2014 – 2016 Siemens Energy Inc.
2014 – 2016 Siemens Energy Inc., Site Execution – Mechanical Piping Engineer for EPC, CCPP
Responsible for all BOP above ground process piping, including trouble shooting design issues
with miss match of equipment connection to process piping, dealing with multiable contractors,
Including a Water treatment plant, Tank farm with 4 fuel oil tanks and 2 biodiesel tanks and there
distribution pumps. Also responsible for ECC packages to turned over to the commissioning as
well as the client at Central Termoelectrica Guillermo Brown in Bahia Blanca, Argentina.
2013 – 2014 Siemens Energy Inc., Site Execution – Mechanical TFA for Installation of KN
Steam Turbine and their Auxiliaries including piping at Termozulia lll in Maracaibo Venezuela.
2013 Siemens Energy Inc., Site Execution – Mechanical TFA training on a KN Steam Turbine
on new construction with the responsibility of learning and assembling HP Turbine, LP outer
casing, LP inner casing with setting the LP Turbine and their Auxiliaries including piping at Panda
Temple Power Plant, in Temple TX, USA
2012-2013 Siemens Energy Inc, Site Execution – Mechanical Lead TFA for 2 of 12 W501F (5)
with the responsibility of Installation GT/GTG and their Auxiliaries, including piping, working with
Samsung LTD at Qurayyah Power Plant (QIPP) in Saudi Arabia.
2012 – Siemens Energy Inc, Site Execution – Mechanical Piping lead TFA for 2 of 12 W501F (5)
with the installation responsibility of auxiliaries and the inter connection piping at Raz Al Kahair
Power Plant, Saudi Arabia.
2011-2012 Siemens Energy Inc, Site Execution – Mechanical lead TFA with the Responsible for
the Installation and cold Commissioning of 2 W501F (4) Gas Turbines including auxiliaries at
Termozulia III, Maracaibo, Venezuela.
2010-2011 Siemens Energy Inc, Site Execution – Mechanical lead piping TFA with the
Responsible for the installation and commissioning of STG mechanical system including the
auxiliaries necessary to operate the ST at Longview Power plant in West Virginia USA
2010 Siemens Energy Inc, Site Execution – Mechanical installation of piping on 2 W501 gas
turbines and responsible for installation and commissioning of all the CTG mechanical systems
including the auxiliaries to operate the CT, at Posco Power, in Seoul, South Korea.
2009-2010 - Siemens Energy, Inc, Site Execution - Mechanical Installation of 2 CMI, HRSG’s
and all auxiliary provided by Siemens, Also Chemical cleaning and steam blows and
commissioning of full combine cycle plant at Termoelectrica, Manuel Belgrano. Buenos Aires,
Argentina.
2008-2009 – Siemens Energy, Inc., Site Execution – Mechanical Installation of 2 W501F gas
turbines, Responsible for the installation and commissioning of all the CTG mechanical systems
including the auxiliaries necessary to operate the CT at Termozulia II, Maracaibo, Venezuela.
2002 to 2008 – Teton Industrial Construction:
2007-2008- Piping Superintendent on FGD Project Plant Bowen installation of process pipe for
emission of coal powered plant and commissioning of auxiliaries systems, in Cartersville GA,
USA
2005-2007-Piping foreman on installation of two Siemens 501F gas turbines, mechanical lead
supervisor responsible for the installation and commissioning of all the CTG mechanical systems
including the auxiliaries necessaries to operate the CT and HRSG’s and reverse osmosis water
treatment plant at Lakeside Power Plant for Pacific Corp, in Orem UT, USA
2004-2005- Piping foreman on installation of two GE gas turbines and mechanical lead foreman
on start-up and commissioning of turbines, HRSG’s and Toshiba steam turbine at Mona, Utah for
Pacific Corp, USA.
2004- Piping foreman on installation of three GE gas turbines and mechanical lead foreman on
start-up and commissioning of turbines and reverse osmosis water treatment plant at Marsh Run
Generation Plant, Remington, VA, USA.
2003 - Piping foreman on installation of two GE gas turbines and all associated ancillary
equipment and start-up and commissioning duties at Stanton Energy Plant, Orlando FL, USA
2002- Piping foreman on installation of six GE gas turbines, HRSG’s and all associated ancillary
equipment and start-up and commissioning duties at Forney Power plant for Florida Power and
Light, Forney, TX, USA.
2000-2002 – Brown & Root. Maintenance technician for PPG Fine Chemicals, La-porte TX (Hyd
pumps, motors, chiller units, low pressure HVAC systems)
1988-2000- General machinist for Massey Grinding Services (Precision grinding and CNC
machinist, manual machinist and shop floor supervisor)
EDUCATION
2013 OSHA 30hr course holding OSHA 30 Card
2001-2002 PPG Fine Chemicals, Laport TX 713 928 5281
Refrigerant Transition and Recovery Program,
Qualified HVAC Technician, Holding a Universal License,
2000-2001 Baytown Lee College, Baytown TX
Millwrights 1,2,3,4 and Pipe class 1 and 2
Holding NCCO cards
[ Need to complete College English for Associates Degree ]
1983-1986 Channelview High School - General Studies

More Related Content

What's hot

Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Sachin Pyasi
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14Jim Benge
 
Martin Walker GE style CV
Martin Walker GE style CVMartin Walker GE style CV
Martin Walker GE style CVMartin Walker
 
R_SealsResume2015
R_SealsResume2015R_SealsResume2015
R_SealsResume2015Rocky Seals
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15Sandher Subayno
 
SYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVSYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVRehan Saleh
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14Jim Benge
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 

What's hot (20)

Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)Power plant desk operation engineer(Boiler, turbine, HVAC)
Power plant desk operation engineer(Boiler, turbine, HVAC)
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14PROJECT-List_Attach_A_Jim Benge 6-14
PROJECT-List_Attach_A_Jim Benge 6-14
 
Martin Walker GE style CV
Martin Walker GE style CVMartin Walker GE style CV
Martin Walker GE style CV
 
Projects alrawan
Projects alrawanProjects alrawan
Projects alrawan
 
Wiiliam CV update
Wiiliam CV updateWiiliam CV update
Wiiliam CV update
 
R_SealsResume2015
R_SealsResume2015R_SealsResume2015
R_SealsResume2015
 
Sandher Updated Resume15
Sandher Updated Resume15Sandher Updated Resume15
Sandher Updated Resume15
 
RESUME
RESUMERESUME
RESUME
 
Trvl Tech
Trvl TechTrvl Tech
Trvl Tech
 
rakesh resume_10.03.2016
rakesh resume_10.03.2016rakesh resume_10.03.2016
rakesh resume_10.03.2016
 
SYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVSYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CV
 
Bilal.cv
Bilal.cvBilal.cv
Bilal.cv
 
C V
C VC V
C V
 
PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14PROJECT-Details_Attach_B_Jim Benge 6-14
PROJECT-Details_Attach_B_Jim Benge 6-14
 
mohamed rabea CV
mohamed rabea CVmohamed rabea CV
mohamed rabea CV
 
Newest
NewestNewest
Newest
 
Surajit cv.doc
Surajit cv.docSurajit cv.doc
Surajit cv.doc
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 
M.reda cv
M.reda cvM.reda cv
M.reda cv
 

Similar to W.O. Place (CV)

Similar to W.O. Place (CV) (20)

CV-Project Manager
CV-Project ManagerCV-Project Manager
CV-Project Manager
 
CV_Anand
CV_AnandCV_Anand
CV_Anand
 
JAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUMEJAMES MICHAEL STULTS_RESUME
JAMES MICHAEL STULTS_RESUME
 
Rich Mathias CV 2016
Rich Mathias CV 2016Rich Mathias CV 2016
Rich Mathias CV 2016
 
jamespickering
jamespickeringjamespickering
jamespickering
 
Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1Resume_for_Kendall_Holland1
Resume_for_Kendall_Holland1
 
Sankar_ Vaid
Sankar_ VaidSankar_ Vaid
Sankar_ Vaid
 
Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016Allmendinger, Jack resume Sept 2016
Allmendinger, Jack resume Sept 2016
 
John P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDFJohn P Henderson Resume- Jan 2016PDF
John P Henderson Resume- Jan 2016PDF
 
new john frost resume
new john frost resumenew john frost resume
new john frost resume
 
Resume_1
Resume_1Resume_1
Resume_1
 
Stewart Kane CV 2015
Stewart Kane CV 2015Stewart Kane CV 2015
Stewart Kane CV 2015
 
Resume-Murugan
Resume-MuruganResume-Murugan
Resume-Murugan
 
George blane resume 1
George blane resume 1George blane resume 1
George blane resume 1
 
Ronald Bray Resume
Ronald Bray ResumeRonald Bray Resume
Ronald Bray Resume
 
TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016TERRY A EVANS RESUME Inspection 07-22-2016
TERRY A EVANS RESUME Inspection 07-22-2016
 
2019 robert bertranb
2019 robert bertranb 2019 robert bertranb
2019 robert bertranb
 
Leslie Banks 2016
Leslie Banks 2016Leslie Banks 2016
Leslie Banks 2016
 
Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016Michael Dunlap Resume - 2016
Michael Dunlap Resume - 2016
 
MM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEERMM GUANZON, CV- MAINTENANCE ENGINEER
MM GUANZON, CV- MAINTENANCE ENGINEER
 

W.O. Place (CV)

  • 1. WO PLACE WORK EXPERIENCE 2014 – 2016 Siemens Energy Inc. 2014 – 2016 Siemens Energy Inc., Site Execution – Mechanical Piping Engineer for EPC, CCPP Responsible for all BOP above ground process piping, including trouble shooting design issues with miss match of equipment connection to process piping, dealing with multiable contractors, Including a Water treatment plant, Tank farm with 4 fuel oil tanks and 2 biodiesel tanks and there distribution pumps. Also responsible for ECC packages to turned over to the commissioning as well as the client at Central Termoelectrica Guillermo Brown in Bahia Blanca, Argentina. 2013 – 2014 Siemens Energy Inc., Site Execution – Mechanical TFA for Installation of KN Steam Turbine and their Auxiliaries including piping at Termozulia lll in Maracaibo Venezuela. 2013 Siemens Energy Inc., Site Execution – Mechanical TFA training on a KN Steam Turbine on new construction with the responsibility of learning and assembling HP Turbine, LP outer casing, LP inner casing with setting the LP Turbine and their Auxiliaries including piping at Panda Temple Power Plant, in Temple TX, USA 2012-2013 Siemens Energy Inc, Site Execution – Mechanical Lead TFA for 2 of 12 W501F (5) with the responsibility of Installation GT/GTG and their Auxiliaries, including piping, working with Samsung LTD at Qurayyah Power Plant (QIPP) in Saudi Arabia. 2012 – Siemens Energy Inc, Site Execution – Mechanical Piping lead TFA for 2 of 12 W501F (5) with the installation responsibility of auxiliaries and the inter connection piping at Raz Al Kahair Power Plant, Saudi Arabia. 2011-2012 Siemens Energy Inc, Site Execution – Mechanical lead TFA with the Responsible for the Installation and cold Commissioning of 2 W501F (4) Gas Turbines including auxiliaries at Termozulia III, Maracaibo, Venezuela. 2010-2011 Siemens Energy Inc, Site Execution – Mechanical lead piping TFA with the Responsible for the installation and commissioning of STG mechanical system including the auxiliaries necessary to operate the ST at Longview Power plant in West Virginia USA 2010 Siemens Energy Inc, Site Execution – Mechanical installation of piping on 2 W501 gas turbines and responsible for installation and commissioning of all the CTG mechanical systems including the auxiliaries to operate the CT, at Posco Power, in Seoul, South Korea. 2009-2010 - Siemens Energy, Inc, Site Execution - Mechanical Installation of 2 CMI, HRSG’s and all auxiliary provided by Siemens, Also Chemical cleaning and steam blows and commissioning of full combine cycle plant at Termoelectrica, Manuel Belgrano. Buenos Aires, Argentina. 2008-2009 – Siemens Energy, Inc., Site Execution – Mechanical Installation of 2 W501F gas turbines, Responsible for the installation and commissioning of all the CTG mechanical systems including the auxiliaries necessary to operate the CT at Termozulia II, Maracaibo, Venezuela. 2002 to 2008 – Teton Industrial Construction:
  • 2. 2007-2008- Piping Superintendent on FGD Project Plant Bowen installation of process pipe for emission of coal powered plant and commissioning of auxiliaries systems, in Cartersville GA, USA 2005-2007-Piping foreman on installation of two Siemens 501F gas turbines, mechanical lead supervisor responsible for the installation and commissioning of all the CTG mechanical systems including the auxiliaries necessaries to operate the CT and HRSG’s and reverse osmosis water treatment plant at Lakeside Power Plant for Pacific Corp, in Orem UT, USA 2004-2005- Piping foreman on installation of two GE gas turbines and mechanical lead foreman on start-up and commissioning of turbines, HRSG’s and Toshiba steam turbine at Mona, Utah for Pacific Corp, USA. 2004- Piping foreman on installation of three GE gas turbines and mechanical lead foreman on start-up and commissioning of turbines and reverse osmosis water treatment plant at Marsh Run Generation Plant, Remington, VA, USA. 2003 - Piping foreman on installation of two GE gas turbines and all associated ancillary equipment and start-up and commissioning duties at Stanton Energy Plant, Orlando FL, USA 2002- Piping foreman on installation of six GE gas turbines, HRSG’s and all associated ancillary equipment and start-up and commissioning duties at Forney Power plant for Florida Power and Light, Forney, TX, USA. 2000-2002 – Brown & Root. Maintenance technician for PPG Fine Chemicals, La-porte TX (Hyd pumps, motors, chiller units, low pressure HVAC systems) 1988-2000- General machinist for Massey Grinding Services (Precision grinding and CNC machinist, manual machinist and shop floor supervisor) EDUCATION 2013 OSHA 30hr course holding OSHA 30 Card 2001-2002 PPG Fine Chemicals, Laport TX 713 928 5281 Refrigerant Transition and Recovery Program, Qualified HVAC Technician, Holding a Universal License, 2000-2001 Baytown Lee College, Baytown TX Millwrights 1,2,3,4 and Pipe class 1 and 2 Holding NCCO cards [ Need to complete College English for Associates Degree ] 1983-1986 Channelview High School - General Studies