21st century design technologies
present us with endless possibilities
to ‘rethink’ how we design and
manufacture and:
• create a shift from mass-
production to mass-customisation;
• embrace parametric modelling for
site specific, value driven responses;
• maximize the interface of these
technologies with manufacturing.
Social, economic and environmental factors suggest an
urgent need to consider new ways to build. These
factors include:
• shortages of skilled trade labour in many
communities;
• need for increased construction quality and lower
costs;
• need to improve construction productivity;
• need for more sustainable, cradle to cradle solutions;
• increased acceptance of quality prefabrication.
© akaidpl 2010. All Rights Reserved.
Why prefabricated structure?
•Speed
•Quality
•Safety
•Skills
•Sustainability
•Cost
•Impermanent site
© akaidpl 2010. All Rights Reserved.
Relocatables>
Common problems
•Heat gain and loss: difficult to manage in current ‘generic’ products;
•Indoor environment quality: acoustics and light levels are often less than ideal;
•Floors: generally low thermal mass, sometimes undesirable floor movement;
•Floor level: typically circa 600mm above ground for connection crawl space;
•Connections and views: generally limited, both visually and physically;
•Placement: often disconnected from other school buildings, hidden from view;
•Toilets: usually not provided due to distance from soil waste connections;
•Extras: no standard range of ‘extras’ that are also ‘relocatable’;
•Temporary: often look and feel temporary, yet can become permanent;
•Details: joins between modules and other details add to ‘temporary feel’;
•Appearance: utilitarian in appearance, generally designed by manufacturers;
•Transport: design is largely defined by transport logistics rather than end use.
© akaidpl 2010. All Rights Reserved.
Future needs
Relocatables of the future will need to respond to:
• a range of climate zones;
• a range of architectural vernacular;
• a wide variety of physical contexts;
• a range of pedagogies and student ages;
• and address the common problems.
How do you:
• develop a design idea that responds to a range of parameters and contexts?
• develop a design idea that is both customisable and economical?
• make it easy to add elements that allow buildings to evolve as needs change? •
deal with the relocation of buildings to new contexts at some point in the future?
Other issues to consider are:
• procurement models
• the role of architects
• the role of manufacturers
• the interface with end users.
© akaidpl 2010. All Rights Reserved.
© akaidpl 2010. All Rights Reserved.
“Prefabricated structure cannot
transform poor design, but prefabricated
structure can be transformed by good
design and considered details.”
Key Lessons
• Importance of a strong, innovative industry body with a research and
development wing;
• Investment in cutting edge manufacturing equipment is a significant
investment that requires a certainty of volume;
• The housing market plays a vital role in creating demand for prefabrication
innovation;
• Lean manufacturing principles and systems thinking are critical to innovation
and development in prefabrication;
• Prefabrication Structure has a vital role to play in the future of a more
sustainable, efficient construction industry;
• Architects have an important role to play in the design and development of
future prefabrication systems;
• Architecture Schools in Europe will increasingly include more teaching of
industrial design thinking to help bridge the gap between architecture and
manufacture.
© akaidpl 2010. All Rights Reserved.
“Prefabricated structure
“The Bauzentrum
near Munich is a
display village with
something for every
taste and budget...
wonderful! It
demonstrates a
range of
prefabricated
structure
approaches and
style choices from
different
manufacturers...
excellent quality,
energy performance
and value for
money are common
to all the products.”
DaVinci Haus
Elk
Gruber
Baufritz Rubner
Huf Haus The Energy Centre
Rubner
© akaidpl 2010. All Rights Reserved.
Gymnasium-Amsterdam
“This is a temporarily sited school building that is moveable and most importantly of a
permament design and construction quality.”
© akaidpl 2010. All Rights Reserved.
Gymnasium -Amsterdam
Key Lessons
• Permanent quality yet moveable;
• Prefabrication fundamental to the design strategy, and vice versa;
• 3D off-site modular approach;
• Cladding and rainscreen as a ‘skin’ that can be changed over time;
• Clever details;
• Life Cycle costing supported argument for increased build quality;
• The role of good design in urban regeneration, even when buildings are temporary.
© akaidpl 2010. All Rights Reserved.
Crissy Field -
Key Lessons
• Prefabrication fundamental to the design strategy, and vice versa;
• 2D off-site kit of parts approach;
• The ’configurator’ software allows for a level of controlled customisation;
• Parametric modelling is core to the mass customisation of the product;
• Product can be fabricated local to the site to avert long distance haulage;
• Straightforward assembly, so no specialist assembly contractors.
© akaidpl 2010. All Rights Reserved.
McDonalds use prefabricated
structures for their buildings, and set
a record of constructing a building
and opening for business within 13
hours.
CONCLUSION
Because of the design simplifications modern
architecture provides many in the manufactured
housing sector generally feel that modern
architecture designs are better suited for prefab home
construction.
© akaidpl 2010. All Rights Reserved.
REFERENCES
Because of the design simplification
www.slideshare.com
(Prefabrication | Future Proofing Schools)
www.Wikipedia.com
www.google.com

Contenu connexe

Tendances

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication constructionDivya Vishnoi
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systemsAkshay Revekar
 
Unique Space Planning concepts for Lifestyle Apartment
Unique Space Planning concepts for Lifestyle Apartment Unique Space Planning concepts for Lifestyle Apartment
Unique Space Planning concepts for Lifestyle Apartment Shashi Rekha
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explainedEyad Reda
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studiesSoumitra Smart
 
Basement construction report
Basement construction reportBasement construction report
Basement construction reportANKITAARORA85
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Bhishma Bhatti
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSJayashreeIyer14
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)Mansi Pushpakar
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationAditi Garg
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .Udayram Patil
 
Long span structures
Long span structures  Long span structures
Long span structures Aroh Thombre
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use buildingshabbirtg
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specificationsSimran Vats
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSASHOK KUMAR TIWARY
 

Tendances (20)

Prefabrication construction
Prefabrication constructionPrefabrication construction
Prefabrication construction
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
High-rise structural systems
High-rise structural systemsHigh-rise structural systems
High-rise structural systems
 
Unique Space Planning concepts for Lifestyle Apartment
Unique Space Planning concepts for Lifestyle Apartment Unique Space Planning concepts for Lifestyle Apartment
Unique Space Planning concepts for Lifestyle Apartment
 
Prefabrication types and Applications explained
Prefabrication types and Applications explainedPrefabrication types and Applications explained
Prefabrication types and Applications explained
 
Tall buildings case studies
Tall buildings   case studiesTall buildings   case studies
Tall buildings case studies
 
Basement construction report
Basement construction reportBasement construction report
Basement construction report
 
Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)Advance Formwork System (PERI FORMWORK SYSTEM)
Advance Formwork System (PERI FORMWORK SYSTEM)
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
 
Group Housing (Library Study)
Group Housing (Library Study)Group Housing (Library Study)
Group Housing (Library Study)
 
Prefabrication
PrefabricationPrefabrication
Prefabrication
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliation
 
Trussed tube
Trussed tubeTrussed tube
Trussed tube
 
Building planning
Building planningBuilding planning
Building planning
 
Tube structures and its type with comparison .
Tube structures and its type with comparison .Tube structures and its type with comparison .
Tube structures and its type with comparison .
 
Types of Cladding
Types of CladdingTypes of Cladding
Types of Cladding
 
Long span structures
Long span structures  Long span structures
Long span structures
 
5.1 Mixed use building
5.1 Mixed use building5.1 Mixed use building
5.1 Mixed use building
 
Detailed specifications
Detailed specificationsDetailed specifications
Detailed specifications
 
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGSADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
ADVANCED TECHNIQUES IN CONSTRUCTIONS IN HIGH RISE BUILDINGS
 

Similaire à Prefabricated structure

High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design WorkshopJerry Yudelson
 
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptxTechnology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptxravi795059
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for constPradeepPandya1
 
6th Modular & Precast Construction event
6th Modular & Precast Construction event6th Modular & Precast Construction event
6th Modular & Precast Construction eventPaco Conde Fernández
 
Genesis Manazil Group Presentation
Genesis Manazil Group PresentationGenesis Manazil Group Presentation
Genesis Manazil Group PresentationAhmed Shalaby
 
The National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan DavisThe National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan DavissustainableCoRE
 
Construction mirror oct2014
Construction mirror oct2014Construction mirror oct2014
Construction mirror oct2014Param Saxena
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014Michael Khalil
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabilMohamed Omer
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxSiharaGallage
 
Conversions of buildings
Conversions of buildingsConversions of buildings
Conversions of buildingsJulian Swindell
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english Buro CITE
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016Aconex
 

Similaire à Prefabricated structure (20)

The Merits of Structural Steelwork
The Merits of Structural SteelworkThe Merits of Structural Steelwork
The Merits of Structural Steelwork
 
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
Jerker Lessing & Rita Lavikka - Towards Sustainability Applying Industrialize...
 
High Performance Building Design Workshop
High Performance Building Design WorkshopHigh Performance Building Design Workshop
High Performance Building Design Workshop
 
E SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptxE SQUARE GROUP A1-6.pptx
E SQUARE GROUP A1-6.pptx
 
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptxTechnology_and_skills_in_the_construction_industry_slide_pack.pptx
Technology_and_skills_in_the_construction_industry_slide_pack.pptx
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
 
6th Modular & Precast Construction event
6th Modular & Precast Construction event6th Modular & Precast Construction event
6th Modular & Precast Construction event
 
Genesis Manazil Group Presentation
Genesis Manazil Group PresentationGenesis Manazil Group Presentation
Genesis Manazil Group Presentation
 
The National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan DavisThe National Refurbishment Challenge - by Jonathan Davis
The National Refurbishment Challenge - by Jonathan Davis
 
bim ppt 2 final
bim ppt 2 finalbim ppt 2 final
bim ppt 2 final
 
Construction mirror oct2014
Construction mirror oct2014Construction mirror oct2014
Construction mirror oct2014
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Advanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptxAdvanced CM_04.09.2022.pptx
Advanced CM_04.09.2022.pptx
 
Conversions of buildings
Conversions of buildingsConversions of buildings
Conversions of buildings
 
Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"Concept to production - "The challenges of PM in the RNLI"
Concept to production - "The challenges of PM in the RNLI"
 
Presentation buro cite english
Presentation buro cite english Presentation buro cite english
Presentation buro cite english
 
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 20165 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
5 Reasons Owners Specify Project-Wide Data Management - Webinar, March 2016
 
NAKO_LBE_Profile_email
NAKO_LBE_Profile_emailNAKO_LBE_Profile_email
NAKO_LBE_Profile_email
 

Plus de Vishvendu pandey

Infusing your brain with mastery
Infusing your brain with masteryInfusing your brain with mastery
Infusing your brain with masteryVishvendu pandey
 
50 simple-stress-relief-strategies
50 simple-stress-relief-strategies50 simple-stress-relief-strategies
50 simple-stress-relief-strategiesVishvendu pandey
 
17 ways to attract abundance
17 ways to attract abundance17 ways to attract abundance
17 ways to attract abundanceVishvendu pandey
 
I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)Vishvendu pandey
 
9296 2001 inspection and maintenance
9296 2001     inspection and maintenance9296 2001     inspection and maintenance
9296 2001 inspection and maintenanceVishvendu pandey
 
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperAr803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperVishvendu pandey
 
Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013 Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013 Vishvendu pandey
 
The origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occursThe origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occursVishvendu pandey
 
From planning-to-execution-wp-352123
From planning-to-execution-wp-352123From planning-to-execution-wp-352123
From planning-to-execution-wp-352123Vishvendu pandey
 
Municipal business bye laws
Municipal business bye lawsMunicipal business bye laws
Municipal business bye lawsVishvendu pandey
 
Le corbusier in furniture design
Le corbusier in furniture designLe corbusier in furniture design
Le corbusier in furniture designVishvendu pandey
 
75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reduced75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reducedVishvendu pandey
 

Plus de Vishvendu pandey (20)

Power of gratitude
Power of gratitudePower of gratitude
Power of gratitude
 
Infusing your brain with mastery
Infusing your brain with masteryInfusing your brain with mastery
Infusing your brain with mastery
 
Finding your-true-passion
Finding your-true-passionFinding your-true-passion
Finding your-true-passion
 
50 simple-stress-relief-strategies
50 simple-stress-relief-strategies50 simple-stress-relief-strategies
50 simple-stress-relief-strategies
 
17 ways to attract abundance
17 ways to attract abundance17 ways to attract abundance
17 ways to attract abundance
 
Urban design hand book
Urban design hand bookUrban design hand book
Urban design hand book
 
I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)I s 2526_-_1963 (acoustical design)
I s 2526_-_1963 (acoustical design)
 
9296 2001 inspection and maintenance
9296 2001     inspection and maintenance9296 2001     inspection and maintenance
9296 2001 inspection and maintenance
 
Ar803 Architectural Structure Question Paper
Ar803 Architectural Structure Question PaperAr803 Architectural Structure Question Paper
Ar803 Architectural Structure Question Paper
 
Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013 Ar803 Architectural Structure Question Paper-2013
Ar803 Architectural Structure Question Paper-2013
 
portfolio
 portfolio portfolio
portfolio
 
portfolio
 portfolio  portfolio
portfolio
 
Basu resume 12
Basu resume 12Basu resume 12
Basu resume 12
 
Basu Resume-12
Basu Resume-12Basu Resume-12
Basu Resume-12
 
The origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occursThe origin of all sources of water is rainfall when precipitation occurs
The origin of all sources of water is rainfall when precipitation occurs
 
From planning-to-execution-wp-352123
From planning-to-execution-wp-352123From planning-to-execution-wp-352123
From planning-to-execution-wp-352123
 
Municipal business bye laws
Municipal business bye lawsMunicipal business bye laws
Municipal business bye laws
 
Le corbusier in furniture design
Le corbusier in furniture designLe corbusier in furniture design
Le corbusier in furniture design
 
75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reduced75 tips and_tricks_excel_reduced
75 tips and_tricks_excel_reduced
 
Matrimandir final
Matrimandir finalMatrimandir final
Matrimandir final
 

Dernier

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...Nguyen Thanh Tu Collection
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Celine George
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxHumphrey A Beña
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfJemuel Francisco
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxleah joy valeriano
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxCarlos105
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxiammrhaywood
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYKayeClaireEstoconing
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxVanesaIglesias10
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsManeerUddin
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfVanessa Camilleri
 

Dernier (20)

HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
HỌC TỐT TIẾNG ANH 11 THEO CHƯƠNG TRÌNH GLOBAL SUCCESS ĐÁP ÁN CHI TIẾT - CẢ NĂ...
 
Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17Field Attribute Index Feature in Odoo 17
Field Attribute Index Feature in Odoo 17
 
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptxINTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
INTRODUCTION TO CATHOLIC CHRISTOLOGY.pptx
 
4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdfGrade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
Grade 9 Quarter 4 Dll Grade 9 Quarter 4 DLL.pdf
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptxMusic 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
Music 9 - 4th quarter - Vocal Music of the Romantic Period.pptx
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptxBarangay Council for the Protection of Children (BCPC) Orientation.pptx
Barangay Council for the Protection of Children (BCPC) Orientation.pptx
 
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptxYOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
YOUVE GOT EMAIL_FINALS_EL_DORADO_2024.pptx
 
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptxECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
ECONOMIC CONTEXT - PAPER 1 Q3: NEWSPAPERS.pptx
 
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITYISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
ISYU TUNGKOL SA SEKSWLADIDA (ISSUE ABOUT SEXUALITY
 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
 
ROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptxROLES IN A STAGE PRODUCTION in arts.pptx
ROLES IN A STAGE PRODUCTION in arts.pptx
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Food processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture honsFood processing presentation for bsc agriculture hons
Food processing presentation for bsc agriculture hons
 
ICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdfICS2208 Lecture6 Notes for SL spaces.pdf
ICS2208 Lecture6 Notes for SL spaces.pdf
 

Prefabricated structure

  • 1. © akaidpl 2010. All Rights Reserved. PREFABRICATED STRUCTURE PANKAJ KUMAR PANKAJ KUMAR SAGAR VISHVENDU PANDEY
  • 2. © akaidpl 2010. All Rights Reserved. 21st century design technologies present us with endless possibilities to ‘rethink’ how we design and manufacture and: • create a shift from mass- production to mass-customisation; • embrace parametric modelling for site specific, value driven responses; • maximize the interface of these technologies with manufacturing. Social, economic and environmental factors suggest an urgent need to consider new ways to build. These factors include: • shortages of skilled trade labour in many communities; • need for increased construction quality and lower costs; • need to improve construction productivity; • need for more sustainable, cradle to cradle solutions; • increased acceptance of quality prefabrication.
  • 3. © akaidpl 2010. All Rights Reserved. Why prefabricated structure? •Speed •Quality •Safety •Skills •Sustainability •Cost •Impermanent site
  • 4. © akaidpl 2010. All Rights Reserved. Relocatables> Common problems •Heat gain and loss: difficult to manage in current ‘generic’ products; •Indoor environment quality: acoustics and light levels are often less than ideal; •Floors: generally low thermal mass, sometimes undesirable floor movement; •Floor level: typically circa 600mm above ground for connection crawl space; •Connections and views: generally limited, both visually and physically; •Placement: often disconnected from other school buildings, hidden from view; •Toilets: usually not provided due to distance from soil waste connections; •Extras: no standard range of ‘extras’ that are also ‘relocatable’; •Temporary: often look and feel temporary, yet can become permanent; •Details: joins between modules and other details add to ‘temporary feel’; •Appearance: utilitarian in appearance, generally designed by manufacturers; •Transport: design is largely defined by transport logistics rather than end use.
  • 5. © akaidpl 2010. All Rights Reserved. Future needs Relocatables of the future will need to respond to: • a range of climate zones; • a range of architectural vernacular; • a wide variety of physical contexts; • a range of pedagogies and student ages; • and address the common problems. How do you: • develop a design idea that responds to a range of parameters and contexts? • develop a design idea that is both customisable and economical? • make it easy to add elements that allow buildings to evolve as needs change? • deal with the relocation of buildings to new contexts at some point in the future? Other issues to consider are: • procurement models • the role of architects • the role of manufacturers • the interface with end users.
  • 6. © akaidpl 2010. All Rights Reserved.
  • 7. © akaidpl 2010. All Rights Reserved. “Prefabricated structure cannot transform poor design, but prefabricated structure can be transformed by good design and considered details.” Key Lessons • Importance of a strong, innovative industry body with a research and development wing; • Investment in cutting edge manufacturing equipment is a significant investment that requires a certainty of volume; • The housing market plays a vital role in creating demand for prefabrication innovation; • Lean manufacturing principles and systems thinking are critical to innovation and development in prefabrication; • Prefabrication Structure has a vital role to play in the future of a more sustainable, efficient construction industry; • Architects have an important role to play in the design and development of future prefabrication systems; • Architecture Schools in Europe will increasingly include more teaching of industrial design thinking to help bridge the gap between architecture and manufacture.
  • 8. © akaidpl 2010. All Rights Reserved. “Prefabricated structure “The Bauzentrum near Munich is a display village with something for every taste and budget... wonderful! It demonstrates a range of prefabricated structure approaches and style choices from different manufacturers... excellent quality, energy performance and value for money are common to all the products.” DaVinci Haus Elk Gruber Baufritz Rubner Huf Haus The Energy Centre Rubner
  • 9. © akaidpl 2010. All Rights Reserved. Gymnasium-Amsterdam “This is a temporarily sited school building that is moveable and most importantly of a permament design and construction quality.”
  • 10. © akaidpl 2010. All Rights Reserved. Gymnasium -Amsterdam Key Lessons • Permanent quality yet moveable; • Prefabrication fundamental to the design strategy, and vice versa; • 3D off-site modular approach; • Cladding and rainscreen as a ‘skin’ that can be changed over time; • Clever details; • Life Cycle costing supported argument for increased build quality; • The role of good design in urban regeneration, even when buildings are temporary.
  • 11. © akaidpl 2010. All Rights Reserved. Crissy Field - Key Lessons • Prefabrication fundamental to the design strategy, and vice versa; • 2D off-site kit of parts approach; • The ’configurator’ software allows for a level of controlled customisation; • Parametric modelling is core to the mass customisation of the product; • Product can be fabricated local to the site to avert long distance haulage; • Straightforward assembly, so no specialist assembly contractors.
  • 12. © akaidpl 2010. All Rights Reserved. McDonalds use prefabricated structures for their buildings, and set a record of constructing a building and opening for business within 13 hours. CONCLUSION Because of the design simplifications modern architecture provides many in the manufactured housing sector generally feel that modern architecture designs are better suited for prefab home construction.
  • 13. © akaidpl 2010. All Rights Reserved. REFERENCES Because of the design simplification www.slideshare.com (Prefabrication | Future Proofing Schools) www.Wikipedia.com www.google.com