SlideShare une entreprise Scribd logo
1  sur  14
Télécharger pour lire hors ligne
MAITHON
DAM
KASHMIR OF KOYLANCHAL
ACKNOWLEDGEMENT
Iwould like to express my special thanks of
gratitude to Prof. A. K. Choudhary as well as
my colleagues who gave me the golden
opportunity to do this wonderful assignment
on the topic ”MAITHON DAM”, which also
helped me in doing a lot of research and I
came to know about so many new things I am
really thankful to them.
Secondly I would also like to thank my friends
who helped me a lot in finalizing this
assignment within the limited time frame.
2 Subham Modi 23rdOct, 2018
INTRODUCTION
MAITHON DAM (MOTHER’S ABODE)
o LOCATION- DHANBAD DISTRICT (JH)
o IMPOUNDS BARAKAR RIVER
o OPENING DATE- 27TH SEPTEMBER, 1957
o OWNER- DVC (DAMODAR VALLEY
CORPORATION)
3 Subham Modi 23rdOct, 2018
HISTORY
o SERIOUS FLOOD 11 TIMES (1730-1943).
o FLOOD (WORLD WAR II) CUT OFF CALCUTTA FOR 10 WEEKS.
o DAMODAR FLOOD ENQUIRY COMMITTEE: 1943 (G.O.B.).
o Mr. Voorduin- DESIGNED THE PLAN OF DAM BY 1945.
o DAMODAR VALLEY CORPORATION (FIRST MULTIPURPOSE
RIVER VALLEY PROJECT OF INDEPENDENT INDIA) 7TH JULY, 1948
o CONSTRUCTION OF FOUR DAMS.
4 Subham Modi 23rdOct, 2018
DAMS
FIRST DAM OF INDEPENDENT INDIA
TILAIYA
21STFEB,1953
KONAR
15THOCT,1955
$1,500,000
Category Title
MAITHON
27THSEP,1957
PANCHET
6THDEC,1959
$1,500,000
Category Title
5 Subham Modi 23rdOct, 2018
DAM’S MISSION
FLOOD CONTROL
o DESIGN FLOOD OR SPILLWAY
CAPACITY OF 13,592 m3/s.
o NAVIGATION AND DRAINAGE.
WATER SUPPLY
o PROMOTION & OPERATION OF
SCHEMES FOR IRRIGATION.
o WATER SUPPLY FOR DOMESTIC &
INDUSTRIAL USE.
o .IRRIGATION 2,70,000 ACRES
POWER
o GENERATION, OPERATION &
DISTRIBUTION OF ELECTRICAL
ENERGY.
6 Subham Modi 23rdOct, 2018
CATCHMENT AREA
THE AREA FROM WHICH RAINFALL FLOWS
INTO A RIVER, LAKE, OR RESERVOIR.
o 6391.74 Km2 USING SRTH-DEM.
o SPREAD OVER DISTRICTS DHANBAD, JAMTARA, GIRIDIH,
KODERMA, HAZARIBAG & CHATRA OF JHARKHAND.
7 Subham Modi 23rdOct, 2018
SALIENT
FEATURES
GENERAL OVERVIEW
&
HYDROLOGICAL OVERVIEW
8 Subham Modi 23rdOct, 2018
GENERAL OVERVIEW
Inauguration 27thSept, 1957
River Barakar
Location Dhanbad
State Jharkhand
HYDROLOGICAL OVERVIEW
Catchment Area
(Km2)
6391.74
Avg. Annual
Precipitation (cm)
114
Avg. Annual
Runoff (MCM)
2700
SALIENT
FEATURES
STRUCTURAL OVERVIEW
9 Subham Modi 23rdOct, 2018
STRUCTURAL OVERVIEW
Type Composite
Maximum Height Above
Foundation(m)
56.08
Overall Length (m) 4426.76
Overflow Section (m) 360
Width at Top (m) 6.71
Width at Base (m) 10.67
Type of Spillway Ogee
Crest Gate Type Tainter
Crest Gate Number 12
Crest Gate Size (m x m) 12.19 x 12.5
Under sluice Type Vertical Lift
Under sluice Number 5
Under sluice Size (m x m) 1.73 x 3.05
SALIENT
FEATURES
RESERVOIR OVERVIEW
10 Subham Modi 23rdOct, 2018
RESERVOIR OVERVIEW
Dead Storage Level (m) above
MSL
132.59
Dead Storage (MCM) 93
Conservation Level (m) above
MSL
146.31
Conservation Storage (MCM) 441.64
Full Reservoir Level (m) 152.4
Gross Storage Capacity (MCM) 1093.54
Dam Top Level (m) 156.06
Crest Level (m) 140.21
Minimum Drawdown Level (m) 132.59
Maximum Water Level (m) 150.88
Maximum Area of Water
Spread (Km2)
99.55
POWER CAPACITY
Hydropower is currently the second most used renewable energy
source in the world, just behind solid biomass. In terms of
electricity production, hydro power is the most important
renewable energy source, both in the EU and globally.
HYDEL POWER PLANT
o MAITHON HYDEL POWER LTD.
o 60,000 KW (3 UNITS OF 20 MW EACH).
o FIRST OF ITS KIND IN THE WHOLE OF SOUTH EAST ASIA..
o UNDERGROUND POWER STATION (100 ft. BELOW WATER
LEVEL).
THERMAL POWER PLANT
o MAITHON THERMAL POWER LIMITED.
o 1050 MW
o OWNED BY MAITHON POWER LIMITED (JOINT VENTURE BETWEEN
DVC AND TATA POWER).
11 Subham Modi 23rdOct, 2018
PROBLEMS
CONFLICT
o POWER GENERATION-
RESERVOIR SHOULD BE FILLED
AS MUCH AS POSSIBLE.
o FLOOD CONTROL- WATER
STORAGE SHOULD BE LOWERED.
o KEPT AT OPTIMUM LEVEL TO
SATISFY BOTH PARTIES.
SEDIMENTATION
o DESIGN CARRYING CAPACITY:
28,000 m3/s.
o CAPACITY AT TIME OF
CONSTRUCTION: 7100 m3/s.
o PRESENT CARRYING CAPACITY:
2,800 m3/s.
o COST OF REMOVING SILT IS
EQUAL TO THE CONSTRUCTION
OF NEW DAM.
AGE OF SERVICE
o MAITHON DAM HAS
COMPLETED 61 YEARS IN
SERVICE.
o SUCH LONG AGE OF SERVICE
NATURALLY HAS AN EFFECT
ON STRUCTURE, INSPITE OF
REGULAR MAINTENANCE.
12 Subham Modi 23rdOct, 2018
REFERENCES
WIKIPEDIA.ORG DVC.GOV.IN
EJATLAS.ORG INDIA-
WRIS.NRSC.GOV.IN
13 Subham Modi 23rdOct, 2018
THANK YOU!
SUBHAM MODI
REG. NO:
xxxx
Email:
xyz@gmail.com
PHONE NO.
+91-XXXXXXXXXX

Contenu connexe

Tendances (20)

ALL YOU NEED TO KNOW ABOUT KAVERI ISSUE
ALL YOU NEED TO KNOW ABOUT KAVERI ISSUE ALL YOU NEED TO KNOW ABOUT KAVERI ISSUE
ALL YOU NEED TO KNOW ABOUT KAVERI ISSUE
 
five dams of india
five dams of indiafive dams of india
five dams of india
 
Nagarjun sagar dam
Nagarjun sagar damNagarjun sagar dam
Nagarjun sagar dam
 
Warsak Dam(16me07)
Warsak Dam(16me07)Warsak Dam(16me07)
Warsak Dam(16me07)
 
dam
damdam
dam
 
Dams%20report
Dams%20reportDams%20report
Dams%20report
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Nagarjuna sagar dam
Nagarjuna sagar damNagarjuna sagar dam
Nagarjuna sagar dam
 
Mangla Dam
Mangla Dam Mangla Dam
Mangla Dam
 
Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891Pakistandams 150815052252-lva1-app6891
Pakistandams 150815052252-lva1-app6891
 
Great man-made-river
Great man-made-riverGreat man-made-river
Great man-made-river
 
TEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONSTEHRI DAM & ITS IMPLICATIONS
TEHRI DAM & ITS IMPLICATIONS
 
diamir bhasha Dam
diamir bhasha Damdiamir bhasha Dam
diamir bhasha Dam
 
Polavaram project
Polavaram projectPolavaram project
Polavaram project
 
Tarbela dam
Tarbela damTarbela dam
Tarbela dam
 
Zeshan khan
Zeshan khanZeshan khan
Zeshan khan
 
The Great Manmade River Project
The Great Manmade River ProjectThe Great Manmade River Project
The Great Manmade River Project
 
Libya great man made river project
Libya   great man made river projectLibya   great man made river project
Libya great man made river project
 
The great manmade river project
The great manmade river projectThe great manmade river project
The great manmade river project
 
Rivers of Pakistan
Rivers of PakistanRivers of Pakistan
Rivers of Pakistan
 

Similaire à Maithon dam

Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Suryasuryakant soni
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation ReportAnuj Kumar
 
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxhydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxlakshmanaraoJeeru1
 
Development of Small Hydro Power in India
Development of Small Hydro Power in IndiaDevelopment of Small Hydro Power in India
Development of Small Hydro Power in Indiaijsrd.com
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plantpranavn007
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800PRIYANSHU KUMAR
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Sheel Shah
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme conNiraj Chand
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVCLinkon Khan
 
Social and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand HimalayasSocial and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand HimalayasNaveenTripathi26
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104Mohammad Asif
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmansabir rehman
 
Sustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongSustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongJessicaNagtalon
 

Similaire à Maithon dam (20)

Hydro Power Plant -Surya
Hydro Power Plant -SuryaHydro Power Plant -Surya
Hydro Power Plant -Surya
 
sardar sarovar project.pptx
sardar sarovar project.pptxsardar sarovar project.pptx
sardar sarovar project.pptx
 
Industrial Orientation Report
Industrial Orientation ReportIndustrial Orientation Report
Industrial Orientation Report
 
ART integrated .pptx
ART integrated .pptxART integrated .pptx
ART integrated .pptx
 
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptxhydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
hydroelectricityandhydropowerplant-141015231355-conversion-gate02.pptx
 
Sardar sarovar dam
Sardar sarovar damSardar sarovar dam
Sardar sarovar dam
 
Development of Small Hydro Power in India
Development of Small Hydro Power in IndiaDevelopment of Small Hydro Power in India
Development of Small Hydro Power in India
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
Punasa report on indra sagar Dam, 9608684800
Punasa  report on indra sagar Dam, 9608684800Punasa  report on indra sagar Dam, 9608684800
Punasa report on indra sagar Dam, 9608684800
 
Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant Report of Sardar Sarovar Hydro Power Plant
Report of Sardar Sarovar Hydro Power Plant
 
Hydro power-plant
Hydro power-plantHydro power-plant
Hydro power-plant
 
THE THREE GORGES ppt
THE THREE GORGES pptTHE THREE GORGES ppt
THE THREE GORGES ppt
 
Srisailam project final
Srisailam project finalSrisailam project final
Srisailam project final
 
narmada river scheme con
narmada river scheme connarmada river scheme con
narmada river scheme con
 
Training report on DVC
Training report on DVCTraining report on DVC
Training report on DVC
 
Social and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand HimalayasSocial and Environmental Impact of hydropower project in Uttarakhand Himalayas
Social and Environmental Impact of hydropower project in Uttarakhand Himalayas
 
Narmada.ppt
Narmada.pptNarmada.ppt
Narmada.ppt
 
Hydropowerplant 160313180104
Hydropowerplant 160313180104Hydropowerplant 160313180104
Hydropowerplant 160313180104
 
Kala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehmanKala bagh dam by engr sabir rehman
Kala bagh dam by engr sabir rehman
 
Sustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the MekongSustainable Hydropower Development Alternatives for the Mekong
Sustainable Hydropower Development Alternatives for the Mekong
 

Dernier

Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical SensorTanvir Moin
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Projectreemakb03
 
Tachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsTachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsEpec Engineered Technologies
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technologyabdulkadirmukarram03
 
Design Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxDesign Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxrajesshs31r
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Bahzad5
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....santhyamuthu1
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Apollo Techno Industries Pvt Ltd
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecTrupti Shiralkar, CISSP
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfJulia Kaye
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide LaboratoryBahzad5
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging systemgokuldongala
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxNaveenVerma126
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfodunowoeminence2019
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...amrabdallah9
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a buildingswethasekhar5
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 

Dernier (20)

計劃趕得上變化
計劃趕得上變化計劃趕得上變化
計劃趕得上變化
 
Basic Principle of Electrochemical Sensor
Basic Principle of  Electrochemical SensorBasic Principle of  Electrochemical Sensor
Basic Principle of Electrochemical Sensor
 
Gender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 ProjectGender Bias in Engineer, Honors 203 Project
Gender Bias in Engineer, Honors 203 Project
 
Tachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and ApplicationsTachyon 100G PCB Performance Attributes and Applications
Tachyon 100G PCB Performance Attributes and Applications
 
The relationship between iot and communication technology
The relationship between iot and communication technologyThe relationship between iot and communication technology
The relationship between iot and communication technology
 
Lecture 4 .pdf
Lecture 4                              .pdfLecture 4                              .pdf
Lecture 4 .pdf
 
Design Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptxDesign Analysis of Alogorithm 1 ppt 2024.pptx
Design Analysis of Alogorithm 1 ppt 2024.pptx
 
Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)Lecture 1: Basics of trigonometry (surveying)
Lecture 1: Basics of trigonometry (surveying)
 
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
SATELITE COMMUNICATION UNIT 1 CEC352 REGULATION 2021 PPT BASICS OF SATELITE ....
 
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...Technology Features of Apollo HDD Machine, Its Technical Specification with C...
Technology Features of Apollo HDD Machine, Its Technical Specification with C...
 
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSecGuardians and Glitches: Navigating the Duality of Gen AI in AppSec
Guardians and Glitches: Navigating the Duality of Gen AI in AppSec
 
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdfsdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
sdfsadopkjpiosufoiasdoifjasldkjfl a asldkjflaskdjflkjsdsdf
 
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratoryدليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
دليل تجارب الاسفلت المختبرية - Asphalt Experiments Guide Laboratory
 
solar wireless electric vechicle charging system
solar wireless electric vechicle charging systemsolar wireless electric vechicle charging system
solar wireless electric vechicle charging system
 
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docxSUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
SUMMER TRAINING REPORT ON BUILDING CONSTRUCTION.docx
 
Lecture 2 .pptx
Lecture 2                            .pptxLecture 2                            .pptx
Lecture 2 .pptx
 
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdfRenewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
Renewable Energy & Entrepreneurship Workshop_21Feb2024.pdf
 
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
Strategies of Urban Morphologyfor Improving Outdoor Thermal Comfort and Susta...
 
specification estimation and valuation of a building
specification estimation and valuation of a buildingspecification estimation and valuation of a building
specification estimation and valuation of a building
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 

Maithon dam

  • 2. ACKNOWLEDGEMENT Iwould like to express my special thanks of gratitude to Prof. A. K. Choudhary as well as my colleagues who gave me the golden opportunity to do this wonderful assignment on the topic ”MAITHON DAM”, which also helped me in doing a lot of research and I came to know about so many new things I am really thankful to them. Secondly I would also like to thank my friends who helped me a lot in finalizing this assignment within the limited time frame. 2 Subham Modi 23rdOct, 2018
  • 3. INTRODUCTION MAITHON DAM (MOTHER’S ABODE) o LOCATION- DHANBAD DISTRICT (JH) o IMPOUNDS BARAKAR RIVER o OPENING DATE- 27TH SEPTEMBER, 1957 o OWNER- DVC (DAMODAR VALLEY CORPORATION) 3 Subham Modi 23rdOct, 2018
  • 4. HISTORY o SERIOUS FLOOD 11 TIMES (1730-1943). o FLOOD (WORLD WAR II) CUT OFF CALCUTTA FOR 10 WEEKS. o DAMODAR FLOOD ENQUIRY COMMITTEE: 1943 (G.O.B.). o Mr. Voorduin- DESIGNED THE PLAN OF DAM BY 1945. o DAMODAR VALLEY CORPORATION (FIRST MULTIPURPOSE RIVER VALLEY PROJECT OF INDEPENDENT INDIA) 7TH JULY, 1948 o CONSTRUCTION OF FOUR DAMS. 4 Subham Modi 23rdOct, 2018
  • 5. DAMS FIRST DAM OF INDEPENDENT INDIA TILAIYA 21STFEB,1953 KONAR 15THOCT,1955 $1,500,000 Category Title MAITHON 27THSEP,1957 PANCHET 6THDEC,1959 $1,500,000 Category Title 5 Subham Modi 23rdOct, 2018
  • 6. DAM’S MISSION FLOOD CONTROL o DESIGN FLOOD OR SPILLWAY CAPACITY OF 13,592 m3/s. o NAVIGATION AND DRAINAGE. WATER SUPPLY o PROMOTION & OPERATION OF SCHEMES FOR IRRIGATION. o WATER SUPPLY FOR DOMESTIC & INDUSTRIAL USE. o .IRRIGATION 2,70,000 ACRES POWER o GENERATION, OPERATION & DISTRIBUTION OF ELECTRICAL ENERGY. 6 Subham Modi 23rdOct, 2018
  • 7. CATCHMENT AREA THE AREA FROM WHICH RAINFALL FLOWS INTO A RIVER, LAKE, OR RESERVOIR. o 6391.74 Km2 USING SRTH-DEM. o SPREAD OVER DISTRICTS DHANBAD, JAMTARA, GIRIDIH, KODERMA, HAZARIBAG & CHATRA OF JHARKHAND. 7 Subham Modi 23rdOct, 2018
  • 8. SALIENT FEATURES GENERAL OVERVIEW & HYDROLOGICAL OVERVIEW 8 Subham Modi 23rdOct, 2018 GENERAL OVERVIEW Inauguration 27thSept, 1957 River Barakar Location Dhanbad State Jharkhand HYDROLOGICAL OVERVIEW Catchment Area (Km2) 6391.74 Avg. Annual Precipitation (cm) 114 Avg. Annual Runoff (MCM) 2700
  • 9. SALIENT FEATURES STRUCTURAL OVERVIEW 9 Subham Modi 23rdOct, 2018 STRUCTURAL OVERVIEW Type Composite Maximum Height Above Foundation(m) 56.08 Overall Length (m) 4426.76 Overflow Section (m) 360 Width at Top (m) 6.71 Width at Base (m) 10.67 Type of Spillway Ogee Crest Gate Type Tainter Crest Gate Number 12 Crest Gate Size (m x m) 12.19 x 12.5 Under sluice Type Vertical Lift Under sluice Number 5 Under sluice Size (m x m) 1.73 x 3.05
  • 10. SALIENT FEATURES RESERVOIR OVERVIEW 10 Subham Modi 23rdOct, 2018 RESERVOIR OVERVIEW Dead Storage Level (m) above MSL 132.59 Dead Storage (MCM) 93 Conservation Level (m) above MSL 146.31 Conservation Storage (MCM) 441.64 Full Reservoir Level (m) 152.4 Gross Storage Capacity (MCM) 1093.54 Dam Top Level (m) 156.06 Crest Level (m) 140.21 Minimum Drawdown Level (m) 132.59 Maximum Water Level (m) 150.88 Maximum Area of Water Spread (Km2) 99.55
  • 11. POWER CAPACITY Hydropower is currently the second most used renewable energy source in the world, just behind solid biomass. In terms of electricity production, hydro power is the most important renewable energy source, both in the EU and globally. HYDEL POWER PLANT o MAITHON HYDEL POWER LTD. o 60,000 KW (3 UNITS OF 20 MW EACH). o FIRST OF ITS KIND IN THE WHOLE OF SOUTH EAST ASIA.. o UNDERGROUND POWER STATION (100 ft. BELOW WATER LEVEL). THERMAL POWER PLANT o MAITHON THERMAL POWER LIMITED. o 1050 MW o OWNED BY MAITHON POWER LIMITED (JOINT VENTURE BETWEEN DVC AND TATA POWER). 11 Subham Modi 23rdOct, 2018
  • 12. PROBLEMS CONFLICT o POWER GENERATION- RESERVOIR SHOULD BE FILLED AS MUCH AS POSSIBLE. o FLOOD CONTROL- WATER STORAGE SHOULD BE LOWERED. o KEPT AT OPTIMUM LEVEL TO SATISFY BOTH PARTIES. SEDIMENTATION o DESIGN CARRYING CAPACITY: 28,000 m3/s. o CAPACITY AT TIME OF CONSTRUCTION: 7100 m3/s. o PRESENT CARRYING CAPACITY: 2,800 m3/s. o COST OF REMOVING SILT IS EQUAL TO THE CONSTRUCTION OF NEW DAM. AGE OF SERVICE o MAITHON DAM HAS COMPLETED 61 YEARS IN SERVICE. o SUCH LONG AGE OF SERVICE NATURALLY HAS AN EFFECT ON STRUCTURE, INSPITE OF REGULAR MAINTENANCE. 12 Subham Modi 23rdOct, 2018