2 | SANTOS 2014 
SANTOS INDONESIA 
NATUNA 
EAST JAVA 
PAPUA 
Operator Non-Operator 
The Peluang development project is a tie-back to the existing facilities at Maleo and is on track for first gas in 2Q 2014. The 
company also recently acquired a 50% interest in acreage which hosts the undeveloped Ande Ande Lumut oil field, located in 
the Northwest Natuna PSC, far offshore Sumatra and Kalimantan. 
Santos has been active in 
Indonesia since the 1990s and 
now operates three producing 
assets, is developing a fourth 
and has an exciting exploration 
program. 
Gas production comes from the 
Oyong, Wortel and Maleo fields 
in offshore East Java and is 
piped to shore for the domestic 
market. 
Oil production from Oyong is 
exported through the Surya 
Putra Jaya floating, storage 
and offloading facility.
SANTOS INDONESIA 
3 | SANTOS 2014 
SAMPANG PSC
Gross prod. : 8.7 MMstb oil, 117.7 Bscf gas 
Gross sales : $ 170m pa 
4 | SANTOS 2014 
SAMPANG PSC 
Oyong 
Wortel 
Grati OPF 
SANTOS INDONESIA
SAMPANG PSC 
LOCATION: Offshore Madura Island, Sampang District, approx. 
70 km from Surabaya. East Java 
Discovery: 2004 
Oil Production (Phase-1): First oil production in September 
2007. Oil was produced via a small wellhead platform and 
process by an adjacent production barge. Associated gas was 
re-injected into the as lift gas and the produced oil was stored 
on an FSO. Oyong infill well, (Oyong-II) was drilled in early 
2012 and started producing in February 2012. Current total oil 
production approximately 1,500 BOPD. 
Gas Production (Phase-2): First gas production in 
September 2009, while the oil production continues. The gas 
production is delivered to an Onshore Gas Processing (OPF) 
Grati, Pasuruan via a 60-km offshore pipeline and being used 
by PT Indonesia Power to produce electricity. The installed 
capacity of the OPF Grati is about 95 MMSCFD. The current 
Oyong gas production is approx. at 30 BBTUD. 
OYONG FIELD 
5 | SANTOS 2014
SAMPANG PSC 
LOCATION: Offshore Madura Island, Sampang 
District, 7 kilometres west of the Oyong field 
DISCOVERY: 2006 
PROJECT & PRODUCTION: The project was 
completed in early 2012; consist of an unmanned 
wellhead platform and 10 kilometer pipeline offshore. 
First gas achieved in February 2012 with current 
production approximately 50 BBTUD 
WORTEL FIELD 
6 | SANTOS 2014
7 | SANTOS 2014 
SANTOS INDONESIA MADURA OFFSHORE PSC
8 | SANTOS 2014 
MADURA OFFSHORE PSC 
Gross prod. : 261.6 Bscf gas 
Gross sales: $ 145m pa 
Maleo Peluang 
SANTOS INDONESIA
MADURA OFFSHORE PSC 
LOCATION: Offshore Madura Island, Sumenep District, 
approximately 145 kilometers from Surabaya, East Java, 
and approximately 7 kilometers from East Java Gas 
Pipeline 
DISCOVERY: 2002 
PRODUCTION: First gas in September 2006, as Santos’ 
first operated offshore gas project outside of Australia. 
Gas from Maleo Field is produced from a fixed platform 
named the Maleo Producer (certified in 2012 by MIGAS) 
supported by a small wellhead platform, connected via a 
7.4-kilometre spurline to the East Java Gas Pipeline. 
Currently, the gas is supplied at a plateau rate 
approximately of 61 BBTUD. 
MALEO FIELD 
9 | SANTOS 2014
MADURA OFFSHORE PSC 
LOCATION: Approximately 17 kilometers Southwest of 
Maleo Field, as a tieback to the existing Maleo facilities 
DISCOVERY: 2009 
STATUS: Plan of Development (POD) was approved in 
2011, Peluang development includes one horizontal gas 
well, minimum facility stand-alone WHP; approximately 
17km 10”-diameter pipeline tie-in to Maleo WHP, 
allocation and sales gas metering on Maleo Producer 
Platform (MPP). This project was sanctioned in 15 
February 2013, following with the development and 
drilling is completed in Q1 2014, while the first gas 
commenced in March 2014 with estimated gas 
production of 25 BBTUD. 
PELUANG FIELD 
10 | SANTOS 2014
NORTHWEST NATUNA PSC ANDE-ANDE LUMUT FIELD 
11 | SANTOS 2014 
LOCATION: 
Offshore North West Natuna, 
approximately 148 kilometers 
from Matak Island, Kepulauan 
Riau Province, approximately 291 
kilometers from Batam Island, 
approximately 718 kilometers from 
Jakarta 
DISCOVERY: 2000 
PROJECT OVERVIEW: 
Ande-Ande Lumut Field (AAL) is 
a large oil field with an estimated 
surface area of approximately 37 km2 
and located approximately 75 meters of 
water close to the Malaysian border in 
the Natuna Sea. 
PoD was approved in 2011. As per PoD, estimated recoverable 
reserve from K sand was 43 million bbls. AAL initial development 
plan contemplates the installation of a wellhead platform, drilling 
43 development wells and producing to a permanently moored, 
leased FPSO (Floating Production Storage and Offloading). The 
development plan anticipates a peak daily production rate of 
25,000 bopd and possibly upside estimated up to 40,000 BOPD. 
The initial design for the processing capability to handle high 
volumes of water up to 350,000 BWPD. The Wellhead platform 
will have 24 slots accommodating 42” conductor, each of slots 
with the capacity for 2 (two) wells. The development is expected 
to commence between 2014 - 2017.
AAL Development PROJECT OVERVIEW 
12 | 
Background : 
─ Oil Discovered by Premier in 2000; 
─ POD Approved in 2011 (Genting); 
─ Acquired 50% & Operatorship from AWE in Nov 2013. 
Development Summary : 
─ 27 Horizontal Wells; 
─ Initial Oil Production : 40,000 BOPD; 
─ Max Fluid Rate : 365,000 BFPD; 
─ K-Sand 2C Resource : 96 MMstb; 
─ Heavy Oil : 15 API; 
─ Facilities : FPSO & WHP, bridge linked; 
AAL Development Concept ─ Current Project Phase : Concept Refine.
AAL Development PROJECT UPDATES 
13 | 
Subsurface : 
─ Detailed K-Sand Subsurface Assessment Complete (Geophysics, Petrophysics, 
Static & Dynamic Modelling); 
─ Initiated G-Sand Subsurface Assessment. 
FEED Studies : 
─ WHP : Complete. Reduction in topsides weight by 35%; 
─ FPSO : 15% complete (vs. 15% planned). 
Major Contracts : 
─ Drilling Rig & Support Services : Technical documentation and execution 
strategy preparation; 
─ FPSO Lease : Tender Plan submitted to SKKMigas; 
─ WHP EPC : Tender Plan being prepared. 
Regulatory Approvals (SKKMigas) 
─ Plan of Development (POD) Revision requirements under discussion with 
SKKMigas 
Project Key Milestones 
Concept Select Gate Complete 
Definition Gate Q4 2014 
Appraisal Drilling Mid-2015 
FID 2H 2015 
First Oil* Q4 2017 - Q2 2018 
* Dependent on POD Revision requirement
14 | SANTOS 2014 
HUMAN RESOURCES 
As per 31 July 2014 
• Permanent hire (regular) : 162 
• Direct hire (fixed term) : 21 
• Third party hire : 49 
TOTAL : 232 
Award 
• Nominated for 2014 LKS Bipartite AWARD from the 
Ministry of Manpower 
• LKS Bipartite is an industrial relations communication 
forum between the company and employees 
SANTOS INDONESIA

More Related Content

What's hot

EXPERIENCE CERTIFICATE IN HOME COUNTRY
EXPERIENCE CERTIFICATE IN HOME COUNTRYEXPERIENCE CERTIFICATE IN HOME COUNTRY
EXPERIENCE CERTIFICATE IN HOME COUNTRY
Ahmed Abbasi
 
Experience Certificate - Saif Ullah--
Experience Certificate -  Saif Ullah--Experience Certificate -  Saif Ullah--
Experience Certificate - Saif Ullah--
Saifullah Saif
 
Coal Mining Project Report
Coal Mining Project ReportCoal Mining Project Report
Coal Mining Project Report
Shikhar Sindhu
 
61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx
Vevietpomata
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
muhammad usama
 
Diploma Electrical Engineering
Diploma Electrical EngineeringDiploma Electrical Engineering
Diploma Electrical Engineering
Durgesh Kumar
 
RIL Relieving letter
RIL Relieving letterRIL Relieving letter
RIL Relieving letter
Gaurav Sharma
 
degree certificate
degree certificatedegree certificate
degree certificate
konal sharma
 
cochin Shipyard fire fighting training cert.PDF
cochin Shipyard fire fighting training cert.PDFcochin Shipyard fire fighting training cert.PDF
cochin Shipyard fire fighting training cert.PDF
PETER DYLAN
 
Cert. of Employment-SSP
Cert. of Employment-SSPCert. of Employment-SSP
Cert. of Employment-SSP
Didik sodikin
 
transkrip Nilai Gita
transkrip Nilai Gitatranskrip Nilai Gita
transkrip Nilai Gita
Gita Bofiela
 
Abdelrhaman Sayed - Experience Letter
Abdelrhaman Sayed - Experience LetterAbdelrhaman Sayed - Experience Letter
Abdelrhaman Sayed - Experience Letter
Abdelrhman Allam
 
Detail Salary with Service date Introduction letter
Detail Salary with Service date Introduction letterDetail Salary with Service date Introduction letter
Detail Salary with Service date Introduction letter
RAHUL KACHHIA
 

What's hot (20)

Petroleum companies of pakistan
Petroleum companies of pakistanPetroleum companies of pakistan
Petroleum companies of pakistan
 
Diploma Mark sheet
Diploma Mark sheetDiploma Mark sheet
Diploma Mark sheet
 
WORLEYPARSONS CERTIFICATE
WORLEYPARSONS CERTIFICATEWORLEYPARSONS CERTIFICATE
WORLEYPARSONS CERTIFICATE
 
EXPERIENCE CERTIFICATE IN HOME COUNTRY
EXPERIENCE CERTIFICATE IN HOME COUNTRYEXPERIENCE CERTIFICATE IN HOME COUNTRY
EXPERIENCE CERTIFICATE IN HOME COUNTRY
 
Experience Certificate - Saif Ullah--
Experience Certificate -  Saif Ullah--Experience Certificate -  Saif Ullah--
Experience Certificate - Saif Ullah--
 
Coal Mining Project Report
Coal Mining Project ReportCoal Mining Project Report
Coal Mining Project Report
 
61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx61904252-ONGC-ANKLESHWAR-ASSET.pptx
61904252-ONGC-ANKLESHWAR-ASSET.pptx
 
internship report by usama
internship report by usamainternship report by usama
internship report by usama
 
Diploma Electrical Engineering
Diploma Electrical EngineeringDiploma Electrical Engineering
Diploma Electrical Engineering
 
Matric Certificate
Matric CertificateMatric Certificate
Matric Certificate
 
BTech Marksheets
BTech MarksheetsBTech Marksheets
BTech Marksheets
 
Iocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_reportIocl industrial training_chemical_engineering_report
Iocl industrial training_chemical_engineering_report
 
RIL Relieving letter
RIL Relieving letterRIL Relieving letter
RIL Relieving letter
 
degree certificate
degree certificatedegree certificate
degree certificate
 
cochin Shipyard fire fighting training cert.PDF
cochin Shipyard fire fighting training cert.PDFcochin Shipyard fire fighting training cert.PDF
cochin Shipyard fire fighting training cert.PDF
 
Cert. of Employment-SSP
Cert. of Employment-SSPCert. of Employment-SSP
Cert. of Employment-SSP
 
transkrip Nilai Gita
transkrip Nilai Gitatranskrip Nilai Gita
transkrip Nilai Gita
 
Abdelrhaman Sayed - Experience Letter
Abdelrhaman Sayed - Experience LetterAbdelrhaman Sayed - Experience Letter
Abdelrhaman Sayed - Experience Letter
 
Guidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanksGuidelines for NDT of GRP pipe systems and tanks
Guidelines for NDT of GRP pipe systems and tanks
 
Detail Salary with Service date Introduction letter
Detail Salary with Service date Introduction letterDetail Salary with Service date Introduction letter
Detail Salary with Service date Introduction letter
 

Similar to Santos indonesia 2014 (linked in)

NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
Richard Exley
 
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-01506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
absmartkarma
 
Bp present panel
Bp present panelBp present panel
Bp present panel
bp
 
New base 562 special 17 march 2015
New base 562 special 17 march  2015New base 562 special 17 march  2015
New base 562 special 17 march 2015
Khaled Al Awadi
 
Annual results presentation14
Annual results presentation14Annual results presentation14
Annual results presentation14
Company Spotlight
 

Similar to Santos indonesia 2014 (linked in) (20)

NTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINALNTG-Oil-Gas-Analysis-FINAL
NTG-Oil-Gas-Analysis-FINAL
 
Premier oil13a pres
Premier oil13a presPremier oil13a pres
Premier oil13a pres
 
New base 730 special 17 november 2015
New base 730 special  17 november 2015New base 730 special  17 november 2015
New base 730 special 17 november 2015
 
PNG LNG
PNG LNGPNG LNG
PNG LNG
 
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-01506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
1506 company update tokyo roadshow 1d0297d8-9514-4029-90d1-17ea21bc3c58-0
 
Attachment GK
Attachment GKAttachment GK
Attachment GK
 
Attachment GK
Attachment GKAttachment GK
Attachment GK
 
Attachment GK
Attachment GKAttachment GK
Attachment GK
 
Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)Steering committee draft policy note 2 (1)
Steering committee draft policy note 2 (1)
 
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois AasiassaOffshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
 
Bp present panel
Bp present panelBp present panel
Bp present panel
 
New base 562 special 17 march 2015
New base 562 special 17 march  2015New base 562 special 17 march  2015
New base 562 special 17 march 2015
 
Ports development in myanmar
Ports development in myanmarPorts development in myanmar
Ports development in myanmar
 
Annual results presentation14
Annual results presentation14Annual results presentation14
Annual results presentation14
 
Annual Results Presentation
Annual Results PresentationAnnual Results Presentation
Annual Results Presentation
 
New base 508 special 30 december 2014
New base 508 special  30 december  2014New base 508 special  30 december  2014
New base 508 special 30 december 2014
 
New base 584 special 16 April 2015
New base 584 special  16 April  2015New base 584 special  16 April  2015
New base 584 special 16 April 2015
 
2014 investor seminar asx
2014 investor seminar asx2014 investor seminar asx
2014 investor seminar asx
 
New base special 15 july 2014
New base special  15 july 2014New base special  15 july 2014
New base special 15 july 2014
 
Corrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSOCorrosion Management System and Implementation of IMO PSPC on FPSO
Corrosion Management System and Implementation of IMO PSPC on FPSO
 

More from Santos Ltd

2015 Second Quarter Activities Report
2015 Second Quarter Activities Report2015 Second Quarter Activities Report
2015 Second Quarter Activities Report
Santos Ltd
 

More from Santos Ltd (20)

CEO SEAAOC speech
CEO SEAAOC speechCEO SEAAOC speech
CEO SEAAOC speech
 
2016 Investor Day ASX Presentation
2016 Investor Day ASX Presentation2016 Investor Day ASX Presentation
2016 Investor Day ASX Presentation
 
Edith Dornwell Intern
Edith Dornwell InternEdith Dornwell Intern
Edith Dornwell Intern
 
2015 Second Quarter Activities Report
2015 Second Quarter Activities Report2015 Second Quarter Activities Report
2015 Second Quarter Activities Report
 
Macquarie Australia Conference Presentation
Macquarie Australia Conference PresentationMacquarie Australia Conference Presentation
Macquarie Australia Conference Presentation
 
300415 2015 AGM-Addresses
300415 2015 AGM-Addresses300415 2015 AGM-Addresses
300415 2015 AGM-Addresses
 
Cooper and GLNG Investor Visit
Cooper and GLNG Investor VisitCooper and GLNG Investor Visit
Cooper and GLNG Investor Visit
 
Fact Sheet Community Benefits
Fact Sheet Community BenefitsFact Sheet Community Benefits
Fact Sheet Community Benefits
 
Fact Sheet Shale Gas
Fact Sheet Shale GasFact Sheet Shale Gas
Fact Sheet Shale Gas
 
Fact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic FracturingFact Sheet Hydraulic Fracturing
Fact Sheet Hydraulic Fracturing
 
Fact Sheet Natural Gas
Fact Sheet Natural GasFact Sheet Natural Gas
Fact Sheet Natural Gas
 
Fact sheet CSG
Fact sheet CSGFact sheet CSG
Fact sheet CSG
 
Fact sheet - LNG
Fact sheet - LNGFact sheet - LNG
Fact sheet - LNG
 
200215 Santos 2014 full year results presentation
200215 Santos 2014 full year results presentation200215 Santos 2014 full year results presentation
200215 Santos 2014 full year results presentation
 
230114 Fourth Quarter Activities Report
230114 Fourth Quarter Activities Report230114 Fourth Quarter Activities Report
230114 Fourth Quarter Activities Report
 
Worlds longest bike
Worlds longest bikeWorlds longest bike
Worlds longest bike
 
2015 Santos Tour Down Under
2015 Santos Tour Down Under2015 Santos Tour Down Under
2015 Santos Tour Down Under
 
Santos brings OzHarvest to WA
Santos brings OzHarvest to WASantos brings OzHarvest to WA
Santos brings OzHarvest to WA
 
Pwc report- Oil and gas industry-Sept-2014
Pwc report- Oil and gas industry-Sept-2014Pwc report- Oil and gas industry-Sept-2014
Pwc report- Oil and gas industry-Sept-2014
 
Yasmin Allen appointed to Santos Board
Yasmin Allen appointed to Santos BoardYasmin Allen appointed to Santos Board
Yasmin Allen appointed to Santos Board
 

Recently uploaded

DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 

Recently uploaded (20)

Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Wadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptxWadi Rum luxhotel lodge Analysis case study.pptx
Wadi Rum luxhotel lodge Analysis case study.pptx
 
Engineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planesEngineering Drawing focus on projection of planes
Engineering Drawing focus on projection of planes
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
kiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal loadkiln thermal load.pptx kiln tgermal load
kiln thermal load.pptx kiln tgermal load
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 

Santos indonesia 2014 (linked in)

  • 1. 1 | SANTOS INDONESIA INTRODUCTION August 2014 DELIVERS DISCOVERS CARES COLLABORATES
  • 2. Overview 2 | SANTOS 2014 SANTOS INDONESIA NATUNA EAST JAVA PAPUA Operator Non-Operator The Peluang development project is a tie-back to the existing facilities at Maleo and is on track for first gas in 2Q 2014. The company also recently acquired a 50% interest in acreage which hosts the undeveloped Ande Ande Lumut oil field, located in the Northwest Natuna PSC, far offshore Sumatra and Kalimantan. Santos has been active in Indonesia since the 1990s and now operates three producing assets, is developing a fourth and has an exciting exploration program. Gas production comes from the Oyong, Wortel and Maleo fields in offshore East Java and is piped to shore for the domestic market. Oil production from Oyong is exported through the Surya Putra Jaya floating, storage and offloading facility.
  • 3. SANTOS INDONESIA 3 | SANTOS 2014 SAMPANG PSC
  • 4. Gross prod. : 8.7 MMstb oil, 117.7 Bscf gas Gross sales : $ 170m pa 4 | SANTOS 2014 SAMPANG PSC Oyong Wortel Grati OPF SANTOS INDONESIA
  • 5. SAMPANG PSC LOCATION: Offshore Madura Island, Sampang District, approx. 70 km from Surabaya. East Java Discovery: 2004 Oil Production (Phase-1): First oil production in September 2007. Oil was produced via a small wellhead platform and process by an adjacent production barge. Associated gas was re-injected into the as lift gas and the produced oil was stored on an FSO. Oyong infill well, (Oyong-II) was drilled in early 2012 and started producing in February 2012. Current total oil production approximately 1,500 BOPD. Gas Production (Phase-2): First gas production in September 2009, while the oil production continues. The gas production is delivered to an Onshore Gas Processing (OPF) Grati, Pasuruan via a 60-km offshore pipeline and being used by PT Indonesia Power to produce electricity. The installed capacity of the OPF Grati is about 95 MMSCFD. The current Oyong gas production is approx. at 30 BBTUD. OYONG FIELD 5 | SANTOS 2014
  • 6. SAMPANG PSC LOCATION: Offshore Madura Island, Sampang District, 7 kilometres west of the Oyong field DISCOVERY: 2006 PROJECT & PRODUCTION: The project was completed in early 2012; consist of an unmanned wellhead platform and 10 kilometer pipeline offshore. First gas achieved in February 2012 with current production approximately 50 BBTUD WORTEL FIELD 6 | SANTOS 2014
  • 7. 7 | SANTOS 2014 SANTOS INDONESIA MADURA OFFSHORE PSC
  • 8. 8 | SANTOS 2014 MADURA OFFSHORE PSC Gross prod. : 261.6 Bscf gas Gross sales: $ 145m pa Maleo Peluang SANTOS INDONESIA
  • 9. MADURA OFFSHORE PSC LOCATION: Offshore Madura Island, Sumenep District, approximately 145 kilometers from Surabaya, East Java, and approximately 7 kilometers from East Java Gas Pipeline DISCOVERY: 2002 PRODUCTION: First gas in September 2006, as Santos’ first operated offshore gas project outside of Australia. Gas from Maleo Field is produced from a fixed platform named the Maleo Producer (certified in 2012 by MIGAS) supported by a small wellhead platform, connected via a 7.4-kilometre spurline to the East Java Gas Pipeline. Currently, the gas is supplied at a plateau rate approximately of 61 BBTUD. MALEO FIELD 9 | SANTOS 2014
  • 10. MADURA OFFSHORE PSC LOCATION: Approximately 17 kilometers Southwest of Maleo Field, as a tieback to the existing Maleo facilities DISCOVERY: 2009 STATUS: Plan of Development (POD) was approved in 2011, Peluang development includes one horizontal gas well, minimum facility stand-alone WHP; approximately 17km 10”-diameter pipeline tie-in to Maleo WHP, allocation and sales gas metering on Maleo Producer Platform (MPP). This project was sanctioned in 15 February 2013, following with the development and drilling is completed in Q1 2014, while the first gas commenced in March 2014 with estimated gas production of 25 BBTUD. PELUANG FIELD 10 | SANTOS 2014
  • 11. NORTHWEST NATUNA PSC ANDE-ANDE LUMUT FIELD 11 | SANTOS 2014 LOCATION: Offshore North West Natuna, approximately 148 kilometers from Matak Island, Kepulauan Riau Province, approximately 291 kilometers from Batam Island, approximately 718 kilometers from Jakarta DISCOVERY: 2000 PROJECT OVERVIEW: Ande-Ande Lumut Field (AAL) is a large oil field with an estimated surface area of approximately 37 km2 and located approximately 75 meters of water close to the Malaysian border in the Natuna Sea. PoD was approved in 2011. As per PoD, estimated recoverable reserve from K sand was 43 million bbls. AAL initial development plan contemplates the installation of a wellhead platform, drilling 43 development wells and producing to a permanently moored, leased FPSO (Floating Production Storage and Offloading). The development plan anticipates a peak daily production rate of 25,000 bopd and possibly upside estimated up to 40,000 BOPD. The initial design for the processing capability to handle high volumes of water up to 350,000 BWPD. The Wellhead platform will have 24 slots accommodating 42” conductor, each of slots with the capacity for 2 (two) wells. The development is expected to commence between 2014 - 2017.
  • 12. AAL Development PROJECT OVERVIEW 12 | Background : ─ Oil Discovered by Premier in 2000; ─ POD Approved in 2011 (Genting); ─ Acquired 50% & Operatorship from AWE in Nov 2013. Development Summary : ─ 27 Horizontal Wells; ─ Initial Oil Production : 40,000 BOPD; ─ Max Fluid Rate : 365,000 BFPD; ─ K-Sand 2C Resource : 96 MMstb; ─ Heavy Oil : 15 API; ─ Facilities : FPSO & WHP, bridge linked; AAL Development Concept ─ Current Project Phase : Concept Refine.
  • 13. AAL Development PROJECT UPDATES 13 | Subsurface : ─ Detailed K-Sand Subsurface Assessment Complete (Geophysics, Petrophysics, Static & Dynamic Modelling); ─ Initiated G-Sand Subsurface Assessment. FEED Studies : ─ WHP : Complete. Reduction in topsides weight by 35%; ─ FPSO : 15% complete (vs. 15% planned). Major Contracts : ─ Drilling Rig & Support Services : Technical documentation and execution strategy preparation; ─ FPSO Lease : Tender Plan submitted to SKKMigas; ─ WHP EPC : Tender Plan being prepared. Regulatory Approvals (SKKMigas) ─ Plan of Development (POD) Revision requirements under discussion with SKKMigas Project Key Milestones Concept Select Gate Complete Definition Gate Q4 2014 Appraisal Drilling Mid-2015 FID 2H 2015 First Oil* Q4 2017 - Q2 2018 * Dependent on POD Revision requirement
  • 14. 14 | SANTOS 2014 HUMAN RESOURCES As per 31 July 2014 • Permanent hire (regular) : 162 • Direct hire (fixed term) : 21 • Third party hire : 49 TOTAL : 232 Award • Nominated for 2014 LKS Bipartite AWARD from the Ministry of Manpower • LKS Bipartite is an industrial relations communication forum between the company and employees SANTOS INDONESIA