SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
RESUME
Shivanagu Rapelly Automation Engineer
Email:shivanagu.rapelly@gmail.com
Phone: 09618464310
Career Objective
To obtain a challenging positionina quality engineeringenvironment, where my
resourceful experience andacademic skills will add value to organizational operations.
Technical Skills
 Configuring and faults diagnosis of PLC, SCADA and HMI.
o PLC : ABB AC 500, GE Versamax, GE PAC Systems Rx3i and Siemens Simatic S7
200,300
o PLC Software: ABB Control Builder Plus, GE ProficyMachine Edition7.5, Simatic
Manager , Step-7 Microwin
o SCADA : GE Cimplicity8.1
o HMI: ABB CP 400, GE Quick Panel View
 Commissioningand servicingof ABB ACS 350, 355, 550,800 & 850 VFDS
 Designing, Implementing and Commissioningof new control loops as per site requirements.
 Technical Support for the instrumentationteam.
 Experiencedin the fieldinstruments and control systems procurement activities
 Having exposure in Communicationprotocols like Profibus DP, Ethernet, Modbus & etc.,
 Familiar with LD & FBD – ProgrammingLanguages.
 Determiningthe IO count for PLC
 Finding the problems and suggest the best possible solution
 Commissioningsupport
 Conduct FactoryAcceptance Tests on control systemswiththe emphasis on PLC & SCADA
systems.
Professional Experience
Microsys AutomationPvt Ltd, Hyderabad.
Designation: Automation Engineer
Duration: January 2013 to January 2015.
Employer Profile
Microsys Automationis one of Industrial Automation Companies. It has done projects mostlyin
Power Plants, Sewage treatment plants and cement plants.
Responsibilities
 Commissioningof control system comprisingof PLC, SCADA, HMI and VFD.
 Prepared conceptual and detailed engineering involving preparation of schedule and functional
logic diagrams in PLC.
 Provide technical support and training at the sites
Executed Projects
 Project: Coal Handling Plant
End User: Navabharat Energy India Limited
Description: Coal Handling Plant (CHP) handles the coal from its receipt to transportingto
Coal Bunkers for Boiler operationandto coal storage area. It also processesthe raw coal to
make it suitable for Boiler operation. This entire plant is controlledbyPLC and operated
through SCADA.
Responsibilities:
o DevelopedPLC source code and PLC was GE PAC Systems Rx3i
o DevelopedSCADA screens and programmedrelevant interfaces
 Project: Sewage Treatment Plant
End User: HMWSSB
Description: Sewage is mixture of domestic and industrial wastages. It is more than 99% water,
but the remainder contains some ions, suspended solids and harmful bacteria that must be
removed before water is released to sea. The entire equipments used in this process are
controlledby PLC and SCADA.
Responsibilities:
o Supervised control cables laying.
o End top end PLC source code development (Ladder Logic) for GE VersamaxPLC
o DevelopedSCADA screens inGE Cimplicity.
 Project: Sewage Treatment Plant
End User: MCC
Description: Sewage is mixture of domestic and industrial wastages. It is more than 99% water,
but the remainder contains some ions, suspended solids and harmful bacteria that must be
removed before water is released to sea. The entire equipments used in this process are
controlledby PLC and SCADA.
Responsibilities:
o End top end PLC source code development (Ladder Logic) for GE VersamaxPLC
o DevelopedSCADA screens inGE Cimplicity.
 Project: Power feeders controlling
End User: Indian Immunologicals Limited
Description: The project includes controllingof PCC, APFC panels through PLC and HMI
Responsibilities:
o Supervised control cables laying.
o End top end PLC source code development. PLC was ABB AC 500
o Development of HMI screens. HMIwas ABB CP 430.
o
 Project: WGCC Plant
End User: Omya India Pvt Ltd
Description: The project includes commissioning of VFDs and making communication between
VFD and PLC.
Responsibilities:
o Commissionedall VFDs on the plant and VFDs are ABB Ac 550 & 850
o Installed Pilzrelayand commissioned.
o Commissioningthe communicationinterface betweenPLC and VFds.
o Assistedwith Instrument/control valves commissioning.
Service Engineering
 Attended ABB service calls inregard to converter module installedonElectric locomotives
 Updated software installations andperformedpower device replacement procedures
 Assistedwith testingABB converter modules at the ABB assemblyplant
 Attended ABB drive commissioningand service calls
Academic Summary
 B.Tech in EEE with 70.85% marks from SR Engineering College, JNTU Hyderabad, year
2012.
 Intermediate with 95.1% marks from Sravanthi Junior College , BIE, A.P. year 2008.
 SSC with 89.7% marks from Gouthami High School, BSE, A.P. year 2006.
Professional Training
 Undergone training in the following PLC Systems from SOS Group of Institutions,
Hyderabad.
Nexgen Codesys Nexgen 2000
Siemens Step-7 Microwin S7 200
Siemens Simatic Manager S7 300
Allen Bradley RS Logix Micrologix1200
 Undergone training in the following SCADA Systems from SOS Group of Institutions,
Hyderabad.
Nexgen Elipse
Software Skills
Operating Systems: Windows XP/7/8
Tools: MS Office.
Packages: PLC/SCADA Programming
Personal Profile
Name : Shivanagu Rapelly
Father’s Name : Kanukaiah Rapelly
Date of Birth : 13th, Mar, 1989
Sex : Male
Marital Status : Unmarried
Nationality : Indian
Languages know : English, Hindi, Telugu
Declaration
I herebydeclare that all the above furnishedinformationis true to the best of my knowledge
and belief.
Place:
Date: Signature

Contenu connexe

Tendances

Tendances (20)

HADY_CV
HADY_CVHADY_CV
HADY_CV
 
PRANTIK_Resume_latest
PRANTIK_Resume_latestPRANTIK_Resume_latest
PRANTIK_Resume_latest
 
Resume-Uday-6+years,DCS,PLC's,Controls design
Resume-Uday-6+years,DCS,PLC's,Controls designResume-Uday-6+years,DCS,PLC's,Controls design
Resume-Uday-6+years,DCS,PLC's,Controls design
 
Avinash_5_years_Process_Automation
Avinash_5_years_Process_AutomationAvinash_5_years_Process_Automation
Avinash_5_years_Process_Automation
 
Engine Mapping And Calibration USA
Engine Mapping And Calibration USAEngine Mapping And Calibration USA
Engine Mapping And Calibration USA
 
Jd phillips 2015
Jd phillips 2015Jd phillips 2015
Jd phillips 2015
 
JOB_THOMAS_SKARIA
JOB_THOMAS_SKARIAJOB_THOMAS_SKARIA
JOB_THOMAS_SKARIA
 
CV 2016 new
CV 2016 newCV 2016 new
CV 2016 new
 
Curriculum Vitae (2015)
Curriculum Vitae (2015)Curriculum Vitae (2015)
Curriculum Vitae (2015)
 
CV
CVCV
CV
 
MUHAMMAD AMIN CV
MUHAMMAD AMIN CVMUHAMMAD AMIN CV
MUHAMMAD AMIN CV
 
CV
CV CV
CV
 
Shashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_IndiaShashank Janbandhu_technical_Cv_India
Shashank Janbandhu_technical_Cv_India
 
CV_S.Syed mohamed Ali _ PLC_SCADA_ENGINEER
CV_S.Syed mohamed Ali _ PLC_SCADA_ENGINEERCV_S.Syed mohamed Ali _ PLC_SCADA_ENGINEER
CV_S.Syed mohamed Ali _ PLC_SCADA_ENGINEER
 
new cv june
new cv junenew cv june
new cv june
 
Rajnish_1971
Rajnish_1971Rajnish_1971
Rajnish_1971
 
CV
CVCV
CV
 
dasu resume 123
dasu resume 123dasu resume 123
dasu resume 123
 
RESUME.
RESUME.RESUME.
RESUME.
 
abhi updated
abhi updatedabhi updated
abhi updated
 

Similaire à RAPELLY_resume1

Similaire à RAPELLY_resume1 (20)

Pradeep_Automation_CV_5+yrs_exp_Doc
Pradeep_Automation_CV_5+yrs_exp_DocPradeep_Automation_CV_5+yrs_exp_Doc
Pradeep_Automation_CV_5+yrs_exp_Doc
 
YOGESH KUMBHAR RESUME - Application Engineer-
YOGESH KUMBHAR RESUME - Application Engineer-YOGESH KUMBHAR RESUME - Application Engineer-
YOGESH KUMBHAR RESUME - Application Engineer-
 
Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)Resume - Swapnil Shewalkar (1)
Resume - Swapnil Shewalkar (1)
 
tsf DCS xpr
tsf DCS xprtsf DCS xpr
tsf DCS xpr
 
CV_Sandeep Anugade
CV_Sandeep AnugadeCV_Sandeep Anugade
CV_Sandeep Anugade
 
Resume Lalit Kumar
Resume Lalit KumarResume Lalit Kumar
Resume Lalit Kumar
 
Resume
ResumeResume
Resume
 
Shakeer_Electrical Engineer
Shakeer_Electrical EngineerShakeer_Electrical Engineer
Shakeer_Electrical Engineer
 
Sujit Das
Sujit DasSujit Das
Sujit Das
 
AnshumanResume1pdf
AnshumanResume1pdfAnshumanResume1pdf
AnshumanResume1pdf
 
FInal_CV_08_4_2016
FInal_CV_08_4_2016FInal_CV_08_4_2016
FInal_CV_08_4_2016
 
Instruments & control System Engineer
Instruments & control System EngineerInstruments & control System Engineer
Instruments & control System Engineer
 
Hammad CV
Hammad CVHammad CV
Hammad CV
 
SidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineeringSidharthSilla ElectricalEngineering
SidharthSilla ElectricalEngineering
 
Aerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves moneyAerospace maintenance facility increases utilization by 50%, saves money
Aerospace maintenance facility increases utilization by 50%, saves money
 
Kewal Summary Switchgear
Kewal Summary SwitchgearKewal Summary Switchgear
Kewal Summary Switchgear
 
khaled cv
khaled cvkhaled cv
khaled cv
 
Murletharan CV
Murletharan CVMurletharan CV
Murletharan CV
 
Muhammad Danish Rafiq
Muhammad Danish RafiqMuhammad Danish Rafiq
Muhammad Danish Rafiq
 
Summer Internship Report on PLC
Summer Internship Report on PLCSummer Internship Report on PLC
Summer Internship Report on PLC
 

RAPELLY_resume1

  • 1. RESUME Shivanagu Rapelly Automation Engineer Email:shivanagu.rapelly@gmail.com Phone: 09618464310 Career Objective To obtain a challenging positionina quality engineeringenvironment, where my resourceful experience andacademic skills will add value to organizational operations. Technical Skills  Configuring and faults diagnosis of PLC, SCADA and HMI. o PLC : ABB AC 500, GE Versamax, GE PAC Systems Rx3i and Siemens Simatic S7 200,300 o PLC Software: ABB Control Builder Plus, GE ProficyMachine Edition7.5, Simatic Manager , Step-7 Microwin o SCADA : GE Cimplicity8.1 o HMI: ABB CP 400, GE Quick Panel View  Commissioningand servicingof ABB ACS 350, 355, 550,800 & 850 VFDS  Designing, Implementing and Commissioningof new control loops as per site requirements.  Technical Support for the instrumentationteam.  Experiencedin the fieldinstruments and control systems procurement activities  Having exposure in Communicationprotocols like Profibus DP, Ethernet, Modbus & etc.,  Familiar with LD & FBD – ProgrammingLanguages.  Determiningthe IO count for PLC  Finding the problems and suggest the best possible solution  Commissioningsupport  Conduct FactoryAcceptance Tests on control systemswiththe emphasis on PLC & SCADA systems. Professional Experience Microsys AutomationPvt Ltd, Hyderabad. Designation: Automation Engineer Duration: January 2013 to January 2015.
  • 2. Employer Profile Microsys Automationis one of Industrial Automation Companies. It has done projects mostlyin Power Plants, Sewage treatment plants and cement plants. Responsibilities  Commissioningof control system comprisingof PLC, SCADA, HMI and VFD.  Prepared conceptual and detailed engineering involving preparation of schedule and functional logic diagrams in PLC.  Provide technical support and training at the sites Executed Projects  Project: Coal Handling Plant End User: Navabharat Energy India Limited Description: Coal Handling Plant (CHP) handles the coal from its receipt to transportingto Coal Bunkers for Boiler operationandto coal storage area. It also processesthe raw coal to make it suitable for Boiler operation. This entire plant is controlledbyPLC and operated through SCADA. Responsibilities: o DevelopedPLC source code and PLC was GE PAC Systems Rx3i o DevelopedSCADA screens and programmedrelevant interfaces  Project: Sewage Treatment Plant End User: HMWSSB Description: Sewage is mixture of domestic and industrial wastages. It is more than 99% water, but the remainder contains some ions, suspended solids and harmful bacteria that must be removed before water is released to sea. The entire equipments used in this process are controlledby PLC and SCADA. Responsibilities: o Supervised control cables laying. o End top end PLC source code development (Ladder Logic) for GE VersamaxPLC o DevelopedSCADA screens inGE Cimplicity.
  • 3.  Project: Sewage Treatment Plant End User: MCC Description: Sewage is mixture of domestic and industrial wastages. It is more than 99% water, but the remainder contains some ions, suspended solids and harmful bacteria that must be removed before water is released to sea. The entire equipments used in this process are controlledby PLC and SCADA. Responsibilities: o End top end PLC source code development (Ladder Logic) for GE VersamaxPLC o DevelopedSCADA screens inGE Cimplicity.  Project: Power feeders controlling End User: Indian Immunologicals Limited Description: The project includes controllingof PCC, APFC panels through PLC and HMI Responsibilities: o Supervised control cables laying. o End top end PLC source code development. PLC was ABB AC 500 o Development of HMI screens. HMIwas ABB CP 430. o  Project: WGCC Plant End User: Omya India Pvt Ltd Description: The project includes commissioning of VFDs and making communication between VFD and PLC. Responsibilities: o Commissionedall VFDs on the plant and VFDs are ABB Ac 550 & 850 o Installed Pilzrelayand commissioned. o Commissioningthe communicationinterface betweenPLC and VFds. o Assistedwith Instrument/control valves commissioning. Service Engineering  Attended ABB service calls inregard to converter module installedonElectric locomotives  Updated software installations andperformedpower device replacement procedures  Assistedwith testingABB converter modules at the ABB assemblyplant  Attended ABB drive commissioningand service calls
  • 4. Academic Summary  B.Tech in EEE with 70.85% marks from SR Engineering College, JNTU Hyderabad, year 2012.  Intermediate with 95.1% marks from Sravanthi Junior College , BIE, A.P. year 2008.  SSC with 89.7% marks from Gouthami High School, BSE, A.P. year 2006. Professional Training  Undergone training in the following PLC Systems from SOS Group of Institutions, Hyderabad. Nexgen Codesys Nexgen 2000 Siemens Step-7 Microwin S7 200 Siemens Simatic Manager S7 300 Allen Bradley RS Logix Micrologix1200  Undergone training in the following SCADA Systems from SOS Group of Institutions, Hyderabad. Nexgen Elipse Software Skills Operating Systems: Windows XP/7/8 Tools: MS Office. Packages: PLC/SCADA Programming Personal Profile Name : Shivanagu Rapelly Father’s Name : Kanukaiah Rapelly Date of Birth : 13th, Mar, 1989 Sex : Male Marital Status : Unmarried Nationality : Indian Languages know : English, Hindi, Telugu Declaration I herebydeclare that all the above furnishedinformationis true to the best of my knowledge and belief. Place: Date: Signature