Daily Kaizen
Fin Miller: Change Manager
Outline of today’s session
• Overview of St Andrews and the case for change
• The wider context of improvement
– Changing the business
– Definitions and methods
• Daily kaizen
– Kaizen theory
– Daily kaizen tools
• Visual management
• Daily huddle
• Universe of work
• Q & A
University of St Andrews
History
• The University was formally
constituted by the issue of a
papal bull in 1413.
• Almost 8,000 students.
• 47% students from outside
the UK.
• 98% retention rate.
• St Andrews is ranked 2nd in
Scotland and 19th in the UK
for overall research
performance, assessed by
quality of publications,
impact and the
environment in which
research takes place.
UK University Rankings
2008
1. Oxford
2. Cambridge
3. Imperial College
4. St Andrews
5. UCL
6. LSE
7. Edinburgh
8. Warwick
9. Bath
10. Loughborough
2015
1. Cambridge
2. Oxford
3. St Andrews
4. Bath
5. Imperial College
6. Surrey
7. London school of economics
8. Durham
9. Warwick
10. Lancaster
So why change?
We face some opportunities
– Estate (for example conference facilities).
– Physical assets (for example IT outsourcing deals).
– Intellectual property (for example patents).
– New markets (for example summer schools).
So why change?
We face some challenges
– Fragmentation (for example data centre
management).
– Devolved control (for example budget).
– Complexity (for example IT supporting schools,
units and commercial services).
– Funding (for example REF).
So why change?
HEIs are not great at differentiation
– Where does the institution derive its identity?
– Where does it invest the most and receive the greatest
return?
– What is the University’s unique core business?
– How is the market changing around us?
Do we need to change in answer to these fundamental
questions?
But what does this mean?
• It means we can improve.
• It means we need to improve.
• And begs the question…how do we improve?
• Especially with a high level of devolution
where change struggles to be mandated from
the top.
The wider context:
Changing the business
BaU definition
• The way the business normally/currently
achieves its strategic objectives.
• Also referred to as ‘running the business’
Portfolio definition
• The totality of an organisation’s investment
(or segment thereof) in the changes required
to achieve its strategic objectives.
Programme definition
• A temporary, flexible, organisation structure
created to coordinate, direct and oversee the
implementation of a set of related projects
and activities in order to deliver outcomes and
benefits related to the organisation’s strategic
objectives.
Project definition
• A temporary organisation that is created for the
purpose of delivering one or more business products
according to an agreed business case.
– It is temporary in that it has a defined beginning and end in time, and
therefore defined scope and resources.
– It is unique in that it is not a routine operation (i.e. BaU), but a specific
set of operations designed to accomplish a singular goal. A project
team often includes people who don’t usually work together.
In summary
– The need for change is identified by comparing business as
usual performance to the achievement of strategic objectives.
– Changes are planned through portfolio management and
delivered via projects and programmes of varying size, nature
and complexity.
– This delivery changes our BaU and results in the realisation of
benefits that allow us to achieve strategic objectives.
Fundamentally, projects and programmes are the means by which
a business adapts what it does in order to meet the challenges of
its competitive environment. And portfolio management is the
planning of those.
The Change sliding scale
Project
management
overhead
justified
‘Small’ change ‘Big’ change
Programme
management
overhead
justified
Methods
• Portfolio management (e.g. MOP)
• Programme management (e.g. MSP)
• Project management (e.g. Traditional/Agile/St Andrews Lean)
– Traditional
• Fixed features
• Variable time/resource/quality
• One deployment
– Agile
• Fixed time/resource/quality
• Variable features
• Deploys iteratively
– St Andrews Lean
• Process improvement
• Maximise value/remove waste
• Deploy immediately
• Culture change
However….
• Today we are not looking at portfolio, programme and project
management (i.e. ‘big change’)
• We are looking at Daily kaizen (i.e. ‘small change’)
• But, they are related to one another in many ways, not least:
– Neither are BaU
– Both require planning and delivery
– Both use the same finite resource
– Both aim to deliver benefits that enable the achievement of strategic
objectives
Daily kaizen
Kaizen theory
• Japanese kaizen consultants don’t like the word
Lean (and they don’t hide it).
• They refer to kaizen.
• Some translate ‘kaizen’ as:
– Continuous improvement (taken from the words ‘Kai‘
that means continuous and ‘zen‘ that means
improvement)
– Change for the better (‘kai‘ to mean change and ‘zen‘
to mean good, or for the better)
Nakao-san of
Shingijutsu consulting
showing his liking for
‘Lean’ and process
mapping
Continuous Improvement
• Always looking for better ways to do
things
Respect for People
• “make every effort to understand each
other… [to] maximise individual and
team performance”
Toyota
W&J - 2 Fundamentals
W&J - 5 Principles/8 wastes
1. Maximise VALUE (incl. TIMWOODS)
2. Understand work as a PROCESS
3. Create smooth FLOW
4. Respond to PULL
5. Aim for PERFECTION
Toyota/Shingijutsu – Focus on waste
Muda = 7 wastes
Mura = Unevenness
of burden
Muri = Unreasonableness
of burden
Monden’s challenging translation
Professor Monden, says in Toyota Production System (first edition, 1983, page
2):
“…although cost-reduction is the system’s most important goal, it must
achieve three other sub-goals in order to achieve its primary objective.
They include:
1. Quantity control, which enables the system to adapt to daily and monthly
fluctuations in demand in terms of quantities and variety;
2. Quality assurance, which assures that each process will supply only good
units to subsequent processes;
3. Respect-for-humanity, which must be cultivated while the system utilizes
the human resources to obtain its cost objectives.
Professor Monden, goes on to say:
“It should be emphasized here that these three goals cannot exist
independently or be achieved independently without influencing each other
or the primary goal of cost reduction.
It is a special feature of the Toyota production system that the primary goal
cannot be achieved without realisation of the subgoals and vice versa.
All goals are outputs of the same system; with productivity as the ultimate
purpose and guiding concept, the Toyota production system strives to realise
each of the goals for which it has been designed.”
Monden’s challenging translation
Yamazumi chart
• The scope of shopfloor kaizen includes the removal
of waste and the reordering of value adding steps.
It does not include the redesign, removal or
addition of value adding steps.
• Often the addition of new value (for example
redesigning a car) involves significant stakeholder
engagement, requirements gathering, market
analysis, etc.
Value vs waste
Kaizen theory
• The point of shopfloor kaizen then, is to:
– Remove waste (muda, mura, muri)
– Establish/improve the standard work
– Support/encourage a culture of waste
removal/continuous improvement
Manufacturing v HE
• Manufacturing production lines:
– Process does not equal the service which does not equal the product.
• HE ‘production lines’:
– Often the process does equal the service which does equal the product.
• To increase complexity, HE staff (operators):
– Run the process
– Design the process/service/product
– And sometimes are the owners.
• This raises an interesting question?
– Can we manoeuvre shopfloor kaizen to not only look at waste removal but
also look at redesigning, removing or adding value?
• Visual management
– Kaizen action sheet (KAS)
– Kaizen board
• Daily huddle
– Complexity model
– Genba
• Improvement time
– Universe of work
Daily kaizen - tools
Kaizen action sheet
• Helps the team to decide what they can tackle
themselves using simple problem solving.
• Encourages adoption of a structured approach to
continuous improvement.
• Enables all work group members to contribute to
improvement activity in real time.
KAS in practice
• A low-tech format to capture small improvement
opportunities and ideas in words and pictures.
• Identifies and captures waste removal/improvement
opportunities that fall below the radar.
• Reviewed at Daily huddle meetings.
• Remember
• Simple and hand-written
• Includes key information in words and pictures
• Sheets are attached to the kaizen board
KAS template
DESCRIBE
ISSUE/PROBLEM
DESCRIBE SOLUTION DESCRIBE RESULTS
‘BEFORE’ PICTURE ‘AFTER’ PICTURE
Kaizen board
• Means of communicating and
sharing key team-focused
information, including team startegy,
KPIs, and performance improvement
activities.
• Provides the focus for the Daily
huddle and is designed/maintained
by the team.
Kaizen board – Trello.com
Daily huddle
• A short, all staff mandatory meeting to focus the
team on what’s important and how they will work
together to achieve outcomes.
• Builds team ethos and provides the forum to identify
improvement opportunities (small and big).
• Held standing in front of the kaizen board.
• Maximum of 10 minutes.
Daily huddle can cover…
Daily topics
• How are we all?
• Cover for absences
• Kaizen board
• Kaizen action sheets
• Review of Performance Measures
• Quality issues
• Housekeeping reminders
• Critical Institution news
Additional topics
• Transition of small change
• Skills training plans
• Dept. performance/status
• Key customer reviews
• General instruction initiatives
and news
• Status and plans for long term
process improvement issues
Complexity modeling
Description A = 0 B = 10 C = 20 D = 40 Select
column
Complexity
scoring
Customer:
Assess how the solution will
impact customers
No customer
impact
Awareness from
customers
Minor behaviour
change from
customers
Major behaviour
change from
customers
C 20
Risk exposure:
The organisation’s exposure to risk
and the impact if errors were
found in the solution
No impact Minor impact to
reputation and
downstream
processes
Minor impact to
reputation but
major impact to
downstream
processes
Major impact to
reputation and
downstream
processes
C 20
Stakeholders:
Each stakeholder may represent a
group of people either internal or
external to the organisation
1 key
stakeholder
2-4 key
stakeholders
5-10 key
stakeholders
11+ key
stakeholders
B 10
Applications and data:
Assess integration of solution
1 key system
and no data
interface
2 key systems
and no data
interface
3 key systems with
1 data interface
> 4 key systems
with 1 data
interface
D 40
Cost Up to
£100,000
£100,000 to
£500,000
£500,000 to £2m > £2m D 40
Project completion time Up to 1 month > 1 month up to
6 months
> 6 months up to
12 months
> 12 months C 20
Governance and lifecycle
determined by complexity
Complexity score Sponsor Project board
required
Level of project
manager required
Reporting Project lifecycle
360-480 Board level Y Senior PM Fortnightly using
detailed highlight
report
Complex
210-350 Divisional level Optional PM Monthly using
summary highlight
report
Standard
50-200 Department level N Junior PM Ad hoc using
summary highlight
report
simple
0-50 Supervisor/Team
leader
N Any member of
staff
Simple
communication
Daily kaizen - PDCA
Daily huddle is ‘in’ the genba - “The
real place”
• See the facts.
• See where the work happens.
• The office
• The team
• The systems (applications, shared drives, desktops)
PDCA
For both ‘small’ and ‘big’ change/projects, Deming’s cycle
applies.
 If successful, capture new standard.
 If not, re-visit root cause.
 Monitor effectiveness of the
solution(s)
 Identify the problem,
 Measure the problem
 Develop solution(s)
 Implement the change
(keeping a record as you go)
Improvement time
Here is Edward Bear, coming downstairs now, bump, bump, bump, on the back of his head
behind Christopher Robin.
It is, as far as he knows, the only way of coming downstairs, but sometimes he feels that
there really is another way, if only he could stop bumping for a moment and think of it.
A. A. Milne
Universe of work
Daily kaizen management
• For daily kaizen, management is local and
follows the Toyota shop floor model:
–Supervisor (80%)
–Team leader (20%)
–Operator (5%)
How to implement daily kaizen?
“Management have to recognise the need for
significant change and must be willing to change
everything. The top leader is the change owner and
must be fully committed.”
Chihiro Nakao, FOM
How to implement daily
kaizen?
• Implementing these tools is itself changing the
business and needs to be managed
appropriately.
• Drop the idea into a complexity model and
determine the correct approach to ensure
success.
Why do daily kaizen?
"People need aligned and purposeful goals alongside the
ability to affect change and see progress. Basically, give staff
the ownership to innovate but also the feedback
mechanisms that show them if their ideas are working. Not
forgetting the safety to take risks, make mistakes and grow.”
Mike Martyn, Shingo Prize winner
Any questions?

More Related Content

What's hot

413: Transforming Spaces, Practices and Attitudes
413: Transforming Spaces, Practices and Attitudes413: Transforming Spaces, Practices and Attitudes
413: Transforming Spaces, Practices and Attitudes
Association of University Administrators
 
Co-creating our careers
Co-creating our careersCo-creating our careers

What's hot (19)

Development Conference 2014, The Professional Behaviours Framework,Ian Darker...
Development Conference 2014, The Professional Behaviours Framework,Ian Darker...Development Conference 2014, The Professional Behaviours Framework,Ian Darker...
Development Conference 2014, The Professional Behaviours Framework,Ian Darker...
 
Midlands Conference, The Two year degree, Nick Allen & Pearl Lewis
Midlands Conference, The Two year degree, Nick Allen & Pearl LewisMidlands Conference, The Two year degree, Nick Allen & Pearl Lewis
Midlands Conference, The Two year degree, Nick Allen & Pearl Lewis
 
Managing Change Open Forum: Embracing change
Managing Change Open Forum: Embracing change Managing Change Open Forum: Embracing change
Managing Change Open Forum: Embracing change
 
Newcomers session
Newcomers sessionNewcomers session
Newcomers session
 
Midlands Conference 2015 - Restructure and reorganisation
Midlands Conference 2015 - Restructure and reorganisationMidlands Conference 2015 - Restructure and reorganisation
Midlands Conference 2015 - Restructure and reorganisation
 
Midlands Conference 2015: Strategic responses presentation
Midlands Conference 2015: Strategic responses presentationMidlands Conference 2015: Strategic responses presentation
Midlands Conference 2015: Strategic responses presentation
 
AUA Partnerships 2014 - Reviewing University oversight/ governance arrangemen...
AUA Partnerships 2014 - Reviewing University oversight/ governance arrangemen...AUA Partnerships 2014 - Reviewing University oversight/ governance arrangemen...
AUA Partnerships 2014 - Reviewing University oversight/ governance arrangemen...
 
James Birkett and Robert Hudd - Case Study
James Birkett and Robert Hudd - Case StudyJames Birkett and Robert Hudd - Case Study
James Birkett and Robert Hudd - Case Study
 
413: Transforming Spaces, Practices and Attitudes
413: Transforming Spaces, Practices and Attitudes413: Transforming Spaces, Practices and Attitudes
413: Transforming Spaces, Practices and Attitudes
 
Transforming the Approach to Change Using Lean to increase participation and ...
Transforming the Approach to Change Using Lean to increase participation and ...Transforming the Approach to Change Using Lean to increase participation and ...
Transforming the Approach to Change Using Lean to increase participation and ...
 
Damien Barry - "Unscrambling the Egg"
Damien Barry - "Unscrambling the Egg"Damien Barry - "Unscrambling the Egg"
Damien Barry - "Unscrambling the Egg"
 
Midlands Conference 2015: Two year degree presentation
Midlands Conference 2015: Two year degree presentationMidlands Conference 2015: Two year degree presentation
Midlands Conference 2015: Two year degree presentation
 
Postgraduate Experience Report Final
Postgraduate Experience Report FinalPostgraduate Experience Report Final
Postgraduate Experience Report Final
 
HE Course and Module Evaluation Conference - Shaun mcgall & Marie salter
HE Course and Module Evaluation Conference - Shaun mcgall & Marie salterHE Course and Module Evaluation Conference - Shaun mcgall & Marie salter
HE Course and Module Evaluation Conference - Shaun mcgall & Marie salter
 
"Challenging traditional program design and delivery to better support wideni...
"Challenging traditional program design and delivery to better support wideni..."Challenging traditional program design and delivery to better support wideni...
"Challenging traditional program design and delivery to better support wideni...
 
Challenges of Quality in Teaching and Learning - Gwen van der velden
Challenges of Quality in Teaching and Learning - Gwen van der veldenChallenges of Quality in Teaching and Learning - Gwen van der velden
Challenges of Quality in Teaching and Learning - Gwen van der velden
 
Frank Haddleton - The Quality Assurance of Dual and Joint Qualifications
Frank Haddleton - The Quality Assurance of Dual and Joint QualificationsFrank Haddleton - The Quality Assurance of Dual and Joint Qualifications
Frank Haddleton - The Quality Assurance of Dual and Joint Qualifications
 
HE Course and Module Evaluation Conference - Paul bennet
HE Course and Module Evaluation Conference - Paul bennet HE Course and Module Evaluation Conference - Paul bennet
HE Course and Module Evaluation Conference - Paul bennet
 
Co-creating our careers
Co-creating our careersCo-creating our careers
Co-creating our careers
 

Viewers also liked

Kaizen masaakiimai-090701152003-phpapp01
Kaizen masaakiimai-090701152003-phpapp01Kaizen masaakiimai-090701152003-phpapp01
Kaizen masaakiimai-090701152003-phpapp01
Kamal Naser
 
AME - Leaders Standardized Work Training
AME - Leaders Standardized Work TrainingAME - Leaders Standardized Work Training
AME - Leaders Standardized Work Training
GE Aviation
 
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEETO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
Mohamed Fayas
 

Viewers also liked (12)

Kaizen masaakiimai-090701152003-phpapp01
Kaizen masaakiimai-090701152003-phpapp01Kaizen masaakiimai-090701152003-phpapp01
Kaizen masaakiimai-090701152003-phpapp01
 
AME - Leaders Standardized Work Training
AME - Leaders Standardized Work TrainingAME - Leaders Standardized Work Training
AME - Leaders Standardized Work Training
 
Lean Comsumption and Lean Thinking in Practice
Lean Comsumption and Lean Thinking in PracticeLean Comsumption and Lean Thinking in Practice
Lean Comsumption and Lean Thinking in Practice
 
One Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentationOne Point Lesson (OPL) Basic presentation
One Point Lesson (OPL) Basic presentation
 
One point lessons (OPLs)
One point lessons (OPLs)One point lessons (OPLs)
One point lessons (OPLs)
 
Daily Management Overview
Daily Management OverviewDaily Management Overview
Daily Management Overview
 
Lean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training ModuleLean Standard or Standardized Work Training Module
Lean Standard or Standardized Work Training Module
 
Standard work for leaders
Standard work for leadersStandard work for leaders
Standard work for leaders
 
Standardized Work
Standardized WorkStandardized Work
Standardized Work
 
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEETO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
TO IMPEOVE THE PERFOMANCE OF THE PLANT USING OEE
 
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
TPM for lean manufacturing  chp4 step of “jlshu hozen “activitiesTPM for lean manufacturing  chp4 step of “jlshu hozen “activities
TPM for lean manufacturing chp4 step of “jlshu hozen “activities
 
AME 2010 Conference - Baltimore
AME 2010 Conference - BaltimoreAME 2010 Conference - Baltimore
AME 2010 Conference - Baltimore
 

Similar to Finlay Miller - Daily Kaizen

Beginning an improvement journey ii introduction to improvement models
Beginning an improvement journey ii introduction to improvement modelsBeginning an improvement journey ii introduction to improvement models
Beginning an improvement journey ii introduction to improvement models
zoswald
 
Strategic Change - Evolution
Strategic Change - EvolutionStrategic Change - Evolution
Strategic Change - Evolution
emmabutler14
 
11_OrganizationProcessApproaches pdf for management
11_OrganizationProcessApproaches pdf for management11_OrganizationProcessApproaches pdf for management
11_OrganizationProcessApproaches pdf for management
vijetakumari201ch059
 

Similar to Finlay Miller - Daily Kaizen (20)

PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0PMI-ACP Domain VII - Continuous Improvement v1.0
PMI-ACP Domain VII - Continuous Improvement v1.0
 
TQM kaizen modified
TQM kaizen modifiedTQM kaizen modified
TQM kaizen modified
 
What is Modern Project Management And Why it is Important - Sameer Mitter
What is Modern Project Management And Why it is Important - Sameer MitterWhat is Modern Project Management And Why it is Important - Sameer Mitter
What is Modern Project Management And Why it is Important - Sameer Mitter
 
Kaizen
KaizenKaizen
Kaizen
 
Chapter 1.pptx
Chapter 1.pptxChapter 1.pptx
Chapter 1.pptx
 
TQM help to gain knowledge and experience KAIZEN.pptx
TQM help to gain knowledge and experience KAIZEN.pptxTQM help to gain knowledge and experience KAIZEN.pptx
TQM help to gain knowledge and experience KAIZEN.pptx
 
Kaizen
KaizenKaizen
Kaizen
 
Beginning an improvement journey ii introduction to improvement models
Beginning an improvement journey ii introduction to improvement modelsBeginning an improvement journey ii introduction to improvement models
Beginning an improvement journey ii introduction to improvement models
 
KAIZEN BY RAIJUL HAQUE
KAIZEN BY RAIJUL HAQUEKAIZEN BY RAIJUL HAQUE
KAIZEN BY RAIJUL HAQUE
 
Strategic Change - Evolution
Strategic Change - EvolutionStrategic Change - Evolution
Strategic Change - Evolution
 
11_OrganizationProcessApproaches pdf for management
11_OrganizationProcessApproaches pdf for management11_OrganizationProcessApproaches pdf for management
11_OrganizationProcessApproaches pdf for management
 
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - PublicThe Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
The Agile Learning Organization - Dave Litwiller - Sept 17 2020 - Public
 
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
Webinar: Engaging Leaders and the Baldrige Framework to Advance Excellence at...
 
Day 4 part 3
Day  4 part 3Day  4 part 3
Day 4 part 3
 
Sfm module iv
Sfm module ivSfm module iv
Sfm module iv
 
Innovation training
Innovation trainingInnovation training
Innovation training
 
Strategies for Large Scale Agile Transformation
Strategies for Large Scale Agile TransformationStrategies for Large Scale Agile Transformation
Strategies for Large Scale Agile Transformation
 
EngManagement - Lecture 4.pptx
EngManagement - Lecture 4.pptxEngManagement - Lecture 4.pptx
EngManagement - Lecture 4.pptx
 
Kizen
KizenKizen
Kizen
 
Ppt total quality management
Ppt total quality managementPpt total quality management
Ppt total quality management
 

More from Association of University Administrators

More from Association of University Administrators (20)

The 2017 AUA Study Tour of Switzerland and Germany
The 2017 AUA Study Tour of Switzerland and GermanyThe 2017 AUA Study Tour of Switzerland and Germany
The 2017 AUA Study Tour of Switzerland and Germany
 
Global Trends in Study Abroad: Student Engagement in International Experience
Global Trends in Study Abroad: Student Engagement in International ExperienceGlobal Trends in Study Abroad: Student Engagement in International Experience
Global Trends in Study Abroad: Student Engagement in International Experience
 
International Student Mobility Trends: Can National Policies Support (or Obst...
International Student Mobility Trends: Can National Policies Support (or Obst...International Student Mobility Trends: Can National Policies Support (or Obst...
International Student Mobility Trends: Can National Policies Support (or Obst...
 
Go International@ Stand Out. Is the UK Making its Mark on Mobility
Go International@ Stand Out. Is the UK Making its Mark on MobilityGo International@ Stand Out. Is the UK Making its Mark on Mobility
Go International@ Stand Out. Is the UK Making its Mark on Mobility
 
Co-designing space that works for everyone
Co-designing space that works for everyoneCo-designing space that works for everyone
Co-designing space that works for everyone
 
"So What Do You Do?" - Building an External Reputation
"So What Do You Do?" - Building an External Reputation"So What Do You Do?" - Building an External Reputation
"So What Do You Do?" - Building an External Reputation
 
The 5 lessons learnt through a critical investigation of professional develop...
The 5 lessons learnt through a critical investigation of professional develop...The 5 lessons learnt through a critical investigation of professional develop...
The 5 lessons learnt through a critical investigation of professional develop...
 
Enhancing public speaking skills using improvisation techniques
Enhancing public speaking skills using improvisation techniquesEnhancing public speaking skills using improvisation techniques
Enhancing public speaking skills using improvisation techniques
 
Cross departmental effectiveness to improve the student experience: a case study
Cross departmental effectiveness to improve the student experience: a case studyCross departmental effectiveness to improve the student experience: a case study
Cross departmental effectiveness to improve the student experience: a case study
 
Creating an Engaged and Effective Technical Team
Creating an Engaged and Effective Technical TeamCreating an Engaged and Effective Technical Team
Creating an Engaged and Effective Technical Team
 
Celebrating 15 Years of the AUA PgCert
Celebrating 15 Years of the AUA PgCertCelebrating 15 Years of the AUA PgCert
Celebrating 15 Years of the AUA PgCert
 
Mark of Excellence
Mark of ExcellenceMark of Excellence
Mark of Excellence
 
Beyond Brexit – Post EU Scenarios for Higher Education
Beyond Brexit – Post EU Scenarios for Higher EducationBeyond Brexit – Post EU Scenarios for Higher Education
Beyond Brexit – Post EU Scenarios for Higher Education
 
Strathclyde’s Distinctive Approach to Enhancing Students’ Experience
Strathclyde’s Distinctive Approach to Enhancing Students’ ExperienceStrathclyde’s Distinctive Approach to Enhancing Students’ Experience
Strathclyde’s Distinctive Approach to Enhancing Students’ Experience
 
Find Your Presenting Style
Find Your Presenting StyleFind Your Presenting Style
Find Your Presenting Style
 
Becoming an AUA Accredited Member or Fellow
Becoming an AUA Accredited Member or FellowBecoming an AUA Accredited Member or Fellow
Becoming an AUA Accredited Member or Fellow
 
AUA Networking
AUA NetworkingAUA Networking
AUA Networking
 
Building an External Reputation
Building an External ReputationBuilding an External Reputation
Building an External Reputation
 
UCAS Presentation - Clare Marchant ARC 2017
UCAS Presentation - Clare Marchant ARC 2017UCAS Presentation - Clare Marchant ARC 2017
UCAS Presentation - Clare Marchant ARC 2017
 
Hot topics: ARC Assessment & Quality Practitioner Group Updates
Hot topics: ARC Assessment & Quality Practitioner Group UpdatesHot topics: ARC Assessment & Quality Practitioner Group Updates
Hot topics: ARC Assessment & Quality Practitioner Group Updates
 

Recently uploaded

Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
KarakKing
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17How to Add New Custom Addons Path in Odoo 17
How to Add New Custom Addons Path in Odoo 17
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
80 ĐỀ THI THỬ TUYỂN SINH TIẾNG ANH VÀO 10 SỞ GD – ĐT THÀNH PHỐ HỒ CHÍ MINH NĂ...
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024FSB Advising Checklist - Orientation 2024
FSB Advising Checklist - Orientation 2024
 
Single or Multiple melodic lines structure
Single or Multiple melodic lines structureSingle or Multiple melodic lines structure
Single or Multiple melodic lines structure
 
ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.ICT role in 21st century education and it's challenges.
ICT role in 21st century education and it's challenges.
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptxCOMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
COMMUNICATING NEGATIVE NEWS - APPROACHES .pptx
 
Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)Jamworks pilot and AI at Jisc (20/03/2024)
Jamworks pilot and AI at Jisc (20/03/2024)
 
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
NO1 Top Black Magic Specialist In Lahore Black magic In Pakistan Kala Ilam Ex...
 
Sociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning ExhibitSociology 101 Demonstration of Learning Exhibit
Sociology 101 Demonstration of Learning Exhibit
 
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdfUnit 3 Emotional Intelligence and Spiritual Intelligence.pdf
Unit 3 Emotional Intelligence and Spiritual Intelligence.pdf
 
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
TỔNG ÔN TẬP THI VÀO LỚP 10 MÔN TIẾNG ANH NĂM HỌC 2023 - 2024 CÓ ĐÁP ÁN (NGỮ Â...
 
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptxExploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
Exploring_the_Narrative_Style_of_Amitav_Ghoshs_Gun_Island.pptx
 
Salient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functionsSalient Features of India constitution especially power and functions
Salient Features of India constitution especially power and functions
 
Understanding Accommodations and Modifications
Understanding  Accommodations and ModificationsUnderstanding  Accommodations and Modifications
Understanding Accommodations and Modifications
 
Google Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptxGoogle Gemini An AI Revolution in Education.pptx
Google Gemini An AI Revolution in Education.pptx
 

Finlay Miller - Daily Kaizen

  • 1. Daily Kaizen Fin Miller: Change Manager
  • 2. Outline of today’s session • Overview of St Andrews and the case for change • The wider context of improvement – Changing the business – Definitions and methods • Daily kaizen – Kaizen theory – Daily kaizen tools • Visual management • Daily huddle • Universe of work • Q & A
  • 4. History • The University was formally constituted by the issue of a papal bull in 1413. • Almost 8,000 students. • 47% students from outside the UK. • 98% retention rate. • St Andrews is ranked 2nd in Scotland and 19th in the UK for overall research performance, assessed by quality of publications, impact and the environment in which research takes place.
  • 5. UK University Rankings 2008 1. Oxford 2. Cambridge 3. Imperial College 4. St Andrews 5. UCL 6. LSE 7. Edinburgh 8. Warwick 9. Bath 10. Loughborough 2015 1. Cambridge 2. Oxford 3. St Andrews 4. Bath 5. Imperial College 6. Surrey 7. London school of economics 8. Durham 9. Warwick 10. Lancaster
  • 6. So why change? We face some opportunities – Estate (for example conference facilities). – Physical assets (for example IT outsourcing deals). – Intellectual property (for example patents). – New markets (for example summer schools).
  • 7. So why change? We face some challenges – Fragmentation (for example data centre management). – Devolved control (for example budget). – Complexity (for example IT supporting schools, units and commercial services). – Funding (for example REF).
  • 8. So why change? HEIs are not great at differentiation – Where does the institution derive its identity? – Where does it invest the most and receive the greatest return? – What is the University’s unique core business? – How is the market changing around us? Do we need to change in answer to these fundamental questions?
  • 9. But what does this mean? • It means we can improve. • It means we need to improve. • And begs the question…how do we improve? • Especially with a high level of devolution where change struggles to be mandated from the top.
  • 11. BaU definition • The way the business normally/currently achieves its strategic objectives. • Also referred to as ‘running the business’
  • 12. Portfolio definition • The totality of an organisation’s investment (or segment thereof) in the changes required to achieve its strategic objectives.
  • 13. Programme definition • A temporary, flexible, organisation structure created to coordinate, direct and oversee the implementation of a set of related projects and activities in order to deliver outcomes and benefits related to the organisation’s strategic objectives.
  • 14. Project definition • A temporary organisation that is created for the purpose of delivering one or more business products according to an agreed business case. – It is temporary in that it has a defined beginning and end in time, and therefore defined scope and resources. – It is unique in that it is not a routine operation (i.e. BaU), but a specific set of operations designed to accomplish a singular goal. A project team often includes people who don’t usually work together.
  • 15. In summary – The need for change is identified by comparing business as usual performance to the achievement of strategic objectives. – Changes are planned through portfolio management and delivered via projects and programmes of varying size, nature and complexity. – This delivery changes our BaU and results in the realisation of benefits that allow us to achieve strategic objectives. Fundamentally, projects and programmes are the means by which a business adapts what it does in order to meet the challenges of its competitive environment. And portfolio management is the planning of those.
  • 16. The Change sliding scale Project management overhead justified ‘Small’ change ‘Big’ change Programme management overhead justified
  • 17. Methods • Portfolio management (e.g. MOP) • Programme management (e.g. MSP) • Project management (e.g. Traditional/Agile/St Andrews Lean) – Traditional • Fixed features • Variable time/resource/quality • One deployment – Agile • Fixed time/resource/quality • Variable features • Deploys iteratively – St Andrews Lean • Process improvement • Maximise value/remove waste • Deploy immediately • Culture change
  • 18. However…. • Today we are not looking at portfolio, programme and project management (i.e. ‘big change’) • We are looking at Daily kaizen (i.e. ‘small change’) • But, they are related to one another in many ways, not least: – Neither are BaU – Both require planning and delivery – Both use the same finite resource – Both aim to deliver benefits that enable the achievement of strategic objectives
  • 20. Kaizen theory • Japanese kaizen consultants don’t like the word Lean (and they don’t hide it). • They refer to kaizen. • Some translate ‘kaizen’ as: – Continuous improvement (taken from the words ‘Kai‘ that means continuous and ‘zen‘ that means improvement) – Change for the better (‘kai‘ to mean change and ‘zen‘ to mean good, or for the better)
  • 21. Nakao-san of Shingijutsu consulting showing his liking for ‘Lean’ and process mapping
  • 22. Continuous Improvement • Always looking for better ways to do things Respect for People • “make every effort to understand each other… [to] maximise individual and team performance” Toyota W&J - 2 Fundamentals
  • 23. W&J - 5 Principles/8 wastes 1. Maximise VALUE (incl. TIMWOODS) 2. Understand work as a PROCESS 3. Create smooth FLOW 4. Respond to PULL 5. Aim for PERFECTION
  • 24. Toyota/Shingijutsu – Focus on waste Muda = 7 wastes Mura = Unevenness of burden Muri = Unreasonableness of burden
  • 25. Monden’s challenging translation Professor Monden, says in Toyota Production System (first edition, 1983, page 2): “…although cost-reduction is the system’s most important goal, it must achieve three other sub-goals in order to achieve its primary objective. They include: 1. Quantity control, which enables the system to adapt to daily and monthly fluctuations in demand in terms of quantities and variety; 2. Quality assurance, which assures that each process will supply only good units to subsequent processes; 3. Respect-for-humanity, which must be cultivated while the system utilizes the human resources to obtain its cost objectives.
  • 26. Professor Monden, goes on to say: “It should be emphasized here that these three goals cannot exist independently or be achieved independently without influencing each other or the primary goal of cost reduction. It is a special feature of the Toyota production system that the primary goal cannot be achieved without realisation of the subgoals and vice versa. All goals are outputs of the same system; with productivity as the ultimate purpose and guiding concept, the Toyota production system strives to realise each of the goals for which it has been designed.” Monden’s challenging translation
  • 28. • The scope of shopfloor kaizen includes the removal of waste and the reordering of value adding steps. It does not include the redesign, removal or addition of value adding steps. • Often the addition of new value (for example redesigning a car) involves significant stakeholder engagement, requirements gathering, market analysis, etc. Value vs waste
  • 29. Kaizen theory • The point of shopfloor kaizen then, is to: – Remove waste (muda, mura, muri) – Establish/improve the standard work – Support/encourage a culture of waste removal/continuous improvement
  • 30. Manufacturing v HE • Manufacturing production lines: – Process does not equal the service which does not equal the product. • HE ‘production lines’: – Often the process does equal the service which does equal the product. • To increase complexity, HE staff (operators): – Run the process – Design the process/service/product – And sometimes are the owners. • This raises an interesting question? – Can we manoeuvre shopfloor kaizen to not only look at waste removal but also look at redesigning, removing or adding value?
  • 31. • Visual management – Kaizen action sheet (KAS) – Kaizen board • Daily huddle – Complexity model – Genba • Improvement time – Universe of work Daily kaizen - tools
  • 32. Kaizen action sheet • Helps the team to decide what they can tackle themselves using simple problem solving. • Encourages adoption of a structured approach to continuous improvement. • Enables all work group members to contribute to improvement activity in real time.
  • 33. KAS in practice • A low-tech format to capture small improvement opportunities and ideas in words and pictures. • Identifies and captures waste removal/improvement opportunities that fall below the radar. • Reviewed at Daily huddle meetings. • Remember • Simple and hand-written • Includes key information in words and pictures • Sheets are attached to the kaizen board
  • 34. KAS template DESCRIBE ISSUE/PROBLEM DESCRIBE SOLUTION DESCRIBE RESULTS ‘BEFORE’ PICTURE ‘AFTER’ PICTURE
  • 35. Kaizen board • Means of communicating and sharing key team-focused information, including team startegy, KPIs, and performance improvement activities. • Provides the focus for the Daily huddle and is designed/maintained by the team.
  • 36.
  • 37. Kaizen board – Trello.com
  • 38. Daily huddle • A short, all staff mandatory meeting to focus the team on what’s important and how they will work together to achieve outcomes. • Builds team ethos and provides the forum to identify improvement opportunities (small and big). • Held standing in front of the kaizen board. • Maximum of 10 minutes.
  • 39. Daily huddle can cover… Daily topics • How are we all? • Cover for absences • Kaizen board • Kaizen action sheets • Review of Performance Measures • Quality issues • Housekeeping reminders • Critical Institution news Additional topics • Transition of small change • Skills training plans • Dept. performance/status • Key customer reviews • General instruction initiatives and news • Status and plans for long term process improvement issues
  • 40. Complexity modeling Description A = 0 B = 10 C = 20 D = 40 Select column Complexity scoring Customer: Assess how the solution will impact customers No customer impact Awareness from customers Minor behaviour change from customers Major behaviour change from customers C 20 Risk exposure: The organisation’s exposure to risk and the impact if errors were found in the solution No impact Minor impact to reputation and downstream processes Minor impact to reputation but major impact to downstream processes Major impact to reputation and downstream processes C 20 Stakeholders: Each stakeholder may represent a group of people either internal or external to the organisation 1 key stakeholder 2-4 key stakeholders 5-10 key stakeholders 11+ key stakeholders B 10 Applications and data: Assess integration of solution 1 key system and no data interface 2 key systems and no data interface 3 key systems with 1 data interface > 4 key systems with 1 data interface D 40 Cost Up to £100,000 £100,000 to £500,000 £500,000 to £2m > £2m D 40 Project completion time Up to 1 month > 1 month up to 6 months > 6 months up to 12 months > 12 months C 20
  • 41. Governance and lifecycle determined by complexity Complexity score Sponsor Project board required Level of project manager required Reporting Project lifecycle 360-480 Board level Y Senior PM Fortnightly using detailed highlight report Complex 210-350 Divisional level Optional PM Monthly using summary highlight report Standard 50-200 Department level N Junior PM Ad hoc using summary highlight report simple 0-50 Supervisor/Team leader N Any member of staff Simple communication Daily kaizen - PDCA
  • 42. Daily huddle is ‘in’ the genba - “The real place” • See the facts. • See where the work happens. • The office • The team • The systems (applications, shared drives, desktops)
  • 43. PDCA For both ‘small’ and ‘big’ change/projects, Deming’s cycle applies.  If successful, capture new standard.  If not, re-visit root cause.  Monitor effectiveness of the solution(s)  Identify the problem,  Measure the problem  Develop solution(s)  Implement the change (keeping a record as you go)
  • 45. Here is Edward Bear, coming downstairs now, bump, bump, bump, on the back of his head behind Christopher Robin. It is, as far as he knows, the only way of coming downstairs, but sometimes he feels that there really is another way, if only he could stop bumping for a moment and think of it. A. A. Milne
  • 47. Daily kaizen management • For daily kaizen, management is local and follows the Toyota shop floor model: –Supervisor (80%) –Team leader (20%) –Operator (5%)
  • 48. How to implement daily kaizen? “Management have to recognise the need for significant change and must be willing to change everything. The top leader is the change owner and must be fully committed.” Chihiro Nakao, FOM
  • 49. How to implement daily kaizen? • Implementing these tools is itself changing the business and needs to be managed appropriately. • Drop the idea into a complexity model and determine the correct approach to ensure success.
  • 50. Why do daily kaizen? "People need aligned and purposeful goals alongside the ability to affect change and see progress. Basically, give staff the ownership to innovate but also the feedback mechanisms that show them if their ideas are working. Not forgetting the safety to take risks, make mistakes and grow.” Mike Martyn, Shingo Prize winner