SlideShare a Scribd company logo
1 of 26
A
Summer Training

Presentation
on
“Operation and maintenance of EHV equipment and
Transmission system”
2013-2014

Rajdhani Engineering College Jaipur
Department of ‘Electrical Engineering
Presented by:Vikas Jangir
Electrical Engineering
Introduction of a substation
 Intermediate link between
Generating station & Consumers
 Important part of T&D
 Step down high voltages
Sanganer GSS Capacity : 220 kV,132kV,33 kV
220 kv GSS Sanganer
• History of GSS.
1.
2
3
4
5

Established in 1981
1981 – Heerapura 132kV was there
1998 – KTPS 220kv was added
2002 – Heerapura-I 220kv was added
2005 – Heerapura-II 220kv added

• Incoming feeders.
1 Heerapura I – 220kV
2 KTPS – 220kV
3 Heerapura II -220kV
Outgoing feeders
•

132kv lines

1. Mansarovar I
2. Mansarovar –II
3. Balawala
4. Niwai
5. Sitapura
6. chaksu

• 33kv lines

• 11kv lines

1.
2.
3.
4.
5.
6.
7.
8.

1.
2.
3.
4.

Muhana Mandi
Malpura
Vatika
Phagi
Sitapura
Sanganer
Durgapura-I
Durgapura-II

Tejawala
Industrial
Pream Nagar
Muhana
Single line diagram
GSS
Classification of substation.
• Basis of Nature of Duties
1.
Step-Up or primary Substations
2. Primary Grid Substations
3. Step-Down or Distribution Substations
• Basis of Service Rendered
1. Transformer Substations
2. Switching Substations
3. Converting Substations
•

Basis of Importance
1.
Grid Substations
2.
Town Substations
Classification on the Basis of Operating Voltage
1. High Voltage Substations
2. Extra High Voltage Substations
3. Ultra High Voltage Substations
Classification on the Basis of Design
1. Indoor Type Substations
2. Outdoor Type Substations
Equipment For Substation
•
•
•
•
•
•
•
•
•
•
•
•
•
•

Lightning Arresters
Main Bus-Bars
Wave Trap
Switchgear
Power Transformer
Instruments Transformers
Capacitor voltage transformer
Isolators
Circuit Breakers
Insulators
Fuses
Protective Relays
Station Insulators
Batteries
Lightning arrester
• Protective device
• Equipment use power poles and towers, power
transformers, circuit breakers, bus structures, and steel
superstructures in substations
Wave trapper
• Trap signals and send it to PLCC control Room
• For information purpose
Bus-bars
• Carry electrical supply
• Maximum load
Switchgears
• Controlling equipment
• Protecting equipment
1. Equipment
• Air break Switches, Oil Switches,Isolators,Circuit breaker
• Earthing Switch
•Air switch breaker

• Isolators
Circuit breakers
• Used to Close or open
electrical circuit
• -It cab be operated manually
or automatically

Classification of C.B
1. Water circuit breaker
2. Air circuit breaker
3. Air blast circuit breaker
4. Sulphur-hexa-fluoride circuit
breaker
5. Vacuum circuit breaker
Power transformer
Types of Transformer
•
•
•
•
•

Power transformer
Current transformer
Potential transformer
Capacitance voltage transformer
Distribution transformer

faults in transformer
• Internal faults
• External faults
Current transformer
• Measurement of electric
currents and protective relays

 Potential transformer
• Reduced high voltage in
a fixed voltage and
measurements purpose
also
Faults in transformer
External faults

Internal faults

• Must be disconnected
• Not allowed to operate for
long time
• Failure of coolant

• Short circuit in windings
• Fire inside transformer
• Over heating

Protection

Protection

• Buchholz protection
• Overheating protection
• Cooling fans

• Fire protection system
• Protection against
magnetizing inrush current
Cooling in transformer
Fire protection system
• N2O2
• Nitrogen injection, when control panel receive indication
Substation earthing
• Every instrument earthed
• Lighting arresters
Control room

Protection
Battery Room

• Very crucial section of GSS as batteries provide power
back up and also DC power for DC signaling of control
equipments and fire protection system
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur
Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur

More Related Content

What's hot

Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV Girish Gupta
 
substation internship report
substation internship report substation internship report
substation internship report Arun Thapa
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraRahul Mehra
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentationKamal Mittal
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training pptShubham Patel
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohitMohit Awasthi
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentationKanahiya Lal
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYRohitashav Goyal
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentationRajashekar Gurrala
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclVISHAL VERMA
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training pptsitesh95074
 
Bil and insulation coordination ppt
Bil and insulation coordination pptBil and insulation coordination ppt
Bil and insulation coordination pptBILAL ALAM
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester pptIrinElsa
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical applianceNishant Kumar
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationankesh kumar
 

What's hot (20)

surge arrester
surge arrestersurge arrester
surge arrester
 
Switchgear presentation
Switchgear presentationSwitchgear presentation
Switchgear presentation
 
Electrical substations: 132 KV
Electrical substations: 132 KV Electrical substations: 132 KV
Electrical substations: 132 KV
 
substation internship report
substation internship report substation internship report
substation internship report
 
Summer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul MehraSummer Internship Report -By Rahul Mehra
Summer Internship Report -By Rahul Mehra
 
Substation Training presentation
Substation Training presentationSubstation Training presentation
Substation Training presentation
 
220 kv gss
220 kv gss220 kv gss
220 kv gss
 
220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt220 kv Sub-station Summer Training ppt
220 kv Sub-station Summer Training ppt
 
1.substation layouts
1.substation  layouts1.substation  layouts
1.substation layouts
 
220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT220 Kv / 132 Kv GSS PPT
220 Kv / 132 Kv GSS PPT
 
400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit400kv sub-station-final-ppt-by-mohit
400kv sub-station-final-ppt-by-mohit
 
Training report on substation presentation
Training report on substation presentationTraining report on substation presentation
Training report on substation presentation
 
Training Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITYTraining Report on 220 KV G.S.S. HINDAUN CITY
Training Report on 220 KV G.S.S. HINDAUN CITY
 
132 33kv substation documentation
132 33kv substation documentation132 33kv substation documentation
132 33kv substation documentation
 
PPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppclPPT on 33/11 sub-station uppcl
PPT on 33/11 sub-station uppcl
 
Sub station training ppt
Sub station training pptSub station training ppt
Sub station training ppt
 
Bil and insulation coordination ppt
Bil and insulation coordination pptBil and insulation coordination ppt
Bil and insulation coordination ppt
 
Surge arrester ppt
Surge arrester pptSurge arrester ppt
Surge arrester ppt
 
Presentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliancePresentation on Over-/under-voltage protection of electrical appliance
Presentation on Over-/under-voltage protection of electrical appliance
 
Training report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substationTraining report-in-a-132-k-v-substation
Training report-in-a-132-k-v-substation
 

Similar to Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur

Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxShubhoDas5
 
Vocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarVocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarNEE260998
 
Cspdcl microsoft power point presentation
Cspdcl microsoft power point presentationCspdcl microsoft power point presentation
Cspdcl microsoft power point presentationRamesh1189
 
Vocational training
Vocational trainingVocational training
Vocational trainingSuraj prasad
 
Internship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationInternship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationOluwaseun Amodu
 
Presentation on middle marshyangdi hydropower project
Presentation on middle  marshyangdi hydropower projectPresentation on middle  marshyangdi hydropower project
Presentation on middle marshyangdi hydropower projectSudarshan Pandey
 
INPLANT TRAINING.pptx
INPLANT TRAINING.pptxINPLANT TRAINING.pptx
INPLANT TRAINING.pptxEMovie1
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transientsmichaeljmack
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad ADARSH KUMAR
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Lakhan Vadher
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentationRamendra Dhiman
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfDevesh54
 
illumination.pptx.pdf
illumination.pptx.pdfillumination.pptx.pdf
illumination.pptx.pdfAyisha Shadha
 
Heavy water plant and there electrical systam
Heavy water plant and there electrical systam Heavy water plant and there electrical systam
Heavy water plant and there electrical systam mohit Navriya
 
Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.YouTubeofficial
 

Similar to Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur (20)

Gss 220 kv
Gss 220 kvGss 220 kv
Gss 220 kv
 
132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR132 KV GSS CHAMBAL JAIPUR
132 KV GSS CHAMBAL JAIPUR
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
industrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptxindustrial-training-at-howrah-220-kv-substation.pptx
industrial-training-at-howrah-220-kv-substation.pptx
 
Vocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagarVocational training in ntpc rihandnagar
Vocational training in ntpc rihandnagar
 
Cspdcl microsoft power point presentation
Cspdcl microsoft power point presentationCspdcl microsoft power point presentation
Cspdcl microsoft power point presentation
 
Vocational training
Vocational trainingVocational training
Vocational training
 
Internship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission stationInternship Report at a 132/33 KV transmission station
Internship Report at a 132/33 KV transmission station
 
Presentation on middle marshyangdi hydropower project
Presentation on middle  marshyangdi hydropower projectPresentation on middle  marshyangdi hydropower project
Presentation on middle marshyangdi hydropower project
 
INPLANT TRAINING.pptx
INPLANT TRAINING.pptxINPLANT TRAINING.pptx
INPLANT TRAINING.pptx
 
Transformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching TransientsTransformer Failure Due to Circuit Breaker Induced Switching Transients
Transformer Failure Due to Circuit Breaker Induced Switching Transients
 
Rps plant
Rps plantRps plant
Rps plant
 
Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad Report on visiting 132/33 kv substation teliarganj allahabad
Report on visiting 132/33 kv substation teliarganj allahabad
 
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
Vocational trainning presentation at ESSAR Power Salaya (Electrical Engineering)
 
Ramendra summer training presentation
Ramendra summer training presentationRamendra summer training presentation
Ramendra summer training presentation
 
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdfindustrialsummertrainingon220kvsubstationppt-170413134021.pdf
industrialsummertrainingon220kvsubstationppt-170413134021.pdf
 
finalseminar.docx
finalseminar.docxfinalseminar.docx
finalseminar.docx
 
illumination.pptx.pdf
illumination.pptx.pdfillumination.pptx.pdf
illumination.pptx.pdf
 
Heavy water plant and there electrical systam
Heavy water plant and there electrical systam Heavy water plant and there electrical systam
Heavy water plant and there electrical systam
 
Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.Ppt on chilla hydropower plant.
Ppt on chilla hydropower plant.
 

Recently uploaded

TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLScyllaDB
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxNavinnSomaal
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024Lorenzo Miniero
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationSlibray Presentation
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxLoriGlavin3
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Mark Simos
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 3652toLead Limited
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfMounikaPolabathina
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024BookNet Canada
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxLoriGlavin3
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii SoldatenkoFwdays
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupFlorian Wilhelm
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 

Recently uploaded (20)

TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
Developer Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQLDeveloper Data Modeling Mistakes: From Postgres to NoSQL
Developer Data Modeling Mistakes: From Postgres to NoSQL
 
SAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptxSAP Build Work Zone - Overview L2-L3.pptx
SAP Build Work Zone - Overview L2-L3.pptx
 
DMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special EditionDMCC Future of Trade Web3 - Special Edition
DMCC Future of Trade Web3 - Special Edition
 
SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024SIP trunking in Janus @ Kamailio World 2024
SIP trunking in Janus @ Kamailio World 2024
 
Connect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck PresentationConnect Wave/ connectwave Pitch Deck Presentation
Connect Wave/ connectwave Pitch Deck Presentation
 
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptxMerck Moving Beyond Passwords: FIDO Paris Seminar.pptx
Merck Moving Beyond Passwords: FIDO Paris Seminar.pptx
 
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
Tampa BSides - Chef's Tour of Microsoft Security Adoption Framework (SAF)
 
Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365Ensuring Technical Readiness For Copilot in Microsoft 365
Ensuring Technical Readiness For Copilot in Microsoft 365
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
What is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdfWhat is DBT - The Ultimate Data Build Tool.pdf
What is DBT - The Ultimate Data Build Tool.pdf
 
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
New from BookNet Canada for 2024: BNC CataList - Tech Forum 2024
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptxThe Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
The Fit for Passkeys for Employee and Consumer Sign-ins: FIDO Paris Seminar.pptx
 
"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko"Debugging python applications inside k8s environment", Andrii Soldatenko
"Debugging python applications inside k8s environment", Andrii Soldatenko
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Streamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project SetupStreamlining Python Development: A Guide to a Modern Project Setup
Streamlining Python Development: A Guide to a Modern Project Setup
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 

Training from 220kv GSS Sanganer, which is located on Muhana Road, Jaipur

  • 1. A Summer Training Presentation on “Operation and maintenance of EHV equipment and Transmission system” 2013-2014 Rajdhani Engineering College Jaipur Department of ‘Electrical Engineering Presented by:Vikas Jangir Electrical Engineering
  • 2. Introduction of a substation  Intermediate link between Generating station & Consumers  Important part of T&D  Step down high voltages Sanganer GSS Capacity : 220 kV,132kV,33 kV
  • 3. 220 kv GSS Sanganer • History of GSS. 1. 2 3 4 5 Established in 1981 1981 – Heerapura 132kV was there 1998 – KTPS 220kv was added 2002 – Heerapura-I 220kv was added 2005 – Heerapura-II 220kv added • Incoming feeders. 1 Heerapura I – 220kV 2 KTPS – 220kV 3 Heerapura II -220kV
  • 4. Outgoing feeders • 132kv lines 1. Mansarovar I 2. Mansarovar –II 3. Balawala 4. Niwai 5. Sitapura 6. chaksu • 33kv lines • 11kv lines 1. 2. 3. 4. 5. 6. 7. 8. 1. 2. 3. 4. Muhana Mandi Malpura Vatika Phagi Sitapura Sanganer Durgapura-I Durgapura-II Tejawala Industrial Pream Nagar Muhana
  • 6. GSS
  • 7. Classification of substation. • Basis of Nature of Duties 1. Step-Up or primary Substations 2. Primary Grid Substations 3. Step-Down or Distribution Substations • Basis of Service Rendered 1. Transformer Substations 2. Switching Substations 3. Converting Substations • Basis of Importance 1. Grid Substations 2. Town Substations
  • 8. Classification on the Basis of Operating Voltage 1. High Voltage Substations 2. Extra High Voltage Substations 3. Ultra High Voltage Substations Classification on the Basis of Design 1. Indoor Type Substations 2. Outdoor Type Substations
  • 9. Equipment For Substation • • • • • • • • • • • • • • Lightning Arresters Main Bus-Bars Wave Trap Switchgear Power Transformer Instruments Transformers Capacitor voltage transformer Isolators Circuit Breakers Insulators Fuses Protective Relays Station Insulators Batteries
  • 10. Lightning arrester • Protective device • Equipment use power poles and towers, power transformers, circuit breakers, bus structures, and steel superstructures in substations
  • 11. Wave trapper • Trap signals and send it to PLCC control Room • For information purpose
  • 12. Bus-bars • Carry electrical supply • Maximum load
  • 13. Switchgears • Controlling equipment • Protecting equipment 1. Equipment • Air break Switches, Oil Switches,Isolators,Circuit breaker • Earthing Switch
  • 15. Circuit breakers • Used to Close or open electrical circuit • -It cab be operated manually or automatically Classification of C.B 1. Water circuit breaker 2. Air circuit breaker 3. Air blast circuit breaker 4. Sulphur-hexa-fluoride circuit breaker 5. Vacuum circuit breaker
  • 17. Types of Transformer • • • • • Power transformer Current transformer Potential transformer Capacitance voltage transformer Distribution transformer faults in transformer • Internal faults • External faults
  • 18. Current transformer • Measurement of electric currents and protective relays  Potential transformer • Reduced high voltage in a fixed voltage and measurements purpose also
  • 19. Faults in transformer External faults Internal faults • Must be disconnected • Not allowed to operate for long time • Failure of coolant • Short circuit in windings • Fire inside transformer • Over heating Protection Protection • Buchholz protection • Overheating protection • Cooling fans • Fire protection system • Protection against magnetizing inrush current
  • 21. Fire protection system • N2O2 • Nitrogen injection, when control panel receive indication
  • 22. Substation earthing • Every instrument earthed • Lighting arresters
  • 24. Battery Room • Very crucial section of GSS as batteries provide power back up and also DC power for DC signaling of control equipments and fire protection system