Servjit Aulak
Foundations | Infrastructure | Environment Page 1 of 3
Superintendent
Qualifications
CSCS Civil Engineering Site Supervisor
Other Training
Workingat Heights
Workplace FirstAid
RiggingandSlinging
Level 1 STMS
Crane Co-Ordinator/ Appointed Person
Temporary Works Supervisors (5 day course)
I ama very skilled individual with many yearsin and around the civil construction industry.I have
worked
on a variety of projects such asroads, bridges, cofferdams and building works, always giving 100% to
my role at all times. I have high levels of personal drive and commitment. Effective goal setting for self
and others. With a successful track record of building and maintaining skilled teams. I pride myself on
achieving excellent safety standardsand work well within a team. I amalso persistent and tenacious
when faced with difficulties.
Employment Record
July 14 – Present Superintendent Brian Perry Civil
Jan 14 – Jun 14 Construction Manager Trans-Tasman Civil
May 12 – Apr13 General foreman Skanska
Apr09 – May 12 General foreman Skanska
Aug 08 – Apr09 Foreman Morgan Vinci
Jul 06 – Aug 08 General Foreman Morgan Vinci
Sep 05 – Jun 06 Foreman Atkinson Formwork
May 03 –Sept 05 Section foreman Tunnelcraft
Apr98 – Mar 02 Foreman O’Rourke’sand DLR
Relevant Experience
Project: NgaurangatoAotea Quay
Date: July2014 – till Present Position: Superintendent
Manageall sub-contractorson siteHigginsthe paving and drainage,also all works
Manageourcrewwith piling, gantry bases,gantry erection on wholeproject.
Manage ITS work activities, slip formed barriers, pre-cast barriers, drainage and street lights installation
workon whole project.
Advanced workplanning withconstruction managerand projectengineer.
Daily managementof TMon site and staff and sub-contractors.
Weekly planning and organising and achieving criticalmile stone
Servjit Aulak
Foundations | Infrastructure | Environment Page 2 of 3
Project: CharterisBay CV$ 3m
Date: January2014 – June 2014 Position: Construction Manager
Monitoring,executing and supervision of civilengineering works.
Leads and manages appropriate resources for projectsand resolves issues of availability and performance
as required
Proactively identify and maintain strategicclient and sub-contractors relationship
Identify assessand managethehazardsand riskassociated with projectactivities
Safetymanagement,costcontroland purchasing
Project: Crossrail PaddingtonStation CV250million pounds
Date: May 2012 – April 2013 Position: General Foreman
Overseesite workson C405 Crossrail project
Contract involves the installation of a box measuring 260m long x25m wide and 23m deep. Consisting of
diaphragmwall,plungecolumns,sheetpiling and RC installation.
Relocation of utilityservicesand ensureallworksarecompleted withoutdamaging theGradeIIlisted façade
of the station
EnsureHealth and Safetyproceduresarefollowed.Winnerof gold award atRoSPAs2012
Excavating of 8000m3 and 16000m3 of clay
Façadeof t he
Project: M25 WideningJ16 to J23 CV 590 millionpounds
Date: April 2009 – May 2012 Position: General Foreman
Managea direct labourteamof approximately 16operativealong with numeroussub-contractors
Managing the directional drilling operations, access steps to cabinets, blockwork and paving, technology
installation worksincluding ducting installation and cabling installation.
Gantry piling operations, gantry erection, street lighting installation and directional signage installation.
Completion of grouting to gantry legsand protection worksto in-road detection loops
Managesitelogistics for related section
Project: M1 WideningJ25 to J28- Bridges 474, 475, 482 CV336millionPounds
Date: August2008 – April 2009 Position: General Foreman
Managesub-contractteamsin theconstruction of 5 numberroad bridges
Installation of pre-castbeamsection 75ton craned into place
Ensureworkwasundertaken in a safemannerand according to schedule
Managesitelogistics for related section
Project: KincardineBridge contract value120million pounds
Date: July2006 – August2008 Position: General Foreman
ManageCemetation forpiling works (1,000 piles installed)
Management of work force 80 to 100 operative, consisting of carpenter ,steel fixers, general operatives,
welders,scaffolders,engineersand pre-stressing
Managesitelogistics for related section
1.2 Kilometrelong push launch,a triple cell systemof 40,000 ton of concreteand steel and 16.5metres wide
Servjit Aulak
Foundations | Infrastructure | Environment Page 3 of 3
Project: CliveAtkinsonFormwork CV 250k to 5m pounds
Date: September2005 – June 2006 Position: Foreman
Foreman on an improvementand extension of a watertreatmentplant
Involved installing pumping station to chambers,circulartanksand diversion works
Managesitelogistics and H&S for related section
Project: Channel Tunnel Rail Link 310 RainhamCrossover
Date: May 2003 -September2005 Position: Section Foreman
Set up initial precastyard for fabrication 2.5x5m RC interlocking panels for retaining walls and RC capping
beamforbridge at Botany Way
Constructing thepierswith steel girders and RC slab for crossoverand box section over live railway line
Manageearthworksstageand finishing worksto thebridgeinstallation
Projectincluded:11.4km of track and 520m long viaductconstruction
Project: Bluewater ShoppingCentre, DocklandLightRailway andMedway Viaduct CTRL 350/410
Date: April 1998 – March 2002 Position: Foreman