Reserves". Mineral resources that are not mineral
reserves do not have demonstrated economic
viability. The potential quantity and grade of any
Exploration Target (previously referred to as a
“Potential Mineral Deposit”) is conceptual in nature,
and it is uncertain if further exploration will result in
the target being delineated as a mineral resource.
Underground Mining Sequence
Business Case, Including Inferred Mineral Resources, March 30, 2016
Extension of UG at Renard 2 to 860L (stope 5)
Deferral of UG at Renard 3 (stope 6) and its extension to 400L (stope 7)
Deferral of UG at Renard 4 (stope 8) and its extension to 410L (stope 9)
New UG at Renard 9 to 410L (stopes 10 and 11)
Does not include non-resource exploration upside. All pipes open at
depth.
Does not include mining of Inferred Mineral Resources at Renard 65
below open pit pending confirmation of Renard 65 ROM $/carat.
12
7
9
10
11
R3 OPEN PIT
R2 OPEN PITR65 OPEN PIT
RETURN AIR
RAISE FRESH AIR
RAISE
PORTAL
BACKFILL RAISES IN
CROWN PILLAR
410L
270L
710L
590L
470L
290L
400L
250L
860L
VENTILATION
RAISE
MAIN
RAMP
5
1
4
2
3
8
6
Reserve and Resource categories are compliant with
the "CIM Definition Standards on Mineral Resources
and Reserves". Mineral resources that are not mineral
reserves do not have demonstrated economic
viability. The potential quantity and grade of any
Exploration Target (previously referred to as a
“Potential Mineral Deposit”) is conceptual in nature,
and it is uncertain if further exploration will result in
the target being delineated as a mineral resource.
RENARD 65
RENARD 4
RENARD 9
RENARD 2
RENARD 3
Production Profile
Mineral Reserve Case Only, March 30, 2016
13
0
1,000,000
2,000,000
3,000,000
4,000,000
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Tonnes
UG R3
UG R4
UG R2
OP R65
OP R2/R3
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030
Carats
R65
R4
R3
CRB
CRB2A
R2
$0
$200
$400
$600
2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031
Gross Revenue
(C$ millions)
Renard 65
Renard 4
Renard 3
Renard 2
Capital Cost Estimate
From November 2011 Feasibility Study to March 2016 Updated Mine Plan
14
$1,045.0
$2.9
$994.4
$18.5
$35.0
$500
$600
$700
$800
$900
$1,000
$1,100
FS Nov 2011 OS Jan 2013 LNG FS Oct 2013 Updated Mine Plan
Mar 2016
Current Mar 2016
Renard LOM Capex (C$ millions)
Including Contingencies and Escalation
$775.4
$61.9
$35.6
$859.1
$1.9
$11.9
$500
$550
$600
$650
$700
$750
$800
$850
$900
FS Nov 2011 OS Jan 2013 LNG FS Oct 2013 Execution Plan
Apr 2014
Updated Mine
Plan Mar 2016
Current Mar 2016
Renard Initial Capex (C $millions)
Including Contingencies and Escalation
11 Year Mine Life 14 Year Mine Life
Note: Expressed in December 2015 nominal terms and excluding Renard Mine Road capital of $69.4 million. Totals may not add up due to rounding.
15
50
100
150
200
250
300
350
Indexto2009=100
US$ May
2011
Renard Sample Valuation Assessments
March
2013
March
2014
C$
March
2016
Renard Diamond Price Assumptions
March 30, 2016 Updated Mine Plan
Body
March 2014 Diamond
Price Model1
(US$/carat)
Estimated Market
Price Adjustment Mar
2014 to Mar 2016
Adjusted Price
Estimates March
2016: “Spot” Price
Models2 (US$/carat)
Renard 2
$197
(High $222, Min $178)
-19%
$160
(High $181, Min $145)
Renard 3
$157
(High $192, Min $146)
$128
(High $156, Min $119)
Renard 4
$106 ($155)3
(High $174, Min $100)
$86 ($126)3
(High $141, Min $81)
Renard 65
$187
(High $190, Min $160)
$152
(High $155, Min $130)
WWW Rough Diamond Price Index, 2004-2016 (RoughPrices.com)
Mine Plan Financial Analysis assumes a 2.5% real terms diamond price escalation
between 2016 and 2028
The Renard Streaming Agreement includes a payment of US$56 per carat on 20%
of ROM production from Renards 2,3,4,9 and 65, Life-of-mine, escalating at 1%
per annum after the 3rd anniversary of production, inclusive of marketing costs.
1. As determined WWW International Diamond Consultants Ltd. at a +1 DTC sieve size cut off.
2. As determined by applying the world average rough price index of roughrices.com to the March 2014 price models, at a +1
DTC sieve size cut-off.
3. Should the Renard 4 diamond population prove to have a size distribution equal to the average of Renard 2 and 3, WWW
have estimated that a base case diamond price model of US$155 per carat would apply based on March 2014 pricing,
equivalent to US$126 per carat on a market price adjusted basis to March 2016.
The weighted average price of the March 2016 Probable Mineral Reserve is
US$155/ct, or C$209/ct, in March 2016 terms
Average life-of-mine pricing is US$185/ct or C$250/ct, or US$159/ct or
C$214/ct after stream.
Life of Mine Revenue
From Jan 2013 Optimization Study to March 2016 Updated Mine Plan
$5.000
$4.500
$4.000
$3.500
$3.000
$2.500
$2.000
$1.500
$1.000
$500
$0
$800
$773
$260
$574
$1,255 $4,555
Net Revenue (C$ millions)
Updated Mine
Plan Mar 2016
OS Jan 2013 Stream
Impact
Spot Diamond
Pricing
Addition
of R65
Addition of R2
to 710m Depth
Exchange Rate
$4,069
Note: Revenue is net of royalties, marketing costs, for the March 2016 Updated Mine Plan and the July 2014 Renard Streaming Agreement
16
Note: Expressed in real terms. Payables and cash as of December 31, 2015 are included in
2016 Net FCF
Financial Analysis
Net Free Cash Flow, After-Tax, After-Steam (C$ million)
17
Progress Report
As of May 30, 2016
18
Renard Project Site
April 2016
19
R2 & R3 PitCrusher
UG Mine Portal
R65 Pit Power Plant
Process Plant
Maintenance Shop
Admin/Dry
Accommodation
Health, Safety, Environment, and Stornoway’s Team
SWY employees: 0.24 (1 incident in 817,550 hours worked)
Contractors: 1.54 (15 incidents in 1,946,300 hours worked)
Engineering: 0.00 (0 incidents in 278,495 hours worked)
Renard Total: 1.05 (16 incidents in 3,042,345 hours worked)
Québec Construction Industry: 0.9
Québec Mining Industry: 1.0
20
“The Courage to Care”
On Personal Safety; On the Safety of our Colleagues; On the
Environment; With our Inter-Cultural Workforce
Lost Time Injury Rate (to the end of April)
Route 167: 2 incidents of non-compliance project-to-date (wetland, remediated)
Renard Project Site: 0 incidents of non-compliance project-to-date
Environment
Construction Progress to May 31, 2016
21
Major Facilities
Accommodation, Mine Dry/Admin, Maintenance Facility Completed Ahead of Schedule by September 2015
22
Power Plant
The First LNG fueled Power Plant in the Canadian Mining Industry
23
Processed Kimberlite Containment
Dry Stacking Processed Kimberlite
24
Processed Kimberlite
Containment (PKC) Ditch
Starter Berm
Foundation
Drains
Centrifuges in process plant de-water processed
kimberlite (PK)…
Primary Crusher, process Plant and PK Loadout connected by
covered conveyors
producing a cake for re-handling.
PK cake is loaded out… as a truckable product… and sent to PKC facility with progressive reclamation.
Water Management
Collecting and Treating 100% of Site Surface Precipitation
25
PKC
Waste Rock
Overburden
UG Mine Portal
Process Plant
Mine Waste Water Treatment
Plant
Collection Trench
Pumping Station
Camp Waste Water
Treatment Plant
Process Plant
World’s First Diamond Plant with LDR in Primary Flow Sheet
26
Nameplate capacity of 6,000 tpd (2.16 Mt/a) based on
78% plant utilization.
Expansion to 7000 tpd (2.52 MT/a) is scheduled for 2018
based on 83.5% utilization and +2% throughput.
Flow sheet:
Primary jaw crushing to < 230mm
Twin DMS circuits at +1mm -19mm
LDR circuit at +19mm -45mm, scalable to -60mm
Oversize +45mm to secondary cone crusher
LDR and DMS tails +6mm -19mm to tertiary High Pressure
Grinding Rolls
Centrifugal de-watering of fines and tails for truckable dry-
stack disposal.
Large Diamond Recovery (“LDR”) through TOMRA XRT.
Ramp-Up Schedule
27
35,154
82,005
108,000
126,000
135,000
145,801
162,000
171,000
180,000 180,000 180,000
-
20,000
40,000
60,000
80,000
100,000
120,000
140,000
160,000
180,000
200,000
M10-2016
M11-2016
M12-2016
M1-2017
M2-2017
M3-2017
M4-2017
M5-2017
M6-2017
M7-2017
M8-2017
MILLFEED(T)
100% Nameplate
Capacity
Commercial Production
60% Nameplate Capacity for 30 days
Open Pit Mining
28
KPIs to May 31, 2016
Actual Plan %
Tonnes Mined, R2-R3/R65 8,883,853 8,753,296 101%
Tonnes Ore Stockpiled 697,895 473,126 148%
Renard 65 Pit (2014-2029)
14.0 Mtonnes moved, 1.38 Mcarats (4.58 Mtonnes at 30cpht)
Stripping ratio (Waste to Ore): 2.11, Depth 155m
March 2018 End 2018 End 2019 End 2021 End 2024 End 2027
March 2016 October 2016 Dec. 2016 August 2017 Dec. 2017 April 2018
Renard 2-3 Pit (2015-2018)
15.5 Mtonnes moved, 2.58 Mcarats (4.33 Mtonnes at 59cpht)
Stripping ratio (Waste to Ore): 2.54, Depth 130m
Underground Mine Ramp Development
29
KPIs to May 31, 2016
Actual Plan %
Ramp Development (m) 1,635 2,003 82%
Looking Forward
Commissioning, Ramp-Up, Resource Reconciliation, Growth
30
Areas of Focus
31
Finality (it’s not over until it’s over)
Mining: now on the critical path
Stakeholder expectations
Full resource reconciliation
Employment market: Lack of trained miners
Opportunities
Construction pace and performance
Operating environment
Large Diamonds
Renard Resource Upside
Growth: Exploration and M&A
0
20
40
60
80
100
120
140
160
180
Resource Growth at Renard
32
0
50
100
150
200
2004 2006 2008 2009 2011 2013 2015
MillionsofTonnes
Resource Growth,
2004-2015
0m
100m
200m
400m
900m
700m
500m
300m
800m
600m
1100m
1200m
1000m
Mine Plan: 14 years of
mining on 22mcarat
Mineral Reserve
(33mtonnes)
Permitting and Long Term Plan
The Vision: Deposit
still Open
Millions of
Tonnes
Grades illustrated are for Indicated and Inferred Mineral Resources respectively at a +1DTC sieve size cut-off.
Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and
Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The
potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral
Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being
delineated as a mineral resource.
30 Mcarat Indicated Mineral Resource
13 Mcarat Inferred Mineral Resource
33-71 Mcarat TFFE
Mineral Resource Estimate Effective
September 24, 2015 (NI 43-101)
Renard 65
24/29cpht
Renard 9
53cpht
Renard 4
61/52cpht
Renard 3
102/112cpht
Renard 2
84/59cpht
TFFE High Range
Inferred Mineral Resource
TFFE Low Range
Indicated Mineral Resource
Conceptual
R7
R1 R65
R4 R9
R2
R3
R10
Resource Reconciliation
Step 1: Reconcile actual pipe
geology with geological model
(Successful example from Renard
3 on 490m level shown opposite)
Step 2: Reconcile grade (to come
upon processing start-up)
Step 3: Reconcile size
distribution and plant recovery
characteristics (to come upon
processing start-up)
Step 4: Reconcile quality
assortment and value (to come
upon sorting and sale)
33
Renard 3: Level 490 Mine Geology
Kimb3i
Kimb3f
Kimb3dg
Kimb3b
Kimb3h
CRB
Kimb3c
Thin lines are the 2015 geological model
Thick lines are actual mine geology
Renard 3:
Level 490
Mine Geology
Renard 2
Renard 3
34
Large Diamonds at Renard
The Renard Diamond Process Plant will be the first plant
in the world to have LDR capacity in the primary flow
sheet.
Large Diamond Recovery (“LDR”) through TOMRA XRT.
High Quality Production with Large Stone Potential
Distribution in Renard 2 predicts three to six 50-100ct stones
and one to two +100ct stones every 100,000 carats.
Base Case Diamond Valuation Estimates Using on Best
Practice Methodology
Average diamond price estimate in March 2016 for the
Mineral Reserves at US$155/ct (un-escalated).
Substantial revenue potential from large diamonds not
accounted for in the base case cash-flow model.
1000T storage bin
with overflow to stockpileRe-load hopper
HPGR
Cone
crusher
Scrubber and
screening
Process office
and MCC’s
DMSPK mixer
Centrifuge
Air compressors
Thickening
Wet
screening
Cold storage
Dry
screening
Process
Water
Diamond Sales
Stornoway will sell 100% of the Renard diamond
production by tender sale in Antwerp on an
undivided basis.
Stornoway has engaged well known diamond
industry broker and rough distributor Bonas-Couzyn
as sales commissionaire and tender agent for arm's
length market sales.
Other than under exceptional circumstances,
Stornoway will sell 100% of what it produces, will not
carry a stockpile outside of normal goods-in-progress,
and will be a market price taker.
Stornoway will support the Québec or Canadian
brand identification initiatives of its clients through
chain of custody certification.
First sales are expected in January 2017.
35
Exploration & Adamantin
Stornoway maintains an active diamond
exploration team and conducts 100%
owned generative programs.
Recent drilling at Adamantin Project
returned kimberlite in 18 of 78 holes
testing 72 geophysical targets interpreted
as 11 discrete kimberlite bodies.
Intersections of undiluted (100%) HK up
to 13.7m and mixed HK/country rock up
to 22.9m.
AD50/51/52 interpreted as one body
dipping 5-10 degrees with a true
thickness of 10m, over a 260m strike
extent, open, 6-12m below surface
(illustrated).
Sampled for diamond content. One
diamond recovered in till in 2015
sampling.
36
AD-50
AD-51
AD-52
AD-52-03
AD-52-01
AD-52-02
SW NE
6-8 m
from surface
9.8 m
AD-50-01
AD-50-02
9-10 m
from surface
9.8 m
SW NE
AD-50
AD-51
AD-52
AD-50 AD-52
12 Month Outlook and Priorities
A Safe and Protected Workplace and
Environment
Project Completion on Budget and Schedule
Resource Reconciliation
First Québec Diamond Sales January 2017
Achieving March 2016 Mine Plan Guidance
0.22 Mcarats Produced in FY2016 and
1.71 Mcarats in FY2017
1.36 Mcarats Sold in FY2017
Operating and Sustaining Capital Costs
Maintain Balance Sheet Strength
37
Appendix
38
History of the Renard Diamond Project
Québec’s First Diamond Mine
1996: Start of initial regional exploration by Ashton & SOQUEM
2001: First kimberlite discovery
2001-08: Drilling, “mini-bulk” sampling, bulk sampling
2006: Stornoway acquires Ashton
2008-10: First NI 43-101 Resource and PEA
2011: Stornoway acquires SOQUEM’s 50% project interest
November 2011: Feasibility Study issued. First mineral reserve
December 2012: ESIA filed
February 2012: Road construction commences under Plan Nord
March 2012: “Mecheshoo Agreement” executed
Nov.-Dec.2012: Mining Lease and Québec Authorizations issued
January 2013: Optimization Study issued
July 2013: Federal Canadian Authorizations Issued
September 2013: Road opens
April-July 2014: $C946m financing completed. Construction commences
December 31, 2016: Scheduled Commercial Production
39
Chibougamau
Montréal
Toronto
800km
360km
Renard
Chronology of Renard Studies
Feasibility Study (Nov 2011. NI 43-101 Technical Report Dec 2011)
11 Year Mine Plan based on 18 million carat Mineral Reserve derived from January 2011 NI 43-101 Resource.
Long Term Business Plan
Companion study to the Feasibility Study with extended mine plan incorporating Inferred Mineral Resources. Basis of mine design and permitting
Optimization Study (Jan 2013. NI 43-101 Technical Report Mar 2013)
Refined Feasibility mine design, including shaft deferral and a modified underground mining sequence.
11 Year Mine Plan based on 17.9 million carat Mineral Reserve.
Mineral Resource Update (July 2013)
Resource update with 14% increase in Indicated Resource contained carats
LNG Feasibility Study (Oct 2013)
Modified project Cap-ex and Op-ex for LNG powered gen-sets
Mineral Resource Update (Sep 2015. NI 43-101 Technical Report Oct 2015)
Resource update with 11% increase in Indicated Resource contained carats
Updated Mine Plan and Mineral Reserve Estimate (Mar 2016. NI 43-101 Technical Report Mar 2016)
Update based on 2013 & 2015 Mineral Resource Updates, accelerated construction schedule, and expanded processing
14 Year Mine Plan based on 22.3 million carat Mineral Reserve
40
Stornoway Board and Management Team
41
Head Office: Longueuil, Québec
Exploration Office: North Vancouver, BC
Community Offices: Mistissini & Chibougamau Québec
Hume Kyle
Independent
John LeBoutillier
Independent/
IQ Designate
Ebe Scherkus
Independent/
Board Chairman
Non-Executive Directors
Marie-Anne Tawil
Independent/
IQ Designate
Peter Nixon
Independent
Serge Vézina
Independent
Douglas Silver
Orion Designate
Gaston Morin
Independent/
IQ Designate
Pat Godin
COO & Director
Matt Manson
President, CEO
& Director
Executive Officers
Rob Chausse
CFO
Annie Torkia-
Lagace
VP Legal
Orin Baranowsky
VP IR & Corp. Dev
42
NI 43-101 Probable Mineral Reserves
March 30, 2016
Probable Mineral Reserve(1,2,4)
(Changes from January 2013 Probable Mineral Reserve estimate shown in italics)
Mining Recovery Factors Utilized in the
Reserve Calculation
Carats (millions) Tonnes (millions)
Grade
(cpht)(3)
Mining
Dilution(5)
Internal
Dilution(6)
Mining
Recovery
Open Pit
Renard 2, All Units 1.85 49% 3.54 170% 52.2 -45% 2.9% 0.0% 98%
Renard 2 1.38 11% 1.49 14% 92.7 -2% 1.7% 0.0% 98%
CRB-2A 0.15 n/a 0.47 n/a 31.4 n/a 1.8% 0.0% 98%
CRB 0.32 n/a 1.58 n/a 20.2 n/a 4.3% 0.0% 98%
Renard 3 0.73 9% 0.79 10% 92.3 -1% 11.4% 0.0% 98%
Renard 4 -- n/a -- n/a -- n/a -- -- --
Renard 65 1.38 n/a 4.58 n/a 30.1 n/a 3.5% 0.0% 98%
OP Probable Mineral Reserves 3.96 107% 8.91 339% 44.4 -53% 3.9% 0.0% 98%
Underground
Renard 2 15.65 15% 19.68 16% 79.6 -1% 20.2% 6.4% 82%
Renard 3 0.86 2% 1.22 22% 70.2 -16% 14.0% 29.8% 85%
Renard 4 1.67 6% 3.46 -7% 48.3 15% 14.0% 2.2% 78%
Renard 65 -- n/a -- n/a -- n/a -- -- --
UG Probable Mineral Reserves 18.18 13.4% 24.36 12.0% 74.6 1% 18.9% 6.7% 82%
Stockpile
Stockpile 0.11 n/a 0.15 n/a 73.9 n/a -- -- --
Total Probable Mineral Reserves 22.26 24.0% 33.42 40.5% 66.6 -11.3% 14.8% 4.9% 86%
Notes
1 Reserve categories follow the CIM Standards for Mineral
Resources and Mineral Reserves.
2 Totals may not add due to rounding.
3 Carats per hundred tonnes. Estimated at a +1 DTC sieve
size cut-off.
4 Diamond valuation data utilized for the test of prospects
of reasonable economic extraction are derived from a
diamond valuation exercise undertaken in March 2014
(see Stornoway Annual Information Form dated March
2016).
5Represents the proportion of waste rock expected to be
extracted during mining. Mining dilution is assumed to
have zero grade.
6Represents planned dilution of waste rock through stope
design in the underground mine.
7Represents mine and stockpiled ore as of December 31,
2015
43
Reserve categories are compliant with
the "CIM Definition Standards on
Mineral Resources and Reserves".
Renard 2
86%
Renard 3
5%
Renard 4
9%
Carats
Renard 2
81%
Renard 3
5%
Renard 4
14%
Tonnes
Underground Probable
Mineral Reserves
Open-Pit Probable
Mineral Reserves
Kimb2a/
Kimb2b
35%
CRB-2A
4%
CRB
8%
Renard 3
18%
Renard 65
35%
Renard 2, All
Units…
Carats
Kimb2a/
Kimb2b
17%
CRB-2A
5%
CRB
18%
Renard 3
9%
Renard 65
51%
Renard 2,
All Units…
Tonnes
NI 43-101 Probable Mineral Reserves
March 30, 2016
44
Inferred Mineral Resources
Indicated Mineral Resources
High Range TFFE
Renard 65
775m depth
Renard 4
775m depth
Renard 9
775m depth
Renard 2
1,250m depth
Renard 3
1,250m depth
Indicated Mineral Resources(1,2,4)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(3)
Renard 2, All Units 21.58 +15.6% 25.70 +38.3% 84 -16.4%
Renard 2, w/o CRB-2A,
CRB
20.39 +11.0% 20.52 +15.9% 99 -4.3%
CRB-2A 0.29 +2.6% 0.90 +2.6% 32 --
CRB 0.90 n/a 4.28 n/a 21 n/a
Renard 3 1.86 +2.3% 1.82 +3.4% 102 -1.0%
Renard 4 4.44 +3.0% 7.25 -- 61 +3.0%
Renard 65 2.30 -- 7.87 -- 29 --
Total Indicated Mineral
Resources
30.17 +11.4% 42.63 +20.2% 71 -7.4%
Inferred Mineral Resources(1,2)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(3)
Renard 2, All Units 3.88 -48.0% 6.59 -44.0% 59 -7.2%
Renard 2, w/o CRB 3.36 -46.1% 4.08 -22.0% 82 -30.9%
CRB 0.53 -57.6% 2.51 -61.6% 21 +10.5%
Renard 3 0.61 -- 0.54 -- 112 --
Renard 4 2.46 +3.5% 4.75 -- 52 +3.5%
Renard 65 1.18 -- 4.93 -- 24 --
Renard 9 3.04 -- 5.70 -- 53 --
Lynx 1.92 -- 1.80 -- 107 --
Hibou 0.26 -- 0.18 -- 144 --
Total Inferred Mineral
Resources
13.35 -20.8% 24.49 -17.5% 54 -4.0%
Notes
1 Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and Reserves".
Mineral resources that are not mineral reserves do not have demonstrated economic viability.
2 Totals may not add due to rounding.
3 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off.
4 Diamond valuation data utilized for the test of prospects of reasonable economic extraction are derived from a diamond
valuation exercise undertaken in March 2014 (see Stornoway Annual Information Form dated July 2015).
Renard Diamond Project NI 43-101 Mineral Resource Estimate
Effective September 24 2015. Changes to Previous Estimate Shown in Italics
North East View
45
Renard Diamond Project Exploration Potential
Effective September 24 2015. Changes to Previous Potential Shown in Italics
Notes
1 Target for Further Exploration: represents potential upside that can be
reasonably assumed given the nature and grade of material within the current
2015 Mineral Resource. The Renard 2 shape has been projected 250m below the
deepest kimberlite intersection at 1,000m depth. Tonnage and grade ranges are
not directly applicable to potential total carats.The potential quantity and grade of
any Exploration Target is conceptual in nature, there has been insufficient
information to define a mineral resource, and it is uncertain if further exploration
will result in the target being delineated as a mineral resource.
2 Carats per hundred tonnes. Potential at a +1 DTC sieve size cut-off.
R10 R7 R1
R65
R4 R9
R2
R3
Notes
Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and
Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability.
Area indicated in yellow represents a gap in drill coverage that may represent additional exploration potential outside
of the current Mineral Resource Estimate and not included in the current Targets for Further Exploration.
Inferred Mineral Resources
Indicated Mineral Resources
High Range TFFE
Renard 65
775m depth
Renard 4
775m depth
Renard 9
775m depth
Renard 2
1,250m depth
Renard 3
1,250m depth
North East View
Targets for Further Exploration(1)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(2)
Renard 1 1.7 to 3.9 8.6 to 13.0 20 to 30
Renard 2, All Units 3.7 to 15.5 6.1 to 15.5 60 to 100
Renard 3 3.6 to 6.3 3.4 to 3.8 105 to 168
Renard 4 5.6 to 11.8 11.1 to 15.4 50 to 77
Renard 65 7.3 to 13.5 29.0 to 40.9 25 to 33
Renard 7 1.9 to 3.8 6.3 to 9.4 30 to 40
Renard 9 2.0 to 4.3 3.9 to 6.3 52 to 68
Renard 10 0.7 to 2.1 1.2 to 1.7 60 to 120
Lynx 3.0 to 3.8 3.1 to 3.2 96 to 120
Hibou 3.6 to 6.1 3.5 to 4.0 104 to 151
Total TFFE
33.0
+28%
to
71.1
+40%
76.2
+49%
to
113.2
+51%
46
Renard 2 Mineral Resource Update
Effective September 24 2015. Changes to Previous Estimate Shown in Italics
Notes
1 Reserve and Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and
Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability.
2 Totals may not add due to rounding.
3 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off.
4 Diamond valuation data utilized for the test of prospects of reasonable economic extraction are derived from a diamond valuation
exercise undertaken in March 2014 (see Stornoway Annual Information Form dated July 2015).
Notes
1 Represents potential upside that can be reasonably assumed given the nature and grade of material within the current 2015 Mineral
Resource. The potential quantity and grade of any Exploration Target is conceptual in nature, there has been insufficient information
to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.
2 Carats per hundred tonnes. Potential at a +1 DTC sieve size cut-off.
Indicated Mineral Resources(1,2,4)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(3)
Renard 2, All Units 21.58 +15.6% 25.70 +38.3% 84 -16.4%
Renard 2, w/o CRB-2A, CRB 20.39 +11.0% 20.52 +15.9% 99 -4.3%
CRB-2A 0.29 +2.6% 0.90 +2.6% 32 --
CRB 0.90 n/a 4.28 n/a 21 n/a
Inferred Mineral Resources(1,2)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(3)
Renard 2, All Units 3.88 -48.0% 6.59 -44.0% 59 -7.2%
Renard 2, w/o CRB 3.36 -46.1% 4.08 -22.0% 82 -30.9%
CRB 0.53 -57.6% 2.51 -61.6% 21 +10.5%
Target for Further Exploration(1)
Contained Carats (millions) Tonnes (millions) Grade (cpht)(2)
Renard 2, All Units 3.7 to 15.5 6.1 to 15.5 60 to 100
Pipe shape
at surface
(1.89ha)
High TFFE at 1,250m
(1.38ha)
0m
700m
850m
1250m
INDICATED
INFERRED
TFFE
600m: Base of
Previous Indicated
Mineral Resources
Depth
Below
Surface
Kimberlite
outline
at surface
(0.75ha)
Low TFFE at 1,250m
(0.62ha)
Base of New
Indicated
Resources
(1.55ha)
North View
Pinch in model
in area lacking
drill coverage
47
Renard 2 Geological Model and Unit Grades
Effective September 24 2015. Changes to Previous Estimate Shown in Italics
Notes
1 Carats per hundred tonnes. Estimated
at a +1 DTC sieve size cut-off.
2 Represents the average amount of
non-diamond bearing country rock
estimated within each geological unit.
3 The Kimb 2c (Hypabyssal Kimberlite, or
“HK”) unit is a constituent component
of each of the Kimb2a, Kimb2b, CRB and
CRB-2a units.
West View
Kimb2b
(“Brown”)
Kimb2a
(“Blue”)
CRB CRB-2a
Kimb2c (HK)
Contact
Photographs of geological units from the 2007
Renard underground bulk sample program
Within the Indicated Mineral Resources
Average Grade (cpht)(1) Average Dilution (%)(2)
Kimb 2a (“Blue”) 76 +3.0% 52 -0.9%
Kimb 2b (“Brown”) 145 +1.0% 30 -0.9%
Kimb 2c (HK)3 229 +0.5% 12 -3.1%
CRB-2a 32 -- 93 --
CRB 21 n/a 96 n/a
Within the Inferred Mineral Resources
Average Grade (cpht)(1) Average Dilution (%)(2)
Kimb 2a (“Blue”) 67 -2.4% 65 +9.2%
Kimb 2b (“Brown”) 145 +0.3% 30 +1.5%
Kimb 2c (HK)3 229 +0.5% 12 -3.1%
CRB 21 +10.5% 96 --
Pinch in model in area
lacking drill coverage
0m
700m
850m
1250m
INDICATED
INFERRED
TFFE
600m: Base of
Previous Indicated
Mineral Resources
Depth
Below
Surface
North View
Renard 2 Average Mineral Resource Grades, by Geological Unit
48
Renard 2 Geological Model and Renard 2-Renard 3 Convergence
Effective September 24 2015
Pipe shape
at surface (1.89ha)
Kimberlite outline
at surface (0.75ha)
Kimb2b (“Brown”)
Kimb2a (“Blue”)
CRB
CRB-2a
Surface View, Looking Down
Renard 2
Renard 3
126.6m R3 intersection in DDH R2-81J (in red)
starting 942.2m downhole: 47m true width.
0m
700m
850m
1250m
R2 INDICATED
R2 INFERRED
R2 TFFE
Depth
Below
Surface
R3 INDICATED
R3 INFERRED
R3 TFFE
North East View
Resource categories were completed in accordance with the "CIM Definition Standards on Mineral
Resources and Reserves". Mineral resources that are not mineral reserves do not have
demonstrated economic viability. The potential quantity and grade of any Exploration Target is
conceptual in nature, there has been insufficient information to define a mineral resource and it is
uncertain if further exploration will result in the target being delineated as a mineral resource.
Renard 2 Renard 3
R3 TFFE: >500m
potential between
drill intersections
49
Jan 2013 Opt.
Study, before
Stream1,2
2016 Mine Plan
Update, after
Stream1,2
Total Operating Cost (C$M)3 $1,352 $1,878
Ore Production (Mt) 23.8 33.4
Diamond Production (Mct) 17.9 22.3
Production Cost
C$57.63/t C$56.20/t
C$76.63/ct C$84.37/ct
Total Gross Revenue (C$M) $4,268 $5,565
Total Net Revenue (C$M) $4,069 $4,555
Marketing Costs (%) 2.7% 1.8%
DIAQUEM Royalty (%) 2.0% 2.0%
Cash Operating Margin (C$M) $2,693 $2,677
% Operating Margin 67% 59%
Operating Margin (C$/ct) $151.05 $120.04
Life of Mine Operating Parameters
March 30 2016 Updated Mine Plan
$97 , 5%
$613 , 33%
$568 , 30%
$600 , 32%
Operating Expenses (C$M and % of OPEX)
Open Pit Mine
Underground
Mine
Concentrator
G&A and
Infrastructure
$0
$50
$100
$150
$200
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
Operating Expenses (C$M)
G&A and
Infrastructure
Concentrator
Underground
Mine
Open Pit Mine
Notes
1. March 2016 study shown net of the July 2014 Renard Streaming Agreement, Diaquem royalty and
marketing costs in terms of net revenue, Cash Operating Margin and NPV. For further information on
the Renard Streaming Agreement see the Stornoway Annual Information Form dated March 30, 2016
2. January 2013 Optimization expressed in October 2012 terms. March 2016 Updated Mine Plan
expressed in December 2015 terms.
3. Expressed in December 2015 real terms.
50
Capital Expenditures
March 30 2016 Updated Mine Plan.
Project Costs of $548.5 million Committed or Incurred to Dec 31 2015
Initial Capital
Site Preparation & General $ 45.1
Mining $ 57.1
Mineral processing plant $ 137.7
Onsite utilities and infrastructures $ 111.1
Network and Distribution $ 15.9
Offsite utilities and infrastructures $ 0.3
Pre-production and Ramp-up $ 88.5
Project indirect costs $ 153.9
Professional Services $ 44.6
Construction indirect costs $ 38.5
Contingency $ 57.5
Escalation $ 25.3
Total Initial Capital $ 775.4
Sustaining and Deferred Capital
Open Pit $ 16.1
Underground $ 222.5
Process Plant $ 12.5
Admin. & Infrastructure $ 3.7
Power Plant and Airport $ 13.7
Total Sustaining/Deferred Capital $ 268.5
Total LOM Capital $ 1,045
$-
$10
$20
$30
$40
$50
$60
$70
$80
$90
$100
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
Capital Costs, 2016 to 2030 (C$M)
Process plant Adm. & Infra.
Power Plant & Airport Open pit
Underground Initial Capital
2016 Initial Capital equals $282 million
Sustaining and Deferred Capital Costs
(C$M and %)
Open pit Process plant
Adm. & Infra. Power Plant & Airport
Underground Notes: expressed in December 2015 nominal terms and excluding Renard
Mine Road capital of $69.4 million. Totals may not add up due to rounding.
Contracting
Where we are Spending the Money: 2015 Data
51
Quebec, $324M
Ontario,
$43M
USA, $23M
South Africa,
$6M
Other,
$4M
C$400 million of
expenses incurred at
Renard in 2015
C$324 million of
expenses incurred
in Québec in 2015
Mistissini and
Eeyou Istchee,
$64M
Chiboug.
& Chapais,
$31M
Abitibi-
Temiscamingue,
$53M
Other, $39M
Chaudiere
Appalaches,
$28M
Bas St-
Laurent,
$21M
Montreal-
Laval, $74M
Saguenay Lac
St-Jean, $14M
Contractors at Mine Site in 2015
Construction Talbon Matoush-Grimard Groupe Promec
Manseau & Perron inc MY Surveying Equ. Pétrolier Lac St-Jean
Sakhiikan Consortium Kesi Construction Construction Proco
Eskan Company RCM Habitation Modulaire Air Creebec
Jos Ste-Croix Swallow-Fournier inc Petronor
Kiskinshiish Camp Services Tessier Ltée Dyno Nobel Canada
Communications Telesignal Propane Nord-Ouest Groupe Robert
Structures GB Ltée Prevost et Frères Mabarex
H2O Innovation Nordic Structures Bois Hewitt
Anixter Canada Recyclage Ungava Corner Cast
Plomberie Chibougamau Sanivac Réseau Revetement RHR
Crevier Chiiwetin Industrie Blais Groupe Industriel Premium
Convoyeur Continental ASDR Environnement Mansour Mining Techno.
Installations AC Washeyaabiin Const. PAR Tanguay (WEC)
Industrie Fournier Biron SNC-Lavalin
Yves Lacombe Pétrole MJ Golder
Lafleur Portes de Garage Moreau Électrique BBA
Protection Incendie Viking Moteur du cuivre/DLB Metallisation du Nord
Monthly Manpower at Site to April 30, 2016
Stornoway Employees and Contractors at Renard
52
53
Origin of Renard’s Workforce
Targeting Local Hiring: Stornoway Employees at Mine Site, April 30, 2016 Data
11
19
27
40
41
49
8
19
58
5
43
0 10 20 30 40 50 60
Other Communities (CA)
Other Communities (QC)
Quebec
Saguenay Lac-St-Jean
Montreal
Abitibi-Témiscamingue
Other Communities NQ
Chapais
Chibougamau
Other Cree Communities
Mistissini
42%
Northern
Quebec
55%
Other
Quebec
3%
Other
Canada
Targeted Contracting for Small and Local Suppliers
Stornoway emphasises local hiring and procurement, with contracts
tailored for local businesses.
Stornoway prioritizes, wherever possible, hiring and contracting in the
Cree communities of Eeyou Itschee, particularly Mistissini, and with the
families of Sydney Swallow (Kiskinshiish Camp Services) and Emerson
Swallow (Swallow-Fournier), Tallymen for the Renard area.
In 2015 Stornoway purchased $95 million in goods and services from
Mistissini, Chibougamau and Chapais, and estimates $8 million in payroll
added to the local economy.
54
169
134
50
Numbers of Contracts for Goods and Services in Québec
2015 Data
10-99K$ 100-999K$ 1M$+
Communities
Stornoway is committed to fostering a positive relationship with its communities.
55
In addition to employment and business development
opportunities, Stornoway aims to foster educational and
training development in youth, respect for traditional
activities, two-way communication with community
representatives on project impacts, and support for local
charitable organisations.
Stornoway undertakes regular communication with our
employees at site, and communicates more formally
through community committees such as the Renard
Committee, the Environment Committee, the Training &
Employment Committee, and the Comité de Liaison Renard.
Our annual Sustainable Development Report is delivered to
each household in the region.
Stornoway’s commitments are laid out in our 2012
Mecheshoo Agreement with the Cree Nation of Mistissini
and the Grand Council of the Crees (EI), and our 2012
Declaration of Partnership with Chibougamau and Chapais.
Community Engagements
56
Centraide/SWY Golf Tournament
Mistissini Open Door Mining Matters activity day
Cree Youth at Quebec Mines ExpoCree Training Programs
Cree Career Fair Site Visits
On-site Cultural Activities
57
58
Stornoway Diamond Corporation TSX:SWY, TSX:SWY.WT.A, TSX:SWY.DB.U
Head Office:
1111 Rue St. Charles Ouest,
Longueuil, Québec J4K 4G4
Tel: +1 (450) 616-5555
IR Contact:
Orin Baranowsky, CFA, VP IR and Corp Dev
obaranowsky@stornowaydiamonds.com
Tel: +1 (416) 304-1026 x2103
www.stornowaydiamonds.com
Info@stornowaydiamonds.com

Contenu connexe

Tendances

Renard Resource Update September 24 2015 Companion Materials
Renard Resource Update September 24 2015 Companion MaterialsRenard Resource Update September 24 2015 Companion Materials
Renard Resource Update September 24 2015 Companion MaterialsStornoway Diamonds
 
Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Stornoway Diamonds
 
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway Diamonds
 
Swy td conference 2019 presentation
Swy td conference 2019 presentationSwy td conference 2019 presentation
Swy td conference 2019 presentationStornoway Diamonds
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Stornoway Diamonds
 
Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Stornoway Diamonds
 
Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Diamonds
 
Presentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferencePresentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferenceStornoway Diamonds
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Diamonds
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway Diamonds
 
Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Diamonds
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway Diamonds
 
Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Diamonds
 
Stornoway Corporate Update Presentation April 17, 2015
Stornoway Corporate Update Presentation April 17, 2015Stornoway Corporate Update Presentation April 17, 2015
Stornoway Corporate Update Presentation April 17, 2015Stornoway Diamonds
 
Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Diamonds
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateNOVAGOLD
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016PretiumR
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Adnet Communications
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017PretiumR
 

Tendances (20)

Renard Resource Update September 24 2015 Companion Materials
Renard Resource Update September 24 2015 Companion MaterialsRenard Resource Update September 24 2015 Companion Materials
Renard Resource Update September 24 2015 Companion Materials
 
Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017Denver Gold Forum Presentation Sep 25 2017
Denver Gold Forum Presentation Sep 25 2017
 
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
Stornoway q1 2017 earnings results presentation final 11.30pm monday 8 may 2017
 
Swy td conference 2019 presentation
Swy td conference 2019 presentationSwy td conference 2019 presentation
Swy td conference 2019 presentation
 
Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017Corporate Presentation PDAC March 2017
Corporate Presentation PDAC March 2017
 
Corporate Presentation Feb 2017
Corporate Presentation Feb 2017Corporate Presentation Feb 2017
Corporate Presentation Feb 2017
 
Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015Stornoway Corporate Presentation December 2015
Stornoway Corporate Presentation December 2015
 
Presentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining ConferencePresentation at the TD Securities Mining Conference
Presentation at the TD Securities Mining Conference
 
Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017Stornoway Corporate Presentation July 13 2017
Stornoway Corporate Presentation July 13 2017
 
Stornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 GuidanceStornoway 2106 Production Results and 2017 Guidance
Stornoway 2106 Production Results and 2017 Guidance
 
Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015Stornoway Corporate Presentation PDAC 2015
Stornoway Corporate Presentation PDAC 2015
 
Stornoway AGM 2018
Stornoway AGM 2018 Stornoway AGM 2018
Stornoway AGM 2018
 
Stornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting PresentationStornoway 2015 Annual General Meeting Presentation
Stornoway 2015 Annual General Meeting Presentation
 
Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015Stornoway Corporate Update May 13, 2015
Stornoway Corporate Update May 13, 2015
 
Stornoway Corporate Update Presentation April 17, 2015
Stornoway Corporate Update Presentation April 17, 2015Stornoway Corporate Update Presentation April 17, 2015
Stornoway Corporate Update Presentation April 17, 2015
 
Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014Stornoway Presentation at PDAC 2014
Stornoway Presentation at PDAC 2014
 
Q3-2016 Financials & Project Update
Q3-2016 Financials & Project UpdateQ3-2016 Financials & Project Update
Q3-2016 Financials & Project Update
 
Denver gold-forum-2016
Denver gold-forum-2016Denver gold-forum-2016
Denver gold-forum-2016
 
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
Lundin Gold Scotiabank Mining Conference November 30 - December 1, 2021
 
Cibc whister jan 25 2017
Cibc whister jan 25 2017Cibc whister jan 25 2017
Cibc whister jan 25 2017
 

Similaire à Stornoway Corporate Update Presentation June 16 2016

Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Stornoway Diamonds
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway Diamonds
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway Diamonds
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamonds
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of DiamondsStornoway Diamonds
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Stornoway Diamonds
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Stornoway Diamonds
 
Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Diamonds
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Stornoway Diamonds
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationStornoway Diamonds
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamonds
 
Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Diamonds
 

Similaire à Stornoway Corporate Update Presentation June 16 2016 (19)

Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
Red Cloud Mining Annual Fall Showcase Presentation October 8, 2015
 
AGM 2017 Presentation
AGM 2017 PresentationAGM 2017 Presentation
AGM 2017 Presentation
 
Swy pdac-2017
Swy pdac-2017Swy pdac-2017
Swy pdac-2017
 
Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results Stornoway Q3 2017 Earnings Results
Stornoway Q3 2017 Earnings Results
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation finalStornoway q4 and fy 2017 earnings results presentation final
Stornoway q4 and fy 2017 earnings results presentation final
 
Stornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation finalStornoway q1 2018 earnings results presentation final
Stornoway q1 2018 earnings results presentation final
 
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental MaterialsStornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
Stornoway Diamond Corporation Q1 2018 Earnings Release Supplemental Materials
 
A Dive into the International World of Diamonds
A Dive into the International World of DiamondsA Dive into the International World of Diamonds
A Dive into the International World of Diamonds
 
Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018Swy corporate presentation bmo feb 25 28 2018
Swy corporate presentation bmo feb 25 28 2018
 
Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017Swy corporate presentation td securities mining conference jan 18 2017
Swy corporate presentation td securities mining conference jan 18 2017
 
Stornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results PresentationStornoway Second Quarter 2018 Earnings Results Presentation
Stornoway Second Quarter 2018 Earnings Results Presentation
 
Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018Swy corporate presentation pdac investor exchange march 5 2018
Swy corporate presentation pdac investor exchange march 5 2018
 
Stornoway AGA 2018
Stornoway AGA 2018 Stornoway AGA 2018
Stornoway AGA 2018
 
Renard Diamond Mine Financing Presentation
Renard Diamond Mine Financing PresentationRenard Diamond Mine Financing Presentation
Renard Diamond Mine Financing Presentation
 
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
Stornoway Diamond Presentation at the Precious Metals Summit Beaver Creek, CO...
 
Stornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 PresentationStornoway Denver Gold Forum 2018 Presentation
Stornoway Denver Gold Forum 2018 Presentation
 
Swy 2013 AGM Presentation
Swy 2013 AGM PresentationSwy 2013 AGM Presentation
Swy 2013 AGM Presentation
 

Dernier

Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityJohanAspro
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024nicola_mining
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdftaxlinkcpa
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingFalcon Invoice Discounting
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCRSapana Sha
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 

Dernier (19)

Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
The Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanityThe Concept of Humanity in Islam and its effects at future of humanity
The Concept of Humanity in Islam and its effects at future of humanity
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024Nicola Mining Inc. Corporate Presentation April 2024
Nicola Mining Inc. Corporate Presentation April 2024
 
Basic Accountants in|TaxlinkConcept.pdf
Basic  Accountants in|TaxlinkConcept.pdfBasic  Accountants in|TaxlinkConcept.pdf
Basic Accountants in|TaxlinkConcept.pdf
 
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
young call girls in Govindpuri 🔝 9953056974 🔝 Delhi escort Service
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Serviceyoung Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
young Call girls in Dwarka sector 1🔝 9953056974 🔝 Delhi escort Service
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Best investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discountingBest investment platform in india - falcon invoice discounting
Best investment platform in india - falcon invoice discounting
 
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Serviceyoung  call girls in   Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Yamuna Vihar 🔝 9953056974 🔝 Delhi escort Service
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
9654467111 Low Rate Call Girls In Tughlakabad, Delhi NCR
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 

Stornoway Corporate Update Presentation June 16 2016

  • 2. Forward Looking Information 2 This presentation contains "forward-looking information" within the meaning of Canadian securities legislation. This information and these statements, referred to herein as “forward-looking statements”, are made as of the date of this presentation and the Corporation does not intend, and does not assume any obligation, to update these forward-looking statements, except as required by law. These forward-looking statements include, among others, statements with respect to our beliefs, plans, objectives, expectations, anticipations, estimates and intentions. Although management considers these assumptions to be reasonable based on information currently available to it, they may prove to be incorrect. Forward-looking statements relate to future events or future performance and reflect current expectations or beliefs regarding future events and include, but are not limited to, statements with respect to: (i) the amount of Mineral Reserves, Mineral Resources and exploration targets; (ii) the amount of future production over any period; (iii) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the March 2016 Updated Renard Mine Plan and Mineral Reserve Estimate; (iv) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the 2016 Updated Renard Mine Plan and Mineral Reserve Estimate; (v) mine expansion potential and expected mine life; (vi) the expected time frames for the completion of construction, start of mining and commercial production at the Renard Diamond Project and the financial obligations or costs incurred by Stornoway in connection with such mine development; (vii) the expected time frames for the completion of the open pit and underground mine at the Renard Diamond Project; (viii) future market prices for rough diamonds; and (ix) future market prices for liquefied natural gas and diesel. All statements, other than statements of historical fact regarding Stornoway or the Renard Diamond Project, are forward-looking statements. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as “expects”, “anticipates”, “plans”, “projects”, “estimates”, “assumes”, “intends”, “strategy”, “goals”, “objectives”, “schedule” or variations thereof or stating that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements. Forward-looking statements are made based upon certain assumptions by Stornoway or its consultants and other important factors that, if untrue, could cause the actual results, performances or achievements of Stornoway to be materially different from future results, performances or achievements expressed or implied by such statements. Such statements and information are based on numerous assumptions regarding present and future business prospects and strategies and the environment in which Stornoway will operate in the future, including the price of diamonds, anticipated costs and Stornoway’s ability to achieve its goals, regulatory developments, development plans, exploration, development and mining activities and commitments. Although management considers its assumptions on such matters to be reasonable based on information currently available to it, they may prove to be incorrect. Certain important assumptions by Stornoway or its consultants in making forward-looking statements include, but are not limited to: (i) required capital investment; (ii) the amount of future production over any period; (iii) assumptions relating to recovered grade, average ore recovery, internal dilution, mining dilution and other mining parameters set out in the March 2016 Updated Renard Mine Plan and Mineral Reserve Estimate ; (iv) assumptions relating to gross revenues, operating cash flow and other revenue metrics set out in the 2016 Updated Renard Mine Plan and Mineral Reserve Estimate ; (v) estimates of net present value; (vi) anticipated timelines for completion of construction, commencement of mine production and development of an open pit and underground mine at the Renard Diamond Project, (vii) anticipated geological formations; (viii) Stornoway’s interpretation of the geological drill data collected and its potential impact on stated Mineral Resources, Mineral Reserves, and mine life; and (ix) Stornoway’s ability to draw on the financing elements of the Renard Diamond Project Financing Transactions closed on July 8th, 2014. By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. We caution readers not to place undue reliance on these forward- looking statements as a number of important risk factors could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. These risk factors may be generally stated as the risk that the assumptions and estimates expressed above do not occur, including the assumption in many forward-looking statements that other forward-looking statements will be correct, but specifically include, without limitation: (i) risks relating to variations in the grade, kimberlite lithologies and country rock content within the material identified as Mineral Resources from that predicted; (ii) variations in rates of recovery and breakage; (iii) changes in development or mining plans due to changes in other factors or exploration results; (iv) slower increases in diamond valuations than assumed; (v) risks relating to fluctuations in the Canadian dollar and other currencies relative to the US dollar; (vi) increases in the costs of proposed capital and operating expenditures; (vii) increases in financing costs or adverse changes to the terms of available financing, if any; (viii) tax rates or royalties being greater than assumed; (ix) risks relating to the receipt of regulatory approvals; and (x) the additional risks described in Stornoway's most recently filed Annual Information Form, annual and interim MD&A and Stornoway's anticipation of and success in managing the foregoing risks. Stornoway cautions that the foregoing list of factors that may affect future results is not exhaustive, and new, unforeseeable risks may arise from time to time. Readers are referred to the technical report dated as of March 30, 2016 entitled “Updated Renard Diamond Project Mine Plan and Mineral Reserve Estimate, Québec, Canada” in respect of the March 2016 Updated Mine Plan and Mineral Reserve Estimate, and the technical report dated January 11, 2016 and press release dated September 24, 2015 in respect of the September 2015 Mineral Resource estimate for further details and assumptions relating to the project. The Qualified Persons that prepared the technical reports and press releases that form the basis for the presentation are listed in the Company’s AIF dated March 30, 2016. Disclosure of a scientific or technical nature in this presentation was prepared under the supervision of Patrick Godin, P.Eng. (Québec), Chief Operating Officer and Robin Hopkins, P.Geol. (NT/NU), Vice President, Exploration, both “qualified persons” under NI 43-101. Darrell Farrow, PrSciNat, P.Geo.(BC), Ordre des geologues du Quebec (Special Authorisation # 332) of GeoStrat Consulting Services Inc. is the independent Qualified Person responsible for preparation of the mineral resource estimate for the Renard Diamond Project. GeoStrat Consulting Services Inc, a mineral resources consultancy, focuses on client interaction and involvement in developing resource models, and has experience in exploration, geological modeling, resource evaluation, production, resource reconciliation and accounting of diamond deposits around the globe. GeoStrat has verified the results disclosed herein with respect to the mineral resources, and has conducted appropriate verification on the underlying data, including visitations to the Renard site and the primary process laboratories.
  • 3. Stornoway Diamond Corporation (TSX: SWY) 3 100% Ownership in Renard, Québec’s First Diamond Mine Road Accessible; Strong Social License; Fully Financed; Fully Permitted; First Production 2016 Construction Progress Ahead of Schedule; Reduced Forecast Cost to Complete Strong Balance Sheet Fully Financed from July 2014 C$946m Project Financing Transaction; Excess Financing Capacity due to Subsequent F/X Gains on US$ Funds; COF Undrawn; Potential for Additional C$85m from In-the-Money Warrants
  • 4. KPIs As of May 31st, 2016 4 Construction 96% complete (compared to 90% plan, 82% initial plan) Budget Forecast cost to complete of C$775m (compared to C$811m initial plan) Mining 8.9 mTonnes from R2, R3 and R65 open pits (101% of plan). 697,895 tonnes ore stockpiled (148% of plan). 1,635m of ramp development (82% of plan). Schedule On track for first ore processing by end-September 2016, and commercial production by end-December, 2016. First Production Guidance March 30, 2016 Updated Mine Plan Diamond Production 0.22 Mcarats in FY2016 and 1.71 Mcarats in FY2017 Diamond Sales 1.36 Mcarats in FY2017
  • 5. Capital Structure & Balance Sheet 5 Balance Sheet(2) Cash and Equivalents $219 million Total Debt $255 million Undrawn Financing Commitments(3) $109 million Project Finance Sponsors Investissement Québec, Orion Mine Finance, CDPQ, Blackstone Tactical Opportunities 1. As of June 14, 2016. 2. As of March 31, 2016. Unaudited 3. Assuming a C$:US$ conversion rate of C$1.10. Does not include $48 million Cost Overrun Facility. 4. Fully Diluted Capital Structure Recent Share Price (TSX)(1) $1.02 52 week range $0.65 – $1.08 Market Capitalization(1) $756 million Shares Outstanding 740.9 million Warrants 114.7 million Employee Options 31.6 million 50.2% 38.5% 11.3% Project Finance Sponsors Institutional Retail and Insiders Share Ownership(4) Institutional Shareholders
  • 6. Publicly Listed Diamond Producers, Developers and Explorers Consensus Analyst Views on Value Ticker Price (14/6/16) Shares O/S (mm) Market Cap($mm) NAV/sh(1) Current P/NAV(1) Target (1) % Return to Target Annual Dividend Diamond Producers ALROSA ALRS:M ₽70.00 7,365.0 ₽515,547 (n/a) (n/a) ₽86.59 26% ₽1.47/sh Dominion Diamonds DDC:T $12.57 85.1 $1,070.1 $23.63 0.5x $22.47 83% US$0.40/sh Gem GEMD:LN £1.38 138.3 £190.5 £1.97 0.7x £1.73 28% US$0.05/sh Lucara LUC:T $4.09 381.3 $1,559.5 $3.17 1.3x $3.92 -3% $0.06/sh Petra PDL:LN £1.11 512.1 £565.9 £1.71 0.6x £1.47 35% £0.02/sh Diamond Developers Firestone FDI:LN £0.305 309.0 £94.2 £0.48 0.6x £0.37 22% (n/a) Mountain Province MPV:T $6.20 159.7 $990.0 $6.64 0.9x $6.42 4% (n/a) Stornoway SWY:T $1.02 740.9 $755.7 $1.41 0.7x $1.35 33% (n/a) Diamond Explorers Kennady Diamonds KDI:V $4.10 46.3 $189.6 (n/a) (n/a) (n/a) (n/a) (n/a) North Arrow Minerals NAR:V $0.21 54.0 $11.3 (n/a) (n/a) (n/a) (n/a) (n/a) Peregrine Diamonds PGD:T $0.205 339.1 $69.5 (n/a) (n/a) (n/a) (n/a) (n/a) Shore Gold SGF:T $0.18 248.7 $44.8 (n/a) (n/a) (n/a) (n/a) (n/a) 1. Bloomberg and Thomson One Analyst Consensus. All Currencies in C$ unless specified 6
  • 7. Mine Plan Plan and Guidance as of March 30, 2016 7
  • 8. Renard Diamond Project – Québec, Canada The Canadian Diamond Mine Connected by Permanent Road Access 8
  • 9. Updated Mine Plan Mineral Reserve Case Only, March 30, 2016 9 1. Estimated average price per carat of the Mineral Reserve in Renards 2, 3, 4 & 65 expressed in March 2016 terms. 2. Expressed in nominal terms, and excluding Renard Mine Road capital of $69.4 million. Initial Capital Cost in the January 2013 Optimization Study was estimated at $793 million based on $752 million of cost and contingency plus $41 million escalation allowance. In April 2014, prior to the commencement of construction, Initial Capital was estimated at $811 million based on $754 million of cost and contingency plus $57 million of escalation. The estimate of $775 million of Initial Capital in the March 2016 Updated Mine Plan includes all costs, contingencies and escalation allowances and represents a reduction of $36 million on the April 2014 estimate. 3. Expressed in real terms. 4. Expressed in real terms. Assumes a 2.5% escalation in diamond prices between 2016 and 2017 and a US$ exchange rate of C$1.35 5. Net of all royalties, costs incurred under the Mecheshoo Agreement (IBA) and the effective revenue impairment associated with the Renard diamond streaming agreement. For further information see the Stornoway AIF dated March 30, 2016. 6. After tax. Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. 30 Mcarat Indicated Mineral Resource 13 Mcarat Inferred Mineral Resource 33-71 Mcarat TFFE Mineral Resource Estimate Effective September 24, 2015 (NI 43-101) Renard 65 Renard 9 Renard 4 Renard 3Renard 2Reserve Carats (M) 22.3 Processing Rate (Mtonnes/annum) 2.2 to 2.5 Mine Life (years) 14 Average Diamond Production Years 1-10 (Mcarats) 1.8 Average Diamond Price (US$/carat)1 $155 Initial Cap-ex (C$M)2 $775 LOM Cap-ex (C$M)2 $1,045 LOM Op-ex (C$/tonne)3 $56.20 LOM Op-ex (C$/carat)3 $84.37 Gross Revenue (C$M)4 $5,565 Net Revenue (C$M)5 $4,555 Cash Operating Margin (C$M)5,6 $2,677 or 59% NPV7% (C$M, unlevered, effective Jan.1, 2016)5,6 $974 Plant Commissioning Commences Oct. 1 2016 Commercial Production Declared Dec. 31 2016
  • 10. Updated Mine Plan Compared to the January 2013 Optimization Study Increased Reserves; Longer Mine Life 24% increase in Probable Mineral Reserves to 22.3 Mcarats (33.4 Mt at 67 cpht); Increase in Mineral Reserve based mine life to 14 years Increased Average Diamond Production; Increased Early Diamond Production Average diamond production in Years 1 to 10 1.8 Mcarats/a compared to 1.6 Mcarats/a previously Guidance of 1.9 Mcarats produced and 1.4 Mcarats sold by end 2017, increases of 24% and 57% resp. Processing Expansion Scheduled increase in processing rate from 2.2 Mt/a (6,000 tpd) to 2.5 Mt/a (7,000 tpd) starting in 2018. Updated Op-ex Estimate based on First Year’s Operating Data LOM average operating costs of $56.20/tonne, or $84.37/carat. Updated Project Valuation, After-Stream, Spot Diamond Price, Spot F/X Real terms cash operating margin of 59% ($120 per carat), after royalties, taxes and stream. Unlevered, stream affected, after tax NPV (7%) of $974 million (real terms, as of January 1st 2016) 10
  • 11. RENARD 65 RENARD 4 RENARD 9 RENARD 2 RENARD 3 RETURN AIR RAISE FRESH AIR RAISE PORTAL BACKFILL RAISES IN CROWN PILLAR 410L 270L 710L 590L 470L 290L 400L 250L 860L VENTILATION RAISE MAIN RAMP Underground Mining Sequence Mineral Reserve Case Only, March 30, 2016 Combined open pit and underground mining 2015-2018 Open pit R2, R3 2014-2029 Open pit R65 2018-2027 Underground R2, blasthole shrink stoppage with panel retreat 2026-2029 Underground R3, R4, longhole stoping and blasthole stoppage respectively 11 1 4 2 3 6 5 R3 OPEN PIT R2 OPEN PITR65 OPEN PIT Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource.
  • 12. Underground Mining Sequence Business Case, Including Inferred Mineral Resources, March 30, 2016 Extension of UG at Renard 2 to 860L (stope 5) Deferral of UG at Renard 3 (stope 6) and its extension to 400L (stope 7) Deferral of UG at Renard 4 (stope 8) and its extension to 410L (stope 9) New UG at Renard 9 to 410L (stopes 10 and 11) Does not include non-resource exploration upside. All pipes open at depth. Does not include mining of Inferred Mineral Resources at Renard 65 below open pit pending confirmation of Renard 65 ROM $/carat. 12 7 9 10 11 R3 OPEN PIT R2 OPEN PITR65 OPEN PIT RETURN AIR RAISE FRESH AIR RAISE PORTAL BACKFILL RAISES IN CROWN PILLAR 410L 270L 710L 590L 470L 290L 400L 250L 860L VENTILATION RAISE MAIN RAMP 5 1 4 2 3 8 6 Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. RENARD 65 RENARD 4 RENARD 9 RENARD 2 RENARD 3
  • 13. Production Profile Mineral Reserve Case Only, March 30, 2016 13 0 1,000,000 2,000,000 3,000,000 4,000,000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Tonnes UG R3 UG R4 UG R2 OP R65 OP R2/R3 0 500,000 1,000,000 1,500,000 2,000,000 2,500,000 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Carats R65 R4 R3 CRB CRB2A R2 $0 $200 $400 $600 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Gross Revenue (C$ millions) Renard 65 Renard 4 Renard 3 Renard 2
  • 14. Capital Cost Estimate From November 2011 Feasibility Study to March 2016 Updated Mine Plan 14 $1,045.0 $2.9 $994.4 $18.5 $35.0 $500 $600 $700 $800 $900 $1,000 $1,100 FS Nov 2011 OS Jan 2013 LNG FS Oct 2013 Updated Mine Plan Mar 2016 Current Mar 2016 Renard LOM Capex (C$ millions) Including Contingencies and Escalation $775.4 $61.9 $35.6 $859.1 $1.9 $11.9 $500 $550 $600 $650 $700 $750 $800 $850 $900 FS Nov 2011 OS Jan 2013 LNG FS Oct 2013 Execution Plan Apr 2014 Updated Mine Plan Mar 2016 Current Mar 2016 Renard Initial Capex (C $millions) Including Contingencies and Escalation 11 Year Mine Life 14 Year Mine Life Note: Expressed in December 2015 nominal terms and excluding Renard Mine Road capital of $69.4 million. Totals may not add up due to rounding.
  • 15. 15 50 100 150 200 250 300 350 Indexto2009=100 US$ May 2011 Renard Sample Valuation Assessments March 2013 March 2014 C$ March 2016 Renard Diamond Price Assumptions March 30, 2016 Updated Mine Plan Body March 2014 Diamond Price Model1 (US$/carat) Estimated Market Price Adjustment Mar 2014 to Mar 2016 Adjusted Price Estimates March 2016: “Spot” Price Models2 (US$/carat) Renard 2 $197 (High $222, Min $178) -19% $160 (High $181, Min $145) Renard 3 $157 (High $192, Min $146) $128 (High $156, Min $119) Renard 4 $106 ($155)3 (High $174, Min $100) $86 ($126)3 (High $141, Min $81) Renard 65 $187 (High $190, Min $160) $152 (High $155, Min $130) WWW Rough Diamond Price Index, 2004-2016 (RoughPrices.com) Mine Plan Financial Analysis assumes a 2.5% real terms diamond price escalation between 2016 and 2028 The Renard Streaming Agreement includes a payment of US$56 per carat on 20% of ROM production from Renards 2,3,4,9 and 65, Life-of-mine, escalating at 1% per annum after the 3rd anniversary of production, inclusive of marketing costs. 1. As determined WWW International Diamond Consultants Ltd. at a +1 DTC sieve size cut off. 2. As determined by applying the world average rough price index of roughrices.com to the March 2014 price models, at a +1 DTC sieve size cut-off. 3. Should the Renard 4 diamond population prove to have a size distribution equal to the average of Renard 2 and 3, WWW have estimated that a base case diamond price model of US$155 per carat would apply based on March 2014 pricing, equivalent to US$126 per carat on a market price adjusted basis to March 2016. The weighted average price of the March 2016 Probable Mineral Reserve is US$155/ct, or C$209/ct, in March 2016 terms Average life-of-mine pricing is US$185/ct or C$250/ct, or US$159/ct or C$214/ct after stream.
  • 16. Life of Mine Revenue From Jan 2013 Optimization Study to March 2016 Updated Mine Plan $5.000 $4.500 $4.000 $3.500 $3.000 $2.500 $2.000 $1.500 $1.000 $500 $0 $800 $773 $260 $574 $1,255 $4,555 Net Revenue (C$ millions) Updated Mine Plan Mar 2016 OS Jan 2013 Stream Impact Spot Diamond Pricing Addition of R65 Addition of R2 to 710m Depth Exchange Rate $4,069 Note: Revenue is net of royalties, marketing costs, for the March 2016 Updated Mine Plan and the July 2014 Renard Streaming Agreement 16
  • 17. Note: Expressed in real terms. Payables and cash as of December 31, 2015 are included in 2016 Net FCF Financial Analysis Net Free Cash Flow, After-Tax, After-Steam (C$ million) 17
  • 18. Progress Report As of May 30, 2016 18
  • 19. Renard Project Site April 2016 19 R2 & R3 PitCrusher UG Mine Portal R65 Pit Power Plant Process Plant Maintenance Shop Admin/Dry Accommodation
  • 20. Health, Safety, Environment, and Stornoway’s Team SWY employees: 0.24 (1 incident in 817,550 hours worked) Contractors: 1.54 (15 incidents in 1,946,300 hours worked) Engineering: 0.00 (0 incidents in 278,495 hours worked) Renard Total: 1.05 (16 incidents in 3,042,345 hours worked) Québec Construction Industry: 0.9 Québec Mining Industry: 1.0 20 “The Courage to Care” On Personal Safety; On the Safety of our Colleagues; On the Environment; With our Inter-Cultural Workforce Lost Time Injury Rate (to the end of April) Route 167: 2 incidents of non-compliance project-to-date (wetland, remediated) Renard Project Site: 0 incidents of non-compliance project-to-date Environment
  • 21. Construction Progress to May 31, 2016 21
  • 22. Major Facilities Accommodation, Mine Dry/Admin, Maintenance Facility Completed Ahead of Schedule by September 2015 22
  • 23. Power Plant The First LNG fueled Power Plant in the Canadian Mining Industry 23
  • 24. Processed Kimberlite Containment Dry Stacking Processed Kimberlite 24 Processed Kimberlite Containment (PKC) Ditch Starter Berm Foundation Drains Centrifuges in process plant de-water processed kimberlite (PK)… Primary Crusher, process Plant and PK Loadout connected by covered conveyors producing a cake for re-handling. PK cake is loaded out… as a truckable product… and sent to PKC facility with progressive reclamation.
  • 25. Water Management Collecting and Treating 100% of Site Surface Precipitation 25 PKC Waste Rock Overburden UG Mine Portal Process Plant Mine Waste Water Treatment Plant Collection Trench Pumping Station Camp Waste Water Treatment Plant
  • 26. Process Plant World’s First Diamond Plant with LDR in Primary Flow Sheet 26 Nameplate capacity of 6,000 tpd (2.16 Mt/a) based on 78% plant utilization. Expansion to 7000 tpd (2.52 MT/a) is scheduled for 2018 based on 83.5% utilization and +2% throughput. Flow sheet: Primary jaw crushing to < 230mm Twin DMS circuits at +1mm -19mm LDR circuit at +19mm -45mm, scalable to -60mm Oversize +45mm to secondary cone crusher LDR and DMS tails +6mm -19mm to tertiary High Pressure Grinding Rolls Centrifugal de-watering of fines and tails for truckable dry- stack disposal. Large Diamond Recovery (“LDR”) through TOMRA XRT.
  • 27. Ramp-Up Schedule 27 35,154 82,005 108,000 126,000 135,000 145,801 162,000 171,000 180,000 180,000 180,000 - 20,000 40,000 60,000 80,000 100,000 120,000 140,000 160,000 180,000 200,000 M10-2016 M11-2016 M12-2016 M1-2017 M2-2017 M3-2017 M4-2017 M5-2017 M6-2017 M7-2017 M8-2017 MILLFEED(T) 100% Nameplate Capacity Commercial Production 60% Nameplate Capacity for 30 days
  • 28. Open Pit Mining 28 KPIs to May 31, 2016 Actual Plan % Tonnes Mined, R2-R3/R65 8,883,853 8,753,296 101% Tonnes Ore Stockpiled 697,895 473,126 148% Renard 65 Pit (2014-2029) 14.0 Mtonnes moved, 1.38 Mcarats (4.58 Mtonnes at 30cpht) Stripping ratio (Waste to Ore): 2.11, Depth 155m March 2018 End 2018 End 2019 End 2021 End 2024 End 2027 March 2016 October 2016 Dec. 2016 August 2017 Dec. 2017 April 2018 Renard 2-3 Pit (2015-2018) 15.5 Mtonnes moved, 2.58 Mcarats (4.33 Mtonnes at 59cpht) Stripping ratio (Waste to Ore): 2.54, Depth 130m
  • 29. Underground Mine Ramp Development 29 KPIs to May 31, 2016 Actual Plan % Ramp Development (m) 1,635 2,003 82%
  • 30. Looking Forward Commissioning, Ramp-Up, Resource Reconciliation, Growth 30
  • 31. Areas of Focus 31 Finality (it’s not over until it’s over) Mining: now on the critical path Stakeholder expectations Full resource reconciliation Employment market: Lack of trained miners Opportunities Construction pace and performance Operating environment Large Diamonds Renard Resource Upside Growth: Exploration and M&A
  • 32. 0 20 40 60 80 100 120 140 160 180 Resource Growth at Renard 32 0 50 100 150 200 2004 2006 2008 2009 2011 2013 2015 MillionsofTonnes Resource Growth, 2004-2015 0m 100m 200m 400m 900m 700m 500m 300m 800m 600m 1100m 1200m 1000m Mine Plan: 14 years of mining on 22mcarat Mineral Reserve (33mtonnes) Permitting and Long Term Plan The Vision: Deposit still Open Millions of Tonnes Grades illustrated are for Indicated and Inferred Mineral Resources respectively at a +1DTC sieve size cut-off. Reserve and Resource categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target (previously referred to as a “Potential Mineral Deposit”) is conceptual in nature, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. 30 Mcarat Indicated Mineral Resource 13 Mcarat Inferred Mineral Resource 33-71 Mcarat TFFE Mineral Resource Estimate Effective September 24, 2015 (NI 43-101) Renard 65 24/29cpht Renard 9 53cpht Renard 4 61/52cpht Renard 3 102/112cpht Renard 2 84/59cpht TFFE High Range Inferred Mineral Resource TFFE Low Range Indicated Mineral Resource Conceptual R7 R1 R65 R4 R9 R2 R3 R10
  • 33. Resource Reconciliation Step 1: Reconcile actual pipe geology with geological model (Successful example from Renard 3 on 490m level shown opposite) Step 2: Reconcile grade (to come upon processing start-up) Step 3: Reconcile size distribution and plant recovery characteristics (to come upon processing start-up) Step 4: Reconcile quality assortment and value (to come upon sorting and sale) 33 Renard 3: Level 490 Mine Geology Kimb3i Kimb3f Kimb3dg Kimb3b Kimb3h CRB Kimb3c Thin lines are the 2015 geological model Thick lines are actual mine geology Renard 3: Level 490 Mine Geology Renard 2 Renard 3
  • 34. 34 Large Diamonds at Renard The Renard Diamond Process Plant will be the first plant in the world to have LDR capacity in the primary flow sheet. Large Diamond Recovery (“LDR”) through TOMRA XRT. High Quality Production with Large Stone Potential Distribution in Renard 2 predicts three to six 50-100ct stones and one to two +100ct stones every 100,000 carats. Base Case Diamond Valuation Estimates Using on Best Practice Methodology Average diamond price estimate in March 2016 for the Mineral Reserves at US$155/ct (un-escalated). Substantial revenue potential from large diamonds not accounted for in the base case cash-flow model. 1000T storage bin with overflow to stockpileRe-load hopper HPGR Cone crusher Scrubber and screening Process office and MCC’s DMSPK mixer Centrifuge Air compressors Thickening Wet screening Cold storage Dry screening Process Water
  • 35. Diamond Sales Stornoway will sell 100% of the Renard diamond production by tender sale in Antwerp on an undivided basis. Stornoway has engaged well known diamond industry broker and rough distributor Bonas-Couzyn as sales commissionaire and tender agent for arm's length market sales. Other than under exceptional circumstances, Stornoway will sell 100% of what it produces, will not carry a stockpile outside of normal goods-in-progress, and will be a market price taker. Stornoway will support the Québec or Canadian brand identification initiatives of its clients through chain of custody certification. First sales are expected in January 2017. 35
  • 36. Exploration & Adamantin Stornoway maintains an active diamond exploration team and conducts 100% owned generative programs. Recent drilling at Adamantin Project returned kimberlite in 18 of 78 holes testing 72 geophysical targets interpreted as 11 discrete kimberlite bodies. Intersections of undiluted (100%) HK up to 13.7m and mixed HK/country rock up to 22.9m. AD50/51/52 interpreted as one body dipping 5-10 degrees with a true thickness of 10m, over a 260m strike extent, open, 6-12m below surface (illustrated). Sampled for diamond content. One diamond recovered in till in 2015 sampling. 36 AD-50 AD-51 AD-52 AD-52-03 AD-52-01 AD-52-02 SW NE 6-8 m from surface 9.8 m AD-50-01 AD-50-02 9-10 m from surface 9.8 m SW NE AD-50 AD-51 AD-52 AD-50 AD-52
  • 37. 12 Month Outlook and Priorities A Safe and Protected Workplace and Environment Project Completion on Budget and Schedule Resource Reconciliation First Québec Diamond Sales January 2017 Achieving March 2016 Mine Plan Guidance 0.22 Mcarats Produced in FY2016 and 1.71 Mcarats in FY2017 1.36 Mcarats Sold in FY2017 Operating and Sustaining Capital Costs Maintain Balance Sheet Strength 37
  • 39. History of the Renard Diamond Project Québec’s First Diamond Mine 1996: Start of initial regional exploration by Ashton & SOQUEM 2001: First kimberlite discovery 2001-08: Drilling, “mini-bulk” sampling, bulk sampling 2006: Stornoway acquires Ashton 2008-10: First NI 43-101 Resource and PEA 2011: Stornoway acquires SOQUEM’s 50% project interest November 2011: Feasibility Study issued. First mineral reserve December 2012: ESIA filed February 2012: Road construction commences under Plan Nord March 2012: “Mecheshoo Agreement” executed Nov.-Dec.2012: Mining Lease and Québec Authorizations issued January 2013: Optimization Study issued July 2013: Federal Canadian Authorizations Issued September 2013: Road opens April-July 2014: $C946m financing completed. Construction commences December 31, 2016: Scheduled Commercial Production 39 Chibougamau Montréal Toronto 800km 360km Renard
  • 40. Chronology of Renard Studies Feasibility Study (Nov 2011. NI 43-101 Technical Report Dec 2011) 11 Year Mine Plan based on 18 million carat Mineral Reserve derived from January 2011 NI 43-101 Resource. Long Term Business Plan Companion study to the Feasibility Study with extended mine plan incorporating Inferred Mineral Resources. Basis of mine design and permitting Optimization Study (Jan 2013. NI 43-101 Technical Report Mar 2013) Refined Feasibility mine design, including shaft deferral and a modified underground mining sequence. 11 Year Mine Plan based on 17.9 million carat Mineral Reserve. Mineral Resource Update (July 2013) Resource update with 14% increase in Indicated Resource contained carats LNG Feasibility Study (Oct 2013) Modified project Cap-ex and Op-ex for LNG powered gen-sets Mineral Resource Update (Sep 2015. NI 43-101 Technical Report Oct 2015) Resource update with 11% increase in Indicated Resource contained carats Updated Mine Plan and Mineral Reserve Estimate (Mar 2016. NI 43-101 Technical Report Mar 2016) Update based on 2013 & 2015 Mineral Resource Updates, accelerated construction schedule, and expanded processing 14 Year Mine Plan based on 22.3 million carat Mineral Reserve 40
  • 41. Stornoway Board and Management Team 41 Head Office: Longueuil, Québec Exploration Office: North Vancouver, BC Community Offices: Mistissini & Chibougamau Québec Hume Kyle Independent John LeBoutillier Independent/ IQ Designate Ebe Scherkus Independent/ Board Chairman Non-Executive Directors Marie-Anne Tawil Independent/ IQ Designate Peter Nixon Independent Serge Vézina Independent Douglas Silver Orion Designate Gaston Morin Independent/ IQ Designate Pat Godin COO & Director Matt Manson President, CEO & Director Executive Officers Rob Chausse CFO Annie Torkia- Lagace VP Legal Orin Baranowsky VP IR & Corp. Dev
  • 42. 42 NI 43-101 Probable Mineral Reserves March 30, 2016 Probable Mineral Reserve(1,2,4) (Changes from January 2013 Probable Mineral Reserve estimate shown in italics) Mining Recovery Factors Utilized in the Reserve Calculation Carats (millions) Tonnes (millions) Grade (cpht)(3) Mining Dilution(5) Internal Dilution(6) Mining Recovery Open Pit Renard 2, All Units 1.85 49% 3.54 170% 52.2 -45% 2.9% 0.0% 98% Renard 2 1.38 11% 1.49 14% 92.7 -2% 1.7% 0.0% 98% CRB-2A 0.15 n/a 0.47 n/a 31.4 n/a 1.8% 0.0% 98% CRB 0.32 n/a 1.58 n/a 20.2 n/a 4.3% 0.0% 98% Renard 3 0.73 9% 0.79 10% 92.3 -1% 11.4% 0.0% 98% Renard 4 -- n/a -- n/a -- n/a -- -- -- Renard 65 1.38 n/a 4.58 n/a 30.1 n/a 3.5% 0.0% 98% OP Probable Mineral Reserves 3.96 107% 8.91 339% 44.4 -53% 3.9% 0.0% 98% Underground Renard 2 15.65 15% 19.68 16% 79.6 -1% 20.2% 6.4% 82% Renard 3 0.86 2% 1.22 22% 70.2 -16% 14.0% 29.8% 85% Renard 4 1.67 6% 3.46 -7% 48.3 15% 14.0% 2.2% 78% Renard 65 -- n/a -- n/a -- n/a -- -- -- UG Probable Mineral Reserves 18.18 13.4% 24.36 12.0% 74.6 1% 18.9% 6.7% 82% Stockpile Stockpile 0.11 n/a 0.15 n/a 73.9 n/a -- -- -- Total Probable Mineral Reserves 22.26 24.0% 33.42 40.5% 66.6 -11.3% 14.8% 4.9% 86% Notes 1 Reserve categories follow the CIM Standards for Mineral Resources and Mineral Reserves. 2 Totals may not add due to rounding. 3 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off. 4 Diamond valuation data utilized for the test of prospects of reasonable economic extraction are derived from a diamond valuation exercise undertaken in March 2014 (see Stornoway Annual Information Form dated March 2016). 5Represents the proportion of waste rock expected to be extracted during mining. Mining dilution is assumed to have zero grade. 6Represents planned dilution of waste rock through stope design in the underground mine. 7Represents mine and stockpiled ore as of December 31, 2015
  • 43. 43 Reserve categories are compliant with the "CIM Definition Standards on Mineral Resources and Reserves". Renard 2 86% Renard 3 5% Renard 4 9% Carats Renard 2 81% Renard 3 5% Renard 4 14% Tonnes Underground Probable Mineral Reserves Open-Pit Probable Mineral Reserves Kimb2a/ Kimb2b 35% CRB-2A 4% CRB 8% Renard 3 18% Renard 65 35% Renard 2, All Units… Carats Kimb2a/ Kimb2b 17% CRB-2A 5% CRB 18% Renard 3 9% Renard 65 51% Renard 2, All Units… Tonnes NI 43-101 Probable Mineral Reserves March 30, 2016
  • 44. 44 Inferred Mineral Resources Indicated Mineral Resources High Range TFFE Renard 65 775m depth Renard 4 775m depth Renard 9 775m depth Renard 2 1,250m depth Renard 3 1,250m depth Indicated Mineral Resources(1,2,4) Contained Carats (millions) Tonnes (millions) Grade (cpht)(3) Renard 2, All Units 21.58 +15.6% 25.70 +38.3% 84 -16.4% Renard 2, w/o CRB-2A, CRB 20.39 +11.0% 20.52 +15.9% 99 -4.3% CRB-2A 0.29 +2.6% 0.90 +2.6% 32 -- CRB 0.90 n/a 4.28 n/a 21 n/a Renard 3 1.86 +2.3% 1.82 +3.4% 102 -1.0% Renard 4 4.44 +3.0% 7.25 -- 61 +3.0% Renard 65 2.30 -- 7.87 -- 29 -- Total Indicated Mineral Resources 30.17 +11.4% 42.63 +20.2% 71 -7.4% Inferred Mineral Resources(1,2) Contained Carats (millions) Tonnes (millions) Grade (cpht)(3) Renard 2, All Units 3.88 -48.0% 6.59 -44.0% 59 -7.2% Renard 2, w/o CRB 3.36 -46.1% 4.08 -22.0% 82 -30.9% CRB 0.53 -57.6% 2.51 -61.6% 21 +10.5% Renard 3 0.61 -- 0.54 -- 112 -- Renard 4 2.46 +3.5% 4.75 -- 52 +3.5% Renard 65 1.18 -- 4.93 -- 24 -- Renard 9 3.04 -- 5.70 -- 53 -- Lynx 1.92 -- 1.80 -- 107 -- Hibou 0.26 -- 0.18 -- 144 -- Total Inferred Mineral Resources 13.35 -20.8% 24.49 -17.5% 54 -4.0% Notes 1 Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. 2 Totals may not add due to rounding. 3 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off. 4 Diamond valuation data utilized for the test of prospects of reasonable economic extraction are derived from a diamond valuation exercise undertaken in March 2014 (see Stornoway Annual Information Form dated July 2015). Renard Diamond Project NI 43-101 Mineral Resource Estimate Effective September 24 2015. Changes to Previous Estimate Shown in Italics North East View
  • 45. 45 Renard Diamond Project Exploration Potential Effective September 24 2015. Changes to Previous Potential Shown in Italics Notes 1 Target for Further Exploration: represents potential upside that can be reasonably assumed given the nature and grade of material within the current 2015 Mineral Resource. The Renard 2 shape has been projected 250m below the deepest kimberlite intersection at 1,000m depth. Tonnage and grade ranges are not directly applicable to potential total carats.The potential quantity and grade of any Exploration Target is conceptual in nature, there has been insufficient information to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. 2 Carats per hundred tonnes. Potential at a +1 DTC sieve size cut-off. R10 R7 R1 R65 R4 R9 R2 R3 Notes Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. Area indicated in yellow represents a gap in drill coverage that may represent additional exploration potential outside of the current Mineral Resource Estimate and not included in the current Targets for Further Exploration. Inferred Mineral Resources Indicated Mineral Resources High Range TFFE Renard 65 775m depth Renard 4 775m depth Renard 9 775m depth Renard 2 1,250m depth Renard 3 1,250m depth North East View Targets for Further Exploration(1) Contained Carats (millions) Tonnes (millions) Grade (cpht)(2) Renard 1 1.7 to 3.9 8.6 to 13.0 20 to 30 Renard 2, All Units 3.7 to 15.5 6.1 to 15.5 60 to 100 Renard 3 3.6 to 6.3 3.4 to 3.8 105 to 168 Renard 4 5.6 to 11.8 11.1 to 15.4 50 to 77 Renard 65 7.3 to 13.5 29.0 to 40.9 25 to 33 Renard 7 1.9 to 3.8 6.3 to 9.4 30 to 40 Renard 9 2.0 to 4.3 3.9 to 6.3 52 to 68 Renard 10 0.7 to 2.1 1.2 to 1.7 60 to 120 Lynx 3.0 to 3.8 3.1 to 3.2 96 to 120 Hibou 3.6 to 6.1 3.5 to 4.0 104 to 151 Total TFFE 33.0 +28% to 71.1 +40% 76.2 +49% to 113.2 +51%
  • 46. 46 Renard 2 Mineral Resource Update Effective September 24 2015. Changes to Previous Estimate Shown in Italics Notes 1 Reserve and Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. 2 Totals may not add due to rounding. 3 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off. 4 Diamond valuation data utilized for the test of prospects of reasonable economic extraction are derived from a diamond valuation exercise undertaken in March 2014 (see Stornoway Annual Information Form dated July 2015). Notes 1 Represents potential upside that can be reasonably assumed given the nature and grade of material within the current 2015 Mineral Resource. The potential quantity and grade of any Exploration Target is conceptual in nature, there has been insufficient information to define a mineral resource, and it is uncertain if further exploration will result in the target being delineated as a mineral resource. 2 Carats per hundred tonnes. Potential at a +1 DTC sieve size cut-off. Indicated Mineral Resources(1,2,4) Contained Carats (millions) Tonnes (millions) Grade (cpht)(3) Renard 2, All Units 21.58 +15.6% 25.70 +38.3% 84 -16.4% Renard 2, w/o CRB-2A, CRB 20.39 +11.0% 20.52 +15.9% 99 -4.3% CRB-2A 0.29 +2.6% 0.90 +2.6% 32 -- CRB 0.90 n/a 4.28 n/a 21 n/a Inferred Mineral Resources(1,2) Contained Carats (millions) Tonnes (millions) Grade (cpht)(3) Renard 2, All Units 3.88 -48.0% 6.59 -44.0% 59 -7.2% Renard 2, w/o CRB 3.36 -46.1% 4.08 -22.0% 82 -30.9% CRB 0.53 -57.6% 2.51 -61.6% 21 +10.5% Target for Further Exploration(1) Contained Carats (millions) Tonnes (millions) Grade (cpht)(2) Renard 2, All Units 3.7 to 15.5 6.1 to 15.5 60 to 100 Pipe shape at surface (1.89ha) High TFFE at 1,250m (1.38ha) 0m 700m 850m 1250m INDICATED INFERRED TFFE 600m: Base of Previous Indicated Mineral Resources Depth Below Surface Kimberlite outline at surface (0.75ha) Low TFFE at 1,250m (0.62ha) Base of New Indicated Resources (1.55ha) North View Pinch in model in area lacking drill coverage
  • 47. 47 Renard 2 Geological Model and Unit Grades Effective September 24 2015. Changes to Previous Estimate Shown in Italics Notes 1 Carats per hundred tonnes. Estimated at a +1 DTC sieve size cut-off. 2 Represents the average amount of non-diamond bearing country rock estimated within each geological unit. 3 The Kimb 2c (Hypabyssal Kimberlite, or “HK”) unit is a constituent component of each of the Kimb2a, Kimb2b, CRB and CRB-2a units. West View Kimb2b (“Brown”) Kimb2a (“Blue”) CRB CRB-2a Kimb2c (HK) Contact Photographs of geological units from the 2007 Renard underground bulk sample program Within the Indicated Mineral Resources Average Grade (cpht)(1) Average Dilution (%)(2) Kimb 2a (“Blue”) 76 +3.0% 52 -0.9% Kimb 2b (“Brown”) 145 +1.0% 30 -0.9% Kimb 2c (HK)3 229 +0.5% 12 -3.1% CRB-2a 32 -- 93 -- CRB 21 n/a 96 n/a Within the Inferred Mineral Resources Average Grade (cpht)(1) Average Dilution (%)(2) Kimb 2a (“Blue”) 67 -2.4% 65 +9.2% Kimb 2b (“Brown”) 145 +0.3% 30 +1.5% Kimb 2c (HK)3 229 +0.5% 12 -3.1% CRB 21 +10.5% 96 -- Pinch in model in area lacking drill coverage 0m 700m 850m 1250m INDICATED INFERRED TFFE 600m: Base of Previous Indicated Mineral Resources Depth Below Surface North View Renard 2 Average Mineral Resource Grades, by Geological Unit
  • 48. 48 Renard 2 Geological Model and Renard 2-Renard 3 Convergence Effective September 24 2015 Pipe shape at surface (1.89ha) Kimberlite outline at surface (0.75ha) Kimb2b (“Brown”) Kimb2a (“Blue”) CRB CRB-2a Surface View, Looking Down Renard 2 Renard 3 126.6m R3 intersection in DDH R2-81J (in red) starting 942.2m downhole: 47m true width. 0m 700m 850m 1250m R2 INDICATED R2 INFERRED R2 TFFE Depth Below Surface R3 INDICATED R3 INFERRED R3 TFFE North East View Resource categories were completed in accordance with the "CIM Definition Standards on Mineral Resources and Reserves". Mineral resources that are not mineral reserves do not have demonstrated economic viability. The potential quantity and grade of any Exploration Target is conceptual in nature, there has been insufficient information to define a mineral resource and it is uncertain if further exploration will result in the target being delineated as a mineral resource. Renard 2 Renard 3 R3 TFFE: >500m potential between drill intersections
  • 49. 49 Jan 2013 Opt. Study, before Stream1,2 2016 Mine Plan Update, after Stream1,2 Total Operating Cost (C$M)3 $1,352 $1,878 Ore Production (Mt) 23.8 33.4 Diamond Production (Mct) 17.9 22.3 Production Cost C$57.63/t C$56.20/t C$76.63/ct C$84.37/ct Total Gross Revenue (C$M) $4,268 $5,565 Total Net Revenue (C$M) $4,069 $4,555 Marketing Costs (%) 2.7% 1.8% DIAQUEM Royalty (%) 2.0% 2.0% Cash Operating Margin (C$M) $2,693 $2,677 % Operating Margin 67% 59% Operating Margin (C$/ct) $151.05 $120.04 Life of Mine Operating Parameters March 30 2016 Updated Mine Plan $97 , 5% $613 , 33% $568 , 30% $600 , 32% Operating Expenses (C$M and % of OPEX) Open Pit Mine Underground Mine Concentrator G&A and Infrastructure $0 $50 $100 $150 $200 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 Operating Expenses (C$M) G&A and Infrastructure Concentrator Underground Mine Open Pit Mine Notes 1. March 2016 study shown net of the July 2014 Renard Streaming Agreement, Diaquem royalty and marketing costs in terms of net revenue, Cash Operating Margin and NPV. For further information on the Renard Streaming Agreement see the Stornoway Annual Information Form dated March 30, 2016 2. January 2013 Optimization expressed in October 2012 terms. March 2016 Updated Mine Plan expressed in December 2015 terms. 3. Expressed in December 2015 real terms.
  • 50. 50 Capital Expenditures March 30 2016 Updated Mine Plan. Project Costs of $548.5 million Committed or Incurred to Dec 31 2015 Initial Capital Site Preparation & General $ 45.1 Mining $ 57.1 Mineral processing plant $ 137.7 Onsite utilities and infrastructures $ 111.1 Network and Distribution $ 15.9 Offsite utilities and infrastructures $ 0.3 Pre-production and Ramp-up $ 88.5 Project indirect costs $ 153.9 Professional Services $ 44.6 Construction indirect costs $ 38.5 Contingency $ 57.5 Escalation $ 25.3 Total Initial Capital $ 775.4 Sustaining and Deferred Capital Open Pit $ 16.1 Underground $ 222.5 Process Plant $ 12.5 Admin. & Infrastructure $ 3.7 Power Plant and Airport $ 13.7 Total Sustaining/Deferred Capital $ 268.5 Total LOM Capital $ 1,045 $- $10 $20 $30 $40 $50 $60 $70 $80 $90 $100 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 Capital Costs, 2016 to 2030 (C$M) Process plant Adm. & Infra. Power Plant & Airport Open pit Underground Initial Capital 2016 Initial Capital equals $282 million Sustaining and Deferred Capital Costs (C$M and %) Open pit Process plant Adm. & Infra. Power Plant & Airport Underground Notes: expressed in December 2015 nominal terms and excluding Renard Mine Road capital of $69.4 million. Totals may not add up due to rounding.
  • 51. Contracting Where we are Spending the Money: 2015 Data 51 Quebec, $324M Ontario, $43M USA, $23M South Africa, $6M Other, $4M C$400 million of expenses incurred at Renard in 2015 C$324 million of expenses incurred in Québec in 2015 Mistissini and Eeyou Istchee, $64M Chiboug. & Chapais, $31M Abitibi- Temiscamingue, $53M Other, $39M Chaudiere Appalaches, $28M Bas St- Laurent, $21M Montreal- Laval, $74M Saguenay Lac St-Jean, $14M Contractors at Mine Site in 2015 Construction Talbon Matoush-Grimard Groupe Promec Manseau & Perron inc MY Surveying Equ. Pétrolier Lac St-Jean Sakhiikan Consortium Kesi Construction Construction Proco Eskan Company RCM Habitation Modulaire Air Creebec Jos Ste-Croix Swallow-Fournier inc Petronor Kiskinshiish Camp Services Tessier Ltée Dyno Nobel Canada Communications Telesignal Propane Nord-Ouest Groupe Robert Structures GB Ltée Prevost et Frères Mabarex H2O Innovation Nordic Structures Bois Hewitt Anixter Canada Recyclage Ungava Corner Cast Plomberie Chibougamau Sanivac Réseau Revetement RHR Crevier Chiiwetin Industrie Blais Groupe Industriel Premium Convoyeur Continental ASDR Environnement Mansour Mining Techno. Installations AC Washeyaabiin Const. PAR Tanguay (WEC) Industrie Fournier Biron SNC-Lavalin Yves Lacombe Pétrole MJ Golder Lafleur Portes de Garage Moreau Électrique BBA Protection Incendie Viking Moteur du cuivre/DLB Metallisation du Nord
  • 52. Monthly Manpower at Site to April 30, 2016 Stornoway Employees and Contractors at Renard 52
  • 53. 53 Origin of Renard’s Workforce Targeting Local Hiring: Stornoway Employees at Mine Site, April 30, 2016 Data 11 19 27 40 41 49 8 19 58 5 43 0 10 20 30 40 50 60 Other Communities (CA) Other Communities (QC) Quebec Saguenay Lac-St-Jean Montreal Abitibi-Témiscamingue Other Communities NQ Chapais Chibougamau Other Cree Communities Mistissini 42% Northern Quebec 55% Other Quebec 3% Other Canada
  • 54. Targeted Contracting for Small and Local Suppliers Stornoway emphasises local hiring and procurement, with contracts tailored for local businesses. Stornoway prioritizes, wherever possible, hiring and contracting in the Cree communities of Eeyou Itschee, particularly Mistissini, and with the families of Sydney Swallow (Kiskinshiish Camp Services) and Emerson Swallow (Swallow-Fournier), Tallymen for the Renard area. In 2015 Stornoway purchased $95 million in goods and services from Mistissini, Chibougamau and Chapais, and estimates $8 million in payroll added to the local economy. 54 169 134 50 Numbers of Contracts for Goods and Services in Québec 2015 Data 10-99K$ 100-999K$ 1M$+
  • 55. Communities Stornoway is committed to fostering a positive relationship with its communities. 55 In addition to employment and business development opportunities, Stornoway aims to foster educational and training development in youth, respect for traditional activities, two-way communication with community representatives on project impacts, and support for local charitable organisations. Stornoway undertakes regular communication with our employees at site, and communicates more formally through community committees such as the Renard Committee, the Environment Committee, the Training & Employment Committee, and the Comité de Liaison Renard. Our annual Sustainable Development Report is delivered to each household in the region. Stornoway’s commitments are laid out in our 2012 Mecheshoo Agreement with the Cree Nation of Mistissini and the Grand Council of the Crees (EI), and our 2012 Declaration of Partnership with Chibougamau and Chapais.
  • 56. Community Engagements 56 Centraide/SWY Golf Tournament Mistissini Open Door Mining Matters activity day Cree Youth at Quebec Mines ExpoCree Training Programs Cree Career Fair Site Visits On-site Cultural Activities
  • 57. 57
  • 58. 58 Stornoway Diamond Corporation TSX:SWY, TSX:SWY.WT.A, TSX:SWY.DB.U Head Office: 1111 Rue St. Charles Ouest, Longueuil, Québec J4K 4G4 Tel: +1 (450) 616-5555 IR Contact: Orin Baranowsky, CFA, VP IR and Corp Dev obaranowsky@stornowaydiamonds.com Tel: +1 (416) 304-1026 x2103 www.stornowaydiamonds.com Info@stornowaydiamonds.com