SlideShare une entreprise Scribd logo
1  sur  2
Télécharger pour lire hors ligne
n°5




                              ERTMS DEPLOYMENT IN SPAIN
Factsheets




                 FROM AIR TO RAIL— INCREASING THE SPANISH RAILWAY’S
                              PERFORMANCE WITH ERTMS
                          With almost 4,500 km of rail tracks contracted (almost 2,500 km of lines), and roughly 1,600 km
                          of lines already in service, Spain clearly emerges as a worldwide leader in ERTMS deployment.
                          Whilst ERTMS has contributed to the success of iconic lines, such as the “AVE” Madrid-Barcelona,
                          where rail is gradually replacing air as the transport of choice (over 48% of market share after 12
                          months of service), the Spanish experience is also a showcase for the effective interoperability
                          of ERTMS, with no less than 6 companies involved in various projects on the Spanish network.


             What is the status of ERTMS deployment in Spain
             Under the strong leadership of infrastructure manager ADIF, Spain has
             embarked on a major program of railway investments, identifying ERTMS as
             the signalling system of choice. The first contracts were signed in the early
             2000s and ERTMS now covers the major part of the Spanish High Speed
             network. Indeed, the “AVE” network has become a phenomenon in Spanish
             society and is a clear paradigm of speed, punctuality and efficiency. Travelling
             in AVE is fast, safe, environmentally-friendly and even “trendy”.

             At present, the following major lines are running using ERTMS:
             –	 Madrid – Lleida - Barcelona High Speed line (650 km route)
             –	 Cordoba - Malaga High Speed line (155 km)
             –	 Madrid – Segovia - Valladolid High Speed line (197 km)
             –	 Madrid – Toledo High Speed line (21 km)
                                                                                      Which ERTMS suppliers are
                                                                                      involved?
             –	 Madrid Atocha High Speed By-pass (12 km)
             –	 Zaragoza – Huesca (80 km)                                             The six UNISIG suppliers of ERTMS
             –	 Madrid – Albacete - Valencia High Speed line (500 km)                 are involved in the Spanish railway
             –	 Figueres - Perpignan High Speed international connection (45 km)      network, and full interoperability
                                                                                      between their products (both on-
             –	 A Coruña – Santiago – Ourense (150 km)
                                                                                      board and trackside) has been
             Other major projects are currently under construction, with several      achieved. In other words, the trains
             lines scheduled for commercial service within the next few years:        supplied by any of the 5 on-board
                                                                                      units suppliers in Spain (see picture
             –	 Barcelona – Figueres High Speed line (130)
                                                                                      below) are able to run on trackside
             –	 Madrid “Cercanías” suburban network (160 km)                          equipment built by any of the
             –	 Barcelona – Girona - Figueres Freight line (162,1 km)                 others, which represents a major
             –	 Valladolid – Ourense High Speed line                                  technological    achievement.    This
             –	 Madrid – Portugal High Speed line                                     brings significant advantages to the
                                                                                      Spanish infrastructure manager ADIF,
             –	 Vigo - Porto High Speed line
                                                                                      who has the guarantee that several
             –	 Albacete – Alicante – Murcia High Speed line                          suppliers will respond to tenders,
             –	 Sevilla – Granada High Speed line                                     lowering the cost of the signalling
             –	 Basque “Y” Project (High Speed line linking the 3 Basque              equipment through basic commercial
                capitals with each other and with Madrid via Valladolid)              and healthy competition.
                                                                                                                                © UNIFE 2012




                                                        Avenue Louise 221, B-1050 Brussels, Belgium
                                                        Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
What are the benefits brought by ERTMS in Spain?
                                  Infrastructure manager ADIF is viewed as a pioneer in ERTMS deployment in
                                  Europe. After several years of ERTMS use in Spain it has brought considerable
                                  benefits:
                                  –	 From an infrastructure manager point of view, choosing ERTMS means
                                     enlarging tendering opportunities, since any ERTMS supplier may respond
                                     to tenders;
                                  –	 In just one year, passenger transport recorded considerable growth on
                                     Madrid- Malaga (+88%), Madrid-Valladolid (+109%) and Madrid-Barcelona
                                     (see below) lines.
                                  –	 On these three lines, punctuality rates were averaging more than 98%
                                     (second only to Japan), attracting a considerable number of customers.
                                  –	 As a consequence, ERTMS also has considerable environmental benefits,
                                     since passengers are knowledgeably opting for the train instead of the
                                     plane when travelling between these cities, therefore producing on average
                                     one sixth of the carbon footprint emissions as opposed to air or road traffic.

                                                                                                       (Source: ADIF)
  From plane to train: the example of the Madrid - Barcelona line
  The Madrid-Lleida-Barcelona line went into commercial service in February 2008, and is
  acknowledged to be one of the most successful examples of modal shift from plane to
  train, with the only equivalent to be found in the Paris-London and Paris-Brussels lines.

  Thanks to the use of ERTMS level 2, trains enjoy record punctuality rates
  (see above). Travelling between the two cities takes only takes 2h30’ -
  compared to 6 hours in the past.

  Spanish operator RENFE estimates that the line has attracted 1.4 million
  passengers that were previously using air transport. In August 2008,
  the average number of passengers had already increased by 84.5%
  as compared to January 2008! After the first year of service, the AVE
  Madrid Barcelona has taken a share of 40 % of all trips between the two
  cities. And the trend is growing.

  The line is set to be connected with France in 2012, opening exciting
  new opportunities for cross border High Speed traffic. Moreover, the opening of the
  Atocha by-pass in December 2008 has considerably reduced travelling time between
  Barcelona and the South of Spain. Indeed, there are now new High Speed connections
  between Barcelona and Seville / Malaga that don’t need to pass by and stop in Madrid,
  reducing travelling time by more than 50 minutes.


                                  Tweaking the Excellence
                                  ADIF, in its never ending effort to reach excellence, has activated in 2011 its
                                  very first lines in ERTMS level 2. It is expected that during the course of 2012
                                  every single Spanish ERTMS High Speed line will enjoy ERTMS level 2 services.
                                  This measure will increase speed and capacity while reducing travel time but
                                  always with the highest levels of safety and efficiency available in the market.
                                  It will ultimately also help passengers to shift from plane to train.

S uppliers
                                                                                                                        © UNIFE 2012




Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org

Contenu connexe

Tendances

ERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for EuropeERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for EuropeUNIFE2012
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingUNIFE2012
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsUNIFE2012
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...UNIFE2012
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewUNIFE2012
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsUNIFE2012
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020Amadeus Rail
 
Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.RollingOnRails
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyScott Martin, CMILT
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentationco1ps
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETIJECEIAES
 
UIC, the worldwide railway organisation, meets its European Members during th...
UIC, the worldwide railway organisation, meets its European Members during th...UIC, the worldwide railway organisation, meets its European Members during th...
UIC, the worldwide railway organisation, meets its European Members during th...UICcom
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesSYSTRA
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003Antonio Bove
 
AUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWAUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWDenis Volchugin
 
CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009zjeftic
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidurnglobalgroup
 

Tendances (20)

ERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for EuropeERTMS Fact Sheet 9 - A unique signalling system for Europe
ERTMS Fact Sheet 9 - A unique signalling system for Europe
 
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understandingERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
ERTMS Fact Sheet 2 -The ERTMS memorandum of understanding
 
ERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trainsERTMS Fact Sheet 1 - From trucks to trains
ERTMS Fact Sheet 1 - From trucks to trains
 
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
ERTMS Fact Sheet 8 - UNISIG- an industrial consortium to develop ertms - etcs...
 
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of viewERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
ERTMS Fact Sheet 13 - ERTMS from the drivers’ point of view
 
ERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levelsERTMS Fact Sheet 3 - ERTMS levels
ERTMS Fact Sheet 3 - ERTMS levels
 
Rail in Europe 2020
Rail in Europe 2020Rail in Europe 2020
Rail in Europe 2020
 
Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.Vectron. The locomotive that’s forging new paths.
Vectron. The locomotive that’s forging new paths.
 
Bringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st CenturyBringing HSR a step closer: Building a Railway for the 21st Century
Bringing HSR a step closer: Building a Railway for the 21st Century
 
Maat general presentation
Maat general presentationMaat general presentation
Maat general presentation
 
An Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANETAn Improved CF-MAC Protocol for VANET
An Improved CF-MAC Protocol for VANET
 
UIC, the worldwide railway organisation, meets its European Members during th...
UIC, the worldwide railway organisation, meets its European Members during th...UIC, the worldwide railway organisation, meets its European Members during th...
UIC, the worldwide railway organisation, meets its European Members during th...
 
CBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehiclesCBTC fitting strategies and challenges for maintenance vehicles
CBTC fitting strategies and challenges for maintenance vehicles
 
PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003PolCorridor User Forum, Prague, 25 September 2003
PolCorridor User Forum, Prague, 25 September 2003
 
AUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEWAUTOLOCATOR COMPANY OVERVIEW
AUTOLOCATOR COMPANY OVERVIEW
 
CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009CVIS Live! at ITS WC 2009
CVIS Live! at ITS WC 2009
 
Session 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan BjerkemoSession 14 1 Sven-Allan Bjerkemo
Session 14 1 Sven-Allan Bjerkemo
 
ERTMS and Brexit
ERTMS and BrexitERTMS and Brexit
ERTMS and Brexit
 
Mass Transit Presentation Raj Naidu
Mass Transit Presentation Raj NaiduMass Transit Presentation Raj Naidu
Mass Transit Presentation Raj Naidu
 
Poster seine gateway 2015 anglais
Poster seine gateway 2015 anglaisPoster seine gateway 2015 anglais
Poster seine gateway 2015 anglais
 

Similaire à ERTMS Fact Sheet 5 - ERTMS deployment in Spain

Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingRecruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingDamien Laurelli
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Damien Laurelli
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónDamien Laurelli
 
Project overview ok
Project overview okProject overview ok
Project overview okLola Ansaldo
 
Carles Rua coordinator of the Clyma Project
Carles Rua coordinator of the Clyma ProjectCarles Rua coordinator of the Clyma Project
Carles Rua coordinator of the Clyma ProjectASCAME
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаMoscowCCI
 
Intermodal_Service_ENG
Intermodal_Service_ENGIntermodal_Service_ENG
Intermodal_Service_ENGTransmec Group
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Ibrahim Al-Hudhaif
 
Electronics and telecommunications
Electronics and telecommunicationsElectronics and telecommunications
Electronics and telecommunicationsCMR WORLD TECH
 
14 01 22 madrid aerospace cluster presentation v 2
14 01 22 madrid aerospace cluster presentation v 214 01 22 madrid aerospace cluster presentation v 2
14 01 22 madrid aerospace cluster presentation v 2Eugenio Fontán
 
French Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvFrench Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvRitesh choudhary
 
Presentación del sector agroindustrial en Andalucía
Presentación del sector agroindustrial en AndalucíaPresentación del sector agroindustrial en Andalucía
Presentación del sector agroindustrial en AndalucíaAgencia IDEA
 
HSR Spain Inc Group
HSR Spain Inc GroupHSR Spain Inc Group
HSR Spain Inc GroupInc Group
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Rajesh Prasad
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSBRTCoE
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013BRTCoE
 
Seminar dt 28.12.2013 at kolkata
 Seminar dt 28.12.2013 at kolkata  Seminar dt 28.12.2013 at kolkata
Seminar dt 28.12.2013 at kolkata Rajesh Prasad
 

Similaire à ERTMS Fact Sheet 5 - ERTMS deployment in Spain (20)

Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in SignalingRecruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
Recruitment campaign Alstom TIS Madrid: 100 positions to be covered in Signaling
 
Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14Recruitment campaign alstom tis feb14
Recruitment campaign alstom tis feb14
 
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in SeñalizaciónRecruitment campaign Alstom TIS Spain: 100 positions in Señalización
Recruitment campaign Alstom TIS Spain: 100 positions in Señalización
 
Project overview ok
Project overview okProject overview ok
Project overview ok
 
Press kit COMSA Corporación
Press kit COMSA CorporaciónPress kit COMSA Corporación
Press kit COMSA Corporación
 
Carles Rua coordinator of the Clyma Project
Carles Rua coordinator of the Clyma ProjectCarles Rua coordinator of the Clyma Project
Carles Rua coordinator of the Clyma Project
 
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП ПарижаСаммит ТПП С-6 в Берлине: Презентация ТПП Парижа
Саммит ТПП С-6 в Берлине: Презентация ТПП Парижа
 
Infrastructure (English)
Infrastructure (English)Infrastructure (English)
Infrastructure (English)
 
Intermodal_Service_ENG
Intermodal_Service_ENGIntermodal_Service_ENG
Intermodal_Service_ENG
 
Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...Powering Safe and Reliable Railways telecommunication to support Middle East ...
Powering Safe and Reliable Railways telecommunication to support Middle East ...
 
CAF Presentation
CAF PresentationCAF Presentation
CAF Presentation
 
Electronics and telecommunications
Electronics and telecommunicationsElectronics and telecommunications
Electronics and telecommunications
 
14 01 22 madrid aerospace cluster presentation v 2
14 01 22 madrid aerospace cluster presentation v 214 01 22 madrid aerospace cluster presentation v 2
14 01 22 madrid aerospace cluster presentation v 2
 
French Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (TgvFrench Train à Grande Vitesse (Tgv
French Train à Grande Vitesse (Tgv
 
Presentación del sector agroindustrial en Andalucía
Presentación del sector agroindustrial en AndalucíaPresentación del sector agroindustrial en Andalucía
Presentación del sector agroindustrial en Andalucía
 
HSR Spain Inc Group
HSR Spain Inc GroupHSR Spain Inc Group
HSR Spain Inc Group
 
Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata Seminar dt 28.12.2013 on high speed at kolkata
Seminar dt 28.12.2013 on high speed at kolkata
 
Theme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLSTheme 1 Technological improvements in BRT and BHLS
Theme 1 Technological improvements in BRT and BHLS
 
Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013Technological improvements in BRT and BHLS Oxford sept 2013
Technological improvements in BRT and BHLS Oxford sept 2013
 
Seminar dt 28.12.2013 at kolkata
 Seminar dt 28.12.2013 at kolkata  Seminar dt 28.12.2013 at kolkata
Seminar dt 28.12.2013 at kolkata
 

Dernier

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607dollysharma2066
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportMintel Group
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Anamaria Contreras
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 

Dernier (20)

(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
(Best) ENJOY Call Girls in Faridabad Ex | 8377087607
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
No-1 Call Girls In Goa 93193 VIP 73153 Escort service In North Goa Panaji, Ca...
 
India Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample ReportIndia Consumer 2024 Redacted Sample Report
India Consumer 2024 Redacted Sample Report
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.Traction part 2 - EOS Model JAX Bridges.
Traction part 2 - EOS Model JAX Bridges.
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 

ERTMS Fact Sheet 5 - ERTMS deployment in Spain

  • 1. n°5 ERTMS DEPLOYMENT IN SPAIN Factsheets FROM AIR TO RAIL— INCREASING THE SPANISH RAILWAY’S PERFORMANCE WITH ERTMS With almost 4,500 km of rail tracks contracted (almost 2,500 km of lines), and roughly 1,600 km of lines already in service, Spain clearly emerges as a worldwide leader in ERTMS deployment. Whilst ERTMS has contributed to the success of iconic lines, such as the “AVE” Madrid-Barcelona, where rail is gradually replacing air as the transport of choice (over 48% of market share after 12 months of service), the Spanish experience is also a showcase for the effective interoperability of ERTMS, with no less than 6 companies involved in various projects on the Spanish network. What is the status of ERTMS deployment in Spain Under the strong leadership of infrastructure manager ADIF, Spain has embarked on a major program of railway investments, identifying ERTMS as the signalling system of choice. The first contracts were signed in the early 2000s and ERTMS now covers the major part of the Spanish High Speed network. Indeed, the “AVE” network has become a phenomenon in Spanish society and is a clear paradigm of speed, punctuality and efficiency. Travelling in AVE is fast, safe, environmentally-friendly and even “trendy”. At present, the following major lines are running using ERTMS: – Madrid – Lleida - Barcelona High Speed line (650 km route) – Cordoba - Malaga High Speed line (155 km) – Madrid – Segovia - Valladolid High Speed line (197 km) – Madrid – Toledo High Speed line (21 km) Which ERTMS suppliers are involved? – Madrid Atocha High Speed By-pass (12 km) – Zaragoza – Huesca (80 km) The six UNISIG suppliers of ERTMS – Madrid – Albacete - Valencia High Speed line (500 km) are involved in the Spanish railway – Figueres - Perpignan High Speed international connection (45 km) network, and full interoperability between their products (both on- – A Coruña – Santiago – Ourense (150 km) board and trackside) has been Other major projects are currently under construction, with several achieved. In other words, the trains lines scheduled for commercial service within the next few years: supplied by any of the 5 on-board units suppliers in Spain (see picture – Barcelona – Figueres High Speed line (130) below) are able to run on trackside – Madrid “Cercanías” suburban network (160 km) equipment built by any of the – Barcelona – Girona - Figueres Freight line (162,1 km) others, which represents a major – Valladolid – Ourense High Speed line technological achievement. This – Madrid – Portugal High Speed line brings significant advantages to the Spanish infrastructure manager ADIF, – Vigo - Porto High Speed line who has the guarantee that several – Albacete – Alicante – Murcia High Speed line suppliers will respond to tenders, – Sevilla – Granada High Speed line lowering the cost of the signalling – Basque “Y” Project (High Speed line linking the 3 Basque equipment through basic commercial capitals with each other and with Madrid via Valladolid) and healthy competition. © UNIFE 2012 Avenue Louise 221, B-1050 Brussels, Belgium Tel: + 32 2 626 12 60, Fax: + 32 2 626 12 61, unife@unife.org
  • 2. What are the benefits brought by ERTMS in Spain? Infrastructure manager ADIF is viewed as a pioneer in ERTMS deployment in Europe. After several years of ERTMS use in Spain it has brought considerable benefits: – From an infrastructure manager point of view, choosing ERTMS means enlarging tendering opportunities, since any ERTMS supplier may respond to tenders; – In just one year, passenger transport recorded considerable growth on Madrid- Malaga (+88%), Madrid-Valladolid (+109%) and Madrid-Barcelona (see below) lines. – On these three lines, punctuality rates were averaging more than 98% (second only to Japan), attracting a considerable number of customers. – As a consequence, ERTMS also has considerable environmental benefits, since passengers are knowledgeably opting for the train instead of the plane when travelling between these cities, therefore producing on average one sixth of the carbon footprint emissions as opposed to air or road traffic. (Source: ADIF) From plane to train: the example of the Madrid - Barcelona line The Madrid-Lleida-Barcelona line went into commercial service in February 2008, and is acknowledged to be one of the most successful examples of modal shift from plane to train, with the only equivalent to be found in the Paris-London and Paris-Brussels lines. Thanks to the use of ERTMS level 2, trains enjoy record punctuality rates (see above). Travelling between the two cities takes only takes 2h30’ - compared to 6 hours in the past. Spanish operator RENFE estimates that the line has attracted 1.4 million passengers that were previously using air transport. In August 2008, the average number of passengers had already increased by 84.5% as compared to January 2008! After the first year of service, the AVE Madrid Barcelona has taken a share of 40 % of all trips between the two cities. And the trend is growing. The line is set to be connected with France in 2012, opening exciting new opportunities for cross border High Speed traffic. Moreover, the opening of the Atocha by-pass in December 2008 has considerably reduced travelling time between Barcelona and the South of Spain. Indeed, there are now new High Speed connections between Barcelona and Seville / Malaga that don’t need to pass by and stop in Madrid, reducing travelling time by more than 50 minutes. Tweaking the Excellence ADIF, in its never ending effort to reach excellence, has activated in 2011 its very first lines in ERTMS level 2. It is expected that during the course of 2012 every single Spanish ERTMS High Speed line will enjoy ERTMS level 2 services. This measure will increase speed and capacity while reducing travel time but always with the highest levels of safety and efficiency available in the market. It will ultimately also help passengers to shift from plane to train. S uppliers © UNIFE 2012 Want to know more about ERTMS? Please check www.ertms.net or contact UNIFE at unife@unife.org