SlideShare une entreprise Scribd logo
1  sur  55
Télécharger pour lire hors ligne
Building on Innovation
Thoughts of MEP Design in lifecycle of buildings
Tero Järvinen
Development Director
04.11.2022
1960
GRANLUND WAS
ESTABLISHED IN
NET SALES OPERATING PROFIT
FINNISH,
100%
EMPLOYEE-OWNED
BUSINESS
NET SALES
PERSONNEL AT THE END OF THE YEAR
2019 2020 2021
981 1,095 1,222
EVERY YEAR
6%
OF NET SALES
ON INNOVATION
Operating profit out of net sales
99%
85%
82%
SATISFIED WITH GRANLUND
FULLY SATISFIED OR SATISFIED WITH
GRANLUND'S EXPERTISE
FULLY SATISFIED OR SATISFIED WITH GRANLUND'S
SUSTAINABILITY
Our customers
NPS
47
Housing companies 5.2%
Property owners and
investors 10.6%
Building and construction 9.6%
Industry 4.6%
Wholesale and retail 8.0%
Social and healthcare
services 16.0%
State 9.2%
Other 12.6%
Municipalities
14.1%
Energy companies 0.4%
Services 5.7%
Information and communications 4.0%
Building on Innovation
History of BIM in Granlund
Multi-objective building
performance optimization
(Using algorithms)
2020
Building on Innovation
Contract
Philosophy Process
IPD
Alliance
Partnering
BIM
Lean
Construction
Tools
Cornerstones of construction project
teroj / 2018
Building on Innovation
Information flow from the Project to Facilities Management
Construction Commissioning Guarantee period Facilities Management
Performance
optimization
Digital
delivery
Updating of
digital assets
Facility
management
requirements
Determination of
data interfaces
Preventitive
maintanance
Linked Data
Data warehouses
and analysis
Standardized information content and services
End user feedback,
analysis and actions
Graphical
Digital Twin
environments
Services
Solutions
teroj / 2020
Building on Innovation
Raportointi
Digital lifecycle management
Data alusta
Digitaalinen kaksonen
Sovellus
Visualisointi
APIt
Sovellus
Sovellus AI/ML
Datasources
Kimmo / 2020
Building on Innovation
From several suggestions to one concept design layout. From concept to Detail Design
Suggestions Concept Design Detail Design
System comparisations,
Energy simulations /
optimization, mock-up rooms.
Comparisations of different
possibilities
Selected systems in one
Concept Design.
Main routes, shafts, technical
spaces, diagrams, device
specifications
Detail Desing BIM model
according to COBIM2012
requirements
Contractor is using designers
models for MEP assemblies
From Suggestions to Detail Design
Building on Innovation
Benchmark data as design input
Concept design
Constuction
Benchmark-data
(Quantities, Cost, Carbon
footprint)
Real project data
(Quantities, Cost, Carbon footprint, 4D-schedule)
Collecting benchmark
data
Development Design
Digitaalinen
delivery
Procurement
The starting point for the initial
design is volume-based data
from previous buildings
In the middle of the general design, the
data becomes the data of the actual object.
TATE purchases are made before the BIM
model is completed
In connection with the digital
handover, the collection of benchmark
data for the following sites will be
ensured
Data platform under construction
teroj / 2022
© Granlund
Digital Project Development
Time
Schedule
Cost
Control
Lifecycle and
Carbon
Footprint
Control
The Maturity of
Design
Readiness
Safety Control on
site and site
logistics
Production
Monitoring
4D-timeschedule
Situation
Awardness
Building on Innovation
Construction project situation room and dynamic reports
Data-platform
4D timeschedule
Cost estimation Quantity take-off Energy Environment /
carbon footprint
Main schedule
Customer
requirements
IFC model
Benchmark data
Broker
IFC Model
Solibri
Granlund Designer
Benchmark data
Granlund Manager
MOBO
CO2 databases
IFC model
Benchmark data
Reporting
Services
Example of
Information
source
Digital Project Development
Collaboration,
coordination
Memo’s
Excel
Smartsheet
teroj / 2021
Building on Innovation
Example from Power BI
8.2.2021
Building on Innovation
Building on innovation
4D timescedule
Scheduling is one of the most important functions guiding a
construction project
• There are major shortcomings nationally, especially in the
scheduling of MEP design / assemblies
• The 4D schedule combines visual control (BIM models)
and the actual installation schedule
• When 4D is introduced, scheduling errors are very easily
noticed
• 4D forces you to think about getting your schedule in
order
• Possibility to connect also cost and CO2 data to the
schedule
• Usable, e.g. in “Tact-Time”
teroj / 2021
Hypemeter
Lots of talk Daily routine
4D in use There are no
obstacles for using 4D
Building on Innovation
Standardization of IFC content
The foundation of a scalable business.
An absolute requirement for cost-effective business
• Almost all construction projects are carried out
with different data contents of BIM models
• The use of information content, e.g. as benchmark
data, is impossible without standardized content
• Finnish “RAVA3Pro” –project is standardizing IFC
content and creating use cases for building control
authorities
• https://kirahub.org/ytv2020-talotekniikan-ja-rakennesuunnittelun-nimistojen-koekayttoa-jatketaan-kevaalle-2022/
teroj / 2021
Hypemeter
Lots of talk Daily routine
Specification is made
Building on Innovation
Building on innovation
teroj / 2021
Digital Delivery to
minimize data transfer
between systems
The end product of
construction project is a
digital system environment
Information content and
links between the systems
are made during the
construction period
Dataflow
Strategic project to develop data platform for Granlund business
units
This presentation sub-project:
“IFC to database”
Building on Innovation
Data -platforms
A concrete need for all companies that swear by
digitization
• Data consistency is achieved through the data
platform
• A demanding operation in a construction
project, as the companies have their own data
platforms
• Ontology platforms are being developed as a
solution, e.g.:
• PoT (Platform of Trust)
• REC (Real Estate Core)
• …
• An enabler of scalable business
teroj / 2021
Hype meter
Lots of talk Daily routine
Data platform in use
Building on Innovation
Software A
Main tool of
business unit
”Z”
Azure
Data
crushing
(including
analytics
services)
Software N
Main tool of
business unit
”Y”
Power BI
Combied
reporting
Target
• from software to a dynamic report via Azure
• includes analytics within Azure
• raw data and analyzed data can be shared elsewhere
Situation
awardness
Internal use in own
business,
”quick and dirty”
Outwardly distri-
buted applications /
data streams
When purchasing
software, they
must have API
interfaces for
Azure connection
(even if it is a little worse
than the other software)
Data transfer to
other platforms
Platform of Trust,
Real Estate Core…
BIM data
(IFC)
API-
connectivity
External sources Fast lane
17.11.2021
Building on Innovation
Datan omistajuus ja ylläpito
Tietomallintaminen pilvipalveluissa yleistyy
• Nykyisin tietomallit ovat suunnittelijoiden servereillä
• Yhteistoiminnallisuuden mahdollistavat pilvipalvelut
yleistyvät – tiedon jakaminen helpottuu
• Ajantasainen tieto on aidosti tilaajan hallinnassa, jos
tilaaja pystyttää oman pilvipalvelun ja kutsuu
suunnittelijat työskentelemään siellä sekä urakoitsijat
hyödyntämään 2D-piirustuksia ja 3D-malleja ilman
tiedostojen lataamistarvetta omille koneille
• Pilvipalvelu mahdollistaa tietomallien
kustannustehokkaan ylläpidon kiinteistön elinkaaren
aikana
teroj / 2021
Designers Reviewers Decision makers
“Projektipankki steroideilla”
Hypemittari
Paljon puhetta Arkipäivää
Pilviympäristö pilotoinnissa
Pilviympäristön käyttöönotolle ei ole esteitä
Building on Innovation
Tietomallinnus
Tietomallinnus vakioituu normaaliksi toimintatavaksi,
ohjeet/määräykset laahaavat edelleen jäljessä
• Maanrakennuslaki uudistumassa -> Rakennuslaki.
Vaatimuksia tietomallien käytölle
• Kansainvälinen ISO19650 standardi
“tietomallinnusprosessin vakiointi” herättää
mielenkiintoa Suomessakin
• SKOL julkaissut uuden yleissuunnitteluvaiheen
prosessikuvauksen tietomallipohjaiselle
suunnittelulle
teroj / 2021
Linkki
Linkki
Linkki
Hypemittari
Paljon puhetta Arkipäivää
Tietomallinnus hankkeissa
Building on Innovation
Alternative solutions
Diagrams and device
databases
Spatial provisions and
service area zones
Life Cycle
CFD-simulations
3D-mockups Technical Visualizations
Lighting Simulations
Sustainability
Spacetype Requirements
and Targets
Energy Simulation Model Combied Models
Model Auditing
Modelling of
MEP-networks
BIM based
Provision of Voids
Device Schedule
database
Network Route Design
Common BIM
Requirements
Information export from
models
Revisionhandling of
Models, Documents
and Equipment data
Model based assembly
inspection
Device Validation As-Built Model
Target values of energy
consumption for
Facility Management
SQL
IFC
Assembly Inspections
Concept Design – Detail Design – Construction Site – Facility Management
Energy Optimization
Drawings
Models with simulation
CMMS Software with
Digital Twin
Cost Estimations
AR / VR solution
Building on Innovation
Building on Innovation
Scope of work for energy consulting
DEVELOPMENT
PHASE
DETAILED
DESIGN AND
CONSTRUCTION
USE PHASE
Geothermal analysis
Thermal comfort and
cooling simulations
Target energy simulation
CONSTRUCTION
PERMIT
Energy certificate
E-value calculation
Geothermal permit materials
Detailed design for heat pump
system
Contractor negotiations
Updates for target energy and
energy certificates Granlund Manager
Digital services
Quality control
Energy
Consulting
Life Cycle
Consulting
Premilinary environmental certificate
analysis (RTS, LEED, BREEAM)
Carbon-neutral target analysis
Life Cycle Consulting
Environmental certificate
coordination: design
phase material
Realized CO2-calculations
Environmental certificate
coordination: construction
phase material
Energy / 2022
Building on Innovation
Building on Innovation
Working methods for energy consulting
Energy
simulations
•The basis for all energy
consulting is simulations
for calculating the target
energy consumption of the
building
•The actual building is
modeled in dynamic
energy calculation
software, and hourly
heating and cooling energy
needs may be used in
energy system evaluation
Geothermal
analysis
•The borehole locations and
amount are determined
according to site plan
•Borehole depth is
optimized with ground
loop simulation software,
using thermal conductivity
data for bedrock when
available
•With simulations, optimal
sizing and total costs for
the system will be
determined
Reporting
•Using visual reports and
graphs, decision making
between different options
will be straightforward in
the early phase of the
project
•Typically, sensitivity
analysis for main variables
(energy price, heat pump
power) may be included to
determine the best system
in different scenarios
Energy / 2022
Building on Innovation
MOBO-
monitavoiteptimointi
• Tehokas vertailu jopa miljoonilla
vaihtoehdoilla
• Mahdollistaa esimerkiksi
energiainvestointien optimoinnin
kokonaisuutena perustuen
luotettavaan kustannustietoon ja
laajaan käytännön kokemukseen
19.11.2022
Optimaaliset tulokset eri energiantuotanto-
ratkaisuille kerrostalokohteessa
Building on Innovation
Rakennusten energia-
ja olosuhdesimulointi
• Rakennusten energiankulutus sekä
jakautuminen eri tuotantomuotojen
ja kuluttajien välillä tuntikohtaisesti
• Yksittäisten huonetilojen olosuhteet
tuntikohtaisesti
19.11.2022
The Concept of Digital Twin
Using information from BIM / cloud -models
teroj / 2018
Building on Innovation
Topi Korpela / Joonas Alakomi 2019
= Saatavilla BIM malleista
Building on Innovation
Business needs
and strategic decissions
CMMS software for daily
technical operations
IFC models, PDF documents
accessible through cloud
Multiple enduser applications
and platforms
teroj / 2019
Different roles, different users
Building on Innovation
BIM2FM key sentences
▪ Information content has to be standardised
❑ Information needs to be machine understandable
▪ Information has to be prioritised
❑ There is too much information in the models
❑ There is a need for information prioritisation and understanding of the use cases
❑ ”Everything is not possible”
▪ Information has to be available 24/7
❑ Cloud services
❑ Roles for users, authentification, documented API’s, security
▪ Information is not transferred
❑ Information is linked between cloud systems
❑ End user decides, which information source is ”home” for them
❑ One cloudservice does not solve problems, for multiple use cases you need multiple cloud services
▪ Information has to be updated
❑ Need for ”Digital Twin”. You need to update the virtual building before or after renovations / minor changes.
It has to be ”a process” in FM workflow
❑ If information content differs in Digital Twin, virtual model will be useless after couple of years. Information
in virtual model has to be reliable (depending of the use cases)
▪ Normal FM operations will be different
❑ ”BIM2FM” usability cannot be compared to existing use cases. Methods to fullfil the needs of existing use
cases will change
❑ Facility management and property owner organisations need to be ready for change and be willing to
change their workmethods
teroj / 2018
Building on Innovation
Granlund Designer
• Designer is for making Device Schedules
• Standardise your company workflow
• History and revision control
• Free coding according to your company standards
• Company device libraries
• Device approval process with contractor input
-> as-built information
• Role based workflow
• Documented API interface
New Generation cloud-based software for device schedules
Building on Innovation
Graphical Bim models
Product Types
Materials
For example: S1 =Swegon Colibri-125-600, 40 dm3/s, 28Pa, 32dB(A)
S1 = Swegon Colibri, FD3 = Halton FDI
Heating system; pipe material: Fe
Device Approval
Process
Updates for Product
information and BIM
Device Approval
Process
Updates for Material
Schedule and BIM
MagiCAD, Revit… -> IFC
Granlund Designer
Granlund Designer
Specifications for central units
AHU01, 4 m3/s, 850Pa, Heating Coil…
Device Approval
Process
Updates for Device
Schedule
Granlund Designer
Concept Design Detail Design
As-built –
information in
use for other
applications
Granlund Designer
has documented
API’s
Device and product information should be linked to a graphical BIM model.
teroj / 2021
Building on Innovation
Tilannehuoneet
Hankkeen etäjohtamisen työkalu, jolla raportoidaan
reaaliaikaisesti hankkeen etenemistä
• Kun tieto on käytettävissä vakioidusti data-alustalla,
voidaan tuottaa skaalautuvasti ja kustannustehokkaasti
näkymiä hankkeen etenemiseen seurantaan
• Käyttötapauksia mm:
• Uudet avoimet asiat ja esteet
• Sovitut tehtävät
• Päätösesitykset
• Tehdyt päätökset
• Talousseuranta
• Tavoitteet ja niiden täyttyminen
• Tilannehuone voidaan tehdä vakioimattomallakin datalla
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Tilannehuone käytössä
Tilannehuoneen käyttöönotolle ei ole esteitä
Building on Innovation
Muita kehitysalueita
Näistä puhutaan välillä isoonkin ääneen
• Lisätty todellisuus (AR, Augmented Reality)
• Paljon videoita / somepostauksia
• Suurin osa PoC tasolla (Proof of Concept)
• AR maailman valmistelu vaatii backofficetyötä
• Tekoäly / koneoppiminen
• Yksittäisiä onnistumisia fokusoituun käyttöön
• Koneoppiminen reaalimaailmaa, tekoäly hieman
kauempana siitä
• Suunnitteluautomaatio
• Tietomallinnus: Rakennepuoli edelläkävijä
• Tietomallinnus: TATE-puolella suuria haasteita
• Energia / elinkaarisimuloinnit: suuria edistysaskeleita
teroj / 2021
Building on Innovation
Building on innovation
Digital Twin
Staattisen ja dynaamisen datan yhdistäjä
• Digital Twin yhdistää staattiset BIM tietomallit
sekä esim. kiinteistön mittaustiedot
(IoT, rakennusautomaatio jne.)
• Kaikki toteutukset ovat riippuvaisia Digital Twin –
ohjelmistoon valituista käyttötapauksista
• Digital Twin’n ydin on data – ei grafiikka.
• Visualisointi voidaan toteuttaa myös esim. Power
BI –tyyppisilä ohjelmistoilla
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Digital Twin käytössä
Digitwinin käyttöönotolle ei ole esteitä
Kiinteistöjen ylläpito
Digitaalisen omaisuuden hallinta
Building on Innovation
Building on innovation
Kiinteistödatan ylläpito
Digitaalisella omaisuudella on arvoa
• Jos rakennushankkeessa syntyvää tietoa
halutaan myös kiinteistön ylläpidon käyttöön,
tulee sen ajantasaistamiseen varautua
kiinteistön ylläpitobudjetissa
• Digitaalisuus kiinteistössä tarkoittaa sitä, että
sekä fyysistä että digitaalista kiinteistöä tulee
ylläpitää.
• Kustannukset maksavat itsensä takaisin mm:
• Tyytyväisenä loppukäyttäjänä
• Kiinteistön arvon säilymisenä
• Peruskorjausten yhteydessä
teroj / 2021
Hypemittari
Paljon puhetta Arkipäivää
Digiomaisuuden ylläpitoprosessi olemassa
Prosessin käyttöönotolle ei ole esteitä
Building on Innovation
BIM to use in FM
Preliminary design Detail Design Construction FM
Spaces / Zones
Designers BIM
models
FM requirements for
BIM model
BIM in FM
FM coordinator sets requirements and monitors fulfilment
Validation of as-
built content in
the models
Construction organisation FM -organisation
FM BIM execution
plan for the building
Monitoring
FM BIM
handover plan
Mobilisation of
transfer and education
FM Coorninator
teroj / 2018
Building on Innovation
Update to native models
Little retrofits:
2D-drawings, hand-made drafts…
Copy from native model if needed
Project drawings / models
Update to native models
Renovation:
Modelling to native
model or copy from it
Project drawings / models
Designers
Service for
building owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Designers
Service for
building owner
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
IFC / PDF publish
FM information systems
API interfaces
Daily use of FM software
Facility owner’s native BIM models and databases
BIM NATIVE MODEL UPDATING DURING LIFECYCLE
Facility Management Renovation
Newbuilding Facility Management
teroj / 2018
Building on Innovation
Päivitys natiivimalleihin
Pienet muutokset:
”Issue” toiminto käytössä,
muutokset www-selaimen kautta
natiivimallin päivittäjälle
As-built tiedon varmistus
Peruskorjaus:
Mallintaminen suoraan
natiivimalliin
Suunnittelijat
Palveluna kiinteistön
omistajalle, esim. 4krt/a
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
Suunnittelijat
Palveluna kiinteistön
omistajalle
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
2D ja 3D pilvipalvelussa käytössä
Ylläpidon tietojärjestlemät
API rajapinnat
Päivittäinen ylläpidon toiminta
Natiivit Revit mallit pilvipalvelussa (Autodesk Construction Cloud)
Tietomallien päivitys kiinteistön elinkaarella (Revit pilvipalvelu)
Kiinteistön ylläpito Peruskorjaus
Uudisrakennus Kiinteistön ylläpito
teroj / 2018
Building on Innovation
Device information
Combining graphical model and seperate
databases we can get all information relevant
to understand assets of the building
Device Schedules, Diagrams…
Air Handling Units, Chillers,
Pumps, Central Units
Concept Design
Network BIM models
Systems
Detail Design
teroj / 2016
Building on Innovation
BIM in Facility Management
"Graphical BIM models" vs. "Facility Management environment"
CMMS (Computerized Maintanance
Management System)
Preventative maintenance, Work Orders, Long
Term Planning, Service Request, Energy...
Native models, IFC-files,
2D-pdf drawings...
teroj / 2018
Building on Innovation
Data
Environment
Graphical
Environment
Updated BIM and Digital Twin during the lifecycle
teroj / 2021
RVT
Granlund Designer
Device schedules and as-built
information
Granlund Manager
Digital Twin
ACC cloud
Issue Management in use
3D and 2D data models for
construction available and
updatable in a browser-based
manner
PDF
IFC
Designer / Construction / Owner / Facilities Management
• Design and construction software is also
deployed during maintenance
• There is no data transfer between the software
• Changes during maintenance can be
communicated to modelers in a browser-based
manner, made by property maintenance
• For renovations, the latest information is
immediately available, without the need for
updates
• The property maintenance system uses the
site's IFC model as the basis for the Digital
Twin environment
• Links to dynamic data via APIs
BMS / IoT
systems
For example: Autodesk Construction Cloud
BIM Digital Twin
Building on Innovation
Example of 3D model / 2D drawing use case
Suggestion for process
ARCH
STRC
HVAC
ELEC
BMS
Native models
in client servers
ifc, pdf
3D IFC publish
2D-pdf publish
ifc, pdf
ifc, pdf
ifc, pdf
ifc, pdf
3D IFC-in cloud
2D pdf cloud
ARCH
STRC
HVAC
ELEC
BMS
Native models in
designers servers
Cloud based
2D-drawing
And/or
3D-BIM model
Viewer for mobile
or desktop use
Same source of information
to every participant
Comments, RFI’s
Updates
teroj / 2018
Building on Innovation
Granlund Manager
Kiinteistön digitaalinen kaksonen
Granlund Manager Digital Twin visualisoi yhteen
näkymään staattisista ja dynaamisista lähteistä
kootut tiedot:
• Rakennuksen tietomalli (BIM)
• Laitetiedot sekä TATE-järjestelmät
• Palvelualueet
• Antureilta mitattu data
• Olosuhteiden pysyvyys
• Huoltohistoria
• Käyttöpäiviäkirjamerkinnät
• Palvelupyynnöt, jättö esim. QR koodeilla
• Palvelupyyntöjen analysointi
19.11.2022
Building on Innovation
Detail Desing modelling software
• MagiCAD for Revit (Autodesk Collaboration Cloud)
• MagiCAD for AutoCAD
• CADMATIC
• Vectorworks
• ArchiCAD
Other tools
• Navisworks
• Solibri Model Checker
• SimpleBIM
• Enscape
• Unity
• Autodesk Forge (Granlund Manager / Digital Twin)
Simulation software
• Riuska (Energy&Comfort)
• IDA-ICE (Energy&Comfort)
• IES (Energy, Comfort, Environmental)
• MOBO (Energy Optimization)
• One Click LCA (LCA calculations)
• Broker (Cost estimation)
• Dialux (Lighting Design)
• Bentley Synchro (4D timeschedule)
• Comsol, Mathlab…
Other
• Granlund Designer (Device schedule)
• Granlund Manager (CMMS)
• M-Files (Document Management)
• Microsoft Teams
• Power BI etc.
• Project Management, ERP, CRM etc.
Software
Building on Innovation
teroj / 2018
Building on Innovation
Building on Innovation
teroj / 2018
Complicated slides
Building on Innovation
3D-Model
IFC Information Enrichment
Information
update
Asset Information Model, AIM
AIM-system
(Granlund
Designer)
Applications
Utilisation of Information
FM application
(Granlund
Manager)
UseCase UseCase UseCase
Documented API
Sharing Information New Information
User-, Building- and Phase Management
Dynamic Information
IoT, Building Automation System, User Feedback
Performance
Optimisation
IoT
Communication
and
authentications
Other
Applications
Virtual
Property
Business needs
Digital
Twin
Tools
for
updating
Digital
Twin
Property Management
FLM
Facility
Life
cycle
Management
Propery Portfolio
The
Concept
of
Virtual
Property
ROAD MAP TO FACILITY LIFE CYCLE MANAGEMENT
Operative level
Tactical level
Strategic level
teroj / 2018
Building on Innovation
Manager
FM Services
REST API
Designer
Device
Database
Metrix
Conditions,
Performance
BAS, IoT
External
Sensors
Pulse
User Feedback
Granlund 3D
User Interface
IFC Properties + Enriched Info from other sources
Linked to Graphics
Linking
Mapping with GUID's, pre-
selected and standardized
IfcObjectClasses / Properties
API Environment
IFC -Files
IFC Graphics (Adesk Forge)
API Environment (Forge)
Granlund
PoC
REST API REST API REST API REST API
Other
Softwares
REST API
Granlund
PoC
Granlund
PoC
Proof Of Concept for linking IFC object information with Information from external sources
teroj / 2018
Building on Innovation
MEP Smart Building process and resources
From design to lifecycle operations:
Design System Supliers Construction Comissioning
Smart Building operative system / platform
MEP design and Implementation guide -> role for OT-expert
Requirements for Construction
Palvelut
Requirements for Services
Experience &
Building
Business
Services
Operations
and
maintenance
OT = Operational Technology
Karhu / 2021
Building on Innovation
Miten tiedosta tulee käyttöliittymä?
Ontologia
Esim. REC tai PoT
- Real Estate Core
- Platform of Trust
Toteutus
Esim. Azure Digital Twin
Loppukäyttäjän ohjelmistot
Esim. Granlund Manager, Designer,
jne.
Rakennushankkeessa syntyvää tietoa
Todellisuudessa myös
suoria point-to-point
API linkkejä
teroj / 2021
Building on Innovation
17.11.2021
Building on Innovation
Year 2010:

Contenu connexe

Tendances

Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBe2camp Admin
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentationrsalbin
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modelingNI BT
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information ModellingNemat Syed
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modellingSumayyaSayeeda
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction Marc Goldman
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?Chun Keung Ng
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for constructionCesare Caoduro
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2Stephen Au
 
Plannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineeringPlannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineeringStephen Au
 
Sustainable construction and Quantity Surveying
Sustainable construction and Quantity SurveyingSustainable construction and Quantity Surveying
Sustainable construction and Quantity SurveyingPrabath Bandara
 
BIM LOD (Level of Definition)
BIM LOD (Level of Definition) BIM LOD (Level of Definition)
BIM LOD (Level of Definition) Scott Berry
 
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiBim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiAri Nassi
 

Tendances (20)

Building Information Modelling (BIM) in India
Building Information Modelling (BIM) in IndiaBuilding Information Modelling (BIM) in India
Building Information Modelling (BIM) in India
 
Bim Presentation
Bim PresentationBim Presentation
Bim Presentation
 
What is bim, building information modeling
What is bim, building information modelingWhat is bim, building information modeling
What is bim, building information modeling
 
BIM training
BIM training BIM training
BIM training
 
BIM - Building Information Modelling
BIM - Building Information ModellingBIM - Building Information Modelling
BIM - Building Information Modelling
 
What is BIM?
What is BIM?What is BIM?
What is BIM?
 
Bim building information modelling
Bim  building information modellingBim  building information modelling
Bim building information modelling
 
MEP BIM design
MEP BIM designMEP BIM design
MEP BIM design
 
BIM Execution plan
BIM  Execution  planBIM  Execution  plan
BIM Execution plan
 
BIM for Construction
BIM for Construction BIM for Construction
BIM for Construction
 
What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?What does BIM mean for Civil Engineers?
What does BIM mean for Civil Engineers?
 
BIM workflow for construction
BIM workflow for constructionBIM workflow for construction
BIM workflow for construction
 
Virtual Design and Construction
Virtual Design and ConstructionVirtual Design and Construction
Virtual Design and Construction
 
Building information modeling & value to the AEC industry Part 2
Building information modeling &  value to the AEC industry   Part 2Building information modeling &  value to the AEC industry   Part 2
Building information modeling & value to the AEC industry Part 2
 
Plannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineeringPlannerly and Dalux for construction system engineering
Plannerly and Dalux for construction system engineering
 
Sustainable construction and Quantity Surveying
Sustainable construction and Quantity SurveyingSustainable construction and Quantity Surveying
Sustainable construction and Quantity Surveying
 
BIM LOD (Level of Definition)
BIM LOD (Level of Definition) BIM LOD (Level of Definition)
BIM LOD (Level of Definition)
 
BIM for Project Managers
BIM for Project ManagersBIM for Project Managers
BIM for Project Managers
 
BIM case study
BIM case studyBIM case study
BIM case study
 
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari NassiBim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
Bim For Construction And Maintenance Singapore 09 Oct30 Ari Nassi
 

Similaire à Lifecycle MEP design for buildings

ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David PhilpETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David PhilpComit Projects Ltd
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models Viasys VDC
 
MPG Construct Tech Market Update - April 2022
MPG Construct Tech Market Update - April 2022MPG Construct Tech Market Update - April 2022
MPG Construct Tech Market Update - April 2022Madison Park Group
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018Aconex
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015Aconex
 
Reimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKReimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKAssociation for Project Management
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...Fabio Roberti
 
CLOUD WEBINAR 2.pptx
CLOUD WEBINAR 2.pptxCLOUD WEBINAR 2.pptx
CLOUD WEBINAR 2.pptxPrakritiGoel4
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distributionIbrahim Al-Hudhaif
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnicsRob Madill
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Rob Madill
 
Virtual Property vs. Digital Twin
Virtual Property vs. Digital TwinVirtual Property vs. Digital Twin
Virtual Property vs. Digital TwinTero Järvinen
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2Est
 
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...OPEN DEI
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET Journal
 
Microsoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionMicrosoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionDWP Information Architects Inc.
 
REDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaborationREDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaborationREDceo.net
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...p6academy
 
The Impacts.pptx
The Impacts.pptxThe Impacts.pptx
The Impacts.pptxKvmRaju
 

Similaire à Lifecycle MEP design for buildings (20)

ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David PhilpETDP 2015 D2 Key Note  Preparing for a Digital Built Britain - David Philp
ETDP 2015 D2 Key Note Preparing for a Digital Built Britain - David Philp
 
Viasys VDC City Models
Viasys VDC City Models Viasys VDC City Models
Viasys VDC City Models
 
MPG Construct Tech Market Update - April 2022
MPG Construct Tech Market Update - April 2022MPG Construct Tech Market Update - April 2022
MPG Construct Tech Market Update - April 2022
 
Digital Transformation 2018
Digital Transformation 2018Digital Transformation 2018
Digital Transformation 2018
 
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
How BIM Can Improve Decisions and Reduce Errors - Webinar, December 2, 2015
 
Reimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UKReimagine project delivery with Oracle Industries Innovation Lab UK
Reimagine project delivery with Oracle Industries Innovation Lab UK
 
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
How to Create a Rock Star BIM Execution Plan (BEP) and MPDT* (Responsibility ...
 
CLOUD WEBINAR 2.pptx
CLOUD WEBINAR 2.pptxCLOUD WEBINAR 2.pptx
CLOUD WEBINAR 2.pptx
 
14.15 andrew killander, aconex for distribution
14.15 andrew killander, aconex   for distribution14.15 andrew killander, aconex   for distribution
14.15 andrew killander, aconex for distribution
 
Recent developments in BIM in geotechnics
Recent developments in BIM  in geotechnicsRecent developments in BIM  in geotechnics
Recent developments in BIM in geotechnics
 
Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics Recent developments in BIM in geotechnics
Recent developments in BIM in geotechnics
 
Virtual Property vs. Digital Twin
Virtual Property vs. Digital TwinVirtual Property vs. Digital Twin
Virtual Property vs. Digital Twin
 
CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2CSCM Bim implementation in malaysia 2
CSCM Bim implementation in malaysia 2
 
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...
Introduction – OPEN DEI Webinar "The role of the Reference Architectures in D...
 
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
 
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BDBIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
BIM Networking Seminar: Documentation from BIM - Tips for GBP Submission to BD
 
Microsoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for ConstructionMicrosoft Whitepaper: Cloud Computing Guide for Construction
Microsoft Whitepaper: Cloud Computing Guide for Construction
 
REDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaborationREDmonitor-the next wave in vertical market data collaboration
REDmonitor-the next wave in vertical market data collaboration
 
Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...Delivering operational efficiency in the new dawn of complex BIM data through...
Delivering operational efficiency in the new dawn of complex BIM data through...
 
The Impacts.pptx
The Impacts.pptxThe Impacts.pptx
The Impacts.pptx
 

Plus de Tero Järvinen

Guide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projectsGuide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projectsTero Järvinen
 
Virtual Reality in AEC
Virtual Reality in AECVirtual Reality in AEC
Virtual Reality in AECTero Järvinen
 
Granlund Virtual Property
Granlund Virtual PropertyGranlund Virtual Property
Granlund Virtual PropertyTero Järvinen
 
BIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, ConceptBIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, ConceptTero Järvinen
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationTero Järvinen
 
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...Tero Järvinen
 
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...Tero Järvinen
 
EBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund OyEBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund OyTero Järvinen
 
Integroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by GranlundIntegroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by GranlundTero Järvinen
 
MEP design and collaboration
MEP design and collaborationMEP design and collaboration
MEP design and collaborationTero Järvinen
 
MEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospitalMEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospitalTero Järvinen
 
Granlund Designer, MEP design database software
Granlund Designer, MEP design database softwareGranlund Designer, MEP design database software
Granlund Designer, MEP design database softwareTero Järvinen
 

Plus de Tero Järvinen (12)

Guide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projectsGuide: MEP Design in Construction Management -projects
Guide: MEP Design in Construction Management -projects
 
Virtual Reality in AEC
Virtual Reality in AECVirtual Reality in AEC
Virtual Reality in AEC
 
Granlund Virtual Property
Granlund Virtual PropertyGranlund Virtual Property
Granlund Virtual Property
 
BIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, ConceptBIM2FM, BIM models to Facility Management, Concept
BIM2FM, BIM models to Facility Management, Concept
 
Building Energy parametric optimization / collaboration
Building Energy parametric optimization / collaborationBuilding Energy parametric optimization / collaboration
Building Energy parametric optimization / collaboration
 
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
BIM Presentation at Helsinki Metropolia University at Applied Sciences (in Fi...
 
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...MEP-BIM process for designing project Origin,  Suspended Ceilings, Provisions...
MEP-BIM process for designing project Origin, Suspended Ceilings, Provisions...
 
EBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund OyEBEC2015 Helsinki. Concept of Big Room, Granlund Oy
EBEC2015 Helsinki. Concept of Big Room, Granlund Oy
 
Integroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by GranlundIntegroitu suunnittelu, tietomallit by Granlund
Integroitu suunnittelu, tietomallit by Granlund
 
MEP design and collaboration
MEP design and collaborationMEP design and collaboration
MEP design and collaboration
 
MEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospitalMEP BIM amount of objects in renovated hospital
MEP BIM amount of objects in renovated hospital
 
Granlund Designer, MEP design database software
Granlund Designer, MEP design database softwareGranlund Designer, MEP design database software
Granlund Designer, MEP design database software
 

Dernier

Presentation of 2023 Results domdev.pptx
Presentation of 2023 Results domdev.pptxPresentation of 2023 Results domdev.pptx
Presentation of 2023 Results domdev.pptxklaudiafilka
 
LCAR Unit 14 - Real Estate Brokerage - 14th Edition Revised
LCAR Unit 14 - Real Estate Brokerage - 14th Edition RevisedLCAR Unit 14 - Real Estate Brokerage - 14th Edition Revised
LCAR Unit 14 - Real Estate Brokerage - 14th Edition RevisedTom Blefko
 
2023 NAR Technology Survey - LCAR RE Practice
2023 NAR Technology Survey - LCAR RE Practice2023 NAR Technology Survey - LCAR RE Practice
2023 NAR Technology Survey - LCAR RE PracticeTom Blefko
 
Signature Global Sector 84 In Gurugram | Easy Living
Signature Global Sector 84 In Gurugram | Easy LivingSignature Global Sector 84 In Gurugram | Easy Living
Signature Global Sector 84 In Gurugram | Easy Livingbhattrishabh270
 
AIPL Joy District Sector 88, In Gurgaon.pdf
AIPL Joy District  Sector 88,  In Gurgaon.pdfAIPL Joy District  Sector 88,  In Gurgaon.pdf
AIPL Joy District Sector 88, In Gurgaon.pdfbhattrishabh270
 
Anshul Kanvas Wagholi Pune Apartments Brochure.pdf
Anshul Kanvas Wagholi Pune Apartments Brochure.pdfAnshul Kanvas Wagholi Pune Apartments Brochure.pdf
Anshul Kanvas Wagholi Pune Apartments Brochure.pdfsabhyara24
 
3 BHK Flats in Zirakpur for Sale - AJ Estates
3 BHK Flats in Zirakpur for Sale - AJ Estates3 BHK Flats in Zirakpur for Sale - AJ Estates
3 BHK Flats in Zirakpur for Sale - AJ EstatesAJ Estates
 
LCAR Unit 15 - Agency in Real Estate - 14th Edition Revised
LCAR Unit 15 - Agency in Real Estate - 14th Edition RevisedLCAR Unit 15 - Agency in Real Estate - 14th Edition Revised
LCAR Unit 15 - Agency in Real Estate - 14th Edition RevisedTom Blefko
 
Anshul Uruli Kanchan Pune E-Brochure.pdf
Anshul Uruli Kanchan Pune  E-Brochure.pdfAnshul Uruli Kanchan Pune  E-Brochure.pdf
Anshul Uruli Kanchan Pune E-Brochure.pdfManishSaxena95
 
4S Sector 59 In Gurugram | Invest, Nest, Rest
4S Sector 59  In Gurugram | Invest, Nest, Rest4S Sector 59  In Gurugram | Invest, Nest, Rest
4S Sector 59 In Gurugram | Invest, Nest, Restbhattrishabh270
 
Provident Manchester IVC Road Bangalore.pdf
Provident Manchester IVC Road Bangalore.pdfProvident Manchester IVC Road Bangalore.pdf
Provident Manchester IVC Road Bangalore.pdfashiyadav24
 
Top 6 Ways to Stay Stay in Touch and Generate Leads
Top 6 Ways to Stay Stay in Touch and Generate LeadsTop 6 Ways to Stay Stay in Touch and Generate Leads
Top 6 Ways to Stay Stay in Touch and Generate LeadsAaron Stelle
 
Mahindra Lifespaces Kandivali East | Expansive spaces for your family
Mahindra Lifespaces Kandivali East | Expansive spaces for your familyMahindra Lifespaces Kandivali East | Expansive spaces for your family
Mahindra Lifespaces Kandivali East | Expansive spaces for your familyaidasheikh47
 
10 Best Property Dealers in Mohali - List Real Estate Property Agents
10 Best Property Dealers in Mohali - List Real Estate Property Agents10 Best Property Dealers in Mohali - List Real Estate Property Agents
10 Best Property Dealers in Mohali - List Real Estate Property AgentsAJ Estates
 
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Price
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable PriceKalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Price
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Priceaidasheikh47
 
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...RE/MAX Realty Solutions
 
K Raheja Amaltis Sion Mumbai | A Return To Better Living
K Raheja Amaltis Sion Mumbai | A Return To Better LivingK Raheja Amaltis Sion Mumbai | A Return To Better Living
K Raheja Amaltis Sion Mumbai | A Return To Better Livingaidasheikh47
 
Points to Consider Before Finalizing on a Property.
Points to Consider Before Finalizing on a Property.Points to Consider Before Finalizing on a Property.
Points to Consider Before Finalizing on a Property.Sunil Agrawal and Associates
 
SVN Live 3.25.24 Weekly Property Broadcast
SVN Live 3.25.24 Weekly Property BroadcastSVN Live 3.25.24 Weekly Property Broadcast
SVN Live 3.25.24 Weekly Property BroadcastSVN International Corp.
 

Dernier (20)

Presentation of 2023 Results domdev.pptx
Presentation of 2023 Results domdev.pptxPresentation of 2023 Results domdev.pptx
Presentation of 2023 Results domdev.pptx
 
LCAR Unit 14 - Real Estate Brokerage - 14th Edition Revised
LCAR Unit 14 - Real Estate Brokerage - 14th Edition RevisedLCAR Unit 14 - Real Estate Brokerage - 14th Edition Revised
LCAR Unit 14 - Real Estate Brokerage - 14th Edition Revised
 
2023 NAR Technology Survey - LCAR RE Practice
2023 NAR Technology Survey - LCAR RE Practice2023 NAR Technology Survey - LCAR RE Practice
2023 NAR Technology Survey - LCAR RE Practice
 
Signature Global Sector 84 In Gurugram | Easy Living
Signature Global Sector 84 In Gurugram | Easy LivingSignature Global Sector 84 In Gurugram | Easy Living
Signature Global Sector 84 In Gurugram | Easy Living
 
AIPL Joy District Sector 88, In Gurgaon.pdf
AIPL Joy District  Sector 88,  In Gurgaon.pdfAIPL Joy District  Sector 88,  In Gurgaon.pdf
AIPL Joy District Sector 88, In Gurgaon.pdf
 
Anshul Kanvas Wagholi Pune Apartments Brochure.pdf
Anshul Kanvas Wagholi Pune Apartments Brochure.pdfAnshul Kanvas Wagholi Pune Apartments Brochure.pdf
Anshul Kanvas Wagholi Pune Apartments Brochure.pdf
 
3 BHK Flats in Zirakpur for Sale - AJ Estates
3 BHK Flats in Zirakpur for Sale - AJ Estates3 BHK Flats in Zirakpur for Sale - AJ Estates
3 BHK Flats in Zirakpur for Sale - AJ Estates
 
LCAR Unit 15 - Agency in Real Estate - 14th Edition Revised
LCAR Unit 15 - Agency in Real Estate - 14th Edition RevisedLCAR Unit 15 - Agency in Real Estate - 14th Edition Revised
LCAR Unit 15 - Agency in Real Estate - 14th Edition Revised
 
Benefits of buying ready to move in flats.
Benefits of buying ready to move in flats.Benefits of buying ready to move in flats.
Benefits of buying ready to move in flats.
 
Anshul Uruli Kanchan Pune E-Brochure.pdf
Anshul Uruli Kanchan Pune  E-Brochure.pdfAnshul Uruli Kanchan Pune  E-Brochure.pdf
Anshul Uruli Kanchan Pune E-Brochure.pdf
 
4S Sector 59 In Gurugram | Invest, Nest, Rest
4S Sector 59  In Gurugram | Invest, Nest, Rest4S Sector 59  In Gurugram | Invest, Nest, Rest
4S Sector 59 In Gurugram | Invest, Nest, Rest
 
Provident Manchester IVC Road Bangalore.pdf
Provident Manchester IVC Road Bangalore.pdfProvident Manchester IVC Road Bangalore.pdf
Provident Manchester IVC Road Bangalore.pdf
 
Top 6 Ways to Stay Stay in Touch and Generate Leads
Top 6 Ways to Stay Stay in Touch and Generate LeadsTop 6 Ways to Stay Stay in Touch and Generate Leads
Top 6 Ways to Stay Stay in Touch and Generate Leads
 
Mahindra Lifespaces Kandivali East | Expansive spaces for your family
Mahindra Lifespaces Kandivali East | Expansive spaces for your familyMahindra Lifespaces Kandivali East | Expansive spaces for your family
Mahindra Lifespaces Kandivali East | Expansive spaces for your family
 
10 Best Property Dealers in Mohali - List Real Estate Property Agents
10 Best Property Dealers in Mohali - List Real Estate Property Agents10 Best Property Dealers in Mohali - List Real Estate Property Agents
10 Best Property Dealers in Mohali - List Real Estate Property Agents
 
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Price
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable PriceKalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Price
Kalpataru Jade Skyline Baner Pune | A New Way Of Living At An Affordable Price
 
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...
4 & 5 BHK Spacious Apartments for sale in Anamika High Point, Off SG Highway ...
 
K Raheja Amaltis Sion Mumbai | A Return To Better Living
K Raheja Amaltis Sion Mumbai | A Return To Better LivingK Raheja Amaltis Sion Mumbai | A Return To Better Living
K Raheja Amaltis Sion Mumbai | A Return To Better Living
 
Points to Consider Before Finalizing on a Property.
Points to Consider Before Finalizing on a Property.Points to Consider Before Finalizing on a Property.
Points to Consider Before Finalizing on a Property.
 
SVN Live 3.25.24 Weekly Property Broadcast
SVN Live 3.25.24 Weekly Property BroadcastSVN Live 3.25.24 Weekly Property Broadcast
SVN Live 3.25.24 Weekly Property Broadcast
 

Lifecycle MEP design for buildings

  • 1. Building on Innovation Thoughts of MEP Design in lifecycle of buildings Tero Järvinen Development Director 04.11.2022
  • 2. 1960 GRANLUND WAS ESTABLISHED IN NET SALES OPERATING PROFIT FINNISH, 100% EMPLOYEE-OWNED BUSINESS NET SALES PERSONNEL AT THE END OF THE YEAR 2019 2020 2021 981 1,095 1,222 EVERY YEAR 6% OF NET SALES ON INNOVATION Operating profit out of net sales
  • 3. 99% 85% 82% SATISFIED WITH GRANLUND FULLY SATISFIED OR SATISFIED WITH GRANLUND'S EXPERTISE FULLY SATISFIED OR SATISFIED WITH GRANLUND'S SUSTAINABILITY Our customers NPS 47 Housing companies 5.2% Property owners and investors 10.6% Building and construction 9.6% Industry 4.6% Wholesale and retail 8.0% Social and healthcare services 16.0% State 9.2% Other 12.6% Municipalities 14.1% Energy companies 0.4% Services 5.7% Information and communications 4.0%
  • 4. Building on Innovation History of BIM in Granlund Multi-objective building performance optimization (Using algorithms) 2020
  • 5. Building on Innovation Contract Philosophy Process IPD Alliance Partnering BIM Lean Construction Tools Cornerstones of construction project teroj / 2018
  • 6. Building on Innovation Information flow from the Project to Facilities Management Construction Commissioning Guarantee period Facilities Management Performance optimization Digital delivery Updating of digital assets Facility management requirements Determination of data interfaces Preventitive maintanance Linked Data Data warehouses and analysis Standardized information content and services End user feedback, analysis and actions Graphical Digital Twin environments Services Solutions teroj / 2020
  • 7. Building on Innovation Raportointi Digital lifecycle management Data alusta Digitaalinen kaksonen Sovellus Visualisointi APIt Sovellus Sovellus AI/ML Datasources Kimmo / 2020
  • 8. Building on Innovation From several suggestions to one concept design layout. From concept to Detail Design Suggestions Concept Design Detail Design System comparisations, Energy simulations / optimization, mock-up rooms. Comparisations of different possibilities Selected systems in one Concept Design. Main routes, shafts, technical spaces, diagrams, device specifications Detail Desing BIM model according to COBIM2012 requirements Contractor is using designers models for MEP assemblies From Suggestions to Detail Design
  • 9. Building on Innovation Benchmark data as design input Concept design Constuction Benchmark-data (Quantities, Cost, Carbon footprint) Real project data (Quantities, Cost, Carbon footprint, 4D-schedule) Collecting benchmark data Development Design Digitaalinen delivery Procurement The starting point for the initial design is volume-based data from previous buildings In the middle of the general design, the data becomes the data of the actual object. TATE purchases are made before the BIM model is completed In connection with the digital handover, the collection of benchmark data for the following sites will be ensured Data platform under construction teroj / 2022
  • 10. © Granlund Digital Project Development Time Schedule Cost Control Lifecycle and Carbon Footprint Control The Maturity of Design Readiness Safety Control on site and site logistics Production Monitoring 4D-timeschedule Situation Awardness
  • 11. Building on Innovation Construction project situation room and dynamic reports Data-platform 4D timeschedule Cost estimation Quantity take-off Energy Environment / carbon footprint Main schedule Customer requirements IFC model Benchmark data Broker IFC Model Solibri Granlund Designer Benchmark data Granlund Manager MOBO CO2 databases IFC model Benchmark data Reporting Services Example of Information source Digital Project Development Collaboration, coordination Memo’s Excel Smartsheet teroj / 2021
  • 12. Building on Innovation Example from Power BI 8.2.2021
  • 13. Building on Innovation Building on innovation 4D timescedule Scheduling is one of the most important functions guiding a construction project • There are major shortcomings nationally, especially in the scheduling of MEP design / assemblies • The 4D schedule combines visual control (BIM models) and the actual installation schedule • When 4D is introduced, scheduling errors are very easily noticed • 4D forces you to think about getting your schedule in order • Possibility to connect also cost and CO2 data to the schedule • Usable, e.g. in “Tact-Time” teroj / 2021 Hypemeter Lots of talk Daily routine 4D in use There are no obstacles for using 4D
  • 14. Building on Innovation Standardization of IFC content The foundation of a scalable business. An absolute requirement for cost-effective business • Almost all construction projects are carried out with different data contents of BIM models • The use of information content, e.g. as benchmark data, is impossible without standardized content • Finnish “RAVA3Pro” –project is standardizing IFC content and creating use cases for building control authorities • https://kirahub.org/ytv2020-talotekniikan-ja-rakennesuunnittelun-nimistojen-koekayttoa-jatketaan-kevaalle-2022/ teroj / 2021 Hypemeter Lots of talk Daily routine Specification is made
  • 15. Building on Innovation Building on innovation teroj / 2021 Digital Delivery to minimize data transfer between systems The end product of construction project is a digital system environment Information content and links between the systems are made during the construction period
  • 16. Dataflow Strategic project to develop data platform for Granlund business units This presentation sub-project: “IFC to database”
  • 17. Building on Innovation Data -platforms A concrete need for all companies that swear by digitization • Data consistency is achieved through the data platform • A demanding operation in a construction project, as the companies have their own data platforms • Ontology platforms are being developed as a solution, e.g.: • PoT (Platform of Trust) • REC (Real Estate Core) • … • An enabler of scalable business teroj / 2021 Hype meter Lots of talk Daily routine Data platform in use
  • 18. Building on Innovation Software A Main tool of business unit ”Z” Azure Data crushing (including analytics services) Software N Main tool of business unit ”Y” Power BI Combied reporting Target • from software to a dynamic report via Azure • includes analytics within Azure • raw data and analyzed data can be shared elsewhere Situation awardness Internal use in own business, ”quick and dirty” Outwardly distri- buted applications / data streams When purchasing software, they must have API interfaces for Azure connection (even if it is a little worse than the other software) Data transfer to other platforms Platform of Trust, Real Estate Core… BIM data (IFC) API- connectivity External sources Fast lane 17.11.2021
  • 19. Building on Innovation Datan omistajuus ja ylläpito Tietomallintaminen pilvipalveluissa yleistyy • Nykyisin tietomallit ovat suunnittelijoiden servereillä • Yhteistoiminnallisuuden mahdollistavat pilvipalvelut yleistyvät – tiedon jakaminen helpottuu • Ajantasainen tieto on aidosti tilaajan hallinnassa, jos tilaaja pystyttää oman pilvipalvelun ja kutsuu suunnittelijat työskentelemään siellä sekä urakoitsijat hyödyntämään 2D-piirustuksia ja 3D-malleja ilman tiedostojen lataamistarvetta omille koneille • Pilvipalvelu mahdollistaa tietomallien kustannustehokkaan ylläpidon kiinteistön elinkaaren aikana teroj / 2021 Designers Reviewers Decision makers “Projektipankki steroideilla” Hypemittari Paljon puhetta Arkipäivää Pilviympäristö pilotoinnissa Pilviympäristön käyttöönotolle ei ole esteitä
  • 20. Building on Innovation Tietomallinnus Tietomallinnus vakioituu normaaliksi toimintatavaksi, ohjeet/määräykset laahaavat edelleen jäljessä • Maanrakennuslaki uudistumassa -> Rakennuslaki. Vaatimuksia tietomallien käytölle • Kansainvälinen ISO19650 standardi “tietomallinnusprosessin vakiointi” herättää mielenkiintoa Suomessakin • SKOL julkaissut uuden yleissuunnitteluvaiheen prosessikuvauksen tietomallipohjaiselle suunnittelulle teroj / 2021 Linkki Linkki Linkki Hypemittari Paljon puhetta Arkipäivää Tietomallinnus hankkeissa
  • 21. Building on Innovation Alternative solutions Diagrams and device databases Spatial provisions and service area zones Life Cycle CFD-simulations 3D-mockups Technical Visualizations Lighting Simulations Sustainability Spacetype Requirements and Targets Energy Simulation Model Combied Models Model Auditing Modelling of MEP-networks BIM based Provision of Voids Device Schedule database Network Route Design Common BIM Requirements Information export from models Revisionhandling of Models, Documents and Equipment data Model based assembly inspection Device Validation As-Built Model Target values of energy consumption for Facility Management SQL IFC Assembly Inspections Concept Design – Detail Design – Construction Site – Facility Management Energy Optimization Drawings Models with simulation CMMS Software with Digital Twin Cost Estimations AR / VR solution
  • 22. Building on Innovation Building on Innovation Scope of work for energy consulting DEVELOPMENT PHASE DETAILED DESIGN AND CONSTRUCTION USE PHASE Geothermal analysis Thermal comfort and cooling simulations Target energy simulation CONSTRUCTION PERMIT Energy certificate E-value calculation Geothermal permit materials Detailed design for heat pump system Contractor negotiations Updates for target energy and energy certificates Granlund Manager Digital services Quality control Energy Consulting Life Cycle Consulting Premilinary environmental certificate analysis (RTS, LEED, BREEAM) Carbon-neutral target analysis Life Cycle Consulting Environmental certificate coordination: design phase material Realized CO2-calculations Environmental certificate coordination: construction phase material Energy / 2022
  • 23. Building on Innovation Building on Innovation Working methods for energy consulting Energy simulations •The basis for all energy consulting is simulations for calculating the target energy consumption of the building •The actual building is modeled in dynamic energy calculation software, and hourly heating and cooling energy needs may be used in energy system evaluation Geothermal analysis •The borehole locations and amount are determined according to site plan •Borehole depth is optimized with ground loop simulation software, using thermal conductivity data for bedrock when available •With simulations, optimal sizing and total costs for the system will be determined Reporting •Using visual reports and graphs, decision making between different options will be straightforward in the early phase of the project •Typically, sensitivity analysis for main variables (energy price, heat pump power) may be included to determine the best system in different scenarios Energy / 2022
  • 24. Building on Innovation MOBO- monitavoiteptimointi • Tehokas vertailu jopa miljoonilla vaihtoehdoilla • Mahdollistaa esimerkiksi energiainvestointien optimoinnin kokonaisuutena perustuen luotettavaan kustannustietoon ja laajaan käytännön kokemukseen 19.11.2022 Optimaaliset tulokset eri energiantuotanto- ratkaisuille kerrostalokohteessa
  • 25. Building on Innovation Rakennusten energia- ja olosuhdesimulointi • Rakennusten energiankulutus sekä jakautuminen eri tuotantomuotojen ja kuluttajien välillä tuntikohtaisesti • Yksittäisten huonetilojen olosuhteet tuntikohtaisesti 19.11.2022
  • 26. The Concept of Digital Twin Using information from BIM / cloud -models teroj / 2018
  • 27. Building on Innovation Topi Korpela / Joonas Alakomi 2019 = Saatavilla BIM malleista
  • 28. Building on Innovation Business needs and strategic decissions CMMS software for daily technical operations IFC models, PDF documents accessible through cloud Multiple enduser applications and platforms teroj / 2019 Different roles, different users
  • 29. Building on Innovation BIM2FM key sentences ▪ Information content has to be standardised ❑ Information needs to be machine understandable ▪ Information has to be prioritised ❑ There is too much information in the models ❑ There is a need for information prioritisation and understanding of the use cases ❑ ”Everything is not possible” ▪ Information has to be available 24/7 ❑ Cloud services ❑ Roles for users, authentification, documented API’s, security ▪ Information is not transferred ❑ Information is linked between cloud systems ❑ End user decides, which information source is ”home” for them ❑ One cloudservice does not solve problems, for multiple use cases you need multiple cloud services ▪ Information has to be updated ❑ Need for ”Digital Twin”. You need to update the virtual building before or after renovations / minor changes. It has to be ”a process” in FM workflow ❑ If information content differs in Digital Twin, virtual model will be useless after couple of years. Information in virtual model has to be reliable (depending of the use cases) ▪ Normal FM operations will be different ❑ ”BIM2FM” usability cannot be compared to existing use cases. Methods to fullfil the needs of existing use cases will change ❑ Facility management and property owner organisations need to be ready for change and be willing to change their workmethods teroj / 2018
  • 30. Building on Innovation Granlund Designer • Designer is for making Device Schedules • Standardise your company workflow • History and revision control • Free coding according to your company standards • Company device libraries • Device approval process with contractor input -> as-built information • Role based workflow • Documented API interface New Generation cloud-based software for device schedules
  • 31. Building on Innovation Graphical Bim models Product Types Materials For example: S1 =Swegon Colibri-125-600, 40 dm3/s, 28Pa, 32dB(A) S1 = Swegon Colibri, FD3 = Halton FDI Heating system; pipe material: Fe Device Approval Process Updates for Product information and BIM Device Approval Process Updates for Material Schedule and BIM MagiCAD, Revit… -> IFC Granlund Designer Granlund Designer Specifications for central units AHU01, 4 m3/s, 850Pa, Heating Coil… Device Approval Process Updates for Device Schedule Granlund Designer Concept Design Detail Design As-built – information in use for other applications Granlund Designer has documented API’s Device and product information should be linked to a graphical BIM model. teroj / 2021
  • 32. Building on Innovation Tilannehuoneet Hankkeen etäjohtamisen työkalu, jolla raportoidaan reaaliaikaisesti hankkeen etenemistä • Kun tieto on käytettävissä vakioidusti data-alustalla, voidaan tuottaa skaalautuvasti ja kustannustehokkaasti näkymiä hankkeen etenemiseen seurantaan • Käyttötapauksia mm: • Uudet avoimet asiat ja esteet • Sovitut tehtävät • Päätösesitykset • Tehdyt päätökset • Talousseuranta • Tavoitteet ja niiden täyttyminen • Tilannehuone voidaan tehdä vakioimattomallakin datalla teroj / 2021 Hypemittari Paljon puhetta Arkipäivää Tilannehuone käytössä Tilannehuoneen käyttöönotolle ei ole esteitä
  • 33. Building on Innovation Muita kehitysalueita Näistä puhutaan välillä isoonkin ääneen • Lisätty todellisuus (AR, Augmented Reality) • Paljon videoita / somepostauksia • Suurin osa PoC tasolla (Proof of Concept) • AR maailman valmistelu vaatii backofficetyötä • Tekoäly / koneoppiminen • Yksittäisiä onnistumisia fokusoituun käyttöön • Koneoppiminen reaalimaailmaa, tekoäly hieman kauempana siitä • Suunnitteluautomaatio • Tietomallinnus: Rakennepuoli edelläkävijä • Tietomallinnus: TATE-puolella suuria haasteita • Energia / elinkaarisimuloinnit: suuria edistysaskeleita teroj / 2021
  • 34. Building on Innovation Building on innovation Digital Twin Staattisen ja dynaamisen datan yhdistäjä • Digital Twin yhdistää staattiset BIM tietomallit sekä esim. kiinteistön mittaustiedot (IoT, rakennusautomaatio jne.) • Kaikki toteutukset ovat riippuvaisia Digital Twin – ohjelmistoon valituista käyttötapauksista • Digital Twin’n ydin on data – ei grafiikka. • Visualisointi voidaan toteuttaa myös esim. Power BI –tyyppisilä ohjelmistoilla teroj / 2021 Hypemittari Paljon puhetta Arkipäivää Digital Twin käytössä Digitwinin käyttöönotolle ei ole esteitä
  • 36. Building on Innovation Building on innovation Kiinteistödatan ylläpito Digitaalisella omaisuudella on arvoa • Jos rakennushankkeessa syntyvää tietoa halutaan myös kiinteistön ylläpidon käyttöön, tulee sen ajantasaistamiseen varautua kiinteistön ylläpitobudjetissa • Digitaalisuus kiinteistössä tarkoittaa sitä, että sekä fyysistä että digitaalista kiinteistöä tulee ylläpitää. • Kustannukset maksavat itsensä takaisin mm: • Tyytyväisenä loppukäyttäjänä • Kiinteistön arvon säilymisenä • Peruskorjausten yhteydessä teroj / 2021 Hypemittari Paljon puhetta Arkipäivää Digiomaisuuden ylläpitoprosessi olemassa Prosessin käyttöönotolle ei ole esteitä
  • 37. Building on Innovation BIM to use in FM Preliminary design Detail Design Construction FM Spaces / Zones Designers BIM models FM requirements for BIM model BIM in FM FM coordinator sets requirements and monitors fulfilment Validation of as- built content in the models Construction organisation FM -organisation FM BIM execution plan for the building Monitoring FM BIM handover plan Mobilisation of transfer and education FM Coorninator teroj / 2018
  • 38. Building on Innovation Update to native models Little retrofits: 2D-drawings, hand-made drafts… Copy from native model if needed Project drawings / models Update to native models Renovation: Modelling to native model or copy from it Project drawings / models Designers Service for building owner IFC / PDF publish FM information systems API interfaces Daily use of FM software Designers Service for building owner IFC / PDF publish FM information systems API interfaces Daily use of FM software IFC / PDF publish FM information systems API interfaces Daily use of FM software Facility owner’s native BIM models and databases BIM NATIVE MODEL UPDATING DURING LIFECYCLE Facility Management Renovation Newbuilding Facility Management teroj / 2018
  • 39. Building on Innovation Päivitys natiivimalleihin Pienet muutokset: ”Issue” toiminto käytössä, muutokset www-selaimen kautta natiivimallin päivittäjälle As-built tiedon varmistus Peruskorjaus: Mallintaminen suoraan natiivimalliin Suunnittelijat Palveluna kiinteistön omistajalle, esim. 4krt/a 2D ja 3D pilvipalvelussa käytössä Ylläpidon tietojärjestlemät API rajapinnat Päivittäinen ylläpidon toiminta Suunnittelijat Palveluna kiinteistön omistajalle 2D ja 3D pilvipalvelussa käytössä Ylläpidon tietojärjestlemät API rajapinnat Päivittäinen ylläpidon toiminta 2D ja 3D pilvipalvelussa käytössä Ylläpidon tietojärjestlemät API rajapinnat Päivittäinen ylläpidon toiminta Natiivit Revit mallit pilvipalvelussa (Autodesk Construction Cloud) Tietomallien päivitys kiinteistön elinkaarella (Revit pilvipalvelu) Kiinteistön ylläpito Peruskorjaus Uudisrakennus Kiinteistön ylläpito teroj / 2018
  • 40. Building on Innovation Device information Combining graphical model and seperate databases we can get all information relevant to understand assets of the building Device Schedules, Diagrams… Air Handling Units, Chillers, Pumps, Central Units Concept Design Network BIM models Systems Detail Design teroj / 2016
  • 41. Building on Innovation BIM in Facility Management "Graphical BIM models" vs. "Facility Management environment" CMMS (Computerized Maintanance Management System) Preventative maintenance, Work Orders, Long Term Planning, Service Request, Energy... Native models, IFC-files, 2D-pdf drawings... teroj / 2018
  • 42. Building on Innovation Data Environment Graphical Environment Updated BIM and Digital Twin during the lifecycle teroj / 2021 RVT Granlund Designer Device schedules and as-built information Granlund Manager Digital Twin ACC cloud Issue Management in use 3D and 2D data models for construction available and updatable in a browser-based manner PDF IFC Designer / Construction / Owner / Facilities Management • Design and construction software is also deployed during maintenance • There is no data transfer between the software • Changes during maintenance can be communicated to modelers in a browser-based manner, made by property maintenance • For renovations, the latest information is immediately available, without the need for updates • The property maintenance system uses the site's IFC model as the basis for the Digital Twin environment • Links to dynamic data via APIs BMS / IoT systems For example: Autodesk Construction Cloud BIM Digital Twin
  • 43. Building on Innovation Example of 3D model / 2D drawing use case Suggestion for process ARCH STRC HVAC ELEC BMS Native models in client servers ifc, pdf 3D IFC publish 2D-pdf publish ifc, pdf ifc, pdf ifc, pdf ifc, pdf 3D IFC-in cloud 2D pdf cloud ARCH STRC HVAC ELEC BMS Native models in designers servers Cloud based 2D-drawing And/or 3D-BIM model Viewer for mobile or desktop use Same source of information to every participant Comments, RFI’s Updates teroj / 2018
  • 44. Building on Innovation Granlund Manager Kiinteistön digitaalinen kaksonen Granlund Manager Digital Twin visualisoi yhteen näkymään staattisista ja dynaamisista lähteistä kootut tiedot: • Rakennuksen tietomalli (BIM) • Laitetiedot sekä TATE-järjestelmät • Palvelualueet • Antureilta mitattu data • Olosuhteiden pysyvyys • Huoltohistoria • Käyttöpäiviäkirjamerkinnät • Palvelupyynnöt, jättö esim. QR koodeilla • Palvelupyyntöjen analysointi 19.11.2022
  • 45. Building on Innovation Detail Desing modelling software • MagiCAD for Revit (Autodesk Collaboration Cloud) • MagiCAD for AutoCAD • CADMATIC • Vectorworks • ArchiCAD Other tools • Navisworks • Solibri Model Checker • SimpleBIM • Enscape • Unity • Autodesk Forge (Granlund Manager / Digital Twin) Simulation software • Riuska (Energy&Comfort) • IDA-ICE (Energy&Comfort) • IES (Energy, Comfort, Environmental) • MOBO (Energy Optimization) • One Click LCA (LCA calculations) • Broker (Cost estimation) • Dialux (Lighting Design) • Bentley Synchro (4D timeschedule) • Comsol, Mathlab… Other • Granlund Designer (Device schedule) • Granlund Manager (CMMS) • M-Files (Document Management) • Microsoft Teams • Power BI etc. • Project Management, ERP, CRM etc. Software
  • 50. Building on Innovation 3D-Model IFC Information Enrichment Information update Asset Information Model, AIM AIM-system (Granlund Designer) Applications Utilisation of Information FM application (Granlund Manager) UseCase UseCase UseCase Documented API Sharing Information New Information User-, Building- and Phase Management Dynamic Information IoT, Building Automation System, User Feedback Performance Optimisation IoT Communication and authentications Other Applications Virtual Property Business needs Digital Twin Tools for updating Digital Twin Property Management FLM Facility Life cycle Management Propery Portfolio The Concept of Virtual Property ROAD MAP TO FACILITY LIFE CYCLE MANAGEMENT Operative level Tactical level Strategic level teroj / 2018
  • 51. Building on Innovation Manager FM Services REST API Designer Device Database Metrix Conditions, Performance BAS, IoT External Sensors Pulse User Feedback Granlund 3D User Interface IFC Properties + Enriched Info from other sources Linked to Graphics Linking Mapping with GUID's, pre- selected and standardized IfcObjectClasses / Properties API Environment IFC -Files IFC Graphics (Adesk Forge) API Environment (Forge) Granlund PoC REST API REST API REST API REST API Other Softwares REST API Granlund PoC Granlund PoC Proof Of Concept for linking IFC object information with Information from external sources teroj / 2018
  • 52. Building on Innovation MEP Smart Building process and resources From design to lifecycle operations: Design System Supliers Construction Comissioning Smart Building operative system / platform MEP design and Implementation guide -> role for OT-expert Requirements for Construction Palvelut Requirements for Services Experience & Building Business Services Operations and maintenance OT = Operational Technology Karhu / 2021
  • 53. Building on Innovation Miten tiedosta tulee käyttöliittymä? Ontologia Esim. REC tai PoT - Real Estate Core - Platform of Trust Toteutus Esim. Azure Digital Twin Loppukäyttäjän ohjelmistot Esim. Granlund Manager, Designer, jne. Rakennushankkeessa syntyvää tietoa Todellisuudessa myös suoria point-to-point API linkkejä teroj / 2021