SlideShare a Scribd company logo
1 of 23
Download to read offline
GeoBIM – a tool for optimal use of geotechnical data
Mats Svensson
Tyréns AB
Who am I?
• Civil engineer Lund University, Sweden,1990
• PhD Geotechnics/Geophysics 2001
• Consultant , Tyréns field geophysics 2002
• Head of Tyréns Geo department 2006
• Enthusiastic about
– Combining different data for best geo model
– Geophysics
– Visualization of geo data
– Well organized data
2015-06-11 www.tyrens.se 2
Many different actors
• Hydrogeologists
• Geotechinical engineers
• Contaminated soil specialists
• Other engineering disciplines
• Society in general
• Contractors
• Authorities
• Clients
• Politicans
• Media
2015-06-11 www.tyrens.se 3
Different needs…. Different capacity
2015-06-11 www.tyrens.se 4
Sheet pile anchor
levels?
Pile length?
Contaminants?
Hydraulic
conductivity?
Groundwater
lowering?
Stability?
Vibrations?
Settlements?
From field to long time administration
2015-06-11 www.tyrens.se 5
Today authorities lose data:
 Bypass Stockholm
 Varberg railway tunnel
 Hallandsås 2 x 8 km railway
tunnel
This is geo data
2015-06-11 www.tyrens.se 6
Hildedal 21/3/2003
Undersökning med EM61 (avancerad
metalldetektor)
V
0 5 10 15 20 25 30 35 40 45
0
5
10
15
20
25
30
35
40
45
0 5 10 15 20 25 30 35 40 45
0
5
10
15
20
25
30
35
40
45
D1 D2
This is geo data
2015-06-11 www.tyrens.se 7
Why complicated?
• Many different data formats
– AGS data format (handle many but not all data types)
– in Sweden approx 10 methods (AutoCAD / GeoSuite)
• Lack of standards
• Specific software handle specific data
• No software can handle all data types
• Still a lot of manual work
2015-06-11 www.tyrens.se 8
GeoBIM concept needed
2015-06-11 www.tyrens.se 99
GeoBIM concept needed
2015-06-11 www.tyrens.se 1010
It could be like this
2015-06-11 www.tyrens.se 11
… or like this…
ESS – European Spallation Source Lund, Sweden
2015-06-11 www.tyrens.se 12
TRUST – Coordination, dissemination & innovation
TRUST – Information models, data
structures and visualization
TRUST – Holistic survey methods
1. Transparent Underground STructure (TRUST) – Management
Ask, Dahlin, Kadefors, Larsson, Mahlemir (LTU – LU – Chalmers – KTH – UU)
TRUST – Smart underground construction
3.1 Adaptive production methods
Schunnesson & Olofsson (LTU)
3.2 Optimization of
Reinforcement
Johansson & Stille (KTH)
3.3 Real Time Grouting Control
Draganovic, Stille, Larsson
(KTH)
2.1 Geoelectric site
investigations
Dahlin, Auken, Rosqvist,
Sparrenbom, Bastani (LU –
SGU)
2.2 Multicomponent seismics and
electromagnetics
Malehmir, Juhlin, Pedersen,
Bastani (UU – SGU)
2.3 Rock mass characterization
Rosberg, Bjelm, Ask, Schunnesson, Stephens (LU – LTU – SGU)
2.4 Development of standards for functional requirements at
underground facilities with respect to the chemical environment
Ericsson, Mossmark, Dahlström (Chalmers – NCC)
4.1 Development of
methodologies for rational
and fast evaluation of
geotechnical investigations
Larsson, Svensson, Jonsson
(KTH – Tyréns – LU)
4.2 Integrated use and
interpretation of data
from geophysical and
non-geophysical methods
for site investigation for
underground construction
Dahlin, Rydén, Günter (LU
– LIAG)
TRUST 4.1 Developing GeoBIM
• Handling ALL geo related data and methods in Infrastructure process
• All data saved with a value of uncertainty
• Make data accessible for all needs/applications
• Visualizing data crucial
2015-06-11 www.tyrens.se 16
Varberg railway tunnel
• Geophysics visualized in
Varberg tunnel
2015-06-11 www.tyrens.se 17
Powerful visualization of GeoBIM
• Large projects – a lot of data
• No tools in geotechnical industry
convenient for visualization
• Use cores from computer game industry
for real time visualization in 3D
2015-06-11 www.tyrens.se 18
Example European Spallation Source (ESS)
2015-06-11 www.tyrens.se 19
Model of uncertainty
Uncertainty (m)
A well defined uncertainty model makes
the bedrock model much more useful
Uncertainty model in tender and contract
With a well defined uncertainty model… …
the risk is defined and could be shared
Conclusions
• Many actors – different needs
• Data often lost
• A need for data format standard
• A need for the Geo-BIM concept
• Powerful visualization a fantastic COMMUNCATION
tool
• Uncertainty model – saves a lot of claims and money
2015-06-11 www.tyrens.se 23
Want to know more?
• mats.svensson@tyrens.se
• www.trust-geoinfra.se
2015-06-11 www.tyrens.se 24
Thank you
www.trust-geoinfra.se

More Related Content

Viewers also liked

Sothea Ngin Original 01 (2)
Sothea Ngin Original 01 (2)Sothea Ngin Original 01 (2)
Sothea Ngin Original 01 (2)
Sothea Ngin
 

Viewers also liked (8)

Immersed Tunnels Recent developments
Immersed Tunnels Recent developmentsImmersed Tunnels Recent developments
Immersed Tunnels Recent developments
 
Developments of regional transportation models as a supporting tool for estim...
Developments of regional transportation models as a supporting tool for estim...Developments of regional transportation models as a supporting tool for estim...
Developments of regional transportation models as a supporting tool for estim...
 
New era of rail innovation – how various generations look at the future of ra...
New era of rail innovation – how various generations look at the future of ra...New era of rail innovation – how various generations look at the future of ra...
New era of rail innovation – how various generations look at the future of ra...
 
Kelių mokslo ir technologijų plėtra 2014-2016 m.
Kelių mokslo ir technologijų plėtra 2014-2016 m.Kelių mokslo ir technologijų plėtra 2014-2016 m.
Kelių mokslo ir technologijų plėtra 2014-2016 m.
 
Modernūs ir inovatyvūs AB Lietuvos geležinkeliai sprendimai
Modernūs ir inovatyvūs AB Lietuvos geležinkeliai sprendimaiModernūs ir inovatyvūs AB Lietuvos geležinkeliai sprendimai
Modernūs ir inovatyvūs AB Lietuvos geležinkeliai sprendimai
 
Sothea Ngin Original 01 (2)
Sothea Ngin Original 01 (2)Sothea Ngin Original 01 (2)
Sothea Ngin Original 01 (2)
 
Forum gesundheitswesen 2016 programm
Forum gesundheitswesen 2016 programmForum gesundheitswesen 2016 programm
Forum gesundheitswesen 2016 programm
 
Immersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, IndiaImmersed tunnels Proposal Mumbai, India
Immersed tunnels Proposal Mumbai, India
 

Similar to GeoBIM – a tool for optimal use of geotechnical data

CV Benjamin N Seive for Linked in
CV Benjamin N Seive for Linked inCV Benjamin N Seive for Linked in
CV Benjamin N Seive for Linked in
Benjamin Seive
 
Tiago Biller_CV_201612_Geo_de
Tiago Biller_CV_201612_Geo_deTiago Biller_CV_201612_Geo_de
Tiago Biller_CV_201612_Geo_de
Tiago Biller
 

Similar to GeoBIM – a tool for optimal use of geotechnical data (20)

Data Services for Geochemical Data
Data Services for Geochemical DataData Services for Geochemical Data
Data Services for Geochemical Data
 
Fiu overview microbes_2014
Fiu overview microbes_2014Fiu overview microbes_2014
Fiu overview microbes_2014
 
CV Benjamin N Seive for Linked in
CV Benjamin N Seive for Linked inCV Benjamin N Seive for Linked in
CV Benjamin N Seive for Linked in
 
abstract review1 (C1)2.pptx
abstract review1 (C1)2.pptxabstract review1 (C1)2.pptx
abstract review1 (C1)2.pptx
 
Herbert cv july2016
Herbert cv july2016Herbert cv july2016
Herbert cv july2016
 
abstract review1 (C1)2.pdf
abstract review1 (C1)2.pdfabstract review1 (C1)2.pdf
abstract review1 (C1)2.pdf
 
Geoscience Information Update 2016
Geoscience Information Update 2016Geoscience Information Update 2016
Geoscience Information Update 2016
 
Role of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas IndustryRole of Geophysics in the Oil and Gas Industry
Role of Geophysics in the Oil and Gas Industry
 
The Southern New England Orogen
The Southern New England OrogenThe Southern New England Orogen
The Southern New England Orogen
 
Exploration in the House 2015: Geoscience Information Update 2015 by Trisha M...
Exploration in the House 2015: Geoscience Information Update 2015 by Trisha M...Exploration in the House 2015: Geoscience Information Update 2015 by Trisha M...
Exploration in the House 2015: Geoscience Information Update 2015 by Trisha M...
 
Hilmar CV_20160217
Hilmar CV_20160217Hilmar CV_20160217
Hilmar CV_20160217
 
Buchroithner - Multitemporal remote sensing-based 3D mapping of glacier chang...
Buchroithner - Multitemporal remote sensing-based 3D mapping of glacier chang...Buchroithner - Multitemporal remote sensing-based 3D mapping of glacier chang...
Buchroithner - Multitemporal remote sensing-based 3D mapping of glacier chang...
 
Interaction of MSE Abutments with Superstructures under Seismic Loading
Interaction of MSE Abutments with Superstructures under Seismic LoadingInteraction of MSE Abutments with Superstructures under Seismic Loading
Interaction of MSE Abutments with Superstructures under Seismic Loading
 
Tiago Biller_CV_201612_Geo_de
Tiago Biller_CV_201612_Geo_deTiago Biller_CV_201612_Geo_de
Tiago Biller_CV_201612_Geo_de
 
Godo sec season
Godo sec seasonGodo sec season
Godo sec season
 
DART AARG Presentation Siena 2009
DART AARG Presentation Siena 2009DART AARG Presentation Siena 2009
DART AARG Presentation Siena 2009
 
Torben Bach - danish groundwater mapping and geodata management
Torben Bach - danish groundwater mapping and geodata managementTorben Bach - danish groundwater mapping and geodata management
Torben Bach - danish groundwater mapping and geodata management
 
Services presentation, minerals
Services presentation, mineralsServices presentation, minerals
Services presentation, minerals
 
C2 Anett Blischke
C2 Anett Blischke C2 Anett Blischke
C2 Anett Blischke
 
Lehnert: Making Small Data Big, IACS, April2015
Lehnert: Making Small Data Big, IACS, April2015Lehnert: Making Small Data Big, IACS, April2015
Lehnert: Making Small Data Big, IACS, April2015
 

More from Statybos Akademija

More from Statybos Akademija (15)

Rekomendacijos daugiabučių namų šiltinimui
Rekomendacijos daugiabučių namų šiltinimuiRekomendacijos daugiabučių namų šiltinimui
Rekomendacijos daugiabučių namų šiltinimui
 
Ankerių tipai ir parinkimas. HILTI
Ankerių tipai ir parinkimas. HILTIAnkerių tipai ir parinkimas. HILTI
Ankerių tipai ir parinkimas. HILTI
 
Overview of some national or regional Ex verification or approval systems and...
Overview of some national or regional Ex verification or approval systems and...Overview of some national or regional Ex verification or approval systems and...
Overview of some national or regional Ex verification or approval systems and...
 
Certification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECExCertification of Personnel Competence (CoPC). IECEx
Certification of Personnel Competence (CoPC). IECEx
 
Overview and Vision of the IECEx International Certification System and the t...
Overview and Vision of the IECEx International Certification System and the t...Overview and Vision of the IECEx International Certification System and the t...
Overview and Vision of the IECEx International Certification System and the t...
 
The UNECE Sectoral Initiative on Equipment for Explosive Enviroments
The UNECE Sectoral Initiative on Equipment for Explosive EnviromentsThe UNECE Sectoral Initiative on Equipment for Explosive Enviroments
The UNECE Sectoral Initiative on Equipment for Explosive Enviroments
 
IECEx and ATEX (and other regional systems)
IECEx and ATEX (and other regional systems)IECEx and ATEX (and other regional systems)
IECEx and ATEX (and other regional systems)
 
IECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex fieldIECEx: Conformity Assessment Solution for the Ex field
IECEx: Conformity Assessment Solution for the Ex field
 
Tekla Structures 21.0
Tekla Structures 21.0Tekla Structures 21.0
Tekla Structures 21.0
 
Lithuania Tekla User Day 2015: Tekla Account, Tekla Services, Tekla Model Sha...
Lithuania Tekla User Day 2015: Tekla Account, Tekla Services, Tekla Model Sha...Lithuania Tekla User Day 2015: Tekla Account, Tekla Services, Tekla Model Sha...
Lithuania Tekla User Day 2015: Tekla Account, Tekla Services, Tekla Model Sha...
 
Inžinerinių sistemų projektavimas su DDS-CAD
Inžinerinių sistemų projektavimas su DDS-CADInžinerinių sistemų projektavimas su DDS-CAD
Inžinerinių sistemų projektavimas su DDS-CAD
 
Building performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overviewBuilding performance analysis system IES VE main features overview
Building performance analysis system IES VE main features overview
 
Equitable projects processes are the foundation to success
Equitable projects processes are the foundation to successEquitable projects processes are the foundation to success
Equitable projects processes are the foundation to success
 
How You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance AnalysisHow You Can Save Energy & Money with Building Performance Analysis
How You Can Save Energy & Money with Building Performance Analysis
 
Žaliųjų pastatų perspektyvos Lietuvoje
Žaliųjų pastatų perspektyvos LietuvojeŽaliųjų pastatų perspektyvos Lietuvoje
Žaliųjų pastatų perspektyvos Lietuvoje
 

Recently uploaded

notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
Hazard Identification (HAZID) vs. Hazard and Operability (HAZOP): A Comparati...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
 
Generative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPTGenerative AI or GenAI technology based PPT
Generative AI or GenAI technology based PPT
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

GeoBIM – a tool for optimal use of geotechnical data

  • 1. GeoBIM – a tool for optimal use of geotechnical data Mats Svensson Tyréns AB
  • 2. Who am I? • Civil engineer Lund University, Sweden,1990 • PhD Geotechnics/Geophysics 2001 • Consultant , Tyréns field geophysics 2002 • Head of Tyréns Geo department 2006 • Enthusiastic about – Combining different data for best geo model – Geophysics – Visualization of geo data – Well organized data 2015-06-11 www.tyrens.se 2
  • 3. Many different actors • Hydrogeologists • Geotechinical engineers • Contaminated soil specialists • Other engineering disciplines • Society in general • Contractors • Authorities • Clients • Politicans • Media 2015-06-11 www.tyrens.se 3
  • 4. Different needs…. Different capacity 2015-06-11 www.tyrens.se 4 Sheet pile anchor levels? Pile length? Contaminants? Hydraulic conductivity? Groundwater lowering? Stability? Vibrations? Settlements?
  • 5. From field to long time administration 2015-06-11 www.tyrens.se 5 Today authorities lose data:  Bypass Stockholm  Varberg railway tunnel  Hallandsås 2 x 8 km railway tunnel
  • 6. This is geo data 2015-06-11 www.tyrens.se 6 Hildedal 21/3/2003 Undersökning med EM61 (avancerad metalldetektor) V 0 5 10 15 20 25 30 35 40 45 0 5 10 15 20 25 30 35 40 45 0 5 10 15 20 25 30 35 40 45 0 5 10 15 20 25 30 35 40 45 D1 D2
  • 7. This is geo data 2015-06-11 www.tyrens.se 7
  • 8. Why complicated? • Many different data formats – AGS data format (handle many but not all data types) – in Sweden approx 10 methods (AutoCAD / GeoSuite) • Lack of standards • Specific software handle specific data • No software can handle all data types • Still a lot of manual work 2015-06-11 www.tyrens.se 8
  • 10. GeoBIM concept needed 2015-06-11 www.tyrens.se 1010
  • 11. It could be like this 2015-06-11 www.tyrens.se 11
  • 12. … or like this… ESS – European Spallation Source Lund, Sweden 2015-06-11 www.tyrens.se 12
  • 13.
  • 14. TRUST – Coordination, dissemination & innovation TRUST – Information models, data structures and visualization TRUST – Holistic survey methods 1. Transparent Underground STructure (TRUST) – Management Ask, Dahlin, Kadefors, Larsson, Mahlemir (LTU – LU – Chalmers – KTH – UU) TRUST – Smart underground construction 3.1 Adaptive production methods Schunnesson & Olofsson (LTU) 3.2 Optimization of Reinforcement Johansson & Stille (KTH) 3.3 Real Time Grouting Control Draganovic, Stille, Larsson (KTH) 2.1 Geoelectric site investigations Dahlin, Auken, Rosqvist, Sparrenbom, Bastani (LU – SGU) 2.2 Multicomponent seismics and electromagnetics Malehmir, Juhlin, Pedersen, Bastani (UU – SGU) 2.3 Rock mass characterization Rosberg, Bjelm, Ask, Schunnesson, Stephens (LU – LTU – SGU) 2.4 Development of standards for functional requirements at underground facilities with respect to the chemical environment Ericsson, Mossmark, Dahlström (Chalmers – NCC) 4.1 Development of methodologies for rational and fast evaluation of geotechnical investigations Larsson, Svensson, Jonsson (KTH – Tyréns – LU) 4.2 Integrated use and interpretation of data from geophysical and non-geophysical methods for site investigation for underground construction Dahlin, Rydén, Günter (LU – LIAG)
  • 15. TRUST 4.1 Developing GeoBIM • Handling ALL geo related data and methods in Infrastructure process • All data saved with a value of uncertainty • Make data accessible for all needs/applications • Visualizing data crucial 2015-06-11 www.tyrens.se 16
  • 16. Varberg railway tunnel • Geophysics visualized in Varberg tunnel 2015-06-11 www.tyrens.se 17
  • 17. Powerful visualization of GeoBIM • Large projects – a lot of data • No tools in geotechnical industry convenient for visualization • Use cores from computer game industry for real time visualization in 3D 2015-06-11 www.tyrens.se 18
  • 18. Example European Spallation Source (ESS) 2015-06-11 www.tyrens.se 19
  • 20. A well defined uncertainty model makes the bedrock model much more useful Uncertainty model in tender and contract With a well defined uncertainty model… … the risk is defined and could be shared
  • 21. Conclusions • Many actors – different needs • Data often lost • A need for data format standard • A need for the Geo-BIM concept • Powerful visualization a fantastic COMMUNCATION tool • Uncertainty model – saves a lot of claims and money 2015-06-11 www.tyrens.se 23
  • 22. Want to know more? • mats.svensson@tyrens.se • www.trust-geoinfra.se 2015-06-11 www.tyrens.se 24