SlideShare une entreprise Scribd logo
1  sur  4
Télécharger pour lire hors ligne
spacer
sYstems
www.ashandlacy.co.za
proDuct information
issue no. 001 January 2016
ash & lacy building systems ltd
lonDon
gateway 3, Davis road
off cox lane, chessington
surrey Kt9 1tD
t 0208 391 9700
f 0208 391 9701
West bromWich
bromford lane
West bromwich
West midlands b70 7JJ
t 0121 525 1444
f 0121 525 3444
glasgoW
unit 4b, albion trading est
south street, Whiteinch
glasgow g14 0sY
t 0141 950 6040
f 0141 950 6080
eXeter
units 2&3 gloucester court
heathpark ind est, honiton
Devon eX14 1sJ
t 01404 549100
f 01404 549440
neath - port talbot
unit 4b, sirius Drive
rutherglen centre
baglan sa12 7br
t 01639 812569
f 01639 813133
cape toWn
29 atlantic Drive
bluewater estate
Kommetjie, cape town 7975
t +27+21+783 0114
m +27+83+215 1782
spacer systems
4dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782
refurbishment applications
Refurbishment
Ashgrid AG40 Safe-LocTM
is an ideal component for the
over-roofing or over-cladding of any building where the existing
roofing or cladding has become unsightly, beyond repair or an
improvement in the thermal performance is required
Ashgrid AG40 Safe-LocTM
is installed over the in-situ roofing or
cladding, providing a stable platform for the new weather
sheet. This also creates a cavity between the new and the old
where insulation can be inserted to increase the building’s
thermal performance to current building regulations and
reduce carbon emissions. This allows for a completely new
weather sheet to be installed with minimal disturbance to
operations within the building and improves the overall
aesthetic.
The Ashgrid System is compatible with all forms of pierced and
concealed fix weather sheets available in South Africa and is
specifically designed to evenly distribute the loads directly into
the existing roof structure.
Ash & Lacy would always recommend that any new system
should be fixed to structural members and not to an existing
secondary system.
Brackets should be installed as per standard procedures, at a
maximum of 1m centres and ensuring a bracket within
100mm of a spigot end. (Bracket centres may need to be
reduced in areas of high wind suction or heavy snow loading).
Comprehensive load span tables are available from Ash & Lacy
South Africa.
Dependant on the condition of the existing roofing materials a
vapour control layer and breather membrane may be required.
Care should always be taken when working with old or
deteriorated materials, existing sheeting can be brittle and all
precautions should be taken to ensure a safe working
platform.
When installing Ashgrid Safe-LocTM
spacer support system over
existing asbestos it is advisable to pre-drill a clearance hole to
prevent damage. Drilling should be carried out in conjunction
with an H-Series asbestos vacuum which is available for
purchase or daily hire from Ash & Lacy South Africa.
All works involving asbestos should be carried out in
accordance with the South African Government Gazette
Regulation No. 7276 Vol. 440 Pretoria 10 February 2002
No. 23108.
2
Refurbishment Applications	 2
Asbestos	3
Over-roofing applications 	 4
Installation 	 5	
	 Method One	 5
	 Method Two 	 6
contents
spacer systems
6dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782Roof • Façade • Screen • Fabrication • Spacer Systems • Fixings • Steel Frame5
spacer systems
Metal sheet over steel purlin with new
pierced fix weather-sheet.
Asbestos-cement sheet over steel purlin
with new pierced fix weather-sheet.
Composite sheet over steel purlin with
new pierced fix weather-sheet.
Metal sheet over steel purlin with new
concealed fix weather-sheet.
Asbestos-cement sheet over concrete
purlin with new concealed fix weather-
sheet.
Composite sheet over steel purlin with
new concealed fix weather-sheet.
over-roofing applicationsASBESTOS
43
Asbestos
Professionals or contractors encountering asbestos roofs may feel
confusion about how to handle asbestos-containing materials.
Some may even avoid asbestos roofs altogether assuming they
will equate to expensive asbestos-removal procedures and red
tape. However, asbestos abatement (the process of removing or
minimizing asbestos health hazards from a structure) can take
many forms, including removal, enclosure or encapsulation and
doesn’t need to be as daunting as it seems.
The average asbestos cement sheet contains no more than about
10% asbestos and the fibres are deeply encapsulated within a
cement casing. The inherently strong natural bond between
cement and asbestos fibres makes emission of fibres impossible
without physical abrasive cutting, abrasive cleaning, impact
damage, severe lichen encroachment or fire damage.
The first priority when deciding best practice on how to deal with
an asbestos roof is to ascertain whether the material in its current
condition is at risk of releasing asbestos fibres. Friable asbestos-
containing-materials (ACMs)* are considered dangerous or at risk
of releasing fibres whilst Non-friable ACMs** are considered safe
and at no risk of releasing fibres.
There are further sub-categories of non-friable ACMs with
asbestos-cement corrugated roof sheets falling into the lowest risk
category. If there is still uncertainty of the materials condition an
assessment of the material can be carried out by an authorised
asbestos assessment consultant.
The vast majority of asbestos-cement roofs encountered in South
Africa are in a non-friable condition and are at no risk of releasing
asbestos fibres. Safer abatement methods such as enclosure are
recommended in these cases. Demolition and removal carries a
higher risk of releasing fibres whilst disposal has severe
environmental consequences.
The enclosure of the asbestos-cement roof sheets prevents any
further risk of weathering or deterioration rendering the material
inert and safe for the remainder of the life cycle of the building.
Asbestos-cement roofs should be considered fragile and when any
roof work is performed, suitable roof ladders, duckboards or
crawling boards should be utilised in accordance with regulation
12 of the General Safety Regulations published by Government
notice R1031 of 30 May 1986. Good practice is to install a cargo
net over the existing asbestos roof which is in turn secured around
the perimeter. This sacrificial fall arrest system remains in-situ
once the insulation and new outer roof covering has been installed.
Spacer systems are traditionally secured through the troughs of
the asbestos sheets into the underlying purlin. This drilling process
can be carried out in conjunction with an H-Series Asbestos
vacuum which captures 100% of the dust produced.
These vacuums are fitted with an Ulpa Filter for 99.999% efficiency
at 0.12 micron. They are ESD safe, meet HSG264 standards of
surveying and are fully compliant with BS EN 60335-2-69.
*Friable ACM is any material that contains more than one percent
asbestos by weight or area, depending on whether it is a bulk or
sheet material and can be crumbled, pulverized, or reduced to
powder by the pressure of an ordinary human hand.
**Non-friable ACM is any material that contains more than one
percent asbestos, but cannot be pulverized under hand pressure.
Further information is available on request from Ash & Lacy
South Africa.
spacer systems
8dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782Roof • Façade • Screen • Fabrication • Spacer Systems • Fixings • Steel Frame7
spacer systems
With the advent of the SANS 10400XA energy efficiency
legislation there is a requirement for deeper thermal cavities
within roof assemblies and it has become increasingly
important that careful consideration be given to the safety and
security of the installers and the spacer support system, in
particular during the construction phases.
A roofing system is at its greatest risk during the installation
stage when it is not restrained by the top sheeting and is
subjected to loading from foot traffic, temporary loading and
heavy sheet packs. This combined with drag forces from high
winds tends to compound these problems further. With
construction depths increasingly exceeding 200mm and with
the ongoing need to improve installation efficiency and system
performance, Ashgrid AG40 has been further enhanced to
satisfy these increasingly demanding requirements.
1. Lay bar on roof deck and offer the
small flange of the bracket to the small
flange of the bar.
2. Tilt and rotate bracket backwards at
desired fixing position.
3. Twist bracket and snap into position at
90° to bar.
Choice of installation methods to suit personal preference and site conditions
Method 1
installation
1. Offer the bracket to the bar at an
angle from the non-spigot end.
4. Making certain there is a bracket
within 100mm of a spigot end, install
additional brackets to match the liner
module up to 1m centres maximum.
(Bracket centres may need to be reduced
in areas of high wind suction or heavy
snow loading).
2. Slide brackets along the bar to the
desired fixing positions.
5. Engage the open end of the bar onto
the Safe-Loc™ spigot and push firmly
until the tab clicks into position. To
release, simply depress the tab with a
sharp object such as a screwdriver.
3. Snap each bracket upright to lock into
position at 90° to the bar.
6. Continue as above for quick, safe and
secure installation.
Brackets should be fixed to the substrate
using two of the appropriate Ash & Lacy
fixings for the application; also ensure the
brackets are not twisted in the bar.
Brackets may be repositioned by reversing this action and sliding along the bar as in steps 1 & 2.
Method 2
Construction depths up to and including 250mm
All spacer support systems will be exposed to in-line sway
forces during their installation. To counter this, the stability of
AG40 has been further enhanced through improvements in
bracket design and the introduction of the Safe-Loc™ spigots.
These designed-in features perform each and every time,
providing peace of mind without reliance on extra, time
consuming bar-end fixings and anti-sway brackets. For cavity
depths up to and including 250mm no additional sway control
measures need to be employed on the new Ashgrid AG40.
For exceptional site loading conditions and for heights above
250mm advice on performance should be sought from the Ash
& Lacy Technical Department.
45 6

Contenu connexe

Tendances

30 x 150 Frame Tent Installation Instructions
30 x 150 Frame Tent Installation Instructions30 x 150 Frame Tent Installation Instructions
30 x 150 Frame Tent Installation Instructionscelinatent
 
30 x 195 Frame Tent Installation Instructions
30 x 195 Frame Tent Installation Instructions30 x 195 Frame Tent Installation Instructions
30 x 195 Frame Tent Installation Instructionscelinatent
 
30 x 165 Frame Tent Installation Instructions
30 x 165 Frame Tent Installation Instructions30 x 165 Frame Tent Installation Instructions
30 x 165 Frame Tent Installation Instructionscelinatent
 
30 x 225 Frame Tent Installation Instructions
30 x 225 Frame Tent Installation Instructions30 x 225 Frame Tent Installation Instructions
30 x 225 Frame Tent Installation Instructionscelinatent
 
Ash and Lacy SA Spacer Support System 12pp Email Version
Ash and Lacy SA Spacer Support System 12pp Email VersionAsh and Lacy SA Spacer Support System 12pp Email Version
Ash and Lacy SA Spacer Support System 12pp Email VersionDion Marsh
 
Carpet Install and re-install 101
Carpet Install and re-install 101Carpet Install and re-install 101
Carpet Install and re-install 101Rob Decker
 
Silicone fusing tape
Silicone fusing tapeSilicone fusing tape
Silicone fusing tapeFlora Wu
 
30 x 90 Frame Tent Installation Instructions
30 x 90 Frame Tent Installation Instructions30 x 90 Frame Tent Installation Instructions
30 x 90 Frame Tent Installation Instructionscelinatent
 
30 x 135 Frame Tent Installation Instructions
30 x 135 Frame Tent Installation Instructions30 x 135 Frame Tent Installation Instructions
30 x 135 Frame Tent Installation Instructionscelinatent
 
30 x 105 Frame Tent Installation Instructions
30 x 105 Frame Tent Installation Instructions30 x 105 Frame Tent Installation Instructions
30 x 105 Frame Tent Installation Instructionscelinatent
 

Tendances (12)

30 x 150 Frame Tent Installation Instructions
30 x 150 Frame Tent Installation Instructions30 x 150 Frame Tent Installation Instructions
30 x 150 Frame Tent Installation Instructions
 
30 x 195 Frame Tent Installation Instructions
30 x 195 Frame Tent Installation Instructions30 x 195 Frame Tent Installation Instructions
30 x 195 Frame Tent Installation Instructions
 
30 x 165 Frame Tent Installation Instructions
30 x 165 Frame Tent Installation Instructions30 x 165 Frame Tent Installation Instructions
30 x 165 Frame Tent Installation Instructions
 
Gaske tech
Gaske techGaske tech
Gaske tech
 
30 x 225 Frame Tent Installation Instructions
30 x 225 Frame Tent Installation Instructions30 x 225 Frame Tent Installation Instructions
30 x 225 Frame Tent Installation Instructions
 
Ash and Lacy SA Spacer Support System 12pp Email Version
Ash and Lacy SA Spacer Support System 12pp Email VersionAsh and Lacy SA Spacer Support System 12pp Email Version
Ash and Lacy SA Spacer Support System 12pp Email Version
 
Flexco Heavy Duty Fastener Applications
Flexco Heavy Duty Fastener Applications Flexco Heavy Duty Fastener Applications
Flexco Heavy Duty Fastener Applications
 
Carpet Install and re-install 101
Carpet Install and re-install 101Carpet Install and re-install 101
Carpet Install and re-install 101
 
Silicone fusing tape
Silicone fusing tapeSilicone fusing tape
Silicone fusing tape
 
30 x 90 Frame Tent Installation Instructions
30 x 90 Frame Tent Installation Instructions30 x 90 Frame Tent Installation Instructions
30 x 90 Frame Tent Installation Instructions
 
30 x 135 Frame Tent Installation Instructions
30 x 135 Frame Tent Installation Instructions30 x 135 Frame Tent Installation Instructions
30 x 135 Frame Tent Installation Instructions
 
30 x 105 Frame Tent Installation Instructions
30 x 105 Frame Tent Installation Instructions30 x 105 Frame Tent Installation Instructions
30 x 105 Frame Tent Installation Instructions
 

En vedette

#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...
#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...
#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...EuroPrivacy
 
Fortune-Lad C Capstone Final 11242015
Fortune-Lad C Capstone Final 11242015Fortune-Lad C Capstone Final 11242015
Fortune-Lad C Capstone Final 11242015Clare Fortune-Lad
 
Finding the Right Provider Challenge Q&A Webinar
Finding the Right Provider Challenge Q&A WebinarFinding the Right Provider Challenge Q&A Webinar
Finding the Right Provider Challenge Q&A WebinarAlicia Davis
 
Salon Films - Class Above All Else
Salon Films - Class Above All ElseSalon Films - Class Above All Else
Salon Films - Class Above All ElseSalonFilms
 
Ukpong's African Art Course Syllabus
Ukpong's African Art Course SyllabusUkpong's African Art Course Syllabus
Ukpong's African Art Course SyllabusOnoyom Ukpong
 
Medios y Recursos Formativos de la Educación a Distancia
Medios y Recursos Formativos de la Educación a DistanciaMedios y Recursos Formativos de la Educación a Distancia
Medios y Recursos Formativos de la Educación a DistanciaCesarina García
 

En vedette (13)

#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...
#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...
#Ready4EUdataP Data Protection Officer, consigli all’uso e certificazioni Bia...
 
Fall_08_WildEast
Fall_08_WildEastFall_08_WildEast
Fall_08_WildEast
 
Fortune-Lad C Capstone Final 11242015
Fortune-Lad C Capstone Final 11242015Fortune-Lad C Capstone Final 11242015
Fortune-Lad C Capstone Final 11242015
 
Finding the Right Provider Challenge Q&A Webinar
Finding the Right Provider Challenge Q&A WebinarFinding the Right Provider Challenge Q&A Webinar
Finding the Right Provider Challenge Q&A Webinar
 
Salon Films - Class Above All Else
Salon Films - Class Above All ElseSalon Films - Class Above All Else
Salon Films - Class Above All Else
 
Cr
CrCr
Cr
 
Ukpong's African Art Course Syllabus
Ukpong's African Art Course SyllabusUkpong's African Art Course Syllabus
Ukpong's African Art Course Syllabus
 
Medios y Recursos Formativos de la Educación a Distancia
Medios y Recursos Formativos de la Educación a DistanciaMedios y Recursos Formativos de la Educación a Distancia
Medios y Recursos Formativos de la Educación a Distancia
 
Thesis G.A.(4.3.15)
Thesis G.A.(4.3.15)Thesis G.A.(4.3.15)
Thesis G.A.(4.3.15)
 
Portifolio
PortifolioPortifolio
Portifolio
 
JoshResume(Revised)[5]
JoshResume(Revised)[5]JoshResume(Revised)[5]
JoshResume(Revised)[5]
 
Presentación
PresentaciónPresentación
Presentación
 
Shoe
ShoeShoe
Shoe
 

Similaire à Over roofing general mini-literature

Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp HiAsh and Lacy SA Over Roofing Asbestos Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp HiVaughn Botha
 
Ash and lacy sa over roofing asbestos roofs
Ash and lacy sa over roofing asbestos roofsAsh and lacy sa over roofing asbestos roofs
Ash and lacy sa over roofing asbestos roofsVaughn Botha
 
DWA Presentation final
DWA Presentation finalDWA Presentation final
DWA Presentation finalMark Heslin
 
Roof and roofing material .pdf
Roof and roofing material .pdfRoof and roofing material .pdf
Roof and roofing material .pdfNehaPaliwal31
 
Crucial factors in steel grain bin management
Crucial factors in steel grain bin management Crucial factors in steel grain bin management
Crucial factors in steel grain bin management Milling and Grain magazine
 
RIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical DetailsRIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical DetailsRIW Ltd
 
Econotile Brochure FINAL_Electronic File 05-09-12
Econotile Brochure  FINAL_Electronic File 05-09-12Econotile Brochure  FINAL_Electronic File 05-09-12
Econotile Brochure FINAL_Electronic File 05-09-12Janine Course
 
RIW Cementjoint Datasheet
RIW Cementjoint DatasheetRIW Cementjoint Datasheet
RIW Cementjoint DatasheetRIW Ltd
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Micheal Mullvihill
 
Pp 16 common insulation hazards and controls
Pp 16  common insulation hazards and controlsPp 16  common insulation hazards and controls
Pp 16 common insulation hazards and controlsScottDickenson2
 
WPM 002 Australian version
WPM 002 Australian versionWPM 002 Australian version
WPM 002 Australian versionnandu_raga
 
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGECABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGEPravin Gaurav
 
Agilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resAgilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resgunalan7
 
Terrace Water Proofing
Terrace Water ProofingTerrace Water Proofing
Terrace Water ProofingD K Associates
 

Similaire à Over roofing general mini-literature (20)

Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp HiAsh and Lacy SA Over Roofing Asbestos Roofs A4 4pp Hi
Ash and Lacy SA Over Roofing Asbestos Roofs A4 4pp Hi
 
Ash and lacy sa over roofing asbestos roofs
Ash and lacy sa over roofing asbestos roofsAsh and lacy sa over roofing asbestos roofs
Ash and lacy sa over roofing asbestos roofs
 
DWA Presentation final
DWA Presentation finalDWA Presentation final
DWA Presentation final
 
Roof and roofing material .pdf
Roof and roofing material .pdfRoof and roofing material .pdf
Roof and roofing material .pdf
 
Crucial factors in steel grain bin management
Crucial factors in steel grain bin management Crucial factors in steel grain bin management
Crucial factors in steel grain bin management
 
RIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical DetailsRIW Structureseal -Sodium Bentonite System - Typical Details
RIW Structureseal -Sodium Bentonite System - Typical Details
 
Econotile Brochure FINAL_Electronic File 05-09-12
Econotile Brochure  FINAL_Electronic File 05-09-12Econotile Brochure  FINAL_Electronic File 05-09-12
Econotile Brochure FINAL_Electronic File 05-09-12
 
Non Slip Walkway Covers
Non Slip Walkway CoversNon Slip Walkway Covers
Non Slip Walkway Covers
 
Formwork.pdf
Formwork.pdfFormwork.pdf
Formwork.pdf
 
RIW Cementjoint Datasheet
RIW Cementjoint DatasheetRIW Cementjoint Datasheet
RIW Cementjoint Datasheet
 
Neptune solutions brochure may 2017
Neptune solutions brochure may 2017Neptune solutions brochure may 2017
Neptune solutions brochure may 2017
 
Pp 16 common insulation hazards and controls
Pp 16  common insulation hazards and controlsPp 16  common insulation hazards and controls
Pp 16 common insulation hazards and controls
 
How To Avoid Screed Failure
How To Avoid Screed FailureHow To Avoid Screed Failure
How To Avoid Screed Failure
 
Roof Waterproofing Karachi
Roof Waterproofing KarachiRoof Waterproofing Karachi
Roof Waterproofing Karachi
 
WPM 002 Australian version
WPM 002 Australian versionWPM 002 Australian version
WPM 002 Australian version
 
SAAH MAR 2014
SAAH MAR 2014SAAH MAR 2014
SAAH MAR 2014
 
Woodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boardsWoodhouse installation guide for cladding boards
Woodhouse installation guide for cladding boards
 
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGECABLE STAYED BRIDGE-SIGNATURE BRIDGE
CABLE STAYED BRIDGE-SIGNATURE BRIDGE
 
Agilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_resAgilia horizontal datasheet_final_2012_lo_res
Agilia horizontal datasheet_final_2012_lo_res
 
Terrace Water Proofing
Terrace Water ProofingTerrace Water Proofing
Terrace Water Proofing
 

Dernier

tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdfchess188chess188
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfBalamuruganV28
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfalene1
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...arifengg7
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Communityprachaibot
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosVictor Morales
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studydhruvamdhruvil123
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewsandhya757531
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical trainingGladiatorsKasper
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHSneha Padhiar
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSsandhya757531
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHbirinder2
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxLina Kadam
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 

Dernier (20)

tourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdftourism-management-srs_compress-software-engineering.pdf
tourism-management-srs_compress-software-engineering.pdf
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
Versatile Engineering Construction Firms
Versatile Engineering Construction FirmsVersatile Engineering Construction Firms
Versatile Engineering Construction Firms
 
CS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdfCS 3251 Programming in c all unit notes pdf
CS 3251 Programming in c all unit notes pdf
 
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdfComprehensive energy systems.pdf Comprehensive energy systems.pdf
Comprehensive energy systems.pdf Comprehensive energy systems.pdf
 
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
Analysis and Evaluation of Dal Lake Biomass for Conversion to Fuel/Green fert...
 
Prach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism CommunityPrach: A Feature-Rich Platform Empowering the Autism Community
Prach: A Feature-Rich Platform Empowering the Autism Community
 
KCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitosKCD Costa Rica 2024 - Nephio para parvulitos
KCD Costa Rica 2024 - Nephio para parvulitos
 
ADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain studyADM100 Running Book for sap basis domain study
ADM100 Running Book for sap basis domain study
 
Artificial Intelligence in Power System overview
Artificial Intelligence in Power System overviewArtificial Intelligence in Power System overview
Artificial Intelligence in Power System overview
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training70 POWER PLANT IAE V2500 technical training
70 POWER PLANT IAE V2500 technical training
 
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACHTEST CASE GENERATION GENERATION BLOCK BOX APPROACH
TEST CASE GENERATION GENERATION BLOCK BOX APPROACH
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMSHigh Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
High Voltage Engineering- OVER VOLTAGES IN ELECTRICAL POWER SYSTEMS
 
Substation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRHSubstation Automation SCADA and Gateway Solutions by BRH
Substation Automation SCADA and Gateway Solutions by BRH
 
AntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptxAntColonyOptimizationManetNetworkAODV.pptx
AntColonyOptimizationManetNetworkAODV.pptx
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 

Over roofing general mini-literature

  • 1. spacer sYstems www.ashandlacy.co.za proDuct information issue no. 001 January 2016 ash & lacy building systems ltd lonDon gateway 3, Davis road off cox lane, chessington surrey Kt9 1tD t 0208 391 9700 f 0208 391 9701 West bromWich bromford lane West bromwich West midlands b70 7JJ t 0121 525 1444 f 0121 525 3444 glasgoW unit 4b, albion trading est south street, Whiteinch glasgow g14 0sY t 0141 950 6040 f 0141 950 6080 eXeter units 2&3 gloucester court heathpark ind est, honiton Devon eX14 1sJ t 01404 549100 f 01404 549440 neath - port talbot unit 4b, sirius Drive rutherglen centre baglan sa12 7br t 01639 812569 f 01639 813133 cape toWn 29 atlantic Drive bluewater estate Kommetjie, cape town 7975 t +27+21+783 0114 m +27+83+215 1782
  • 2. spacer systems 4dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782 refurbishment applications Refurbishment Ashgrid AG40 Safe-LocTM is an ideal component for the over-roofing or over-cladding of any building where the existing roofing or cladding has become unsightly, beyond repair or an improvement in the thermal performance is required Ashgrid AG40 Safe-LocTM is installed over the in-situ roofing or cladding, providing a stable platform for the new weather sheet. This also creates a cavity between the new and the old where insulation can be inserted to increase the building’s thermal performance to current building regulations and reduce carbon emissions. This allows for a completely new weather sheet to be installed with minimal disturbance to operations within the building and improves the overall aesthetic. The Ashgrid System is compatible with all forms of pierced and concealed fix weather sheets available in South Africa and is specifically designed to evenly distribute the loads directly into the existing roof structure. Ash & Lacy would always recommend that any new system should be fixed to structural members and not to an existing secondary system. Brackets should be installed as per standard procedures, at a maximum of 1m centres and ensuring a bracket within 100mm of a spigot end. (Bracket centres may need to be reduced in areas of high wind suction or heavy snow loading). Comprehensive load span tables are available from Ash & Lacy South Africa. Dependant on the condition of the existing roofing materials a vapour control layer and breather membrane may be required. Care should always be taken when working with old or deteriorated materials, existing sheeting can be brittle and all precautions should be taken to ensure a safe working platform. When installing Ashgrid Safe-LocTM spacer support system over existing asbestos it is advisable to pre-drill a clearance hole to prevent damage. Drilling should be carried out in conjunction with an H-Series asbestos vacuum which is available for purchase or daily hire from Ash & Lacy South Africa. All works involving asbestos should be carried out in accordance with the South African Government Gazette Regulation No. 7276 Vol. 440 Pretoria 10 February 2002 No. 23108. 2 Refurbishment Applications 2 Asbestos 3 Over-roofing applications 4 Installation 5 Method One 5 Method Two 6 contents
  • 3. spacer systems 6dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782Roof • Façade • Screen • Fabrication • Spacer Systems • Fixings • Steel Frame5 spacer systems Metal sheet over steel purlin with new pierced fix weather-sheet. Asbestos-cement sheet over steel purlin with new pierced fix weather-sheet. Composite sheet over steel purlin with new pierced fix weather-sheet. Metal sheet over steel purlin with new concealed fix weather-sheet. Asbestos-cement sheet over concrete purlin with new concealed fix weather- sheet. Composite sheet over steel purlin with new concealed fix weather-sheet. over-roofing applicationsASBESTOS 43 Asbestos Professionals or contractors encountering asbestos roofs may feel confusion about how to handle asbestos-containing materials. Some may even avoid asbestos roofs altogether assuming they will equate to expensive asbestos-removal procedures and red tape. However, asbestos abatement (the process of removing or minimizing asbestos health hazards from a structure) can take many forms, including removal, enclosure or encapsulation and doesn’t need to be as daunting as it seems. The average asbestos cement sheet contains no more than about 10% asbestos and the fibres are deeply encapsulated within a cement casing. The inherently strong natural bond between cement and asbestos fibres makes emission of fibres impossible without physical abrasive cutting, abrasive cleaning, impact damage, severe lichen encroachment or fire damage. The first priority when deciding best practice on how to deal with an asbestos roof is to ascertain whether the material in its current condition is at risk of releasing asbestos fibres. Friable asbestos- containing-materials (ACMs)* are considered dangerous or at risk of releasing fibres whilst Non-friable ACMs** are considered safe and at no risk of releasing fibres. There are further sub-categories of non-friable ACMs with asbestos-cement corrugated roof sheets falling into the lowest risk category. If there is still uncertainty of the materials condition an assessment of the material can be carried out by an authorised asbestos assessment consultant. The vast majority of asbestos-cement roofs encountered in South Africa are in a non-friable condition and are at no risk of releasing asbestos fibres. Safer abatement methods such as enclosure are recommended in these cases. Demolition and removal carries a higher risk of releasing fibres whilst disposal has severe environmental consequences. The enclosure of the asbestos-cement roof sheets prevents any further risk of weathering or deterioration rendering the material inert and safe for the remainder of the life cycle of the building. Asbestos-cement roofs should be considered fragile and when any roof work is performed, suitable roof ladders, duckboards or crawling boards should be utilised in accordance with regulation 12 of the General Safety Regulations published by Government notice R1031 of 30 May 1986. Good practice is to install a cargo net over the existing asbestos roof which is in turn secured around the perimeter. This sacrificial fall arrest system remains in-situ once the insulation and new outer roof covering has been installed. Spacer systems are traditionally secured through the troughs of the asbestos sheets into the underlying purlin. This drilling process can be carried out in conjunction with an H-Series Asbestos vacuum which captures 100% of the dust produced. These vacuums are fitted with an Ulpa Filter for 99.999% efficiency at 0.12 micron. They are ESD safe, meet HSG264 standards of surveying and are fully compliant with BS EN 60335-2-69. *Friable ACM is any material that contains more than one percent asbestos by weight or area, depending on whether it is a bulk or sheet material and can be crumbled, pulverized, or reduced to powder by the pressure of an ordinary human hand. **Non-friable ACM is any material that contains more than one percent asbestos, but cannot be pulverized under hand pressure. Further information is available on request from Ash & Lacy South Africa.
  • 4. spacer systems 8dion.marsh@ashandlacy.com • www.ashandlacy.co.za • M +27+83+215 1782Roof • Façade • Screen • Fabrication • Spacer Systems • Fixings • Steel Frame7 spacer systems With the advent of the SANS 10400XA energy efficiency legislation there is a requirement for deeper thermal cavities within roof assemblies and it has become increasingly important that careful consideration be given to the safety and security of the installers and the spacer support system, in particular during the construction phases. A roofing system is at its greatest risk during the installation stage when it is not restrained by the top sheeting and is subjected to loading from foot traffic, temporary loading and heavy sheet packs. This combined with drag forces from high winds tends to compound these problems further. With construction depths increasingly exceeding 200mm and with the ongoing need to improve installation efficiency and system performance, Ashgrid AG40 has been further enhanced to satisfy these increasingly demanding requirements. 1. Lay bar on roof deck and offer the small flange of the bracket to the small flange of the bar. 2. Tilt and rotate bracket backwards at desired fixing position. 3. Twist bracket and snap into position at 90° to bar. Choice of installation methods to suit personal preference and site conditions Method 1 installation 1. Offer the bracket to the bar at an angle from the non-spigot end. 4. Making certain there is a bracket within 100mm of a spigot end, install additional brackets to match the liner module up to 1m centres maximum. (Bracket centres may need to be reduced in areas of high wind suction or heavy snow loading). 2. Slide brackets along the bar to the desired fixing positions. 5. Engage the open end of the bar onto the Safe-Loc™ spigot and push firmly until the tab clicks into position. To release, simply depress the tab with a sharp object such as a screwdriver. 3. Snap each bracket upright to lock into position at 90° to the bar. 6. Continue as above for quick, safe and secure installation. Brackets should be fixed to the substrate using two of the appropriate Ash & Lacy fixings for the application; also ensure the brackets are not twisted in the bar. Brackets may be repositioned by reversing this action and sliding along the bar as in steps 1 & 2. Method 2 Construction depths up to and including 250mm All spacer support systems will be exposed to in-line sway forces during their installation. To counter this, the stability of AG40 has been further enhanced through improvements in bracket design and the introduction of the Safe-Loc™ spigots. These designed-in features perform each and every time, providing peace of mind without reliance on extra, time consuming bar-end fixings and anti-sway brackets. For cavity depths up to and including 250mm no additional sway control measures need to be employed on the new Ashgrid AG40. For exceptional site loading conditions and for heights above 250mm advice on performance should be sought from the Ash & Lacy Technical Department. 45 6