Evolution of Storm Surge Barrier Design - Dale Morris
1. Evolution of Surge Barrier
Design
Options for a New York / New
Jersey Regional Storm Surge
Barrier
Dale Morris
Sr. Economist / Coordinator for Water
Royal Netherlands Embassy
Washington, DC
May ย 18, ย 2017
2. Water Mgmt and SLR in NL
59% of land is at or below sea level
70% of people live in, and 70% of GDP is
produced in, flood-prone areas
Adaptation easier: strong public will, and past flood
investments help w/ SLR challenge
IPCC SLR mid-level projections:
--8 inches by 2050
--33 inches by 2100
4. Afsluitdijk: Enclosure Dam
1932: 20 miles long, 300 ft wide, 24 feet high, protects all Ijssel Lake communities (including
Amsterdam)
--Small navigation channel/lock, discharge sluices
--Major disruption to economic/cultural assets around brackish estuary. Became freshwater lake
--Useful life 100 yrs. Renovation: how to repair eco-damage? Fish Migration river, Blue Energy
(chemical) pilotsโฆ
2
5. Eastern Scheldt Barrier (5 miles)
Cost: $3.0b (1976-1986), $5b in 2010 $
O+M = $33m / yr
Closing: on average 1 โ 2 x / yr
Partially Open, Redesign
Environmental Impacts
โขFlow (saline gradient)
โขSediment balance
โขScour
โขBiology / Water Quality
6. Maeslant Barrier
โข Open, navigable. Minimal enviro impact.
โข Massive (22m high, 210m long)
โข Complicated design / operation: high water levels on
both sides during closures
โข $700 m (1990-1997)
$1b 2010 $
โข Closure design: 1/10 yr
โข Closings: twice since 1997
โข O + M = $12 - $15 m / yr
19-ยญ05-ยญ17
6
7. Thames Barrier
โข 1972 โ 1984, $2.6b (2016 $)
โข Small-ish (520 m) closure. 6 navigable / 4 non
nav channels
โข Design closure: 3x /yr. Actual closures: 4x yr
average. J๏
โข O + M = ?
โข SLR? Design life was 2030; extended to 2060.
19-ยญ05-ยญ17
7
8. IHNC Lake Borgne Barrier New Orleans
โข $1.1 billion in 2011 (est. @ $800m)
โข 1.8 mile static barrier, small navigable gates
โข 2012 Isaac! $5billion in prevented damageโฆ
โข โeasyโ environment (shallow, low-flow,
already degraded ecosystem)
โข O + M = $14m (who pays?)
โข Rigolets / Chef Menteur?
19-ยญ05-ยญ17
8
10. Ramspool Barrier ย
10
19-ยญ05-ยญ17
2001: ย 45 ย million ย euro
Protection ย against ย Ijssel ย Lake ย flooding ย (primarily ย wind ย driven)
Three ย 80-ยญmeter ย air/water ย bladders
Design ย height ย 8.3m ย (11 ย ft NAP)
11. St Petersburg Barrier (Bay of Finland)
16 mile dam, two small navigation openings
$4 - $6b (high cost = long construction delays)
Improved road network
Heavy ecosystem damage
19-ยญ05-ยญ17
11
12. Venice Lagoon โMoseโ Barrier
5.5b euro
3 gates at lagoon inlets
Design: 1990s, Construction: 2003 โ 2017/18
Already degraded lagoon water qualityโฆ
Strengthening of lagoon natural margins, quays, docks
19-ยญ05-ยญ17
12
13. Barriers are not enough; water will just go around them, unlessโฆ
200: Critical Coastal Protection Infra had
โweak linksโ
Dune height, width insufficient (wind erosion)
Beach width insufficient (wave erosion)
Human penetrations of critical dune areas
โThe backbone of coastal infra is below legal standardโ
10 year Coastal Action Plan (2005 โ 2015)
Address โweak linksโ with 800 mln euro project funds
with ongoing local CIP
Provincial / local govts add-ons for on collateral benefits:
transport/mobility, ecological, amenity, resilience
13
14. Katwijk
National Govโt preferred option:
--straigten the (red) line of protection
--coastal dune heightening (+10 - + 12 ft)
--beach widening
--sand is primary tool
Local Govโt had concerns:
--beachfront views, and access, for
Homeowners, tourists and retail
--โseparationโ of town and sea
--redevelopment
--land value
15. Dike in the dune. Increased protection. 660 hidden beachfront parking
spaces. Better beach access. Better beachfront retail.
16.
17. Strengthen primary coastal defense, improve pedestrian and public transit, donโt
disrupt commerce, maintain historic aesthetics: $400 million (4 miles)
17
18.
19. Coastal Mega Nourishments: The Sand Engine
21m cubic meters (366 acres)
Aug-Oct 2011
20 miles โreachโ and 20 yr design life
Mother nature distributes sand to
foreshore / dune
>4$ per cubic meter sand
22. Deltacommissaris
Delta Program (20 โ 50 โ 100 yr plan)
โข Delta Program: annual update to Parliament on actions ย
โข Delta Decisions (strategic, 2015) ย
โ On Flood Risk level (1/100,000, cost-benefit)
โ On Freshwater Supply
โ On Ijsselmeer water levels (summer and winter)
โ On Flood Protection in the Delta
โ On Experimental โwater-robustโ Land-Use and Planning
โ On Sand (coastwide sediment budget = to SLR)
โข Delta Commission (small staff)
--supervising coherence, coordination and
multi-governmental implementation
โข Delta Fund, 1.2 bln ั / yr (guaranteed to 2030)
โข Delta Act, legal โanchoringโ Delta-commissioner, program and fund
23. Multiple Layers of Defense
19-ยญ05-ยญ17
Surge Barriers must be linked into dunes
and other coastal protection.
Redundancy; stormwater; Norโeastersโฆ
26. Deltacommissaris
Extreme weather: โWeโll pay, one way or another.โ
Since 1980, $1 billion disasters in the U.S. have
tripled. More people, wealth, capital in coastal areas.
โฆfrom 1980 to 2011, weather-related catastrophes
costโฆan average of more than $34 billion a year.
Lossesโฆare rising in a long-term trend consistent with
models of climate change.
Katrina $150 b, Sandy $60 b, Ike $40 b,
Isaac $2.9 b, Matthew $ 10 b
Houston Tax Day 2016 $1.2 - $1.9 b
Memorial Day 2015 $1 b
San Antonio / Austin 2015 $1 b
Charleston / SC 2015 $2 b
Baton Rouge $9 b ??
Ellicott City $25 m
Hermine (Dare Cty, NC) $2.6 m