SlideShare a Scribd company logo
1 of 39
Chapter 2.2:
Cost Estimation Techniques
Cost-Estimation Techniques
Whenever an engineering economic analysis
is performed for a major capital investment,
the cost-estimating effort for that analysis
should be an integral part of a
comprehensive planning and design process
requiring the active participation of not only
engineering designers but also personnel
from marketing, manufacturing, finance, and
top management.
The objective of Chapter 3 is to
present various methods for
estimating important factors in an
engineering economy study.
Estimating the future cash flows for
feasible alternatives is a critical step in
engineering economy studies.
Estimating costs, revenues, useful
lives, residual values, and other
pertinent data can be the most
difficult, expensive, and time-
consuming part of the study.
Results of cost estimating are used for a
variety of purposes.
 Setting selling prices for quoting, bidding, or
evaluating contracts.
 Determining if a proposed product can be made
and distributed at a profit.
 Evaluating how much capital can be justified for
changes and other improvements.
 Setting benchmarks for productivity improvement
programs.
Approaches for Cost Estimating
 The two fundamental approaches are “top-
down” and “bottom-up.”
 The top-down approach basically uses historical
data from similar engineering projects to estimate
the costs, revenues, and other data for the current
project by modifying these data for changes.
 This approach is best used early in the estimating
process when alternatives are still being developed
and refined.
KP Gwachha (M.Phil) 6
The two fundamental approaches are
“top-down” and “bottom-up.”
 The bottom-up approach is a more detailed method
of cost estimating. This method breaks down a project
into small, manageable units and estimates their
economic consequences.
 These smaller unit costs are added together with other
types of costs to obtain an overall cost estimate.
 This approach usually works bet when the detail
concerning the desired output (a product or a service)
has been defined and clarified.
An Integrated Approach
This integrated approach includes three basic components:
1. Work breakdown structure (WBS) :This is a technique for
explicitly defining, at successive levels of detail, the work
elements of a project and their interrelationships
(sometimes called a work element structure).
2. Cost and revenue structure(classification) :Delineation of
cost and revenue categories and elements is made for
estimates of cash flows at each level of the WBS.
3. Estimating techniques (models) :Selected mathematical
models are used to estimate the future costs and revenues
during the analysis period. • These three basic components,
together with integrating procedural steps, provide an
organized approach for developing the cash flows for the
alternatives.)
Work Breakdown Structure (WBS)
 A basic tool in project management
 A framework for defining all project work elements
and their relationships, collecting and organizing
information, developing relevant cost and revenue
data, and management activities.
 Each level of a WBS divides the work elements into
increasing detail.
A WBS has other characteristics.
 Both functional and physical work elements are
included.
 The content and resource requirements for a work
element are the sum of the activities and resources
of related subelements below it.
 A project WBS usually includes recurring and
nonrecurring work elements.
Cost and Revenue Structure
 Used to identify and categorize the costs and
revenues that need to be included in the analysis.
 The life-cycle concept and WBS are important aids
in developing the cost and revenue structure for a
project.
 Perhaps the most serious source of errors in
developing cash flows is overlooking important
categories of costs and revenues.
Estimating Techniques
 Order-of-magnitude estimates (±30%)
 Semidetailed, or budget, estimates (±15%)
 Definitive (detailed) estimates (±5%)
REMEMBER! The purpose of estimating is to develop
cash-flow projections—not to produce exact data about the
future, which is virtually impossible. Cost and revenue
estimates can be classified according to detail, accuracy, and
their intended use.
The level of detail and accuracy of
estimates depends on
 time and effort available as justified by the
importance of the study,
 difficulty of estimating the items in question,
 methods or techniques employed,
 qualifications of the estimator(s), and
 sensitivity of study results to particular factor
estimates.
A variety of sources exist for cost and
revenue estimation.
 Accounting records: good for historical data,
but limited for engineering economic analysis.
 Other sources inside the firm: e.g., sales,
engineering, production, purchasing.
 Sources outside the firm: U.S. government
data, industry surveys, trade journals, and
personal contacts.
 Research and development: e.g., pilot plant,
test marketing program, surveys.
These models can be used in many
types of estimates.
 Indexes
 Unit technique
 Factor technique
Indexes
 Costs and prices vary with time for a number of
reasons, including (1) technological advances, (2)
availability of labor and materials (3) inflation.
 An index is a dimensionless number that indicates
how a cost or a price has changed with time
(typically escalated) with respect to a base year.
 Indexes provide a convenient means for developing
present and future cost and price estimates from
historical data.
KP Gwachha (M.Phil) 18
Indexes, I, provide a means for developing
present and future cost and price estimates
from historical data.
k = reference year for which cost or price is known.
n = year for which cost or price is to be estimated (n>k).
Cn = estimated cost or price of item in year n.
Ck = cost or price of item in reference year k.
Indexes can be created for a single item or for multiple
items (eqs. 3-1, 3-2).
KP Gwachha (M.Phil) 20
In 2002 Acme Chemical purchased a large pump for
$112,000. Acme keys their cost estimating for these
pumps to the industrial pump index, with a baseline of
100 established in 1992. The index in 2002 was 212.
Acme is now (2010) considering construction of a new
addition and must estimate the cost of the same type
and size of pump. If the industrial pump index is
currently 286, what is the estimated cost of the new
pump?
Pause and solve
The unit technique is one that is widely known
and understood.
A “per unit factor” is used, along with the
appropriate number of units, to find the total estimate
of cost. An often used example is the cost of a
particular house. Using a per unit factor of, say,
$120 per square foot, and applying that to a house
with 3,000 square feet, results in an estimated cost of
$120 x 3,000 = $360,000.
This techniques is useful in preliminary estimates,
but using average costs can be very misleading.
The factor technique is an extension of
the unit technique where the products of
several quantities are summed and then
added to components estimated directly.
C = cost being estimated
Cd = cost of the selected component d estimated directly
fm = cost per unit of component m
Um = number of units of component m
Parametric cost estimating is the use of
historical cost data and statistical techniques
(e.g., linear regression) to predict future costs.
Parametric models are used in the early
design stages to get an idea of how much the
product (or project) will cost, on the basis of a
few physical attributes (such as weight,
volume, and power).
The power-sizing technique (or exponential model)
is frequently used for developing capital investment
estimates for industrial plants and equipment.
(both in $ as of the point in time
for which the estimate is desired)
(both in the same physical units)
KP Gwachha (M.Phil) 26
Acme Logistics provides “Less than truck load”
(LTL) services throughout the U.S. They have
several hubs where they use cross-docking to
move goods from one trailer to another. Acme
built its last hub 10 years ago, and it had 36 dock
doors. The cost index at that time was 140, and
the total cost was $6 million. Acme plans a new
hub that will have 48 dock doors. The cost index
now is 195, and Acme will use a capacity factor of
0.82. What is the estimated cost of the new hub?
Pause and solve
A learning curve reflects increased efficiency
and performance with repetitive production of
a good or service. The concept is that some
input resources decrease, on a per-output-unit
basis, as the number of units produced
increases.
Most learning curves assume a constant
percentage reduction occurs as the number of
units produced is doubled.
Learning curve example: Assume the first unit of
production required 3 hours time for assembly. The
learning rate is 75%. Find (a) the time to assemble
the 8th unit, and (b) the time needed to assemble
the first 6 units.
A cost estimating relationship (CER) describes
the cost of a project as a function of design
variables.
There are four basic steps in developing a
CER.
 Problem definition
 Data collection and normalization
 CER equation development
 Model validation and documentation
Cost Estimation in the Design Process
 To ensure that products can be sold at
competitive prices, cost must be a major factor in
the design of the product.
 Both a bottom-up approach and a top-down
approach can be used to determine product costs
and selling price.
 Used together with the concepts of target costing,
design-to-cost, and value engineering, these
techniques can assist engineers in the design of
cost-effective and competitively prices products.
“Bottom-up” cost estimating is commonly
used to make decisions about what to produce
and how to price products.
Major types of costs to estimate are
 tooling costs,
 manufacturing labor costs,
 material costs,
 supervision,
 factory overhead, and
 general and administrative costs.
Example: Determination of the cost of a throttle assembly
“Top-down,” or target costing, focuses on “what
should the product cost” instead of “what does
the product cost,” with the aim of designing costs
out of products before they enter the
manufacturing process. Costs are viewed as an
input to the design process.
or
The practice of considering cost performance
(i.e., the target cost) as important as technical
performance during the design process is
termed design to cost.
If the total manufacturing cost is more than
the target cost, then the design must be fed
back into the value engineering process to
challenge the functionality of the design and
attempt to reduce the cost of design.
Cost-Estimation-Techniques unit 2.pptx
Cost-Estimation-Techniques unit 2.pptx

More Related Content

Similar to Cost-Estimation-Techniques unit 2.pptx

L06 cost management
L06 cost managementL06 cost management
L06 cost management
Asa Chan
 
Study of Probability Distributions of Cpi and Spi in Earned Value Analysis
Study of Probability Distributions of Cpi and Spi in Earned Value AnalysisStudy of Probability Distributions of Cpi and Spi in Earned Value Analysis
Study of Probability Distributions of Cpi and Spi in Earned Value Analysis
theijes
 

Similar to Cost-Estimation-Techniques unit 2.pptx (20)

Preparing cost estimate for manufactured products.ppt by-aragaw gebremedhin
Preparing cost estimate for manufactured products.ppt by-aragaw gebremedhinPreparing cost estimate for manufactured products.ppt by-aragaw gebremedhin
Preparing cost estimate for manufactured products.ppt by-aragaw gebremedhin
 
Chap07
Chap07Chap07
Chap07
 
Preparing Cost Estimate for Manufactured Products.ppt-Aragaw-edited.pdf
Preparing Cost Estimate for Manufactured Products.ppt-Aragaw-edited.pdfPreparing Cost Estimate for Manufactured Products.ppt-Aragaw-edited.pdf
Preparing Cost Estimate for Manufactured Products.ppt-Aragaw-edited.pdf
 
Preparation and approaches of cost estimates
Preparation and approaches of cost estimatesPreparation and approaches of cost estimates
Preparation and approaches of cost estimates
 
Cost Analysis of ComFrame: A Communication Framework for Data Management in ...
Cost Analysis of ComFrame: A Communication Framework for  Data Management in ...Cost Analysis of ComFrame: A Communication Framework for  Data Management in ...
Cost Analysis of ComFrame: A Communication Framework for Data Management in ...
 
Project cost management
Project cost management Project cost management
Project cost management
 
Cost Indices for Industrial Application
Cost Indices for Industrial ApplicationCost Indices for Industrial Application
Cost Indices for Industrial Application
 
Sharpen your cost_estimating_skills
Sharpen your cost_estimating_skillsSharpen your cost_estimating_skills
Sharpen your cost_estimating_skills
 
project cost management.pptx
project cost management.pptxproject cost management.pptx
project cost management.pptx
 
Cost estimation method
Cost estimation methodCost estimation method
Cost estimation method
 
7 cost PMBOK
7 cost PMBOK7 cost PMBOK
7 cost PMBOK
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
CCP_SEC2_ Cost Estimating
CCP_SEC2_ Cost EstimatingCCP_SEC2_ Cost Estimating
CCP_SEC2_ Cost Estimating
 
Concept of Value Engineering with Case Study
Concept of Value Engineering with Case StudyConcept of Value Engineering with Case Study
Concept of Value Engineering with Case Study
 
Study of Probability Distributions of Cpi and Spi in Earned Value Analysis
Study of Probability Distributions of Cpi and Spi in Earned Value AnalysisStudy of Probability Distributions of Cpi and Spi in Earned Value Analysis
Study of Probability Distributions of Cpi and Spi in Earned Value Analysis
 
How to Identify Accurate & Correct Cost Drivers to Capture the Best Pricing
How to Identify Accurate & Correct Cost Drivers to Capture the Best Pricing How to Identify Accurate & Correct Cost Drivers to Capture the Best Pricing
How to Identify Accurate & Correct Cost Drivers to Capture the Best Pricing
 
Constructiion cost estimating 2017
Constructiion cost estimating 2017Constructiion cost estimating 2017
Constructiion cost estimating 2017
 
Strategic Cost Management
Strategic Cost ManagementStrategic Cost Management
Strategic Cost Management
 
Web Engineering - Web Effort Estimation
Web Engineering - Web Effort EstimationWeb Engineering - Web Effort Estimation
Web Engineering - Web Effort Estimation
 

Recently uploaded

Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
dipikadinghjn ( Why You Choose Us? ) Escorts
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort : 9352852248 Make on-demand Arrangements Near yOU
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
dipikadinghjn ( Why You Choose Us? ) Escorts
 

Recently uploaded (20)

Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...Booking open Available Pune Call Girls Talegaon Dabhade  6297143586 Call Hot ...
Booking open Available Pune Call Girls Talegaon Dabhade 6297143586 Call Hot ...
 
The Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdfThe Economic History of the U.S. Lecture 22.pdf
The Economic History of the U.S. Lecture 22.pdf
 
The Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdfThe Economic History of the U.S. Lecture 30.pdf
The Economic History of the U.S. Lecture 30.pdf
 
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
Solution Manual for Financial Accounting, 11th Edition by Robert Libby, Patri...
 
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
Call Girls in New Friends Colony Delhi 💯 Call Us 🔝9205541914 🔝( Delhi) Escort...
 
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Shivane  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Shivane 6297143586 Call Hot Indian Gi...
 
The Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdfThe Economic History of the U.S. Lecture 25.pdf
The Economic History of the U.S. Lecture 25.pdf
 
03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx03_Emmanuel Ndiaye_Degroof Petercam.pptx
03_Emmanuel Ndiaye_Degroof Petercam.pptx
 
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure serviceWhatsApp 📞 Call : 9892124323  ✅Call Girls In Chembur ( Mumbai ) secure service
WhatsApp 📞 Call : 9892124323 ✅Call Girls In Chembur ( Mumbai ) secure service
 
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
Call Girls in New Ashok Nagar, (delhi) call me [9953056974] escort service 24X7
 
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdfShrambal_Distributors_Newsletter_Apr-2024 (1).pdf
Shrambal_Distributors_Newsletter_Apr-2024 (1).pdf
 
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
VIP Independent Call Girls in Bandra West 🌹 9920725232 ( Call Me ) Mumbai Esc...
 
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
Solution Manual for Principles of Corporate Finance 14th Edition by Richard B...
 
Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.Gurley shaw Theory of Monetary Economics.
Gurley shaw Theory of Monetary Economics.
 
00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx00_Main ppt_MeetupDORA&CyberSecurity.pptx
00_Main ppt_MeetupDORA&CyberSecurity.pptx
 
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
VVIP Pune Call Girls Katraj (7001035870) Pune Escorts Nearby with Complete Sa...
 
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
From Luxury Escort Service Kamathipura : 9352852248 Make on-demand Arrangemen...
 
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
VIP Independent Call Girls in Andheri 🌹 9920725232 ( Call Me ) Mumbai Escorts...
 
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
TEST BANK For Corporate Finance, 13th Edition By Stephen Ross, Randolph Weste...
 
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
02_Fabio Colombo_Accenture_MeetupDora&Cybersecurity.pptx
 

Cost-Estimation-Techniques unit 2.pptx

  • 2. Cost-Estimation Techniques Whenever an engineering economic analysis is performed for a major capital investment, the cost-estimating effort for that analysis should be an integral part of a comprehensive planning and design process requiring the active participation of not only engineering designers but also personnel from marketing, manufacturing, finance, and top management.
  • 3. The objective of Chapter 3 is to present various methods for estimating important factors in an engineering economy study.
  • 4. Estimating the future cash flows for feasible alternatives is a critical step in engineering economy studies. Estimating costs, revenues, useful lives, residual values, and other pertinent data can be the most difficult, expensive, and time- consuming part of the study.
  • 5. Results of cost estimating are used for a variety of purposes.  Setting selling prices for quoting, bidding, or evaluating contracts.  Determining if a proposed product can be made and distributed at a profit.  Evaluating how much capital can be justified for changes and other improvements.  Setting benchmarks for productivity improvement programs.
  • 6. Approaches for Cost Estimating  The two fundamental approaches are “top- down” and “bottom-up.”  The top-down approach basically uses historical data from similar engineering projects to estimate the costs, revenues, and other data for the current project by modifying these data for changes.  This approach is best used early in the estimating process when alternatives are still being developed and refined. KP Gwachha (M.Phil) 6
  • 7. The two fundamental approaches are “top-down” and “bottom-up.”  The bottom-up approach is a more detailed method of cost estimating. This method breaks down a project into small, manageable units and estimates their economic consequences.  These smaller unit costs are added together with other types of costs to obtain an overall cost estimate.  This approach usually works bet when the detail concerning the desired output (a product or a service) has been defined and clarified.
  • 8. An Integrated Approach This integrated approach includes three basic components: 1. Work breakdown structure (WBS) :This is a technique for explicitly defining, at successive levels of detail, the work elements of a project and their interrelationships (sometimes called a work element structure). 2. Cost and revenue structure(classification) :Delineation of cost and revenue categories and elements is made for estimates of cash flows at each level of the WBS. 3. Estimating techniques (models) :Selected mathematical models are used to estimate the future costs and revenues during the analysis period. • These three basic components, together with integrating procedural steps, provide an organized approach for developing the cash flows for the alternatives.)
  • 9.
  • 10. Work Breakdown Structure (WBS)  A basic tool in project management  A framework for defining all project work elements and their relationships, collecting and organizing information, developing relevant cost and revenue data, and management activities.  Each level of a WBS divides the work elements into increasing detail.
  • 11.
  • 12. A WBS has other characteristics.  Both functional and physical work elements are included.  The content and resource requirements for a work element are the sum of the activities and resources of related subelements below it.  A project WBS usually includes recurring and nonrecurring work elements.
  • 13. Cost and Revenue Structure  Used to identify and categorize the costs and revenues that need to be included in the analysis.  The life-cycle concept and WBS are important aids in developing the cost and revenue structure for a project.  Perhaps the most serious source of errors in developing cash flows is overlooking important categories of costs and revenues.
  • 14. Estimating Techniques  Order-of-magnitude estimates (±30%)  Semidetailed, or budget, estimates (±15%)  Definitive (detailed) estimates (±5%) REMEMBER! The purpose of estimating is to develop cash-flow projections—not to produce exact data about the future, which is virtually impossible. Cost and revenue estimates can be classified according to detail, accuracy, and their intended use.
  • 15. The level of detail and accuracy of estimates depends on  time and effort available as justified by the importance of the study,  difficulty of estimating the items in question,  methods or techniques employed,  qualifications of the estimator(s), and  sensitivity of study results to particular factor estimates.
  • 16. A variety of sources exist for cost and revenue estimation.  Accounting records: good for historical data, but limited for engineering economic analysis.  Other sources inside the firm: e.g., sales, engineering, production, purchasing.  Sources outside the firm: U.S. government data, industry surveys, trade journals, and personal contacts.  Research and development: e.g., pilot plant, test marketing program, surveys.
  • 17. These models can be used in many types of estimates.  Indexes  Unit technique  Factor technique
  • 18. Indexes  Costs and prices vary with time for a number of reasons, including (1) technological advances, (2) availability of labor and materials (3) inflation.  An index is a dimensionless number that indicates how a cost or a price has changed with time (typically escalated) with respect to a base year.  Indexes provide a convenient means for developing present and future cost and price estimates from historical data. KP Gwachha (M.Phil) 18
  • 19. Indexes, I, provide a means for developing present and future cost and price estimates from historical data. k = reference year for which cost or price is known. n = year for which cost or price is to be estimated (n>k). Cn = estimated cost or price of item in year n. Ck = cost or price of item in reference year k. Indexes can be created for a single item or for multiple items (eqs. 3-1, 3-2).
  • 21. In 2002 Acme Chemical purchased a large pump for $112,000. Acme keys their cost estimating for these pumps to the industrial pump index, with a baseline of 100 established in 1992. The index in 2002 was 212. Acme is now (2010) considering construction of a new addition and must estimate the cost of the same type and size of pump. If the industrial pump index is currently 286, what is the estimated cost of the new pump? Pause and solve
  • 22. The unit technique is one that is widely known and understood. A “per unit factor” is used, along with the appropriate number of units, to find the total estimate of cost. An often used example is the cost of a particular house. Using a per unit factor of, say, $120 per square foot, and applying that to a house with 3,000 square feet, results in an estimated cost of $120 x 3,000 = $360,000. This techniques is useful in preliminary estimates, but using average costs can be very misleading.
  • 23. The factor technique is an extension of the unit technique where the products of several quantities are summed and then added to components estimated directly. C = cost being estimated Cd = cost of the selected component d estimated directly fm = cost per unit of component m Um = number of units of component m
  • 24. Parametric cost estimating is the use of historical cost data and statistical techniques (e.g., linear regression) to predict future costs. Parametric models are used in the early design stages to get an idea of how much the product (or project) will cost, on the basis of a few physical attributes (such as weight, volume, and power).
  • 25. The power-sizing technique (or exponential model) is frequently used for developing capital investment estimates for industrial plants and equipment. (both in $ as of the point in time for which the estimate is desired) (both in the same physical units)
  • 27. Acme Logistics provides “Less than truck load” (LTL) services throughout the U.S. They have several hubs where they use cross-docking to move goods from one trailer to another. Acme built its last hub 10 years ago, and it had 36 dock doors. The cost index at that time was 140, and the total cost was $6 million. Acme plans a new hub that will have 48 dock doors. The cost index now is 195, and Acme will use a capacity factor of 0.82. What is the estimated cost of the new hub? Pause and solve
  • 28. A learning curve reflects increased efficiency and performance with repetitive production of a good or service. The concept is that some input resources decrease, on a per-output-unit basis, as the number of units produced increases.
  • 29. Most learning curves assume a constant percentage reduction occurs as the number of units produced is doubled.
  • 30. Learning curve example: Assume the first unit of production required 3 hours time for assembly. The learning rate is 75%. Find (a) the time to assemble the 8th unit, and (b) the time needed to assemble the first 6 units.
  • 31. A cost estimating relationship (CER) describes the cost of a project as a function of design variables. There are four basic steps in developing a CER.  Problem definition  Data collection and normalization  CER equation development  Model validation and documentation
  • 32. Cost Estimation in the Design Process  To ensure that products can be sold at competitive prices, cost must be a major factor in the design of the product.  Both a bottom-up approach and a top-down approach can be used to determine product costs and selling price.  Used together with the concepts of target costing, design-to-cost, and value engineering, these techniques can assist engineers in the design of cost-effective and competitively prices products.
  • 33. “Bottom-up” cost estimating is commonly used to make decisions about what to produce and how to price products. Major types of costs to estimate are  tooling costs,  manufacturing labor costs,  material costs,  supervision,  factory overhead, and  general and administrative costs.
  • 34. Example: Determination of the cost of a throttle assembly
  • 35. “Top-down,” or target costing, focuses on “what should the product cost” instead of “what does the product cost,” with the aim of designing costs out of products before they enter the manufacturing process. Costs are viewed as an input to the design process. or
  • 36.
  • 37. The practice of considering cost performance (i.e., the target cost) as important as technical performance during the design process is termed design to cost. If the total manufacturing cost is more than the target cost, then the design must be fed back into the value engineering process to challenge the functionality of the design and attempt to reduce the cost of design.