The document provides a work experience summary for an individual with over 20 years of experience in mechanical piping and turbine installation and commissioning roles for major energy companies like Siemens Energy and Teton Industrial Construction. Their experience includes domestic and international projects across industries like power generation, oil and gas, and chemicals. They have a background in machining, maintenance technician work, and hold relevant safety and technical certifications.
1. WO PLACE
WORK EXPERIENCE
2014 – 2016 Siemens Energy Inc.
2014 – 2016 Siemens Energy Inc., Site Execution – Mechanical Piping Engineer for EPC, CCPP
Responsible for all BOP above ground process piping, including trouble shooting design issues
with miss match of equipment connection to process piping, dealing with multiable contractors,
Including a Water treatment plant, Tank farm with 4 fuel oil tanks and 2 biodiesel tanks and there
distribution pumps. Also responsible for ECC packages to turned over to the commissioning as
well as the client at Central Termoelectrica Guillermo Brown in Bahia Blanca, Argentina.
2013 – 2014 Siemens Energy Inc., Site Execution – Mechanical TFA for Installation of KN
Steam Turbine and their Auxiliaries including piping at Termozulia lll in Maracaibo Venezuela.
2013 Siemens Energy Inc., Site Execution – Mechanical TFA training on a KN Steam Turbine
on new construction with the responsibility of learning and assembling HP Turbine, LP outer
casing, LP inner casing with setting the LP Turbine and their Auxiliaries including piping at Panda
Temple Power Plant, in Temple TX, USA
2012-2013 Siemens Energy Inc, Site Execution – Mechanical Lead TFA for 2 of 12 W501F (5)
with the responsibility of Installation GT/GTG and their Auxiliaries, including piping, working with
Samsung LTD at Qurayyah Power Plant (QIPP) in Saudi Arabia.
2012 – Siemens Energy Inc, Site Execution – Mechanical Piping lead TFA for 2 of 12 W501F (5)
with the installation responsibility of auxiliaries and the inter connection piping at Raz Al Kahair
Power Plant, Saudi Arabia.
2011-2012 Siemens Energy Inc, Site Execution – Mechanical lead TFA with the Responsible for
the Installation and cold Commissioning of 2 W501F (4) Gas Turbines including auxiliaries at
Termozulia III, Maracaibo, Venezuela.
2010-2011 Siemens Energy Inc, Site Execution – Mechanical lead piping TFA with the
Responsible for the installation and commissioning of STG mechanical system including the
auxiliaries necessary to operate the ST at Longview Power plant in West Virginia USA
2010 Siemens Energy Inc, Site Execution – Mechanical installation of piping on 2 W501 gas
turbines and responsible for installation and commissioning of all the CTG mechanical systems
including the auxiliaries to operate the CT, at Posco Power, in Seoul, South Korea.
2009-2010 - Siemens Energy, Inc, Site Execution - Mechanical Installation of 2 CMI, HRSG’s
and all auxiliary provided by Siemens, Also Chemical cleaning and steam blows and
commissioning of full combine cycle plant at Termoelectrica, Manuel Belgrano. Buenos Aires,
Argentina.
2008-2009 – Siemens Energy, Inc., Site Execution – Mechanical Installation of 2 W501F gas
turbines, Responsible for the installation and commissioning of all the CTG mechanical systems
including the auxiliaries necessary to operate the CT at Termozulia II, Maracaibo, Venezuela.
2002 to 2008 – Teton Industrial Construction:
2. 2007-2008- Piping Superintendent on FGD Project Plant Bowen installation of process pipe for
emission of coal powered plant and commissioning of auxiliaries systems, in Cartersville GA,
USA
2005-2007-Piping foreman on installation of two Siemens 501F gas turbines, mechanical lead
supervisor responsible for the installation and commissioning of all the CTG mechanical systems
including the auxiliaries necessaries to operate the CT and HRSG’s and reverse osmosis water
treatment plant at Lakeside Power Plant for Pacific Corp, in Orem UT, USA
2004-2005- Piping foreman on installation of two GE gas turbines and mechanical lead foreman
on start-up and commissioning of turbines, HRSG’s and Toshiba steam turbine at Mona, Utah for
Pacific Corp, USA.
2004- Piping foreman on installation of three GE gas turbines and mechanical lead foreman on
start-up and commissioning of turbines and reverse osmosis water treatment plant at Marsh Run
Generation Plant, Remington, VA, USA.
2003 - Piping foreman on installation of two GE gas turbines and all associated ancillary
equipment and start-up and commissioning duties at Stanton Energy Plant, Orlando FL, USA
2002- Piping foreman on installation of six GE gas turbines, HRSG’s and all associated ancillary
equipment and start-up and commissioning duties at Forney Power plant for Florida Power and
Light, Forney, TX, USA.
2000-2002 – Brown & Root. Maintenance technician for PPG Fine Chemicals, La-porte TX (Hyd
pumps, motors, chiller units, low pressure HVAC systems)
1988-2000- General machinist for Massey Grinding Services (Precision grinding and CNC
machinist, manual machinist and shop floor supervisor)
EDUCATION
2013 OSHA 30hr course holding OSHA 30 Card
2001-2002 PPG Fine Chemicals, Laport TX 713 928 5281
Refrigerant Transition and Recovery Program,
Qualified HVAC Technician, Holding a Universal License,
2000-2001 Baytown Lee College, Baytown TX
Millwrights 1,2,3,4 and Pipe class 1 and 2
Holding NCCO cards
[ Need to complete College English for Associates Degree ]
1983-1986 Channelview High School - General Studies