1. SUBRATOMUKHERJEE
Senior Engineer/Site-In-Charge at Dhrub Construction, U.P, India
E-mail:subratom89@gmail.com & smukherjee_2009@yahoo.in
Mobile: 919163210262 & 919198637206
Passport No.- K8122701
Availability- 2 weeks
_____________________________________________________________________________________________
SUMMARY
OBJECTIVE:- Senior Engineer/Site-In-Charge with 23+ years experience seeking relocation in
India and abroad.
FUNCTIONAL AREA:- High-rise (up to G+29) and multistoried residential and commercial
building projects(including club house, car park, podium/raised garden and shopping mall and project
infrastructure),Irrigation and water related projects(aqueduct, pump house, canal, STP, WTP/UGR,
cofferdam, causeway), roads and infrastructural projects(bitumen road, RCC drain, boundary wall,
sewer & water main line, electrical sub-station), bore pile, driven pile and pile cap and earth-moving
works.
SKILL SET:- Site planning, management and execution; planning,allocation and reconciliation of
resources;budget monitoring, site-financeplanning, fund utilization and reconciliation:measurement
of works, bill preparation, verification and paymentprocessing of client/contractorsand vendors;
quality and safety compliance; co-ordination with client,vendors,contractors and consultant;
preparation and submission of work-progress reportto superior.
___________________________________________________________________________________
BRIEF WORKHISTORY
A. High-rise, Multi-storied buildings/Villas - 12 years.
B. Road & Infrastructure works - 4 years.
C. Irrigation & water related structures-4 years 0 months.
D. PILING & PILE CAPS - 2 years 2 months.
E. STP, WTP/UGR, Sewer & Water pipeline network- 1 year
TOTAL EXPERIENCE:- 23 years 2 months (as on March, 2016).
(NOTE- Above statement is approximateas some of the projects were handled simultaneously)
___________________________________________________________________________________
CURRENT EMPLOYMENT
Dhrub Construction, Uttar Pradesh
Senior Engineer/Site-In-Charge
October, 2014 – present (1 year 6 months)
Project- Construction of AQUEDUCT( atch.-14.59km) on Arjun feeder canal (site- Basariavillage,
near Panwari) in Arjun Sahayak Pariyojna, under Mahoba division, Dept.of Irrigation, Uttar Pradesh.
Consisting - RCC raft(1500-2000 mm thick), 2 nos. piers(1500 mm thick), 2 nos. abutments(2000 mm
thick), canal deck slab(900 mm thick), foot over-bridge, 4 wing walls each for canal & river, PCC
2. thrust blocks on u/s & d/s side of river and boulder pitching on river u/s & d/s side.
Achievements- Completed- 1. > 4900cum RCC in raft, piers,abutments.
2. >29000cum earth cutting/filling for preparation of PCC block bed, canal bed etc and
3. >1300nos. PCC blocks (1mx1mx1m) includingblock-laying–in about 300 working days(no work for
about 75 days due to shortageof cement & steel).
4. Worked as Finance Manager(simultaneously);responsibilities:- total management of site
finance including finance planning, utilization and reconciliation; budget monitoring, finance control,
cost cutting, optimum utilization of resources; managing client bills and bills & payments of
sub-contractors and vendors.
CURRENT SALARY- INR 6,00,000 per annum(CTC) plus free lodging, medical & accidental insurance
EXPECTED SALARY (minimum) - INR 6,60,000 per annum(in India) and INR 12,00,000 (for abroad)
NOITICE PERIOD-15 days
__________________________________________________________________________________
PREVIOUS EMPLOYMENTS
Citystar Infrastructure Ltd., Kolkata
Senior Engineer/Site-In-Charge
April, 2011 -September, 2014(3 years 5 months)
Projects-
1. Construction of multistoried buildings up to G+3 and Officers’ club complex (in IOCL,
Paradip, Odisha) – June, 2011-November, 2012 & June, 2013 - September, 2014
2. Construction of cofferdam and causeway over ‘SANTRA CREEK’ in IOCL, Paradip, Odisha -
June, 2011- November, 2012
3. Bore piles and pile caps in IOCL, Paradip, Odisha - July, 2011 - June, 2012
4. Profile making of national highway (Bhubaneshwar-Puri, part) – November, 2012 – June,
2013
5. Construction of pump house in Chillimal, Uttar Pradesh under U.P Irrigation- April, 2011-
June, 2011
Achievements-1.Completed works worth > INR 280 million alongwith sitemanagement,
resourcemanagement, financecontrol,billingand quality & safety compliance.
2. Worked as Finance Manager(simultaneously);responsibilities:-total management of site
finance including finance planning, utilization and reconciliation; budget monitoring, finance control,
cost cutting and optimum utilization of resources; managing client bills and bills & payments of
vendors & sub-contractors; procurement of payment.
__________________________________________________________________________
Keppel-Magus Development Pvt. Ltd., Kolkata
(Joint venture between KEPPEL LAND of Singapore and JATIA GROUP of India)
Senior Engineer (civil & structural)
August, 2007- March, 2011(3 years 8 months)
Project- ‘Ellita Garden Vista’ High rise residential building project Consisting - 15 nos. residential
apartment blocks(G+14 to G+29), one club house, RCC covered car park of 27000sqmatGL, raised
garden/podium above car park of 29000 sqm area, shopping mall and project infrastructure works.
Achievements- Completed:- 1.construction of model flat
2. Property survey, block layout and pile-point layout with surveyors
3. 3.>1450nos. driven cast-in-situ RCC piles,>255 nos. pile caps (1 pileto 56 piles),
4. Grade slab of 4 blocks, RCC structure, brickwork and finishingof one G+24 block (jointly with
another engineer)
5. (i)>250nos. RCC piles&36nos. RCC columns in CLUB HOUSE.
(ii)>750nos.RCC columns foundations, >840nos. RCC columns (300x500),>95000m long RCC
tie-beam(300x600),aprox.29000sq m RCC slab(200 thick) & aprox.7500m long1-1.2m high RCC wall
in CAR-PARK & PODIUM.
(iii) Totalquantity of RCC > 26,000cum
-Completed the whole work in (aprox.) 480 working days
6. (i) >2.5km of RCC drain (600mmx600mm) and
(ii) >1.5km of boundary wall in about 100 working days
(iii) >2.0km of road profile consisting- box cutting(of earth), sand filling,doublelayer B.F.S & WBM in
aprox.65 workingdays
7. civil works of 4 nos. electrical sub-station
8. RCC structureof 3nos. UGR/WTP(- 40,000 lit.water storagetank+ filtration plant,pumps etc. in two
adjoining chambers at 8.50m below G.L and 1no. STP (- 80,000 lit. sludge storage tank+ filtration plant,
pump etc. in two adjoiningchambers at8.0m below G.L)
9.layingof-(I) > 2.0 km swear main line (600mm dia.HDPE Main linewith 200/300mm dia.HDPE
Branch lines) alongwith manholes;and (ii)>1.5km water main line
10. total > 46000 cum RCC in 3 years 8 months and all other works as mentioned above; total bill
generated > Rs.56,00,00000
11. worked as Deputy Quality-In-charge time to time
12. provided technical and practical inputs for cost-cutting resulting saving of > INR 25 millions.
___________________________________________________________________________________
Pradip Construction, Durgapur, West Bengal
Site Engineer
January, 2002 - February, 2007(5 years 1 months)
Projects-residential,commercial & industrial constructions
Achievements- Completed:- 1. Numerous residential,commercial and industrial construction
works includingQS & billing.
2.Construction of several residential and commercial buildings.
3.Systemized construction procedure, billingand material reconciliation.
4.Total billed amount of completed works >Rs.12,50,00000.
___________________________________________________________________________________
Durgapur Municipal Corporation, West Bengal
Licensed building planner and Estimator
April, 1993-March, 2001(8 years)
Project-Preparation and (getting) approval of plans & estimates of multistoried buildings and villas
and supervision of construction works.
Achievements-1.Completed plans of >180nos. residential, >25nos. commercial & 5nos.
industrial buildings and one stadium includingapproval.
2. Prepared cost& material estimateof all abovementioned works
3. Supervised construction of all abovementioned works
4. Chandak Engineering Works, Durgapur, West Bengal
Site Engineer
February, 1991-August, 1991(6 months)
Project-Earth-moving works in 220kv/400kv sub-station under NTPC (Mithan TL) and Haldia
Petrochemical Ltd.
Achievements- 1.Completed works valued >Rs.2,50,00000 including overall supervision of works;
planning,deployment & controllingall machineries,consumables and manpower; survey works;soil
testing & billing.
2. Provided technical help in preparation of tender-quotation, negotiated contractand disputes in
works several times.
___________________________________________________________________________________
Dept. of Irrigation & Waterways, Govt. of West Bengal
Trainee Apprenticeship Engineer
September, 1989 - September, 1990(1year)
Project-Trainingin different irrigation structures and systems
Achievements-1.Supervised construction of PCC canal lining of RBMC & LBMC of Durgapur
Barrage.
2.Prepared daily reportof water intakeand outflow of differentirrigation structures.
3.Getting familiarized with different irrigation structures by visitingtheseseveral times with superiors.
___________________________________________________________________________________
PERSONAL INFORMATION
EDUCATION
1. Diploma in Civil Engineering from State Council for Engineering and Technical Education, Govt. of
West Bengal (1984-1987) with 75%.
2.Higher Secondary Certificate(12th standard science) from West Bengal Council for Higher
Secondary Education(1982-1984) with 54%.
3.Secondary Certificate(10th standard) from West Bengal board of Secondary Education with 66%.
ADDRESS
Present-site & office-vill.- Basaria, P.S- Mahukanth(near Panwari), Dist.- Banda, Utter Pradesh.
Permanent- C-11 Amarabati Colony,Durgapur,West Bengal.PIN-713214.
Passport no.- K8122701, valid up to - 05.03.2023