1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 1
1H13 Consolidated Results
Flavio Cattaneo Chief Executive Officer
Giuseppe Saponaro Chief Financial Officer
JULY 25th, 2013
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 2
Agenda
Highlights 3
1H13 Results 5
Annexes 12
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 3
Highlights
1H2013 at a Glance
+7.3% yoy
at 919€mn
Total Revenues
EBITDA
+9.4% yoy
at 732€mn
OPERATING
PERFORMANCE
CAPEX & NET DEBT NET INCOME
Total Group Capex
504€mn
Net Debt
6,575€mn
Group Net Income
+19% yoy
at 264€mn
79.7%
+1.6pp yoy
EBITDA Margin
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 4
Highlights
Strategic Update
Growth
 Projects’ execution on track
- Recent kick-off of important projects, such as Italy-
France interconnection and Capri-Mainland link
- Battery project progressing
 Sustainable growth + sustainable approach
Innovative, high-tech and eco-sustainable projects
Capital Structure
 Permanent management of capital structure to
constantly add funding flexibility
- Renewed EMTN programme, up to 6bn
- New EIB loan (570mn) to support Grid capex
Strategic Targets Actions
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 5
746
820
81
6722
217
12
1H12 1H13
Grid Fee Other Energy Items
Non Traditional Activities Other Revenues
1H13 Results
Consolidated Revenues
Total Revenues
Revenues Evolution
+7.3% yoy
at 919€mn
Grid Fee
Revenues Breakdown
Other Activities
+10% yoy
at 820€mn
857
919
In € mn
+62
857 919
74 -14
3
1H12 Grid Fee Other Energy
Items
Other
Activities
1H13
at 32€mn
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 6
104 103 104
64 64 65
20 21 19
1H11 1H12 1H13
Salaries
Services
Other
1H13 Results
Consolidated Costs & EBITDA
Costs Evolution
EBITDA
Costs Breakdown
+9.4% yoy
at 732€mn
188 187
In € mn
79.7%
+1.6pp yoy
EBITDA Margin
Stableyoy
at 187€mn
Total Operating Costs
188
186.9 187
1 1
-2
1H12 Salaries Services Other 1H13
=
Stable
187
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 7
1H13 Results
From EBIT to Net Income
EBIT
+11.6% yoy
at 519€mn
Profit Before Taxes
+18.3% yoy
at 476€mn
Group Net Income
+18.8% yoy
at 264€mn
€ mn 1H12 1H13 Δ Δ %
EBITDA 669 732 63 9.4%
D&A 205 213 9 4.4%
EBIT 464 519 54 11.6%
Net Financial Expenses 62 43 -19 -31.2%- Financial Income & Equity inv. 36 47 11
PBT 402 476 73 18.3%
Tax Rate 44.8% 44.6%
Taxes 180 212 32 17.6%
Group Net Income 222 264 42 18.8%
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 8
Category 1H12 1H13 Δ yoy Δ % yoy
+2% 295 233 -62 -21%
+1.5% 131 144 13 10%
Incentivized Capex 426 377 -48 -11%
Base Return 98 105 7 7%
Total Regulated Capex 523 482 -41 -8%
Other
2
28 22 -6
Total Group Capex 551 504 -47 -9%
22%
30%
48%
Base Return +1.5% +2%
1H13 Results
Total Regulated Capex
482
€mn
1. Figures in accordance with resolution AEEG 40/2013
2. Capitalized Financial Charges + Non Traditional Capex
Capex Breakdown €mn
1
Total Regulated Capex
482€mn
Work in Progress
Capex Breakdown
>200 Building Sites
for 3€bn Cumulated Capex
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 9
5,407 5,407
5,911
6,575
5,855
448 504
261
402
Net Debt Evolution & Financial Structure
1. Including Other Fixed Assets Changes, Change in Capital & Other
2. Government Related Entity
Dec.31,
2012
Operating
Cash
Flow
Δ WC
&
Other1
June 30,
2013
Net Debt Fixed/Floating Ratio
69/31
+720
Financial IndebtednessNet Debt Evolution€mn
Avg. Maturity
7.2 years
1H13 Results
Capex
70%
16%
14%
Terna SpA Bonds
EIB Loans
Banks
Dividends
Rating Delta
Terna
2
Sovereign Terna
2
Sovereign
S&P BBB+ BBB +1 notch Negative Negative
Moody's Baa1 Baa2 +1 notch Negative Negative
Fitch A- BBB+ +1 notch Negative Negative
As of July, 25 2013
M/L Term Outlook
6,575€mn
+720€mn vs. Dec. 31, 2012
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 10
Closing Remarks
 Capex to step up in the second half of the year
 Storage project gradually entering into a more operational phase
 WACC interim revision: a mathematical adjustment
 Building the conditions to perform on Non Traditional Activities
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 11
Flavio Cattaneo Chief Executive Officer
Giuseppe Saponaro Chief Financial Officer
1H13 Consolidated Results
JULY 25th, 2013
THANK YOU.
QUESTIONS?
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 12
ANNEXES
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 13
Annexes
Electricity Market Trends
1H13 Energy Demand
-3.6% yoy
-3.1% 12 months rolling
TWh
2012 final figures, 2013 provisional figures (as of July 2013)
24
26
28
30
32
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Range last 5 years
12 Months Rolling
Yr -1
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
YoY Chg% 2.4% 1.6% -8.3% -2.5% -5.3% -3.5% -1.5% -7.3% -1.4% -1.6% -3.0% -6.6%
1H12 1H13 Δ %
Demand TWh 164 158 -3.6%
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 14
Consolidated Income Statement
Annexes
€ mn 1H12 1H13 Δmn Δ%
Operating Revenues 857 919 62 7.3%
of which
Grid Fee 746 820 74 9.9%
Other Energy Items 81 67 -14 -17.7%
Other Activities* 29 32 3 10.3%
Operating Expenses 188 187 -1 -0.4%
of which
Salaries 103 104 1 0.5%
Services 64 65 1 1.7%
Other 21 19 -2 -11.4%
EBITDA 669 732 63 9.4%
D&A 205 213 9 4.4%
EBIT 464 519 54 11.6%
Net Financial Charges 62 43 -19 -31.2%
Pre Tax Profit 402 476 73 18.3%
Taxes 180 212 32 17.6%
Tax Rate (%) 45% 45%
Group Net Income 222 264 42 18.8%
* Other Revenues + Non Traditional Revenues
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 15
Consolidated Balance Sheet
Annexes
€ mn Dec. 31,2012 Jun. 30,2013 Δmn
Assets
PP&E 9,342 9,650 308
Intangible Asset, net 470 463 -8
Financial Inv. And Other 81 83 2
Total Fixed Assets 9,894 10,196 302
Net WC -770 -348 422
Funds -480 -451 29
Total Net Invested Capital 8,643 9,397 753
Financed by
Consolidated Net Debt 5,855 6,575 720
Total Shareholder's Equity 2,788 2,822 33
D/E Ratio Continuing Operations 2.1 2.3
Number of Shares ('000) 2,010 2,010
*
*
* Including the effect of the application of the IAS 19 R accounting principle “Benefits for employees”
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 16
Consolidated Cash Flow
Annexes
€ mn 1H12 1H13
Net Income 222 264
Depreciation* 203 213
Net Change in Funds -27 -29
Operating Cash Flow 398 448
Change in Working Capital -330 -422
Cash Flow from Operating Activities 67 26
Capital Expenditures -551 -504
Other Fixed Asset Changes 6 -11
Free Cash Flow -478 -490
Dividends -261 -261
Change in Capital and Other -24 31
Change in Net Cash (Debt) -764 -720
* Net of assets’ disposal
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 17
Quarterly Analysis
1. Excluding IFRIC12
2. Other Revenues + Non Traditional Revenues
Annexes
€ mn 1Q12 1Q13 Δ 2Q12 2Q13 Δ
Operating Revenues 432 470 38 425 449 24
of which
Grid Fee 384 423 39 362 397 35
Other Energy Items 1 27 29 2 40 26 -14
Other Activities 2 15 13 -2 15 19 5
IFRIC 12 5 5 -1 9 7 -2
Operating Expenses 92 89 -3 96 98 2
EBITDA 340 381 41 329 351 22
D&A 101 106 5 103 107 4
EBIT 239 275 36 226 244 18
Net Financial Charges 31 18 -13 31 25 -6
Pre Tax Profit 208 257 49 195 219 24
Taxes 93 115 22 87 97 10
Group Net Income 114 142 28 108 122 14
Total Group Capex 246 206 -40 305 298 -7
Net Debt (end of period) 5,273 5,924 5,887 6,575
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 18
PROJECT IN NUMBERS
Total Capex: ~ 100€mn
 Length: 31km
of which 30km via submarine
Main Projects – New Openings
Annexes
Italy-France Interconnection Capri-Mainland Link
PROJECT IN NUMBERS
Total Capex: 1.4€bn
of which Terna ~ 0.4€bn*
 Length: 190km, HVDC
 Capacity: up to 1,200MW
 To become the 23rd interconnection
190 km of DC extra-high voltage
underground cable - the longest
connection in the world of this type
* 0.5€bn including the Piossasco substation
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 19
PROJECT IN NUMBERS
Substations: 4
Overhead Lines: ~ 60km
Underground cable: ~ 5km
Submarine cable: ~ 38km
Capacity: up to 2,000MW
 Submarine cables placed
 Sorgente substation powered
 Currently digging the Favazzina
shaft (reached 210mt) and the sub-
horizontal tunnel (reached 180mt)
Main Projects – Work In Progress
Annexes
Trino-Lacchiarella
95 km of new high-tech overhead lines with
a low environmental impact
Sorgente-Rizziconi
38 km below the Strait of Messina:
World record for AC cables
 Installed the innovative Tubular*
and the high-tech and
aesthetically pleasing Rosenthal
pylons
* Their compact solution ensures the least occupation of land among all possible solutions for overhead electricity lines
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 20
THIS DOCUMENT HAS BEEN PREPARED BY TERNA S.P.A. (THE “COMPANY”) FOR THE SOLE PURPOSE DESCRIBED HEREIN. IN NO
CASE MAY IT BE INTERPRETED AS AN OFFER OR INVITATION TO SELL OR PURCHASE ANY SECURITY ISSUED BY THE COMPANY
OR ITS SUBSIDIARIES.
THE CONTENT OF THIS DOCUMENT HAS A MERELY INFORMATIVE AND PROVISIONAL NATURE AND THE STATEMENTS CONTAINED
HEREIN HAVE NOT BEEN INDEPENDENTLY VERIFIED. NEITHER THE COMPANY NOR ANY OF ITS REPRESENTATIVES SHALL
ACCEPT ANY LIABILITY WHATSOEVER (WHETHER IN NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY FROM THE USE OF THIS
DOCUMENT OR ITS CONTENTS OR OTHERWISE ARISING IN CONNECTION WITH THIS DOCUMENT OR ANY MATERIAL DISCUSSED
DURING THE PRESENTATION.
THIS DOCUMENT MAY NOT BE REPRODUCED OR REDISTRIBUTED, IN WHOLE OR IN PART, TO ANY OTHER PERSON. THE
INFORMATION CONTAINED HEREIN AND OTHER MATERIAL DISCUSSED AT THE CONFERENCE CALL MAY INCLUDE FORWARD-
LOOKING STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS ABOUT THE COMPANY’S BELIEFS AND
EXPECTATIONS. THESE STATEMENTS ARE BASED ON CURRENT PLANS, ESTIMATES, PROJECTIONS AND PROJECTS, AND CANNOT
BE INTERPRETED AS A PROMISE OR GUARANTEE OF WHATSOEVER NATURE.
HOWEVER, FORWARD-LOOKING STATEMENTS INVOLVE INHERENT RISKS AND UNCERTAINTIES AND ARE CURRENT ONLY AT THE
DATE THEY ARE MADE. WE CAUTION YOU THAT A NUMBER OF FACTORS COULD CAUSE THE COMPANY’S ACTUAL RESULTS AND
PROVISIONS TO DIFFER MATERIALLY FROM THOSE CONTAINED IN ANY FORWARD-LOOKING STATEMENT. SUCH FACTORS
INCLUDE, BUT ARE NOT LIMITED TO: TRENDS IN COMPANY’S BUSINESS, ITS ABILITY TO IMPLEMENT COST-CUTTING PLANS,
CHANGES IN THE REGULATORY ENVIRONMENT, DIFFERENT INTERPRETATION OF THE LAW AND REGULATION, ITS ABILITY TO
SUCCESSFULLY DIVERSIFY AND THE EXPECTED LEVEL OF FUTURE CAPITAL EXPENDITURES. THEREFORE, YOU SHOULD NOT
PLACE UNDUE RELIANCE ON SUCH FORWARD-LOOKING STATEMENTS. TERNA DOES NOT UNDERTAKE ANY OBLIGATION TO
UPDATE FORWARD-LOOKING STATEMENTS TO REFLECT ANY CHANGES IN TERNA’S EXPECTATIONS WITH REGARD THERETO OR
ANY CHANGES IN EVENTS.
EXECUTIVE IN CHARGE OF THE PREPARATION OF ACCOUNTING DOCUMENTS “LUCIANO DI BACCO” DECLARES, PURSUANT TO
PARAGRAPH 2 OF ARTICLE 154-BIS OF THE CONSOLIDATED LAW ON FINANCE, THAT THE ACCOUNTING INFORMATION CONTAINED
IN THIS PRESENTATION, FOR WHAT CONCERNS THE ACTUAL FIGURES, CORRESPONDS TO THE DOCUMENT RESULTS, BOOKS
AND ACCOUNTING RECORDS.
Disclaimer
1H13 CONSOLIDATED RESULTS JULY 25th 2013
Investor Relations 21
investor.relations@terna.it I +39 06 8313 8397 I www.terna.it

Contenu connexe

Tendances

1H 2018 Consolidated Results Presentation
1H 2018 Consolidated Results Presentation1H 2018 Consolidated Results Presentation
1H 2018 Consolidated Results PresentationTerna SpA
 
Terna FY 2016 Consolidated Results
Terna FY 2016 Consolidated ResultsTerna FY 2016 Consolidated Results
Terna FY 2016 Consolidated ResultsTerna SpA
 
1H 2016 Consolidated Results
 1H 2016 Consolidated Results 1H 2016 Consolidated Results
1H 2016 Consolidated ResultsTerna SpA
 
1Q 2016 Consolidated Results (May 4, 2016)
 1Q 2016 Consolidated Results (May 4, 2016) 1Q 2016 Consolidated Results (May 4, 2016)
1Q 2016 Consolidated Results (May 4, 2016)Terna SpA
 
Terna 2012-2016 Strategic Plan
Terna 2012-2016 Strategic PlanTerna 2012-2016 Strategic Plan
Terna 2012-2016 Strategic PlanTerna SpA
 
Terna - 1Q 2021 Consolidated Results
Terna - 1Q 2021 Consolidated ResultsTerna - 1Q 2021 Consolidated Results
Terna - 1Q 2021 Consolidated ResultsTerna SpA
 
Terna - 9M 2021 Consolidated Results Presentation
Terna - 9M 2021 Consolidated Results PresentationTerna - 9M 2021 Consolidated Results Presentation
Terna - 9M 2021 Consolidated Results PresentationTerna SpA
 
2021-2025 Terna Industrial Plan Presentation
2021-2025 Terna Industrial Plan Presentation2021-2025 Terna Industrial Plan Presentation
2021-2025 Terna Industrial Plan PresentationTerna SpA
 
9M 2016 Consolidated Results (November 4, 2016)
 9M 2016 Consolidated Results (November 4, 2016) 9M 2016 Consolidated Results (November 4, 2016)
9M 2016 Consolidated Results (November 4, 2016)Terna SpA
 
Terna 9M2013 Consolidated Results
Terna 9M2013 Consolidated ResultsTerna 9M2013 Consolidated Results
Terna 9M2013 Consolidated ResultsTerna SpA
 
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)Terna SpA
 
1Q 2013 Consolidated Results (May 14, 2013)
1Q 2013 Consolidated Results (May 14, 2013) 1Q 2013 Consolidated Results (May 14, 2013)
1Q 2013 Consolidated Results (May 14, 2013) Terna SpA
 
Terna 2017>2021 Enabling Energy Transition
Terna 2017>2021 Enabling Energy TransitionTerna 2017>2021 Enabling Energy Transition
Terna 2017>2021 Enabling Energy TransitionTerna SpA
 
2021 2025 Industrial Plan Update Presentation
2021 2025 Industrial Plan Update Presentation2021 2025 Industrial Plan Update Presentation
2021 2025 Industrial Plan Update PresentationTerna SpA
 
Apple Financial Ratios 2014
Apple Financial Ratios 2014Apple Financial Ratios 2014
Apple Financial Ratios 2014Zeeshan Hassan
 
2014 Full Year Results & Strategy Update
2014 Full Year Results & Strategy Update2014 Full Year Results & Strategy Update
2014 Full Year Results & Strategy UpdateSnam
 
Snam 2014 3Q results
Snam 2014 3Q resultsSnam 2014 3Q results
Snam 2014 3Q resultsSnam
 
2013 Full Year Results Snam
2013 Full Year Results Snam2013 Full Year Results Snam
2013 Full Year Results SnamSnam
 

Tendances (20)

1H 2018 Consolidated Results Presentation
1H 2018 Consolidated Results Presentation1H 2018 Consolidated Results Presentation
1H 2018 Consolidated Results Presentation
 
Terna FY 2016 Consolidated Results
Terna FY 2016 Consolidated ResultsTerna FY 2016 Consolidated Results
Terna FY 2016 Consolidated Results
 
1H 2016 Consolidated Results
 1H 2016 Consolidated Results 1H 2016 Consolidated Results
1H 2016 Consolidated Results
 
1Q 2016 Consolidated Results (May 4, 2016)
 1Q 2016 Consolidated Results (May 4, 2016) 1Q 2016 Consolidated Results (May 4, 2016)
1Q 2016 Consolidated Results (May 4, 2016)
 
Terna 2012-2016 Strategic Plan
Terna 2012-2016 Strategic PlanTerna 2012-2016 Strategic Plan
Terna 2012-2016 Strategic Plan
 
Terna - 1Q 2021 Consolidated Results
Terna - 1Q 2021 Consolidated ResultsTerna - 1Q 2021 Consolidated Results
Terna - 1Q 2021 Consolidated Results
 
Terna - 9M 2021 Consolidated Results Presentation
Terna - 9M 2021 Consolidated Results PresentationTerna - 9M 2021 Consolidated Results Presentation
Terna - 9M 2021 Consolidated Results Presentation
 
2021-2025 Terna Industrial Plan Presentation
2021-2025 Terna Industrial Plan Presentation2021-2025 Terna Industrial Plan Presentation
2021-2025 Terna Industrial Plan Presentation
 
9M 2016 Consolidated Results (November 4, 2016)
 9M 2016 Consolidated Results (November 4, 2016) 9M 2016 Consolidated Results (November 4, 2016)
9M 2016 Consolidated Results (November 4, 2016)
 
Terna 9M2013 Consolidated Results
Terna 9M2013 Consolidated ResultsTerna 9M2013 Consolidated Results
Terna 9M2013 Consolidated Results
 
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)
FY2014 and 2015-2019 Strategic Plan (26 marzo 2015)
 
1Q 2013 Consolidated Results (May 14, 2013)
1Q 2013 Consolidated Results (May 14, 2013) 1Q 2013 Consolidated Results (May 14, 2013)
1Q 2013 Consolidated Results (May 14, 2013)
 
Terna 2017>2021 Enabling Energy Transition
Terna 2017>2021 Enabling Energy TransitionTerna 2017>2021 Enabling Energy Transition
Terna 2017>2021 Enabling Energy Transition
 
2021 2025 Industrial Plan Update Presentation
2021 2025 Industrial Plan Update Presentation2021 2025 Industrial Plan Update Presentation
2021 2025 Industrial Plan Update Presentation
 
Mizigo
MizigoMizigo
Mizigo
 
Apple Financial Ratios 2014
Apple Financial Ratios 2014Apple Financial Ratios 2014
Apple Financial Ratios 2014
 
2012 GSE annual Report and Financial Statements
2012 GSE annual Report and Financial Statements 2012 GSE annual Report and Financial Statements
2012 GSE annual Report and Financial Statements
 
2014 Full Year Results & Strategy Update
2014 Full Year Results & Strategy Update2014 Full Year Results & Strategy Update
2014 Full Year Results & Strategy Update
 
Snam 2014 3Q results
Snam 2014 3Q resultsSnam 2014 3Q results
Snam 2014 3Q results
 
2013 Full Year Results Snam
2013 Full Year Results Snam2013 Full Year Results Snam
2013 Full Year Results Snam
 

En vedette

1Q 2015 Consolidated Results (6 Maggio 2015)
1Q 2015 Consolidated Results (6 Maggio 2015)1Q 2015 Consolidated Results (6 Maggio 2015)
1Q 2015 Consolidated Results (6 Maggio 2015)Terna SpA
 
1Q 2014 Consolidated Results (May 14, 2014)
1Q 2014 Consolidated Results (May 14, 2014)1Q 2014 Consolidated Results (May 14, 2014)
1Q 2014 Consolidated Results (May 14, 2014)Terna SpA
 
XI Sodalitas Social Award - Candidatura Terna
XI Sodalitas Social Award - Candidatura TernaXI Sodalitas Social Award - Candidatura Terna
XI Sodalitas Social Award - Candidatura TernaTerna SpA
 
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...Terna SpA
 
9M 2015 Consolidated Results (November 11, 2015)
9M 2015 Consolidated Results (November 11, 2015)9M 2015 Consolidated Results (November 11, 2015)
9M 2015 Consolidated Results (November 11, 2015)Terna SpA
 
Candidatura al Premio Aretê 2010
Candidatura al Premio Aretê 2010Candidatura al Premio Aretê 2010
Candidatura al Premio Aretê 2010Terna SpA
 
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)FY2013 and 2014-2018 Strategic Plan (March 25, 2014)
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)Terna SpA
 
2016-2019 Strategic Plan Presentation
 2016-2019 Strategic Plan Presentation  2016-2019 Strategic Plan Presentation
2016-2019 Strategic Plan Presentation Terna SpA
 
La missione dell’energia: Terna per il progetto Kami in Bolivia
La missione dell’energia: Terna per il progetto Kami in BoliviaLa missione dell’energia: Terna per il progetto Kami in Bolivia
La missione dell’energia: Terna per il progetto Kami in BoliviaTerna SpA
 
Yammer Social Data Mining
Yammer Social Data MiningYammer Social Data Mining
Yammer Social Data MiningJoris Poelmans
 
I L G A T T O I L L U S I O N I S T A
I L  G A T T O  I L L U S I O N I S T AI L  G A T T O  I L L U S I O N I S T A
I L G A T T O I L L U S I O N I S T ARoberto Traetta
 
Short information about Finland via EBook
Short information about Finland via EBookShort information about Finland via EBook
Short information about Finland via EBookrajeev227
 
Insert latest articles on blogger
Insert latest articles on bloggerInsert latest articles on blogger
Insert latest articles on bloggerStefano Vinci
 

En vedette (18)

1Q 2015 Consolidated Results (6 Maggio 2015)
1Q 2015 Consolidated Results (6 Maggio 2015)1Q 2015 Consolidated Results (6 Maggio 2015)
1Q 2015 Consolidated Results (6 Maggio 2015)
 
1Q 2014 Consolidated Results (May 14, 2014)
1Q 2014 Consolidated Results (May 14, 2014)1Q 2014 Consolidated Results (May 14, 2014)
1Q 2014 Consolidated Results (May 14, 2014)
 
XI Sodalitas Social Award - Candidatura Terna
XI Sodalitas Social Award - Candidatura TernaXI Sodalitas Social Award - Candidatura Terna
XI Sodalitas Social Award - Candidatura Terna
 
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...
Progetto “Arrivano i nonni”: avvio attività di monitoraggio per valutarne gli...
 
9M 2015 Consolidated Results (November 11, 2015)
9M 2015 Consolidated Results (November 11, 2015)9M 2015 Consolidated Results (November 11, 2015)
9M 2015 Consolidated Results (November 11, 2015)
 
Candidatura al Premio Aretê 2010
Candidatura al Premio Aretê 2010Candidatura al Premio Aretê 2010
Candidatura al Premio Aretê 2010
 
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)FY2013 and 2014-2018 Strategic Plan (March 25, 2014)
FY2013 and 2014-2018 Strategic Plan (March 25, 2014)
 
2016-2019 Strategic Plan Presentation
 2016-2019 Strategic Plan Presentation  2016-2019 Strategic Plan Presentation
2016-2019 Strategic Plan Presentation
 
La missione dell’energia: Terna per il progetto Kami in Bolivia
La missione dell’energia: Terna per il progetto Kami in BoliviaLa missione dell’energia: Terna per il progetto Kami in Bolivia
La missione dell’energia: Terna per il progetto Kami in Bolivia
 
Artikulo 4 (2)
Artikulo 4 (2)Artikulo 4 (2)
Artikulo 4 (2)
 
Mee too how it works
Mee too how it works  Mee too how it works
Mee too how it works
 
Yammer Social Data Mining
Yammer Social Data MiningYammer Social Data Mining
Yammer Social Data Mining
 
MobileDiagnosis Onlus 5 x 1000 2016
MobileDiagnosis Onlus         5 x 1000     2016           MobileDiagnosis Onlus         5 x 1000     2016
MobileDiagnosis Onlus 5 x 1000 2016
 
Amazon summit 2015
Amazon summit 2015Amazon summit 2015
Amazon summit 2015
 
UP BUSINESS MART
UP BUSINESS MART UP BUSINESS MART
UP BUSINESS MART
 
I L G A T T O I L L U S I O N I S T A
I L  G A T T O  I L L U S I O N I S T AI L  G A T T O  I L L U S I O N I S T A
I L G A T T O I L L U S I O N I S T A
 
Short information about Finland via EBook
Short information about Finland via EBookShort information about Finland via EBook
Short information about Finland via EBook
 
Insert latest articles on blogger
Insert latest articles on bloggerInsert latest articles on blogger
Insert latest articles on blogger
 

Similaire à 1H13 Consolidated Results

Terna – 1Q 2023 Consolidated Results Presentation
Terna – 1Q 2023 Consolidated Results PresentationTerna – 1Q 2023 Consolidated Results Presentation
Terna – 1Q 2023 Consolidated Results PresentationTerna SpA
 
Terna – 1H 2023 Consolidated Results Presentation
Terna – 1H 2023 Consolidated Results PresentationTerna – 1H 2023 Consolidated Results Presentation
Terna – 1H 2023 Consolidated Results PresentationTerna SpA
 
Terna – 9M 2022 Consolidated Results Presentation
Terna – 9M 2022 Consolidated Results PresentationTerna – 9M 2022 Consolidated Results Presentation
Terna – 9M 2022 Consolidated Results PresentationTerna SpA
 
9M 2020 Consolidated Results Presentation
9M 2020 Consolidated Results Presentation9M 2020 Consolidated Results Presentation
9M 2020 Consolidated Results PresentationTerna SpA
 
1Q 2022 Consolidated Results Presentation
1Q 2022 Consolidated Results Presentation1Q 2022 Consolidated Results Presentation
1Q 2022 Consolidated Results PresentationTerna SpA
 
1Q 2020 Terna Consolidated Results Presentation
 1Q 2020 Terna Consolidated Results Presentation 1Q 2020 Terna Consolidated Results Presentation
1Q 2020 Terna Consolidated Results PresentationTerna SpA
 
1H 2020 Consolidated Results Presentation
1H 2020 Consolidated Results Presentation1H 2020 Consolidated Results Presentation
1H 2020 Consolidated Results PresentationTerna SpA
 
Terna – 9M 2023 Consolidated Results Presentation
Terna – 9M 2023 Consolidated Results PresentationTerna – 9M 2023 Consolidated Results Presentation
Terna – 9M 2023 Consolidated Results PresentationTerna SpA
 
1H 2022 Consolidated Results Presentation
1H 2022 Consolidated Results Presentation1H 2022 Consolidated Results Presentation
1H 2022 Consolidated Results PresentationTerna SpA
 
Terna – FY 2022 Consolidated Results Presentation.pdf
Terna – FY 2022 Consolidated Results Presentation.pdfTerna – FY 2022 Consolidated Results Presentation.pdf
Terna – FY 2022 Consolidated Results Presentation.pdfTerna SpA
 
1Q2017 Consolidated Results (May 9, 2017)
1Q2017 Consolidated Results (May 9, 2017) 1Q2017 Consolidated Results (May 9, 2017)
1Q2017 Consolidated Results (May 9, 2017) Terna SpA
 
2013 Full Year Results Snam
2013 Full Year Results Snam2013 Full Year Results Snam
2013 Full Year Results SnamSnam
 
Terna - 1H 2021 Consolidated Results Presentation
Terna - 1H 2021 Consolidated Results PresentationTerna - 1H 2021 Consolidated Results Presentation
Terna - 1H 2021 Consolidated Results PresentationTerna SpA
 
Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso
 
Snam 1Q 2015 Consolidated Results
Snam 1Q 2015 Consolidated ResultsSnam 1Q 2015 Consolidated Results
Snam 1Q 2015 Consolidated ResultsSnam
 
1Q 2018 Consolidated Results Presentation
1Q 2018 Consolidated Results Presentation1Q 2018 Consolidated Results Presentation
1Q 2018 Consolidated Results PresentationTerna SpA
 
ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 acciona
 
Stora Enso Financial Results Q3/2013 presentation
Stora Enso Financial Results Q3/2013 presentationStora Enso Financial Results Q3/2013 presentation
Stora Enso Financial Results Q3/2013 presentationStora Enso
 
ACCIONA Results Presentation 9M2013
ACCIONA Results Presentation 9M2013ACCIONA Results Presentation 9M2013
ACCIONA Results Presentation 9M2013acciona
 
08/13/2013 - 2Q13 Earnings Conference Call
08/13/2013 - 2Q13 Earnings Conference Call08/13/2013 - 2Q13 Earnings Conference Call
08/13/2013 - 2Q13 Earnings Conference CallKianne Paganini
 

Similaire à 1H13 Consolidated Results (20)

Terna – 1Q 2023 Consolidated Results Presentation
Terna – 1Q 2023 Consolidated Results PresentationTerna – 1Q 2023 Consolidated Results Presentation
Terna – 1Q 2023 Consolidated Results Presentation
 
Terna – 1H 2023 Consolidated Results Presentation
Terna – 1H 2023 Consolidated Results PresentationTerna – 1H 2023 Consolidated Results Presentation
Terna – 1H 2023 Consolidated Results Presentation
 
Terna – 9M 2022 Consolidated Results Presentation
Terna – 9M 2022 Consolidated Results PresentationTerna – 9M 2022 Consolidated Results Presentation
Terna – 9M 2022 Consolidated Results Presentation
 
9M 2020 Consolidated Results Presentation
9M 2020 Consolidated Results Presentation9M 2020 Consolidated Results Presentation
9M 2020 Consolidated Results Presentation
 
1Q 2022 Consolidated Results Presentation
1Q 2022 Consolidated Results Presentation1Q 2022 Consolidated Results Presentation
1Q 2022 Consolidated Results Presentation
 
1Q 2020 Terna Consolidated Results Presentation
 1Q 2020 Terna Consolidated Results Presentation 1Q 2020 Terna Consolidated Results Presentation
1Q 2020 Terna Consolidated Results Presentation
 
1H 2020 Consolidated Results Presentation
1H 2020 Consolidated Results Presentation1H 2020 Consolidated Results Presentation
1H 2020 Consolidated Results Presentation
 
Terna – 9M 2023 Consolidated Results Presentation
Terna – 9M 2023 Consolidated Results PresentationTerna – 9M 2023 Consolidated Results Presentation
Terna – 9M 2023 Consolidated Results Presentation
 
1H 2022 Consolidated Results Presentation
1H 2022 Consolidated Results Presentation1H 2022 Consolidated Results Presentation
1H 2022 Consolidated Results Presentation
 
Terna – FY 2022 Consolidated Results Presentation.pdf
Terna – FY 2022 Consolidated Results Presentation.pdfTerna – FY 2022 Consolidated Results Presentation.pdf
Terna – FY 2022 Consolidated Results Presentation.pdf
 
1Q2017 Consolidated Results (May 9, 2017)
1Q2017 Consolidated Results (May 9, 2017) 1Q2017 Consolidated Results (May 9, 2017)
1Q2017 Consolidated Results (May 9, 2017)
 
2013 Full Year Results Snam
2013 Full Year Results Snam2013 Full Year Results Snam
2013 Full Year Results Snam
 
Terna - 1H 2021 Consolidated Results Presentation
Terna - 1H 2021 Consolidated Results PresentationTerna - 1H 2021 Consolidated Results Presentation
Terna - 1H 2021 Consolidated Results Presentation
 
Stora Enso second quarter results 2013
Stora Enso second quarter results 2013Stora Enso second quarter results 2013
Stora Enso second quarter results 2013
 
Snam 1Q 2015 Consolidated Results
Snam 1Q 2015 Consolidated ResultsSnam 1Q 2015 Consolidated Results
Snam 1Q 2015 Consolidated Results
 
1Q 2018 Consolidated Results Presentation
1Q 2018 Consolidated Results Presentation1Q 2018 Consolidated Results Presentation
1Q 2018 Consolidated Results Presentation
 
ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14 ACCIONA FY 2014 results report #ACCIONAFY14
ACCIONA FY 2014 results report #ACCIONAFY14
 
Stora Enso Financial Results Q3/2013 presentation
Stora Enso Financial Results Q3/2013 presentationStora Enso Financial Results Q3/2013 presentation
Stora Enso Financial Results Q3/2013 presentation
 
ACCIONA Results Presentation 9M2013
ACCIONA Results Presentation 9M2013ACCIONA Results Presentation 9M2013
ACCIONA Results Presentation 9M2013
 
08/13/2013 - 2Q13 Earnings Conference Call
08/13/2013 - 2Q13 Earnings Conference Call08/13/2013 - 2Q13 Earnings Conference Call
08/13/2013 - 2Q13 Earnings Conference Call
 

Plus de Terna SpA

Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna SpA
 
Terna - FY 2021 Consolidated Results Presentation
Terna - FY 2021 Consolidated Results PresentationTerna - FY 2021 Consolidated Results Presentation
Terna - FY 2021 Consolidated Results PresentationTerna SpA
 
9M 2019 Consolidated Results Presentation
9M 2019 Consolidated Results Presentation9M 2019 Consolidated Results Presentation
9M 2019 Consolidated Results PresentationTerna SpA
 
1H 2019 Consolidated Results Presentation
1H 2019 Consolidated Results Presentation1H 2019 Consolidated Results Presentation
1H 2019 Consolidated Results PresentationTerna SpA
 
2019-2023 Strategic Plan - Presentation
2019-2023 Strategic Plan - Presentation2019-2023 Strategic Plan - Presentation
2019-2023 Strategic Plan - PresentationTerna SpA
 
Terna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna SpA
 
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi Michi
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi MichiRuolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi Michi
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi MichiTerna SpA
 
L’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederL’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederTerna SpA
 
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...Terna SpA
 
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...Terna SpA
 

Plus de Terna SpA (10)

Terna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 PresentationTerna Capital Markets Day 2024 Presentation
Terna Capital Markets Day 2024 Presentation
 
Terna - FY 2021 Consolidated Results Presentation
Terna - FY 2021 Consolidated Results PresentationTerna - FY 2021 Consolidated Results Presentation
Terna - FY 2021 Consolidated Results Presentation
 
9M 2019 Consolidated Results Presentation
9M 2019 Consolidated Results Presentation9M 2019 Consolidated Results Presentation
9M 2019 Consolidated Results Presentation
 
1H 2019 Consolidated Results Presentation
1H 2019 Consolidated Results Presentation1H 2019 Consolidated Results Presentation
1H 2019 Consolidated Results Presentation
 
2019-2023 Strategic Plan - Presentation
2019-2023 Strategic Plan - Presentation2019-2023 Strategic Plan - Presentation
2019-2023 Strategic Plan - Presentation
 
Terna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and ValuesTerna 2018 2022 Strategic Plan Grid and Values
Terna 2018 2022 Strategic Plan Grid and Values
 
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi Michi
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi MichiRuolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi Michi
Ruolo e prospettive dello Storage nel Sistema Elettrico Italiano, Luigi Michi
 
L’esperienza della California, Mark Rothleder
L’esperienza della California, Mark RothlederL’esperienza della California, Mark Rothleder
L’esperienza della California, Mark Rothleder
 
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...
Introduzione ai progetti pilota Terna: esigenze di rete e criticità legate al...
 
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...
Introduzione ai progetti pilota: Lo Storage nel Piano di Sviluppo e Piano di ...
 

Dernier

(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一S SDS
 
project management information system lecture notes
project management information system lecture notesproject management information system lecture notes
project management information system lecture notesongomchris
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证jdkhjh
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppmiss dipika
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfshaunmashale756
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintSuomen Pankki
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfMichael Silva
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxNarayaniTripathi2
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfHenry Tapper
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHenry Tapper
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...Amil baba
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》rnrncn29
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)twfkn8xj
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Commonwealth
 
Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Devarsh Vakil
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdfHenry Tapper
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasCherylouCamus
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptPriyankaSharma89719
 
Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Champak Jhagmag
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...Amil baba
 

Dernier (20)

(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
(办理学位证)加拿大萨省大学毕业证成绩单原版一比一
 
project management information system lecture notes
project management information system lecture notesproject management information system lecture notes
project management information system lecture notes
 
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
原版1:1复刻堪萨斯大学毕业证KU毕业证留信学历认证
 
Vp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsAppVp Girls near me Delhi Call Now or WhatsApp
Vp Girls near me Delhi Call Now or WhatsApp
 
government_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdfgovernment_intervention_in_business_ownership[1].pdf
government_intervention_in_business_ownership[1].pdf
 
Governor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraintGovernor Olli Rehn: Dialling back monetary restraint
Governor Olli Rehn: Dialling back monetary restraint
 
Stock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdfStock Market Brief Deck FOR 4/17 video.pdf
Stock Market Brief Deck FOR 4/17 video.pdf
 
Role of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptxRole of Information and technology in banking and finance .pptx
Role of Information and technology in banking and finance .pptx
 
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdfmagnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
magnetic-pensions-a-new-blueprint-for-the-dc-landscape.pdf
 
House of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview documentHouse of Commons ; CDC schemes overview document
House of Commons ; CDC schemes overview document
 
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
NO1 WorldWide Genuine vashikaran specialist Vashikaran baba near Lahore Vashi...
 
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
《加拿大本地办假证-寻找办理Dalhousie毕业证和达尔豪斯大学毕业证书的中介代理》
 
(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)(中央兰开夏大学毕业证学位证成绩单-案例)
(中央兰开夏大学毕业证学位证成绩单-案例)
 
Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]Economic Risk Factor Update: April 2024 [SlideShare]
Economic Risk Factor Update: April 2024 [SlideShare]
 
Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024Market Morning Updates for 16th April 2024
Market Morning Updates for 16th April 2024
 
fca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdffca-bsps-decision-letter-redacted (1).pdf
fca-bsps-decision-letter-redacted (1).pdf
 
The Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng PilipinasThe Core Functions of the Bangko Sentral ng Pilipinas
The Core Functions of the Bangko Sentral ng Pilipinas
 
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.pptAnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
AnyConv.com__FSS Advance Retail & Distribution - 15.06.17.ppt
 
Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024Unveiling Business Expansion Trends in 2024
Unveiling Business Expansion Trends in 2024
 
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
NO1 Certified Amil Baba In Lahore Kala Jadu In Lahore Best Amil In Lahore Ami...
 

1H13 Consolidated Results

  • 1. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 1 1H13 Consolidated Results Flavio Cattaneo Chief Executive Officer Giuseppe Saponaro Chief Financial Officer JULY 25th, 2013
  • 2. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 2 Agenda Highlights 3 1H13 Results 5 Annexes 12
  • 3. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 3 Highlights 1H2013 at a Glance +7.3% yoy at 919€mn Total Revenues EBITDA +9.4% yoy at 732€mn OPERATING PERFORMANCE CAPEX & NET DEBT NET INCOME Total Group Capex 504€mn Net Debt 6,575€mn Group Net Income +19% yoy at 264€mn 79.7% +1.6pp yoy EBITDA Margin
  • 4. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 4 Highlights Strategic Update Growth  Projects’ execution on track - Recent kick-off of important projects, such as Italy- France interconnection and Capri-Mainland link - Battery project progressing  Sustainable growth + sustainable approach Innovative, high-tech and eco-sustainable projects Capital Structure  Permanent management of capital structure to constantly add funding flexibility - Renewed EMTN programme, up to 6bn - New EIB loan (570mn) to support Grid capex Strategic Targets Actions
  • 5. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 5 746 820 81 6722 217 12 1H12 1H13 Grid Fee Other Energy Items Non Traditional Activities Other Revenues 1H13 Results Consolidated Revenues Total Revenues Revenues Evolution +7.3% yoy at 919€mn Grid Fee Revenues Breakdown Other Activities +10% yoy at 820€mn 857 919 In € mn +62 857 919 74 -14 3 1H12 Grid Fee Other Energy Items Other Activities 1H13 at 32€mn
  • 6. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 6 104 103 104 64 64 65 20 21 19 1H11 1H12 1H13 Salaries Services Other 1H13 Results Consolidated Costs & EBITDA Costs Evolution EBITDA Costs Breakdown +9.4% yoy at 732€mn 188 187 In € mn 79.7% +1.6pp yoy EBITDA Margin Stableyoy at 187€mn Total Operating Costs 188 186.9 187 1 1 -2 1H12 Salaries Services Other 1H13 = Stable 187
  • 7. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 7 1H13 Results From EBIT to Net Income EBIT +11.6% yoy at 519€mn Profit Before Taxes +18.3% yoy at 476€mn Group Net Income +18.8% yoy at 264€mn € mn 1H12 1H13 Δ Δ % EBITDA 669 732 63 9.4% D&A 205 213 9 4.4% EBIT 464 519 54 11.6% Net Financial Expenses 62 43 -19 -31.2%- Financial Income & Equity inv. 36 47 11 PBT 402 476 73 18.3% Tax Rate 44.8% 44.6% Taxes 180 212 32 17.6% Group Net Income 222 264 42 18.8%
  • 8. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 8 Category 1H12 1H13 Δ yoy Δ % yoy +2% 295 233 -62 -21% +1.5% 131 144 13 10% Incentivized Capex 426 377 -48 -11% Base Return 98 105 7 7% Total Regulated Capex 523 482 -41 -8% Other 2 28 22 -6 Total Group Capex 551 504 -47 -9% 22% 30% 48% Base Return +1.5% +2% 1H13 Results Total Regulated Capex 482 €mn 1. Figures in accordance with resolution AEEG 40/2013 2. Capitalized Financial Charges + Non Traditional Capex Capex Breakdown €mn 1 Total Regulated Capex 482€mn Work in Progress Capex Breakdown >200 Building Sites for 3€bn Cumulated Capex
  • 9. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 9 5,407 5,407 5,911 6,575 5,855 448 504 261 402 Net Debt Evolution & Financial Structure 1. Including Other Fixed Assets Changes, Change in Capital & Other 2. Government Related Entity Dec.31, 2012 Operating Cash Flow Δ WC & Other1 June 30, 2013 Net Debt Fixed/Floating Ratio 69/31 +720 Financial IndebtednessNet Debt Evolution€mn Avg. Maturity 7.2 years 1H13 Results Capex 70% 16% 14% Terna SpA Bonds EIB Loans Banks Dividends Rating Delta Terna 2 Sovereign Terna 2 Sovereign S&P BBB+ BBB +1 notch Negative Negative Moody's Baa1 Baa2 +1 notch Negative Negative Fitch A- BBB+ +1 notch Negative Negative As of July, 25 2013 M/L Term Outlook 6,575€mn +720€mn vs. Dec. 31, 2012
  • 10. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 10 Closing Remarks  Capex to step up in the second half of the year  Storage project gradually entering into a more operational phase  WACC interim revision: a mathematical adjustment  Building the conditions to perform on Non Traditional Activities
  • 11. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 11 Flavio Cattaneo Chief Executive Officer Giuseppe Saponaro Chief Financial Officer 1H13 Consolidated Results JULY 25th, 2013 THANK YOU. QUESTIONS?
  • 12. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 12 ANNEXES
  • 13. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 13 Annexes Electricity Market Trends 1H13 Energy Demand -3.6% yoy -3.1% 12 months rolling TWh 2012 final figures, 2013 provisional figures (as of July 2013) 24 26 28 30 32 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Range last 5 years 12 Months Rolling Yr -1 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun YoY Chg% 2.4% 1.6% -8.3% -2.5% -5.3% -3.5% -1.5% -7.3% -1.4% -1.6% -3.0% -6.6% 1H12 1H13 Δ % Demand TWh 164 158 -3.6%
  • 14. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 14 Consolidated Income Statement Annexes € mn 1H12 1H13 Δmn Δ% Operating Revenues 857 919 62 7.3% of which Grid Fee 746 820 74 9.9% Other Energy Items 81 67 -14 -17.7% Other Activities* 29 32 3 10.3% Operating Expenses 188 187 -1 -0.4% of which Salaries 103 104 1 0.5% Services 64 65 1 1.7% Other 21 19 -2 -11.4% EBITDA 669 732 63 9.4% D&A 205 213 9 4.4% EBIT 464 519 54 11.6% Net Financial Charges 62 43 -19 -31.2% Pre Tax Profit 402 476 73 18.3% Taxes 180 212 32 17.6% Tax Rate (%) 45% 45% Group Net Income 222 264 42 18.8% * Other Revenues + Non Traditional Revenues
  • 15. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 15 Consolidated Balance Sheet Annexes € mn Dec. 31,2012 Jun. 30,2013 Δmn Assets PP&E 9,342 9,650 308 Intangible Asset, net 470 463 -8 Financial Inv. And Other 81 83 2 Total Fixed Assets 9,894 10,196 302 Net WC -770 -348 422 Funds -480 -451 29 Total Net Invested Capital 8,643 9,397 753 Financed by Consolidated Net Debt 5,855 6,575 720 Total Shareholder's Equity 2,788 2,822 33 D/E Ratio Continuing Operations 2.1 2.3 Number of Shares ('000) 2,010 2,010 * * * Including the effect of the application of the IAS 19 R accounting principle “Benefits for employees”
  • 16. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 16 Consolidated Cash Flow Annexes € mn 1H12 1H13 Net Income 222 264 Depreciation* 203 213 Net Change in Funds -27 -29 Operating Cash Flow 398 448 Change in Working Capital -330 -422 Cash Flow from Operating Activities 67 26 Capital Expenditures -551 -504 Other Fixed Asset Changes 6 -11 Free Cash Flow -478 -490 Dividends -261 -261 Change in Capital and Other -24 31 Change in Net Cash (Debt) -764 -720 * Net of assets’ disposal
  • 17. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 17 Quarterly Analysis 1. Excluding IFRIC12 2. Other Revenues + Non Traditional Revenues Annexes € mn 1Q12 1Q13 Δ 2Q12 2Q13 Δ Operating Revenues 432 470 38 425 449 24 of which Grid Fee 384 423 39 362 397 35 Other Energy Items 1 27 29 2 40 26 -14 Other Activities 2 15 13 -2 15 19 5 IFRIC 12 5 5 -1 9 7 -2 Operating Expenses 92 89 -3 96 98 2 EBITDA 340 381 41 329 351 22 D&A 101 106 5 103 107 4 EBIT 239 275 36 226 244 18 Net Financial Charges 31 18 -13 31 25 -6 Pre Tax Profit 208 257 49 195 219 24 Taxes 93 115 22 87 97 10 Group Net Income 114 142 28 108 122 14 Total Group Capex 246 206 -40 305 298 -7 Net Debt (end of period) 5,273 5,924 5,887 6,575
  • 18. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 18 PROJECT IN NUMBERS Total Capex: ~ 100€mn  Length: 31km of which 30km via submarine Main Projects – New Openings Annexes Italy-France Interconnection Capri-Mainland Link PROJECT IN NUMBERS Total Capex: 1.4€bn of which Terna ~ 0.4€bn*  Length: 190km, HVDC  Capacity: up to 1,200MW  To become the 23rd interconnection 190 km of DC extra-high voltage underground cable - the longest connection in the world of this type * 0.5€bn including the Piossasco substation
  • 19. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 19 PROJECT IN NUMBERS Substations: 4 Overhead Lines: ~ 60km Underground cable: ~ 5km Submarine cable: ~ 38km Capacity: up to 2,000MW  Submarine cables placed  Sorgente substation powered  Currently digging the Favazzina shaft (reached 210mt) and the sub- horizontal tunnel (reached 180mt) Main Projects – Work In Progress Annexes Trino-Lacchiarella 95 km of new high-tech overhead lines with a low environmental impact Sorgente-Rizziconi 38 km below the Strait of Messina: World record for AC cables  Installed the innovative Tubular* and the high-tech and aesthetically pleasing Rosenthal pylons * Their compact solution ensures the least occupation of land among all possible solutions for overhead electricity lines
  • 20. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 20 THIS DOCUMENT HAS BEEN PREPARED BY TERNA S.P.A. (THE “COMPANY”) FOR THE SOLE PURPOSE DESCRIBED HEREIN. IN NO CASE MAY IT BE INTERPRETED AS AN OFFER OR INVITATION TO SELL OR PURCHASE ANY SECURITY ISSUED BY THE COMPANY OR ITS SUBSIDIARIES. THE CONTENT OF THIS DOCUMENT HAS A MERELY INFORMATIVE AND PROVISIONAL NATURE AND THE STATEMENTS CONTAINED HEREIN HAVE NOT BEEN INDEPENDENTLY VERIFIED. NEITHER THE COMPANY NOR ANY OF ITS REPRESENTATIVES SHALL ACCEPT ANY LIABILITY WHATSOEVER (WHETHER IN NEGLIGENCE OR OTHERWISE) ARISING IN ANY WAY FROM THE USE OF THIS DOCUMENT OR ITS CONTENTS OR OTHERWISE ARISING IN CONNECTION WITH THIS DOCUMENT OR ANY MATERIAL DISCUSSED DURING THE PRESENTATION. THIS DOCUMENT MAY NOT BE REPRODUCED OR REDISTRIBUTED, IN WHOLE OR IN PART, TO ANY OTHER PERSON. THE INFORMATION CONTAINED HEREIN AND OTHER MATERIAL DISCUSSED AT THE CONFERENCE CALL MAY INCLUDE FORWARD- LOOKING STATEMENTS THAT ARE NOT HISTORICAL FACTS, INCLUDING STATEMENTS ABOUT THE COMPANY’S BELIEFS AND EXPECTATIONS. THESE STATEMENTS ARE BASED ON CURRENT PLANS, ESTIMATES, PROJECTIONS AND PROJECTS, AND CANNOT BE INTERPRETED AS A PROMISE OR GUARANTEE OF WHATSOEVER NATURE. HOWEVER, FORWARD-LOOKING STATEMENTS INVOLVE INHERENT RISKS AND UNCERTAINTIES AND ARE CURRENT ONLY AT THE DATE THEY ARE MADE. WE CAUTION YOU THAT A NUMBER OF FACTORS COULD CAUSE THE COMPANY’S ACTUAL RESULTS AND PROVISIONS TO DIFFER MATERIALLY FROM THOSE CONTAINED IN ANY FORWARD-LOOKING STATEMENT. SUCH FACTORS INCLUDE, BUT ARE NOT LIMITED TO: TRENDS IN COMPANY’S BUSINESS, ITS ABILITY TO IMPLEMENT COST-CUTTING PLANS, CHANGES IN THE REGULATORY ENVIRONMENT, DIFFERENT INTERPRETATION OF THE LAW AND REGULATION, ITS ABILITY TO SUCCESSFULLY DIVERSIFY AND THE EXPECTED LEVEL OF FUTURE CAPITAL EXPENDITURES. THEREFORE, YOU SHOULD NOT PLACE UNDUE RELIANCE ON SUCH FORWARD-LOOKING STATEMENTS. TERNA DOES NOT UNDERTAKE ANY OBLIGATION TO UPDATE FORWARD-LOOKING STATEMENTS TO REFLECT ANY CHANGES IN TERNA’S EXPECTATIONS WITH REGARD THERETO OR ANY CHANGES IN EVENTS. EXECUTIVE IN CHARGE OF THE PREPARATION OF ACCOUNTING DOCUMENTS “LUCIANO DI BACCO” DECLARES, PURSUANT TO PARAGRAPH 2 OF ARTICLE 154-BIS OF THE CONSOLIDATED LAW ON FINANCE, THAT THE ACCOUNTING INFORMATION CONTAINED IN THIS PRESENTATION, FOR WHAT CONCERNS THE ACTUAL FIGURES, CORRESPONDS TO THE DOCUMENT RESULTS, BOOKS AND ACCOUNTING RECORDS. Disclaimer
  • 21. 1H13 CONSOLIDATED RESULTS JULY 25th 2013 Investor Relations 21 investor.relations@terna.it I +39 06 8313 8397 I www.terna.it