[TYPE THE COMPANY NAME]
Reconstruction of a 4 storey Commercial
Building to a 5 Story building.
[Type the document subtitle]
DELL
[Pick the date]
[Type the abstract of the document here. The abstract is typically a short summary of the contents of the
document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the
document.]
Table of Content
Part A
Introduction………………………………………………………………………….…2
Feasibility Study…………………………………………………………………….…3
Structural Options ………………………………………………………………….…9-12
Option 1 - Concrete structure (Mention Why did i choose this for the project) …..10
Option 2 - Steel or Timber (Why this is not chosen for the project …………..……11
Option 3- Concrete structure (Mention Why did i choose this for the project) …..12
Design selection………………………………………………………………………12
Conclusion………………………………………………………………………………12
Part C
References……………………………………………………………………………….13
Reconstruction of a 4 Storey Commercial Building
to a 5 Story building.
Part A
1. Introduction
The population of the world is increasing day by day. As a result, the population density is
increasing rapidly and decreasing the cultivation land and forest area for construction of
residential and commercial building. But land is fixed. When it is necessary to stop decreasing
the cultivation land and forest area, there is a problem arising. This problem is accommodation
problem. There is arising office building space problem and it can be solved by reconstruction of
existing building. This project deals with typical four storied commercial building to be extended
up to 5 stories. This project will act as a guideline for future works with above location for
similar multistoried high rise building. It will also give an idea about comparative study between
mat foundation & pile foundation for different works of the above proposed area. Professional
engineers, organizations may avail this project as a guideline for effective, economic and
convenient design of multistoried building in suitable storey.
Feasibility Study
The subject property is situated within The Moor, Sheffield. The Moor is currently going through
a rapid period of transformation with the new markets block opening in November 2013 and a
number of other blocks being in the process of redevelopment. The premises form part of a four
storey building situated on a prominent corner at the junction on the Moor, Sheffield. The
property comprises a four storey building with retail accommodation at ground floor and the
office accommodation over the first, second and third floors of the building. The Building is
surrounded by the retail hustle and bustle of the city centre shopping precincts and there are a
number of car parks located in the immediate area
Fig:MidCity House, Furnival Gate, Sheffield, S1 4QR
Structural Options
Structural options are the most important things for building and economy. We will find the best
structural solution of the proposed building. At first we will discuss about some structural oftion
for the building.
Fig; Floor plan of the building.
Option 1 - Concrete structure (Mention Why did i choose this for the project)
The ground floor office area is to provide a 24 m by 22 m area with no internal columns. Stairs
locations are as shown in drawing. A 15.5 m wide public area is required at first floor, running
along the entire length of the building. Clear headroom of 3m is required for the public. No part
of the structure shall be higher than 6 m above the ground level. Perimeter columns shall not be
spaced closer than 4m.So; we can use concrete structure as proper solution for the entire
building. All beams and columns should be RCC structure. Brick walls and zed cladding board
panel and steel bracing will be used for covering the entire building. Here, foundation is the main
problem for reconstruction .From the bore hole data it is clear that it is on clay layer, So
consolidation occurred here and this soil is strong enough now to carry extended building load.
So, previous foundation is ok for this reconstruction. But, to ensure safety we will use roof truss
in upper floor to minimize the dead load. So, no, huge load will be added here. only few walls
load and lightweight rood truss load will be added here. For roof we should use roof truss
because it will be safe and cheaper solution for entire building. So, truss solution is the proper
solution for this building. Roof truss will carry wind load and total roof load and will transfer it
to beams and then beams will transfer this load to column and column will transmit this load to
foundation. Single strip footing can be used here and no pile will be required. The First stage
assessment of the risk of damage to buildings and structures in tunneling zones involved
preparation of settlement profile induced by tunnel excavation. Settlement was computed at
every 100m interval along tunneling alignment using the method based on the Gaussian normal
distribution curve presented above. Settlement induced by each tunnel was predicted
independently and superimposed to determine the total settlement induced by the twin
tunnels.10mm and 25mm settlement contours were plotted in the topography plan.
Fig: Details with footing.
Option 2 - Steel Structure (Why this is not chosen for the project)
The ground floor office area is to provide a 24 m by 22 m area with no internal columns. Stairs
locations are as shown in drawing. A 15.5 m wide public area is required at first floor, running
along the entire length of the building. Clear headroom of 3m is required for the public. No part
of the structure shall be higher than 6 m above the ground level. Perimeter columns shall not be
spaced closer than 4m.So; we can use steel structure as proper solution for the entire building.
All beams and columns should be steel structure. Brick walls and zed cladding board panel and
steel bracing will be used for covering the entire building. For roof we should use roof truss
because it will be safe and cheaper solution for entire building. So, truss solution is the proper
solution for this building. Roof truss will carry wind load and total roof load and will transfer it
to beams and then beams will transfer this load to column and column will transmit this load to
foundation. Single strip footing can be used here and no pile will be required. The First stage
assessment of the risk of damage to buildings and structures in tunneling zones involved
preparation of settlement profile induced by tunnel excavation. Settlement was computed at
every 100m interval along tunneling alignment using the method based on the Gaussian normal
distribution curve presented above. Settlement induced by each tunnel was predicted
independently and superimposed to determine the total settlement induced by the twin
tunnels.10mm and 25mm settlement contours were plotted in the topography plan.
Fig: Details plan.
Option 3 - Concrete structure (Mention Why did i choose this for the project)
Here, foundation is the main problem for reconstruction .From the bore hole data it is clear that it
is on clay layer, So consolidation occurred here and this soil is strong enough now to carry
extended building load. So, previous foundation is ok for this reconstruction. But, to ensure
safety we will use roof truss in upper floor to minimize the dead load. So, no, huge load will be
added here. only few walls load and lightweight rood truss load will be added here. For roof we
should use roof truss because it will be safe and cheaper solution for entire building. So, truss
solution is the proper solution for this building. The ground floor office area is to provide a 24 m
by 22 m area with no internal columns. Stairs locations are as shown in drawing. A 15.5 m wide
public area is required at first floor, running along the entire length of the building. Clear
headroom of 3m is required for the public. No part of the structure shall be higher than 6 m
above the ground level. Perimeter columns shall not be spaced closer than 4m.So; we can use
concrete structure as proper solution for the entire building. All beams and columns should be
RCC structure. Brick walls and zed cladding board panel and steel bracing will be used for
covering the entire building
Fig: Structural option 3
Selection of Structural strategies:
So, we will use option 1 for construction. Walls and columns should be constructed and roof will
be constructed by roof truss. This building is a steel structured building. Roof trusses have been
used at the roof level. Beams and columns are jointed together. So, it is a steel framed structure.
There is some extension of the building floors. The main part of this building is foundation.
Here, it is a RCC framed structure and high rise building. So, foundation is critical here in this
building.
Conclusion
The sub-soil exploration has been performed at the proposed site for the construction of the
area. Three boreholes of 45-ft. depth from the existing ground level were drilled. Based on
the information obtained from sub-soil test results, both in the field and laboratory, it may
be concluded that the sub-soil condition is good from, approximately, 30 ft below the
existing ground level upto the bottom of boring. For buildings of standard occupancy upto
2-3 stories, spread foundation or mat may be used within 4-5 ft from existing ground level.
Attention should be given to settlement calculation. The final selection of type and
dimensions of foundation for the proposed structure is to be decided by the consultant/
designer engineer.
Part C
References
1. Winter, G &Nilson A.H. (7th
Edition) “Design of Steel Structures” Tata McGraw-Hall
PublishingCompany LTD. , P.P. 200-205
2. Nilson A.H.,Darwin D& Dolan C.W. (13TH
Edition) „„ Design of steel Structure”
McGraw Hill Higher Education. P.P. 395-396
3. Hassoun, M.N.(1998) „‟ Structural steel Theory & Design‟‟ An imprint of Addison
Wesley Longman, Inc. P.P. 290,495,496,497.
4. Shah, SP and Naaman, AE (1978): “Crack control in steel and its comparison with
reinforced concrete”, Journal of Ferrocement, vol. 8, no. 2, pp.67-80.
5. Naaman, AE and Shah, SP (1971): “Tensile test of ferrocement”, ACI Journal,
Proceedings, vol. 68, no. 9, pp.693-698.
6.Guera, AE, Naaman, AE and Shah, SP (1978): “Ferrocement cylindrical tanks: cracking
and leakage behavior”, ACI Journal, Proceedings, vol. 75, no. 1, pp. 22-30.
7. Nimityongskul, P, Chen, BS and Karasudhi, P. (1980): “Impact resistance of ferrocement
boat hulls”, Journal of Ferrocement, vol. 10, no. 1, pp. 1- 10.
8. Kadir, MRA, Samad, AAA, Muda, ZC and Abdullah, AAA (1997): “Flexural behavior of
composite beams with ferrocement permanent formwork”, Journal of Ferrocement, vol.
27, no. 3, pp. 209- 214.
9. Arshdeep, SC (2009): “Effect of percentage of reinforcement on beams retrofitted with
ferrocement jacketing”, Thapar University, Patiala-147004.
10. M. A. Mansur and P. Paramasivam, “Ferrocement short column under axial and eccentric
compression”, ACI Structural Journal, vol. 87, Issue Number: 5, Publisher: American
Concrete Institute, ISSN: 0889-324,1OCLC: 13846957, September 1990.
11. S. Elavenil and V. Chandrasekar, “Analysis of reinforcement concrete beams
strengthened with ferrocement”, International Journal of Applied Engineering Research,
ISSN 0973-4562, Vol. 2, November 3, 2007.
12. T. K. Mohammad and M. Reza, “Seismic shear strengthening of R/C columns with
ferrocement jacket”, Cement and Concrete Composites, Vol. 27, Issues 7-8, pp. 834-
842, August-September 2005.
13. [10] W. N. Al-Rifaie and K. A. Mohammad, “Strength of ferrocement-brick
composite columns”, Journal of Ferrocement, vol. 30, no. 1, pp. 69- 83, 2000.
14. A. Jagannathan, “Impact study on ferrocement slabs reinforced with polymer mesh”,
International Journal of Applied Engineering Research, Dec 1, 2008.
15. Standard Test Method for Static Modulus of Elasticity and Poisson‟s Ratio of Concrete in
Compression”, ASTM C469-94.
16. M. Erdogan, G. Ibrahim,” The finite element method and application in engineering using
ANSYS”.

More Related Content

What's hot

High rise buildings
High rise buildingsHigh rise buildings
High rise buildingsAnas Adel
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentationSze Ting Kuek
 
Stability of High-Rise Buildings
Stability of High-Rise BuildingsStability of High-Rise Buildings
Stability of High-Rise BuildingsAkash Waghani
 
Slipform construction
Slipform constructionSlipform construction
Slipform constructiontivar rose
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential buildingK.MAHESH KUMAR
 
footing
footingfooting
footingillpa
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high riseAnamikaAntora
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildingsKarthik Suresh
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGAmritpal Singh
 
Straight Concrete Staircase
Straight Concrete StaircaseStraight Concrete Staircase
Straight Concrete StaircaseAndi Rahman
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 reportAmos Tan
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of buildingARUN KUMAR
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...nishant patyal
 

What's hot (20)

High rise buildings
High rise buildingsHigh rise buildings
High rise buildings
 
Construction technology presentation
Construction technology presentationConstruction technology presentation
Construction technology presentation
 
FOOTING (STRUCTURE)
FOOTING (STRUCTURE)FOOTING (STRUCTURE)
FOOTING (STRUCTURE)
 
Type of high rise building
Type of high rise buildingType of high rise building
Type of high rise building
 
Stability of High-Rise Buildings
Stability of High-Rise BuildingsStability of High-Rise Buildings
Stability of High-Rise Buildings
 
Introduction To Building Services
Introduction To Building ServicesIntroduction To Building Services
Introduction To Building Services
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
Design of residential building
Design of residential buildingDesign of residential building
Design of residential building
 
footing
footingfooting
footing
 
presentation ON TALL BUILDING
 presentation ON TALL BUILDING presentation ON TALL BUILDING
presentation ON TALL BUILDING
 
Slab
SlabSlab
Slab
 
Tall buildings
Tall buildingsTall buildings
Tall buildings
 
A presentation on high rise
A presentation on high riseA presentation on high rise
A presentation on high rise
 
Structural systems in high rise buildings
Structural systems in high rise buildingsStructural systems in high rise buildings
Structural systems in high rise buildings
 
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDINGPROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
PROJECT REPORT ON DESIGN OF A RESIDENTIAL BUILDING
 
Grid/ Waffle Slabs
Grid/ Waffle SlabsGrid/ Waffle Slabs
Grid/ Waffle Slabs
 
Straight Concrete Staircase
Straight Concrete StaircaseStraight Concrete Staircase
Straight Concrete Staircase
 
Building construction I project 1 report
Building construction I project 1 reportBuilding construction I project 1 report
Building construction I project 1 report
 
Setting out of building
Setting out of buildingSetting out of building
Setting out of building
 
Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...Precast and Prefabricated components and structures and the connection betwee...
Precast and Prefabricated components and structures and the connection betwee...
 

Similar to Reconstruction of a 4 storey commercial building to a 5 story building

Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal reportConor Meaney
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Parham Farhadpoor
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Arthur Wilson
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartmentJy Chong
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology IOng Shi Hui
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard buildingBirukYared3
 
Site report
Site reportSite report
Site reportHuiYik
 
Site visit report
Site visit reportSite visit report
Site visit reportshensin1015
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1Gertrude Lee
 
Final Report
Final Report Final Report
Final Report Jack Ng
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....MSulmanSarwar
 
Integrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMIntegrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMJaey Chai
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORTWan Nee
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit ReportHasif Alias
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSOUMYA KHANDELWAL
 

Similar to Reconstruction of a 4 storey commercial building to a 5 story building (20)

Design Appraisal report
Design Appraisal reportDesign Appraisal report
Design Appraisal report
 
Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1Sem 1 degree ct assignment 1
Sem 1 degree ct assignment 1
 
Bachelor in quantity surveying 2
Bachelor in quantity surveying 2Bachelor in quantity surveying 2
Bachelor in quantity surveying 2
 
IBS design proposal of apartment
IBS design proposal of apartmentIBS design proposal of apartment
IBS design proposal of apartment
 
Building Technology I
Building Technology IBuilding Technology I
Building Technology I
 
Site report
Site reportSite report
Site report
 
foundation and structural system of the shard building
foundation and structural system  of the shard buildingfoundation and structural system  of the shard building
foundation and structural system of the shard building
 
Site Report
Site Report Site Report
Site Report
 
Report
ReportReport
Report
 
Site report
Site reportSite report
Site report
 
Site report 1
Site report 1Site report 1
Site report 1
 
Site visit report
Site visit reportSite visit report
Site visit report
 
Building Technology 1
Building Technology 1Building Technology 1
Building Technology 1
 
Final Report
Final Report Final Report
Final Report
 
Highrise buildings....
Highrise buildings....Highrise buildings....
Highrise buildings....
 
Integrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BMIntegrated Assignment : Measurement & CT & BM
Integrated Assignment : Measurement & CT & BM
 
Site report
Site reportSite report
Site report
 
SITE VISIT REPORT
SITE VISIT REPORTSITE VISIT REPORT
SITE VISIT REPORT
 
BQS Site Visit Report
BQS Site Visit ReportBQS Site Visit Report
BQS Site Visit Report
 
Speedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALSSpeedy construction- FORMS AND MATERIALS
Speedy construction- FORMS AND MATERIALS
 

More from Service_supportAssignment

Social construction of race and gender, patriarchy and prejudice and discrimi...
Social construction of race and gender, patriarchy and prejudice and discrimi...Social construction of race and gender, patriarchy and prejudice and discrimi...
Social construction of race and gender, patriarchy and prejudice and discrimi...Service_supportAssignment
 
Visual thinking in my field 'imagination has its own power
Visual thinking in my field 'imagination has its own powerVisual thinking in my field 'imagination has its own power
Visual thinking in my field 'imagination has its own powerService_supportAssignment
 
Critical analysis of the strategic and tactical approaches of coca cola
Critical analysis of the strategic and tactical approaches of coca colaCritical analysis of the strategic and tactical approaches of coca cola
Critical analysis of the strategic and tactical approaches of coca colaService_supportAssignment
 
Double tree hilton australia international expansion to ireland
Double tree hilton australia international expansion to irelandDouble tree hilton australia international expansion to ireland
Double tree hilton australia international expansion to irelandService_supportAssignment
 
Us commercial banks capital ratio and how it affects lending
Us commercial banks capital ratio and how it affects lendingUs commercial banks capital ratio and how it affects lending
Us commercial banks capital ratio and how it affects lendingService_supportAssignment
 
Understanding the social gifts of drinking rituals an alternative framework f...
Understanding the social gifts of drinking rituals an alternative framework f...Understanding the social gifts of drinking rituals an alternative framework f...
Understanding the social gifts of drinking rituals an alternative framework f...Service_supportAssignment
 
Project report on design & execution of a theatre and arts complex
Project report on design & execution of a theatre and arts complexProject report on design & execution of a theatre and arts complex
Project report on design & execution of a theatre and arts complexService_supportAssignment
 

More from Service_supportAssignment (20)

The melting north pole
The melting north poleThe melting north pole
The melting north pole
 
Social construction of race and gender, patriarchy and prejudice and discrimi...
Social construction of race and gender, patriarchy and prejudice and discrimi...Social construction of race and gender, patriarchy and prejudice and discrimi...
Social construction of race and gender, patriarchy and prejudice and discrimi...
 
Visual thinking in my field 'imagination has its own power
Visual thinking in my field 'imagination has its own powerVisual thinking in my field 'imagination has its own power
Visual thinking in my field 'imagination has its own power
 
Organization management
Organization managementOrganization management
Organization management
 
Strategic analysis of nike
Strategic analysis of nikeStrategic analysis of nike
Strategic analysis of nike
 
Critical analysis of the strategic and tactical approaches of coca cola
Critical analysis of the strategic and tactical approaches of coca colaCritical analysis of the strategic and tactical approaches of coca cola
Critical analysis of the strategic and tactical approaches of coca cola
 
Financial environment analysis
Financial environment analysisFinancial environment analysis
Financial environment analysis
 
Samsung electronics case study
Samsung electronics case studySamsung electronics case study
Samsung electronics case study
 
Double tree hilton australia international expansion to ireland
Double tree hilton australia international expansion to irelandDouble tree hilton australia international expansion to ireland
Double tree hilton australia international expansion to ireland
 
Chinese cosmetic market
Chinese cosmetic marketChinese cosmetic market
Chinese cosmetic market
 
Steel structures failure
Steel structures failureSteel structures failure
Steel structures failure
 
Contemporary design issues
Contemporary design issuesContemporary design issues
Contemporary design issues
 
Social media
Social mediaSocial media
Social media
 
Us commercial banks capital ratio and how it affects lending
Us commercial banks capital ratio and how it affects lendingUs commercial banks capital ratio and how it affects lending
Us commercial banks capital ratio and how it affects lending
 
There are no fixed points in space
There are no fixed points in spaceThere are no fixed points in space
There are no fixed points in space
 
Understanding the social gifts of drinking rituals an alternative framework f...
Understanding the social gifts of drinking rituals an alternative framework f...Understanding the social gifts of drinking rituals an alternative framework f...
Understanding the social gifts of drinking rituals an alternative framework f...
 
Music
Music Music
Music
 
Strategic recruitment and selection
Strategic recruitment and selection Strategic recruitment and selection
Strategic recruitment and selection
 
Proposal nike presence in nigeria
Proposal  nike presence in nigeriaProposal  nike presence in nigeria
Proposal nike presence in nigeria
 
Project report on design & execution of a theatre and arts complex
Project report on design & execution of a theatre and arts complexProject report on design & execution of a theatre and arts complex
Project report on design & execution of a theatre and arts complex
 

Recently uploaded

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Celine George
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 

Recently uploaded (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 

Reconstruction of a 4 storey commercial building to a 5 story building

  • 1. [TYPE THE COMPANY NAME] Reconstruction of a 4 storey Commercial Building to a 5 Story building. [Type the document subtitle] DELL [Pick the date] [Type the abstract of the document here. The abstract is typically a short summary of the contents of the document. Type the abstract of the document here. The abstract is typically a short summary of the contents of the document.]
  • 2. Table of Content Part A Introduction………………………………………………………………………….…2 Feasibility Study…………………………………………………………………….…3 Structural Options ………………………………………………………………….…9-12 Option 1 - Concrete structure (Mention Why did i choose this for the project) …..10 Option 2 - Steel or Timber (Why this is not chosen for the project …………..……11 Option 3- Concrete structure (Mention Why did i choose this for the project) …..12 Design selection………………………………………………………………………12 Conclusion………………………………………………………………………………12 Part C References……………………………………………………………………………….13
  • 3. Reconstruction of a 4 Storey Commercial Building to a 5 Story building. Part A 1. Introduction The population of the world is increasing day by day. As a result, the population density is increasing rapidly and decreasing the cultivation land and forest area for construction of residential and commercial building. But land is fixed. When it is necessary to stop decreasing the cultivation land and forest area, there is a problem arising. This problem is accommodation problem. There is arising office building space problem and it can be solved by reconstruction of existing building. This project deals with typical four storied commercial building to be extended up to 5 stories. This project will act as a guideline for future works with above location for similar multistoried high rise building. It will also give an idea about comparative study between mat foundation & pile foundation for different works of the above proposed area. Professional engineers, organizations may avail this project as a guideline for effective, economic and convenient design of multistoried building in suitable storey. Feasibility Study The subject property is situated within The Moor, Sheffield. The Moor is currently going through a rapid period of transformation with the new markets block opening in November 2013 and a number of other blocks being in the process of redevelopment. The premises form part of a four storey building situated on a prominent corner at the junction on the Moor, Sheffield. The property comprises a four storey building with retail accommodation at ground floor and the office accommodation over the first, second and third floors of the building. The Building is surrounded by the retail hustle and bustle of the city centre shopping precincts and there are a number of car parks located in the immediate area
  • 4. Fig:MidCity House, Furnival Gate, Sheffield, S1 4QR Structural Options Structural options are the most important things for building and economy. We will find the best structural solution of the proposed building. At first we will discuss about some structural oftion
  • 5. for the building. Fig; Floor plan of the building.
  • 6. Option 1 - Concrete structure (Mention Why did i choose this for the project) The ground floor office area is to provide a 24 m by 22 m area with no internal columns. Stairs locations are as shown in drawing. A 15.5 m wide public area is required at first floor, running along the entire length of the building. Clear headroom of 3m is required for the public. No part of the structure shall be higher than 6 m above the ground level. Perimeter columns shall not be spaced closer than 4m.So; we can use concrete structure as proper solution for the entire building. All beams and columns should be RCC structure. Brick walls and zed cladding board panel and steel bracing will be used for covering the entire building. Here, foundation is the main problem for reconstruction .From the bore hole data it is clear that it is on clay layer, So consolidation occurred here and this soil is strong enough now to carry extended building load. So, previous foundation is ok for this reconstruction. But, to ensure safety we will use roof truss in upper floor to minimize the dead load. So, no, huge load will be added here. only few walls load and lightweight rood truss load will be added here. For roof we should use roof truss because it will be safe and cheaper solution for entire building. So, truss solution is the proper solution for this building. Roof truss will carry wind load and total roof load and will transfer it to beams and then beams will transfer this load to column and column will transmit this load to foundation. Single strip footing can be used here and no pile will be required. The First stage assessment of the risk of damage to buildings and structures in tunneling zones involved preparation of settlement profile induced by tunnel excavation. Settlement was computed at every 100m interval along tunneling alignment using the method based on the Gaussian normal distribution curve presented above. Settlement induced by each tunnel was predicted independently and superimposed to determine the total settlement induced by the twin tunnels.10mm and 25mm settlement contours were plotted in the topography plan.
  • 7. Fig: Details with footing. Option 2 - Steel Structure (Why this is not chosen for the project)
  • 8. The ground floor office area is to provide a 24 m by 22 m area with no internal columns. Stairs locations are as shown in drawing. A 15.5 m wide public area is required at first floor, running along the entire length of the building. Clear headroom of 3m is required for the public. No part of the structure shall be higher than 6 m above the ground level. Perimeter columns shall not be spaced closer than 4m.So; we can use steel structure as proper solution for the entire building. All beams and columns should be steel structure. Brick walls and zed cladding board panel and steel bracing will be used for covering the entire building. For roof we should use roof truss because it will be safe and cheaper solution for entire building. So, truss solution is the proper solution for this building. Roof truss will carry wind load and total roof load and will transfer it to beams and then beams will transfer this load to column and column will transmit this load to foundation. Single strip footing can be used here and no pile will be required. The First stage assessment of the risk of damage to buildings and structures in tunneling zones involved preparation of settlement profile induced by tunnel excavation. Settlement was computed at every 100m interval along tunneling alignment using the method based on the Gaussian normal distribution curve presented above. Settlement induced by each tunnel was predicted independently and superimposed to determine the total settlement induced by the twin
  • 9. tunnels.10mm and 25mm settlement contours were plotted in the topography plan.
  • 10.
  • 11. Fig: Details plan. Option 3 - Concrete structure (Mention Why did i choose this for the project) Here, foundation is the main problem for reconstruction .From the bore hole data it is clear that it is on clay layer, So consolidation occurred here and this soil is strong enough now to carry extended building load. So, previous foundation is ok for this reconstruction. But, to ensure safety we will use roof truss in upper floor to minimize the dead load. So, no, huge load will be added here. only few walls load and lightweight rood truss load will be added here. For roof we should use roof truss because it will be safe and cheaper solution for entire building. So, truss solution is the proper solution for this building. The ground floor office area is to provide a 24 m by 22 m area with no internal columns. Stairs locations are as shown in drawing. A 15.5 m wide public area is required at first floor, running along the entire length of the building. Clear headroom of 3m is required for the public. No part of the structure shall be higher than 6 m above the ground level. Perimeter columns shall not be spaced closer than 4m.So; we can use concrete structure as proper solution for the entire building. All beams and columns should be RCC structure. Brick walls and zed cladding board panel and steel bracing will be used for covering the entire building
  • 12.
  • 13. Fig: Structural option 3 Selection of Structural strategies: So, we will use option 1 for construction. Walls and columns should be constructed and roof will be constructed by roof truss. This building is a steel structured building. Roof trusses have been used at the roof level. Beams and columns are jointed together. So, it is a steel framed structure. There is some extension of the building floors. The main part of this building is foundation. Here, it is a RCC framed structure and high rise building. So, foundation is critical here in this building. Conclusion The sub-soil exploration has been performed at the proposed site for the construction of the area. Three boreholes of 45-ft. depth from the existing ground level were drilled. Based on the information obtained from sub-soil test results, both in the field and laboratory, it may be concluded that the sub-soil condition is good from, approximately, 30 ft below the existing ground level upto the bottom of boring. For buildings of standard occupancy upto 2-3 stories, spread foundation or mat may be used within 4-5 ft from existing ground level. Attention should be given to settlement calculation. The final selection of type and dimensions of foundation for the proposed structure is to be decided by the consultant/ designer engineer. Part C References 1. Winter, G &Nilson A.H. (7th Edition) “Design of Steel Structures” Tata McGraw-Hall PublishingCompany LTD. , P.P. 200-205 2. Nilson A.H.,Darwin D& Dolan C.W. (13TH Edition) „„ Design of steel Structure” McGraw Hill Higher Education. P.P. 395-396
  • 14. 3. Hassoun, M.N.(1998) „‟ Structural steel Theory & Design‟‟ An imprint of Addison Wesley Longman, Inc. P.P. 290,495,496,497. 4. Shah, SP and Naaman, AE (1978): “Crack control in steel and its comparison with reinforced concrete”, Journal of Ferrocement, vol. 8, no. 2, pp.67-80. 5. Naaman, AE and Shah, SP (1971): “Tensile test of ferrocement”, ACI Journal, Proceedings, vol. 68, no. 9, pp.693-698. 6.Guera, AE, Naaman, AE and Shah, SP (1978): “Ferrocement cylindrical tanks: cracking and leakage behavior”, ACI Journal, Proceedings, vol. 75, no. 1, pp. 22-30. 7. Nimityongskul, P, Chen, BS and Karasudhi, P. (1980): “Impact resistance of ferrocement boat hulls”, Journal of Ferrocement, vol. 10, no. 1, pp. 1- 10. 8. Kadir, MRA, Samad, AAA, Muda, ZC and Abdullah, AAA (1997): “Flexural behavior of composite beams with ferrocement permanent formwork”, Journal of Ferrocement, vol. 27, no. 3, pp. 209- 214. 9. Arshdeep, SC (2009): “Effect of percentage of reinforcement on beams retrofitted with ferrocement jacketing”, Thapar University, Patiala-147004. 10. M. A. Mansur and P. Paramasivam, “Ferrocement short column under axial and eccentric compression”, ACI Structural Journal, vol. 87, Issue Number: 5, Publisher: American Concrete Institute, ISSN: 0889-324,1OCLC: 13846957, September 1990. 11. S. Elavenil and V. Chandrasekar, “Analysis of reinforcement concrete beams strengthened with ferrocement”, International Journal of Applied Engineering Research, ISSN 0973-4562, Vol. 2, November 3, 2007. 12. T. K. Mohammad and M. Reza, “Seismic shear strengthening of R/C columns with ferrocement jacket”, Cement and Concrete Composites, Vol. 27, Issues 7-8, pp. 834- 842, August-September 2005. 13. [10] W. N. Al-Rifaie and K. A. Mohammad, “Strength of ferrocement-brick composite columns”, Journal of Ferrocement, vol. 30, no. 1, pp. 69- 83, 2000.
  • 15. 14. A. Jagannathan, “Impact study on ferrocement slabs reinforced with polymer mesh”, International Journal of Applied Engineering Research, Dec 1, 2008. 15. Standard Test Method for Static Modulus of Elasticity and Poisson‟s Ratio of Concrete in Compression”, ASTM C469-94. 16. M. Erdogan, G. Ibrahim,” The finite element method and application in engineering using ANSYS”.