1. VIPIN KUMAR MISHRA Phone: +91-9766912754
Email: vipin.mishra05@yahoo.com
Seeking challenging assignment and responsibility, with an opportunity for growth and
career advancement across the industry
PROFESSIONAL SYNOPSIS
6.7 years of experience in Technical service operations, currently serving as Junior Manager as
prominent team member of mechanical maintenance group at Sinter Plant in JSW Steel Ltd.
(Vijayanagar works).
Competencies in entailing planning, resource utilization, maintenance & manpower management.
A consistence performer with a proven track record of increasing revenues, customer satisfaction levels
and streamlining workflow.
Demonstrated abilities in working on initiatives, thereby bringing down plant breakdown, implementing
work safety & achieving annual costs savings.
CORE COMPETENCIES
Operations & Maintenance
Planning and effecting preventive maintenance schedules of various equipments to increase the
equipments up time/ equipment reliability; thereby accomplishing planned production targets.
Proactively identify areas of obstruction/ breakdowns and take steps to rectify the equipments through
application of trouble shooting tools.
Executing cost saving and energy saving techniques/ measures and modifications to achieve substantial
reduction in O&M expenditures and work within the budget.
Troubleshooting technical problems arising in the systems.
Maintaining of ISO records for total productive maintenance of the equipments.
Maintaining Daily Work Management (DWM) system to overview machine availability, cost &
performances on daily basis.
Quality Control
Ensuring adherence to quality standards viz ISO, TQM and maintaining all related documents.
Implementing latest quality tools and executing process enhancement projects.
Identifying areas of quality failures and take steps to rectify the system.
Team Management
Supervising and guiding a team of junior engineers, technicians providing training on modern service
tools, and systematic steps to take for easy maintenance of equipments ensuring optimum
performance/Production.
Managing & motivating the service team for achieving preset revenue targets and ensuring optimum
performance for better development.
CAREER HIGHLIGHTS
Since May-2013 working with JSW Steel Ltd (Vijayanagar works) India’s 2nd
largest steel Plant designated
as Junior Manager of mechanical group at Sinter Plant (Sinter M/c Area- 225m2 & Capacity 2.8 MTPA) &
Sinter Plant Waste Heat Recovery Boilers (2*15TPH & 1*45TPH).
Key Jobs handled
- Erection & Commissioning of Waste Heat Recovery Boilers (2*15TPH & 1*45TPH)
- Preparation & execution annual IBR statuary inspection of boilers.
- Preventive maintenance of all equipments (Boilers & Auxiliaries) & records maintenance.
- Prepare Shutdown job list, scheduling & execution with safety.
- Spares management for imported and Indian equipments.
- Break down maintenance and proper analysis (Pareto, criticality) of breakdown for avoiding repeatability.
- Implementing all safety initiatives like safety audit, contractor audit and Job cycle checks etc to achieve
Zero accident target.
- Monitoring of plant & people safety by applying work permits, protocols & PPEs.
- Maintain integrity of maintenance SAP-PM, analysis and costs - by timely and correct data entries and
validations.
*Now as a Team Member of Mechanical Maintenance Sinter Plant.
- Preventive maintenance of Sinter Machine, Sinter Cooler, MND & all equipments, records maintenance.
- Break down maintenance and proper analysis (Pareto, criticality) of breakdown for avoiding repeatability.
2. Since Nov-2009 till Apr-2013 with Maharashtra Enviro Power Ltd. (SMS Infrastructure Ltd.) to
install, commissioned and operate Electric Arc Furnace (PGVR) with PLASMA TECHNOLOGY (MARC-3A
Plasma Torches-300 KW) based incineration of chemical hazardous waste disposal facility of capacity 3MTPH
and generates 3MWH of Power (Waste-to-Energy) using Waste Heat Recovery Boiler.
Key Jobs handled
Maintenance of Plasma Gasification & Vetrification Reactor (Electric Arc Furnace) of capacity 72 TPD.
Operation & maintenance of MARC 3A Plasma Torches (Westinghouse Plasma Corp., USA) of capacity
300KW.
Maintenance of Hydraulic Auto Waste Feed System.
Operation & Maintenance of utilities i.e cooling towers, pumps, compressors, Blowers, Fans, chillers etc
Operation & maintenance of WET Electrostatic Precipitator (WET ESP) rating of 35 KV& 1600 mAmp.
Operation & maintenance of Waste Heat Recovery Boiler (WHRB) of capacity 10 TPH & Pressure 45
kg/cm2 & Steam Temperature 420 +/- 10 C.
Was responsible for all maintenance related activities.
EDUCATIONAL QUALIFICATIONS
TRAINING/SOFT SKILLS
Attended extensive trainings on following
Safety measures in steel industry.
7 Days training on Advances in Steel Plant Lubrication at IOCL, Faridabad
Awareness Program on Efficient & Safe Use of Boilers under The Indian Boiler Regulation (IBR) 1950 &
Indian Boilers (Amendment) ACT 2007
Energy Conservation Techniques in Industrial Sector
Auto Cad.
Proficient in the use of: MS-Office (Word/Excel/PowerPoint/Project).
PERSONAL DETAILS
Name : VIPIN KUMAR MISHRA
Father’s Name : Mr. BALENDU BHUSHAN MISHRA
Mother’s Name : Mrs. NIRMALA MISHRA
Date of Birth : 05th
June, 1987
Gender : Male
Marital Status : Married
Permanent Address : 43/4, SHIVKUTI, TELIYERGANJ,
ALLAHABAD, U.P. – 211004
Country : INDIA
DECLARATION:
I hereby declare that all statement in this resume is correct/true to the best of my
knowledge & belief.
Place: Bellary VIPIN KUMAR MISHRA
Education Institution Year of Completion Percentage
B.E (Mechanical) Umrer College of Engg., Nagpur 2009 62.23%