17 + years’ experience in construction and manufacturing of Refinery and Oil & Gas Plants, onshore
rig, Onshore-Skid Module, offshore- Rigs, barge & platform, Pressure vessel, heat exchanger, pump,
valves, process & Power Piping, heavy Structural Steels fabrication, worked as QA/QC Inspection
Engineer, Client inspector & TPI, QA/QC coordinator.
QA / QC Inspector/Engineer with excellent exposure and experience in various Construction Projects
involving time bound schedules, Possessing good management skills with sound knowledge of Codes,
Standards and Various Client Specifications.
PROFESSIONAL QUALIFICATION:
TECHNICAL BACKGROUND
1. NDT LEVEL 2
TYPE OF COURSES LEVEL OF INSPECTION
Radiography Testing Level II
Ultrasonic Testing Level II
Magnetic Particle Testing Level II
Dye penetrate Testing Level II
2. AWS (CWI) certified welding inspector Certificate No: 08092941
3. TWI - CSWIP 3.1 certified welding inspector Certificate No: 46761
4. TWI-CSWIP-BGAS LEVEL-2. Certified welding inspector Certificate No: 57803
5. PIPING ENGG.
EDUCATIONAL QUALIFICATIONS
Bachelor of Engineering - V L B Janaki Ammal College Engineer & Technology.
Bharathiar University- Coimbatore-TN-INDIA.
UAE driving license No; 1882911, Expiry year; 2023.
COMPUTER SKILLS - Operating Systems : Windows 98/ 2000 NT/ XP.
CONVERSANT CODES AND STANDARDS:
1. ASME SEC V, 2. ASME SECTION PARTS A, B, C, 3. ASME SECTION VIII, DIV-1, 4. ASME SECTION IX, 5.
ASME B31.3, 6. AWS D1.1, 8. API 1104, 9. API 650, 10. API 510, 11. API 570.
NATURE OF RESPONSIBILITIES:
• Make sure all the works are carried out with all relevant safety standards.
2. • Verification of calibration status of Equipments and Instruments at
required stage.
• Material Receiving Inspection – MTC review, Traceability, Verification
& project requirement tests with respect to purchase order and project
requirements.
• Perform Fit up, visual, dimensional inspections of Raw materials &
verification of transfer of material traceability.
• Witnessing and conducting the PQR and WQT as per ASME Sec.IX,
ASMEB31.3/AWS D1.1M etc.
• Inspection of components as per ITPS, Drawings
And Operation Process sheet.
• Monitor and ensure welding is carried out as per approved welding
procedures.
• Monitor and ensure welders used are qualified for process, position etc
as may be required by the governing code or specs.
• Controlling of welding consumables & Documents by performing weld
audit.
• Inspect weld joints of work in progress and of completed
structures/pressure vessels/piping /pipelines/tanks for visible weld
defects, correct dimensions, weld sizes, type of weld etc., in
conformance with approved drawings and work order specifications.
• Witnessing in process examination-Welding Inspection-NDE, PWHT,
Hardness testing, Delta Ferrite test,PMI test on components as per the
Purchase order and Project specification.
• Reviewing of RT Film, Weld history sheet, Test pack, Heat treatment
charts, NDE Reports with respect to weld map, Approved drawings and
Project ITP requirements.
• Witnessing hydrostatic test, Vacuum test, pneumatic testing, VPCI Test
as per the project specification/ requirements.
• Perform Inspection on Cleaning, Surface preparation, Galvanizing,
Painting, Powder coating on components, witnessed salt test, dolly-
adhesion test, holiday test, toast test & review report.
• Perform Inspection on insulation work & HVAC, review report.
3. • To rise an NCR & punch list if the product/works deviates from project
specifications and relevant standards.
• Follow up of NCRS/punch list (if any raised) to make sure corrective &
preventive actions have taken.
• As-Built drawing and verifies load out for conformity to specified
requirements /standards.
Preparation of Inspection reports & Inspection release note.
MAJOR PROJECT EXECUTED:
Period; form oct- 2016 to till date.
Designation: QA/QC Filed Engineer.
Company ; PETROFAC EMIRATES LLC-UAE.
Project : AL TAWEELAH ALUMINA REFINERY PROJECT.
Client : EMIRATES GLOBAL ALUMINIUM(EGA)-UAE.
CONTRACTER/Site; OUTOTEC/TARGET ENGINEER LLC-AL TAWEELAS-UAE.
Period; form oct- 2015 to Sep. 2016.
Designation: QC Engineer.
Company ; PETROFAC EMIRATES LLC-UAE.
Project : UPPER ZAKUM 750-ISLAND SURFACE FACILITIES PROJECT-EPC2.
Client : ZAKUM DEVELOPMENT COMPANY (ZADCO)-UAE.
Contractor/Site; LAMPRELL ENERAGY LTD-UAE.
Period; form Aug- 2013 to Aug. 2015.
Designation: QA/QC Multi Discipline Inspector
Company ; INTERTECK GLOBAL LTD-UAE.
Project : ISLAND RIG ACQUISITION PROJECT. IRAN.
Client : NATIONAL IRANIAN OIL COMPANY, UAE.
Contractor/Site; Sichuan Honghua Petroleum Equipment co ltd, Sichuan, Chengdu city, China P.R.
Period; October 2012 – July-2013.
Designation: QA/QC Engineer.
Company : TECNIMONT SPA LIMITED-ITALY.
Project ; SOUTH PARS GAS FIELD DEVELOPMENT PHASE-12 PROJECT. IRAN.
Contractor /Site: FEBTECH INTERNATIONL LTD, GMMOS-DUBAI, SERCK-SHARJAH-UAE.
Client : NATIONAL IRANIAN OIL COMPANY, IRAN.
Period; form December 2011 - To September-2012
Designation: QA/QC Inspector.
Company : PETRO FAC INTERNATIONL (UAE) LLC - Sharjah.
Project : SOUTHYOLOTENGAS FILED DEVELOPMENT PROJECT.
4. Contractor/Site: ARABIAN INDUSTRIES MANUFACTURING LLC. Oman –Sohar & Russell.
Client : TURKMENGAS. TURKMENISTAN.
Period; form August 2009-TO Nomber-2011.
Designation : QA/QC Inspector,
company :MARITIME INDUSTRIAL SERVICES CO LTD,SHARJAH.
Project : UQUO GAS PLANT, SEPTA ENERGY NIGERIA LTD.
Client : PETROFAC.
Project : Fabrication of piles for ONGC D-1, Development project
Client : Essar offshore subsea ltd, India.
Consultant : ABS.
Project : F&G SUPPER M2 JACK-UP DRILLING RIG-106
Client : MEJU 1.
Consultant : ABS.
Project : RIGS (NOBORS-655 & NABORS-656)
Client : NOBORS TRILLING NTERNATIONAL, USA.
Consultant : ABS.
Project : OFFSHORE INSTALATION VESSEL
Client : FLED OSLEN WIND CARRIER, USA.
Consultant : DNV.
Project : 1.ONGC-Platform
(North Tapti Gas Field Development).
: 2.Dubai Petroleum Platform (Al Jallilah Field Development).
PERIOD; from oct- 2008 - to July 2009.
Company : EIL LLC, Dubai-UAE.
Project ; Aluminum Smelter project, Qatar,
Consultant : Fives Solios, France.
Contractor : Petron, Dubai
Designation : INSPECTION ENGINEER (Multi Discipline-Third Party).
Project ; Japan Turkey Metro Joint Venture – Dubai Metro Project
Consultant : SYSTRA
Designation : Third Party Inspector (Multi Discipline).
Period; form October 2004 to december2008
Company : TATA PROJECTS LIMITED.
Project : BPCL, CEMP PHASE 2. COCHIN.
Consultant : EIL.
Contractor : TECH SHORP ENGINEERS LTD.
5. Designation : QA/QC INSPECTION ENGINEER.
Period; April 2001 to August 2004,
Company : TECH SHORP ENGINEERS LTD.
PROJECT : LUBE EXPANSION PROJECT, CPCL, CHENNAI.INDIA.
PERSONAL PARTICULARS:
Name : D. vijayasekaran.
Father’s Name : S. Dhanabalan
Sex : Male.
Status : Married
Date of Birth : 27th
September, 1976
Languages Known : English, Tamil, Malayalam, Hindi,
Contact number : 00971-508468316,
Passport no : H0485002
Date of expiry : 10-09-2018.
Perm ant Address for Communication : 4/595-B, Jeevan nagar 2 nd streets, udamalpet (TK), Tirupur,
Tamil nadu, India-642124.
I hereby declare that all the testimonials furnished above are true to the best of my knowledge and
belief.
With regards,
(VIJAYASEKARAN.D).
6. Designation : QA/QC INSPECTION ENGINEER.
Period; April 2001 to August 2004,
Company : TECH SHORP ENGINEERS LTD.
PROJECT : LUBE EXPANSION PROJECT, CPCL, CHENNAI.INDIA.
PERSONAL PARTICULARS:
Name : D. vijayasekaran.
Father’s Name : S. Dhanabalan
Sex : Male.
Status : Married
Date of Birth : 27th
September, 1976
Languages Known : English, Tamil, Malayalam, Hindi,
Contact number : 00971-508468316,
Passport no : H0485002
Date of expiry : 10-09-2018.
Perm ant Address for Communication : 4/595-B, Jeevan nagar 2 nd streets, udamalpet (TK), Tirupur,
Tamil nadu, India-642124.
I hereby declare that all the testimonials furnished above are true to the best of my knowledge and
belief.
With regards,
(VIJAYASEKARAN.D).