Scarborough Subway
Extension
TPAP Public Meeting
May 10, 2017
2
Preliminary Planning
TPAP commenced on April 27, 2017
3
• The Scarborough Subway Extension (SSE) project and budget were approved
by City Council in 2013, prior to an alignment or station concept being
developed.
• In 2016, Council approved an express subway option to Scarborough Centre
as part of a Scarborough transit network plan that also includes SmartTrack
and a Light Rail Transit (LRT) on Eglinton Avenue East. Council directed staff to
continue to develop an express subway option.
• In 2017, Council approved the extension of Line 2 (Bloor-Danforth Subway)
from Kennedy Station to Scarborough Centre via the McCowan alignment,
including the station concept, tunnel at-grade facilities, and Triton bus
terminal concept. Council also authorized the initiation of the Transit Project
Assessment Process (TPAP) for the SSE project.
City Council Direction
4
Transit Planning in Scarborough
Transit planning priorities for
Scarborough support the
development of:
1. Scarborough Centre as a vibrant
urban node
2. Complete communities along the
Avenues to improve local accessibility
The SSE is one part of the transit
network plan in Scarborough.
Other projects include:
• Extension of Line 5 –
Eglinton Crosstown LRT
• SmartTrack stations at Lawrence
Avenue East and Finch Avenue East
• A rapid transit solution on the
Sheppard East corridor
5
Scarborough Subway Extension Study Area
6
Evaluation of Express Corridors
The key criteria to evaluate and identify the
preferred alignment and station location included:
• The ability to support the existing and planned
development within Scarborough Centre,
including provisions for future extensions
• Impacts to existing customers on Scarborough
Rapid Transit (SRT) – Existing Line 3 during
construction
• Property impacts
• Costs
The corridors evaluated (as per City Council’s
direction in January 2016) included:
• SRT – Existing Line 3
• Midland
• Brimley
• McCowan
7
Initial Business Case (IBC)
• July 2016, Council received the SSE IBC
• Alignments were evaluated on four cases:
– Strategic
– Economic
– Financial
– Deliverability & Operations
• Council removed the 3-stop McCowan
option from consideration and directed
staff to further develop the McCowan
express option and other possible express
subway alignment options
8
Express Alignments Evaluated
9
Updated Business Case
• Council received the updated
Initial Business Case at its March
2017 meeting.
• The updated Business Case
included an Express Brimley option.
• Staff continued to support the
McCowan Express option to
Scarborough Centre.
10
Scarborough Centre
Gateway
Recommended Subway
Station
Source: Google Earth
11
Preferred McCowan Alignment
Both feedback from the community & the
technical analyses performed identified
McCowan as the preferred alignment:
• Station would be in the most central location
relative to existing and future developments
• Offers travel times as fast as any alternative
• Allows SRT to remain operational during
construction
12
Transit Project Assessment Process
In March 2017, City Council provided approval to proceed with the TPAP.
What is the TPAP?
• A streamlined (6-month) environmental assessment process specific to transit
projects in Ontario to satisfy the requirements of the Environmental Assessment
Act (Ontario Regulation 231/08).
13
Overview
The 6.2 km express subway from
Kennedy Station to Scarborough
Centre, includes the:
• Alignment – including the location and
configuration of the SSE
• Scarborough Centre Station
• Bus Terminal
• Ancillary Facilities – supporting
components required for the operation of
the subway
• Construction Methods
LEGEND
CUT AND COVER
TUNNEL
EMERGENCY EXIT BUILDING (EEB)
SUBSTATION
VENTILATION SHAFT
14
Scarborough Centre Station
Main components include:
• Side platforms
• Concourse
• Ventilation Shafts
• Bus Terminal
• Traction Power Substation
• 3 Station Entrances (potentially more
in the future)
• Barrier Free Access
• Bicycle Facilities
• Associated Road Improvements
(new Borough Drive Extension)
Example Station Entrance
Example Station Concourse
15
Bus Terminal
Refined bus terminal option:
• Minimizes property impacts
• Does not preclude future roadways
• Protects key development blocks
Bus Terminal features:
• Indoor waiting areas and outdoor
platform (weather protected)
• Bus bays serving local and regional routes
• Internal circulation
• Direct access to Scarborough Centre
Station and Scarborough Town Centre
Construction Phasing:
• 2 phases
16
Ancillary Facilities
Emergency Exit Buildings (EEB)
• Provide emergency access to the surface
• 8 EEBs are required (maximum 762 m
spacing)
Traction Power Substations
• Provide electrical power to the trains and
other electrical equipment
• 3 substations are required, 1 at Scarborough
Centre Station and 2 stand-alone structures
along the alignment
Tunnel Ventilation Structures
• Provide fans for mechanical ventilation in
case of fire
• 3 ventilation structures are required
(2 consolidated with EEBs)
Example Emergency Exit Building
Example Traction Power Substation
17
Construction Methods
Single Large Diameter Tunnel
• Entire tunnel planned to be constructed using a single
large tunnel boring machine
– Tunnel spans approximately 6 km
• 10.7 m diameter
– Toronto-Yonge Spadina Subway Extension tunnel
constructed using twin tunnel boring machines
(6 m diameter)
• Minimizes areas that must be constructed using cut-
and-cover construction (i.e. Crossover tracks),
reducing construction disruption at the surface
10.7 metre diameter tunnel configuration
18
Construction Methods
Cut-and-Cover
Cut-and-cover locations throughout the extension
include:
• Scarborough Centre Station
• The shallow section immediately east of Kennedy
Station
• Emergency exit buildings and ventilation
structures which extend from the subway tunnel
to the surface
• Traction Power Substations where the cable runs
into the ground
At locations where cut-and-cover construction
crosses a roadway, decking is placed on the surface
to allow road traffic to cross while work is being
completed below.
19
Preliminary Construction Plan
Tunnelling Sequence
• At the tunnel launch site #1 assemble and
launch tunnel boring machine
• Tunnel through station box
• Establish tunnel construction site #2 south of
station box
• Continue tunnelling south along alignment
• Extract tunnel boring machine at cut-and-
cover section east of Kennedy Station
Typical Tunnel Work Site Activities
• Extract soil
• Inspect tunnel liners
• Store equipment & materials
• Maintain the tunnel boring machine
20
Project Impacts
An environmental assessment is founded on the consideration of
impacts caused by the Project.
SSE impacts have been categorized as follows:
1. Displacement of Existing Features (Permanent)
– Emergency exit buildings, traction power substations
2. Construction (Temporary)
– Dewatering, traffic diversions
3. Operations and Maintenance (Long-term & Ongoing)
– Subway operations, bus operations, testing of emergency equipment
21
Mitigation, Monitoring & Commitments
Mitigation
• Measures put in place to minimize impacts
Monitoring
• Ensures the mitigation measures are effective
Future Commitments
• Future work based on the identification of impacts, mitigation & monitoring,
including further studies, permits & approvals
• A complete list of commitments can be found in the Draft Executive Summary
(scarboroughsubwayextension.ca; reference copies available at this event)
22
Impacted Features
What features are likely to be impacted?
Natural Environment
Terrain & Soils; Groundwater; Drainage & Hydrology;
Fish & Fish Habitat; Terrestrial Ecosystem
Emissions
Air Quality; Noise & Vibration; Electromagnetic Interference;
Climate Change
23
Impacted Features
What features are likely to be impacted (contd.)?
Socio-Economic
Utilities; Buildings &
Property; Business &
Recreation; Urban
Design
Cultural Environment
Archaeology;
Built Heritage
Transportation
Auto Traffic & Transit;
Pedestrians & Cyclists; Rail
24
Terrain & Soils / Groundwater
Potential Impacts:
• Displacement of surplus excavated material (Permanent)
• Settlement or structural stress due to tunnelling, dewatering & installation of
excavation support (Construction)
• Dewatering – need for handling & discharge
• Potential impacts to existing facilities, infrastructure and buildings
(Construction)
Mitigation Measures:
• Soil & Groundwater Management Strategy
• Monitoring program for groundwater management
• Tunnel will be installed using earth pressure balancing tunnel boring machine
• Additional ground stabilization such as grouting, using groundwater cut-offs
and the installation of underpinning & support for infrastructure
25
Drainage & Hydrology
Potential Impacts:
• Impacts to segments requiring cut-and-cover (Construction)
• The proposed driveways, bus bays, access roads are subject to pollutant
loadings, resulting in poor storm run-off water quality (Operations and
Maintenance)
Mitigation Measures:
• Hydraulic analysis and modelling to further refine controls
• Erosion and Sediment Control Plan
• Temporary erosion and sediment control measures during construction, such
as erosion control blankets and silt fences
• Lot level controls
26
Terrestrial Ecosystem
Potential Impacts:
• Displacement & disturbance to vegetation communities (Permanent)
• 27 bird species recorded that are protected under the Migratory Bird
Convention Act (MBCA) (Construction):
– No nests of migratory birds but evidence of potential to nest within the
vicinity of the SSE
Mitigation Measures:
• Tree Preservation Plan to determine tree protection and mitigation
• A nesting survey to determine active nests
• Site specific mitigation plan
27
Air Quality – Construction
Potential Impacts:
• Temporary dust, nitrous oxides & volatile organic carbon emissions
Mitigation Measures:
• Best management practices during construction, for example:
– Material wetting or use of chemical suppressants to reduce dust
– Wind barriers & limiting exposed areas
28
Noise & Vibration – Construction
Potential Impacts:
• Noise & vibration from construction activities including tunnelling, building
demolition, excavation & truck movements
Mitigation Measures:
• Construction Noise & Vibration Management Plan
• Construction activities controlled by:
– Selection of low sound / vibration emission equipment
– Construction of temporary noise barriers (if feasible)
29
Buildings & Properties
Potential Impacts:
• For the Bus Terminal, Station Entrances, Traction Power Substations, EEBs & the
tunnel structure (Permanent):
– Small portion of 35 private & 6 public properties
– 1 full private property
Mitigation Measures:
• Majority of the subway alignment falls within the municipal & provincial road
allowances reducing overall Project footprint
• Single 10.7 meter diameter bored tunnel has smaller property impact than
traditional twin tunnels
30
Utilities – Construction
Potential Impacts:
• Impacted by cut-and-cover
• Potential disruption to users / customers of impacted utility services
Mitigation Measures:
• Careful planning & discussions with utility companies
• Where cut-and-cover is required (for example, station box and emergency
exits):
– Temporary support & protection
– Relocation (large utilities that cannot be temporarily supported)
31
Transportation – Construction
Potential Impacts:
• Key areas of impact include:
– Eglinton Avenue, Danforth Road and
McCowan Road
– Kennedy Station; EEB locations; Traction
Power Substation; East-side of Scarborough
Town Centre
– Traffic delays and queues; lane restrictions;
re-routing; temporary bus stops
• Operation of SRT during SSE construction
Mitigation Measures:
• Traffic Impact Study
• Protection of SRT during SSE construction
32
Commitment to Engagement
Highlights of consultation to date (preliminary planning phase)
• 21 Public Meetings
• 8 Technical Advisory Committee meetings
• 5 Stakeholder Advisory Group meetings
• 2 Government Review Team meetings
• Multiple meetings with residential & commercial property owners
• Multiple meetings with key agencies
• Online consultation, Project email address & phone number
TPAP “120-day” consultation period – May to August 2017
Consultation will continue through detailed design & construction
• Public Information Office
• Construction Liaison Committee
33
Next Steps
Collect feedback from this public meeting
Consult government authorities/agencies on the Draft Environmental
Project Report. Discuss & address questions /concerns (May - August
2017)
Commence 30-day Review of the Final Environmental Project Report
(August - September 2017)
35 days for Minister to act & give notice
(September - October 2017)
Submit a “Statement of Completion” & proceed to detailed design
34
Your Feedback is Important
• Speak to a member of the Project Team at this meeting
• Fill out a comment form
• Review the Draft Environmental Project Report Executive
Summary & other Project materials online:
scarboroughsubwayextension.ca
• Email: scarboroughsubwayextension@toronto.ca
• Call us: 416-338-3095

More Related Content

What's hot

Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Toronto Public Consultation Unit
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Toronto Public Consultation Unit
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2StittsvilleCentral.ca
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyStittsvilleCentral.ca
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Toronto Public Consultation Unit
 

What's hot (20)

Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031Developing Toronto’s Transit Network Plan to 2031
Developing Toronto’s Transit Network Plan to 2031
 
Briefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning UpdateBriefing: Scarborough Transit Planning Update
Briefing: Scarborough Transit Planning Update
 
Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Toronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting PresentationToronto Relief Line Public Meeting Presentation
Toronto Relief Line Public Meeting Presentation
 
February-March Consultation Report
February-March Consultation ReportFebruary-March Consultation Report
February-March Consultation Report
 
2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG2016-06-06 Scarborough Subway Extension SAG
2016-06-06 Scarborough Subway Extension SAG
 
Scarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation PlanScarborough Subway Extension - Public Consultation Plan
Scarborough Subway Extension - Public Consultation Plan
 
King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck King Street Phase 2 Slide Deck
King Street Phase 2 Slide Deck
 
2015 06-15 relief line presentation
2015 06-15 relief line presentation2015 06-15 relief line presentation
2015 06-15 relief line presentation
 
Transit Network Plan Update and Financial Strategy
 Transit Network Plan Update and Financial Strategy Transit Network Plan Update and Financial Strategy
Transit Network Plan Update and Financial Strategy
 
February Transit Update Presentation
February Transit Update PresentationFebruary Transit Update Presentation
February Transit Update Presentation
 
Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016Scarborough Subway Extension SAG Meeting - February 8, 2016
Scarborough Subway Extension SAG Meeting - February 8, 2016
 
Relief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and CriteriaRelief Line - Draft Evaluation Process and Criteria
Relief Line - Draft Evaluation Process and Criteria
 
Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...Scarborough Subway Extension - Public Meeting Presentation - January/February...
Scarborough Subway Extension - Public Meeting Presentation - January/February...
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2Kanata-Stittsville LRT Planning & EA - Open House #2
Kanata-Stittsville LRT Planning & EA - Open House #2
 
Kanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment StudyKanata LRT Planning and Environmental Assessment Study
Kanata LRT Planning and Environmental Assessment Study
 
15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation15 03-24 rlpa sag1 presentation
15 03-24 rlpa sag1 presentation
 
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
Presentation - Park Lawn Lake Shore Transportation Master Plan Community Work...
 
Draft Relief Line Corridor Evaluation
Draft Relief Line Corridor EvaluationDraft Relief Line Corridor Evaluation
Draft Relief Line Corridor Evaluation
 

Similar to Scarborough Subway TPAP PIC

Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Crosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Crosstown TO
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCrosstown TO
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Crosstown TO
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Crosstown TO
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor WideCrosstown TO
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Crosstown TO
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarAssociation for Project Management
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018Crosstown TO
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgradeRobert Lee - CEng, MICE, PMP
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesAdina Levin
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open houseCrosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 

Similar to Scarborough Subway TPAP PIC (20)

Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5Mount Pleasant Junior School Meeting May 5
Mount Pleasant Junior School Meeting May 5
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Caledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open HouseCaledonia Station, West Portal and Elevated Guideway Open House
Caledonia Station, West Portal and Elevated Guideway Open House
 
Avenue Station Open House - May 2017
Avenue Station Open House - May 2017Avenue Station Open House - May 2017
Avenue Station Open House - May 2017
 
Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017Surface Section and Kennedy Station Open House - April 2017
Surface Section and Kennedy Station Open House - April 2017
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinarNorth West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
North West Multi-Modal Transport Hub (NWMTH) Derry – Londonderry webinar
 
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
West Open House (Mount Dennis Station to Keelesdale Station) - March 2018
 
rup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgraderup-20151016-part-1-item07-victoria-station-upgrade
rup-20151016-part-1-item07-victoria-station-upgrade
 
Caltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanesCaltrans San Mateo county managed lanes
Caltrans San Mateo county managed lanes
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 

More from Toronto Public Consultation Unit

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Toronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides Toronto Public Consultation Unit
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Toronto Public Consultation Unit
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 finalToronto Public Consultation Unit
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 

More from Toronto Public Consultation Unit (20)

Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE). Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
Waterfront Sanitary Servicing Master Plan Update (Oct. 30 PIE).
 
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
King-Liberty Pedestrian / Cycling Bridge Project Update - Slides
 
Sewer Outfall Project
Sewer Outfall ProjectSewer Outfall Project
Sewer Outfall Project
 
General information
General informationGeneral information
General information
 
Disinfection System
Disinfection SystemDisinfection System
Disinfection System
 
2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information 2017 Sediment Basin construction updated information
2017 Sediment Basin construction updated information
 
2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final2017 05-18 Etobicoke Creek Nort Trail panels final
2017 05-18 Etobicoke Creek Nort Trail panels final
 
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017Six Points Interchange Reconfiguration public event display panels, May 11, 2017
Six Points Interchange Reconfiguration public event display panels, May 11, 2017
 
Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing Downsview Area Long Term Water Servicing
Downsview Area Long Term Water Servicing
 
FG Gardiner New Simcoe Ramp - display boards
FG Gardiner   New Simcoe Ramp - display boardsFG Gardiner   New Simcoe Ramp - display boards
FG Gardiner New Simcoe Ramp - display boards
 
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28  finalCollege Street Promenade BIA Streetscaping Update Public Meeting Feb 28  final
College Street Promenade BIA Streetscaping Update Public Meeting Feb 28 final
 
Swc public consultation_pres_170307_final
Swc public consultation_pres_170307_finalSwc public consultation_pres_170307_final
Swc public consultation_pres_170307_final
 
King Street Pilot Public Meeting
King Street Pilot Public MeetingKing Street Pilot Public Meeting
King Street Pilot Public Meeting
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
Park Lawn Lake Shore Transportation Master Plan Community Workshop 1 Display ...
 
Downsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study BoardsDownsview Water Service Improvement Study Boards
Downsview Water Service Improvement Study Boards
 
Downsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study MapsDownsview Water Service Improvement Study Maps
Downsview Water Service Improvement Study Maps
 
King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge King-Liberty Pedestrian / Cycling Bridge
King-Liberty Pedestrian / Cycling Bridge
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 

Recently uploaded

The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...nservice241
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)NAP Global Network
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisChristina Parmionova
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfSamirsinh Parmar
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCNAP Global Network
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...tanu pandey
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...robinsonayot
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlEdouardHusson
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...MOHANI PANDEY
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...tanu pandey
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLSarandianics
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourCall Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Call Girls in Nagpur High Profile
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...SUHANI PANDEY
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learningNAP Global Network
 

Recently uploaded (20)

The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...The Economic and Organised Crime Office (EOCO) has been advised by the Office...
The Economic and Organised Crime Office (EOCO) has been advised by the Office...
 
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Sangamwadi Call Me 7737669865 Budget Friendly No Advance Booking
 
Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)Tuvalu Coastal Adaptation Project (TCAP)
Tuvalu Coastal Adaptation Project (TCAP)
 
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
(NEHA) Call Girls Nagpur Call Now 8250077686 Nagpur Escorts 24x7
 
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Junnar ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Junnar ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
Russian🍌Dazzling Hottie Get☎️ 9053900678 ☎️call girl In Chandigarh By Chandig...
 
Election 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdfElection 2024 Presiding Duty Keypoints_01.pdf
Election 2024 Presiding Duty Keypoints_01.pdf
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...Akurdi ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For S...
Akurdi ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For S...
 
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
TEST BANK For Essentials of Negotiation, 7th Edition by Roy Lewicki, Bruce Ba...
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
Get Premium Budhwar Peth Call Girls (8005736733) 24x7 Rate 15999 with A/c Roo...
 
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...Pimpri Chinchwad ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi R...
Pimpri Chinchwad ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi R...
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hourcelebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
celebrity 💋 Agra Escorts Just Dail 8250092165 service available anytime 24 hour
 
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
Call Girls in Chandni Chowk (delhi) call me [9953056974] escort service 24X7
 
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...Top Rated  Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
Top Rated Pune Call Girls Bhosari ⟟ 6297143586 ⟟ Call Me For Genuine Sex Ser...
 
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
VIP Model Call Girls Lohegaon ( Pune ) Call ON 8005736733 Starting From 5K to...
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 

Scarborough Subway TPAP PIC

  • 3. 3 • The Scarborough Subway Extension (SSE) project and budget were approved by City Council in 2013, prior to an alignment or station concept being developed. • In 2016, Council approved an express subway option to Scarborough Centre as part of a Scarborough transit network plan that also includes SmartTrack and a Light Rail Transit (LRT) on Eglinton Avenue East. Council directed staff to continue to develop an express subway option. • In 2017, Council approved the extension of Line 2 (Bloor-Danforth Subway) from Kennedy Station to Scarborough Centre via the McCowan alignment, including the station concept, tunnel at-grade facilities, and Triton bus terminal concept. Council also authorized the initiation of the Transit Project Assessment Process (TPAP) for the SSE project. City Council Direction
  • 4. 4 Transit Planning in Scarborough Transit planning priorities for Scarborough support the development of: 1. Scarborough Centre as a vibrant urban node 2. Complete communities along the Avenues to improve local accessibility The SSE is one part of the transit network plan in Scarborough. Other projects include: • Extension of Line 5 – Eglinton Crosstown LRT • SmartTrack stations at Lawrence Avenue East and Finch Avenue East • A rapid transit solution on the Sheppard East corridor
  • 6. 6 Evaluation of Express Corridors The key criteria to evaluate and identify the preferred alignment and station location included: • The ability to support the existing and planned development within Scarborough Centre, including provisions for future extensions • Impacts to existing customers on Scarborough Rapid Transit (SRT) – Existing Line 3 during construction • Property impacts • Costs The corridors evaluated (as per City Council’s direction in January 2016) included: • SRT – Existing Line 3 • Midland • Brimley • McCowan
  • 7. 7 Initial Business Case (IBC) • July 2016, Council received the SSE IBC • Alignments were evaluated on four cases: – Strategic – Economic – Financial – Deliverability & Operations • Council removed the 3-stop McCowan option from consideration and directed staff to further develop the McCowan express option and other possible express subway alignment options
  • 9. 9 Updated Business Case • Council received the updated Initial Business Case at its March 2017 meeting. • The updated Business Case included an Express Brimley option. • Staff continued to support the McCowan Express option to Scarborough Centre.
  • 11. 11 Preferred McCowan Alignment Both feedback from the community & the technical analyses performed identified McCowan as the preferred alignment: • Station would be in the most central location relative to existing and future developments • Offers travel times as fast as any alternative • Allows SRT to remain operational during construction
  • 12. 12 Transit Project Assessment Process In March 2017, City Council provided approval to proceed with the TPAP. What is the TPAP? • A streamlined (6-month) environmental assessment process specific to transit projects in Ontario to satisfy the requirements of the Environmental Assessment Act (Ontario Regulation 231/08).
  • 13. 13 Overview The 6.2 km express subway from Kennedy Station to Scarborough Centre, includes the: • Alignment – including the location and configuration of the SSE • Scarborough Centre Station • Bus Terminal • Ancillary Facilities – supporting components required for the operation of the subway • Construction Methods LEGEND CUT AND COVER TUNNEL EMERGENCY EXIT BUILDING (EEB) SUBSTATION VENTILATION SHAFT
  • 14. 14 Scarborough Centre Station Main components include: • Side platforms • Concourse • Ventilation Shafts • Bus Terminal • Traction Power Substation • 3 Station Entrances (potentially more in the future) • Barrier Free Access • Bicycle Facilities • Associated Road Improvements (new Borough Drive Extension) Example Station Entrance Example Station Concourse
  • 15. 15 Bus Terminal Refined bus terminal option: • Minimizes property impacts • Does not preclude future roadways • Protects key development blocks Bus Terminal features: • Indoor waiting areas and outdoor platform (weather protected) • Bus bays serving local and regional routes • Internal circulation • Direct access to Scarborough Centre Station and Scarborough Town Centre Construction Phasing: • 2 phases
  • 16. 16 Ancillary Facilities Emergency Exit Buildings (EEB) • Provide emergency access to the surface • 8 EEBs are required (maximum 762 m spacing) Traction Power Substations • Provide electrical power to the trains and other electrical equipment • 3 substations are required, 1 at Scarborough Centre Station and 2 stand-alone structures along the alignment Tunnel Ventilation Structures • Provide fans for mechanical ventilation in case of fire • 3 ventilation structures are required (2 consolidated with EEBs) Example Emergency Exit Building Example Traction Power Substation
  • 17. 17 Construction Methods Single Large Diameter Tunnel • Entire tunnel planned to be constructed using a single large tunnel boring machine – Tunnel spans approximately 6 km • 10.7 m diameter – Toronto-Yonge Spadina Subway Extension tunnel constructed using twin tunnel boring machines (6 m diameter) • Minimizes areas that must be constructed using cut- and-cover construction (i.e. Crossover tracks), reducing construction disruption at the surface 10.7 metre diameter tunnel configuration
  • 18. 18 Construction Methods Cut-and-Cover Cut-and-cover locations throughout the extension include: • Scarborough Centre Station • The shallow section immediately east of Kennedy Station • Emergency exit buildings and ventilation structures which extend from the subway tunnel to the surface • Traction Power Substations where the cable runs into the ground At locations where cut-and-cover construction crosses a roadway, decking is placed on the surface to allow road traffic to cross while work is being completed below.
  • 19. 19 Preliminary Construction Plan Tunnelling Sequence • At the tunnel launch site #1 assemble and launch tunnel boring machine • Tunnel through station box • Establish tunnel construction site #2 south of station box • Continue tunnelling south along alignment • Extract tunnel boring machine at cut-and- cover section east of Kennedy Station Typical Tunnel Work Site Activities • Extract soil • Inspect tunnel liners • Store equipment & materials • Maintain the tunnel boring machine
  • 20. 20 Project Impacts An environmental assessment is founded on the consideration of impacts caused by the Project. SSE impacts have been categorized as follows: 1. Displacement of Existing Features (Permanent) – Emergency exit buildings, traction power substations 2. Construction (Temporary) – Dewatering, traffic diversions 3. Operations and Maintenance (Long-term & Ongoing) – Subway operations, bus operations, testing of emergency equipment
  • 21. 21 Mitigation, Monitoring & Commitments Mitigation • Measures put in place to minimize impacts Monitoring • Ensures the mitigation measures are effective Future Commitments • Future work based on the identification of impacts, mitigation & monitoring, including further studies, permits & approvals • A complete list of commitments can be found in the Draft Executive Summary (scarboroughsubwayextension.ca; reference copies available at this event)
  • 22. 22 Impacted Features What features are likely to be impacted? Natural Environment Terrain & Soils; Groundwater; Drainage & Hydrology; Fish & Fish Habitat; Terrestrial Ecosystem Emissions Air Quality; Noise & Vibration; Electromagnetic Interference; Climate Change
  • 23. 23 Impacted Features What features are likely to be impacted (contd.)? Socio-Economic Utilities; Buildings & Property; Business & Recreation; Urban Design Cultural Environment Archaeology; Built Heritage Transportation Auto Traffic & Transit; Pedestrians & Cyclists; Rail
  • 24. 24 Terrain & Soils / Groundwater Potential Impacts: • Displacement of surplus excavated material (Permanent) • Settlement or structural stress due to tunnelling, dewatering & installation of excavation support (Construction) • Dewatering – need for handling & discharge • Potential impacts to existing facilities, infrastructure and buildings (Construction) Mitigation Measures: • Soil & Groundwater Management Strategy • Monitoring program for groundwater management • Tunnel will be installed using earth pressure balancing tunnel boring machine • Additional ground stabilization such as grouting, using groundwater cut-offs and the installation of underpinning & support for infrastructure
  • 25. 25 Drainage & Hydrology Potential Impacts: • Impacts to segments requiring cut-and-cover (Construction) • The proposed driveways, bus bays, access roads are subject to pollutant loadings, resulting in poor storm run-off water quality (Operations and Maintenance) Mitigation Measures: • Hydraulic analysis and modelling to further refine controls • Erosion and Sediment Control Plan • Temporary erosion and sediment control measures during construction, such as erosion control blankets and silt fences • Lot level controls
  • 26. 26 Terrestrial Ecosystem Potential Impacts: • Displacement & disturbance to vegetation communities (Permanent) • 27 bird species recorded that are protected under the Migratory Bird Convention Act (MBCA) (Construction): – No nests of migratory birds but evidence of potential to nest within the vicinity of the SSE Mitigation Measures: • Tree Preservation Plan to determine tree protection and mitigation • A nesting survey to determine active nests • Site specific mitigation plan
  • 27. 27 Air Quality – Construction Potential Impacts: • Temporary dust, nitrous oxides & volatile organic carbon emissions Mitigation Measures: • Best management practices during construction, for example: – Material wetting or use of chemical suppressants to reduce dust – Wind barriers & limiting exposed areas
  • 28. 28 Noise & Vibration – Construction Potential Impacts: • Noise & vibration from construction activities including tunnelling, building demolition, excavation & truck movements Mitigation Measures: • Construction Noise & Vibration Management Plan • Construction activities controlled by: – Selection of low sound / vibration emission equipment – Construction of temporary noise barriers (if feasible)
  • 29. 29 Buildings & Properties Potential Impacts: • For the Bus Terminal, Station Entrances, Traction Power Substations, EEBs & the tunnel structure (Permanent): – Small portion of 35 private & 6 public properties – 1 full private property Mitigation Measures: • Majority of the subway alignment falls within the municipal & provincial road allowances reducing overall Project footprint • Single 10.7 meter diameter bored tunnel has smaller property impact than traditional twin tunnels
  • 30. 30 Utilities – Construction Potential Impacts: • Impacted by cut-and-cover • Potential disruption to users / customers of impacted utility services Mitigation Measures: • Careful planning & discussions with utility companies • Where cut-and-cover is required (for example, station box and emergency exits): – Temporary support & protection – Relocation (large utilities that cannot be temporarily supported)
  • 31. 31 Transportation – Construction Potential Impacts: • Key areas of impact include: – Eglinton Avenue, Danforth Road and McCowan Road – Kennedy Station; EEB locations; Traction Power Substation; East-side of Scarborough Town Centre – Traffic delays and queues; lane restrictions; re-routing; temporary bus stops • Operation of SRT during SSE construction Mitigation Measures: • Traffic Impact Study • Protection of SRT during SSE construction
  • 32. 32 Commitment to Engagement Highlights of consultation to date (preliminary planning phase) • 21 Public Meetings • 8 Technical Advisory Committee meetings • 5 Stakeholder Advisory Group meetings • 2 Government Review Team meetings • Multiple meetings with residential & commercial property owners • Multiple meetings with key agencies • Online consultation, Project email address & phone number TPAP “120-day” consultation period – May to August 2017 Consultation will continue through detailed design & construction • Public Information Office • Construction Liaison Committee
  • 33. 33 Next Steps Collect feedback from this public meeting Consult government authorities/agencies on the Draft Environmental Project Report. Discuss & address questions /concerns (May - August 2017) Commence 30-day Review of the Final Environmental Project Report (August - September 2017) 35 days for Minister to act & give notice (September - October 2017) Submit a “Statement of Completion” & proceed to detailed design
  • 34. 34 Your Feedback is Important • Speak to a member of the Project Team at this meeting • Fill out a comment form • Review the Draft Environmental Project Report Executive Summary & other Project materials online: scarboroughsubwayextension.ca • Email: scarboroughsubwayextension@toronto.ca • Call us: 416-338-3095