Wellesley Public Schools
         FY 2012
 Capital Outlay Request


Presented to the
School Committee
         October 19, 2010
Debt Exclusion Update
Summer 2008
  Fiske/Hardy/Schofield - roof replacement
Summer 2009
  Fiske/Hardy/Schofield/Upham - boiler replacement
  Fiske/Hardy/Hunnewell/Schofield/Upham -
   abatement/flooring
  Hunnewell/Upham - gymnasium ceiling
  Upham/Hunnewell (partial) - roof replacement
  Fiske - abatement, ceiling replacement, sprinklers -
   phase 1
Debt Exclusion Update
Summer 2010
  Fiske - abatement, window replacement, ceiling
   replacement, sprinklers - phase 2
  Hunnewell - abatement/flooring
  Schofield - abatement/entry grates
To Be Completed
  middle school - lower gymnasium floor replacement
Capital Request Summary
                           Non-
                         Facilities   Facilities    Total

 Instructional               21,913         -       21,913
 Equipment                    2,090     13,258      15,348
 Furniture/Furnishings       28,870         -       28,870
 Infrastructure              35,000   126,350      161,350
 Maintenance                      -         -          -
 Safety                           -   130,000      130,000
 Technology                 613,237         -      613,237
 TOTAL                      701,110   269,608      970,718
Instructional Capital Defined
 durable, educational items and/or materials
 useful life of five years or more and/or a unit cost
  greater than $5,000
 items necessary for students to experience the
  curriculum
Instructional
 Fitness and Health
   continuation of multi-year fitness center replacement
 Performing Arts
   instruments
 Science
   microscopes - enrollment need
 Visual Arts
   phase one of multi-year kiln replacement
   continuation of multi-year enlarger replacement
   cameras - enrollment need
                                             Total - $21,913
Operations Capital Defined
 services and/or non-expendable items
  repair or reconditioning of school buildings, grounds
   and/or equipment
 useful life of five years or more
 items can be exchanged between schools and/or
  classrooms with no affect on curriculum
 five subcategories
  equipment, furniture/furnishings, infrastructure,
   maintenance, and safety
Operations Equipment
Non-Facilities
   continuation of wall mat replacement
   refrigerator for Sprague nursing
   copier replacement deferred one year
Facilities
   vacuum cleaners and floor scrubber
   AC replacement - Hardy main office
   barrel cart - district-wide recycling program
                                            Total - $15,348
Furniture/Furnishings
 classroom furniture
    • mostly replacement
    • new for enrollment increases
 rug replacement
 shade/blinds - phase 1 of multi-year plan to repair or
  replace in all schools




                                        Total - $28,870
Furniture Highlights

    Hunnewell shades
                       P   t
                       r   a
                       e   b
                       s   l
                       c   e
                       h   s
                       o
                       o
                       l
Infrastructure
Non-Facilities
   contingency for interior modifications
Facilities
   Preschool - exhaust vents/hot water system
   Hardy - faucets/restroom partitions/smoke detectors
   Hunnewell - steam trap replacement
   Sprague - lighting/floor repair
   All buildings - annual roof inspection/repair
                                          Total - $161,350
Sprague Lighting
 Non-functioning lights
Maintenance
No request for FY12
Safety
 Schofield - drainage improvements
    • remediation based on engineering review
 contingency for environmental safety testing and/or
  mitigation




                                          Total - $130,000
Safety - Schofield




          Photographs taken Friday, October 15, 2010
          Overnight precipitation approximately 1.6”
Technology Capital Defined
 computer hardware and peripherals
 network infrastructure and cabling
 installation/setup of equipment
 four subcategories
  replacement/enrollment/system maintenance/new
   equipment
Technology
 cyclical replacement
  102 desktop - 7 year cycle
  276 laptop - 5 year cycle
  30 printers
 enrollment
  laptop carts for middle school
  laptops for new professional staff
Technology
 system maintenance
  year 1 of 5 year plan to enhance security and
   management of WAN/LAN
     • elementary and middle school switches
 new equipment
  continuation of multi-year plan - SMARTboard,
   document camera, projection system



                                           Total - $613,237
Capital Request Summary
                           Non-
                         Facilities   Facilities    Total

 Instructional               21,913         -       21,913
 Equipment                    2,090     13,258      15,348
 Furniture/Furnishings       28,870         -       28,870
 Infrastructure              35,000   126,350      161,350
 Maintenance                      -         -          -
 Safety                           -   130,000      130,000
 Technology                 613,237         -      613,237
 TOTAL                      701,110   269,608      970,718
Request vs. Advisory
Guideline
                              Non-Facilities Facilities   Total

  FY11 Budget                      569,714    243,747     813,461


  FY12 Request                     701,110    269,608     970,718


  ADVISORY GUIDELINE (1.5%)                               825,663


  Variance from Guideline                                 145,055
Recommendation
 funds from Facilities Maintenance Reserve
  Account
  correct Schofield safety now               120,000


 reallocate FY11 funds for vehicles
  improve ventilation and relocate hot water system at
   preschool                                    22,500

                                       Total - $142,500
Request vs. Advisory
Guideline
                              Non-Facilities Facilities    Total

  FY11 Budget                      569,714    243,747     813,461


  FY12 Request                     701,110    269,608     970,718


  ADVISORY GUIDELINE (1.5%)                               825,663


  Variance from Guideline                                 145,055


  Recommended Changes                                     (142,500)


  Variance from Guideline                                    2,555
QUESTIONS????

More Related Content

Similar to Fy12 Capital Outlay Requests

Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Kenneth Hogge Sr
 
Advanced energy design guides a blueprint for cutting your campus energy us...
Advanced energy design guides   a blueprint for cutting your campus energy us...Advanced energy design guides   a blueprint for cutting your campus energy us...
Advanced energy design guides a blueprint for cutting your campus energy us...TNenergy
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesAnne Patenaude
 
Technical Compentencies
Technical CompentenciesTechnical Compentencies
Technical CompentenciesMeg Thompson
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project PresentationSteve Schneider
 
Automation Upgrade
Automation UpgradeAutomation Upgrade
Automation UpgradeRyan Gunhold
 
HHH Budget Presentation 3-26-07
HHH Budget Presentation 3-26-07HHH Budget Presentation 3-26-07
HHH Budget Presentation 3-26-07E Robertson
 
City Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity of San Angelo Texas
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...Rajeswaran Muthu Venkatachalam
 
Introducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityIntroducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityTaylorDuncan
 
Introducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityIntroducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityTaylorDuncan
 
Energy modeling 101 (public)
Energy modeling 101 (public)Energy modeling 101 (public)
Energy modeling 101 (public)Michael Brown
 
Finance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesFinance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesSeattle2030District
 
A case study on total Energy Conservation opportunities in a Solar power assi...
A case study on total Energy Conservation opportunities in a Solar power assi...A case study on total Energy Conservation opportunities in a Solar power assi...
A case study on total Energy Conservation opportunities in a Solar power assi...Ambika Prasanna Dhal
 
ASBA Presentation: Schools and Energy Efficiency
ASBA Presentation: Schools and Energy Efficiency ASBA Presentation: Schools and Energy Efficiency
ASBA Presentation: Schools and Energy Efficiency Programmed
 

Similar to Fy12 Capital Outlay Requests (20)

Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023Gcps long range capital plan fy2019 2023
Gcps long range capital plan fy2019 2023
 
Advanced energy design guides a blueprint for cutting your campus energy us...
Advanced energy design guides   a blueprint for cutting your campus energy us...Advanced energy design guides   a blueprint for cutting your campus energy us...
Advanced energy design guides a blueprint for cutting your campus energy us...
 
DFP
DFPDFP
DFP
 
The Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency InitiativesThe Role of Incentives in Advancing Energy Efficiency Initiatives
The Role of Incentives in Advancing Energy Efficiency Initiatives
 
Technical Compentencies
Technical CompentenciesTechnical Compentencies
Technical Compentencies
 
CV-S Building Project Presentation
CV-S Building Project PresentationCV-S Building Project Presentation
CV-S Building Project Presentation
 
Automation Upgrade
Automation UpgradeAutomation Upgrade
Automation Upgrade
 
Michel Reygaerts CV
Michel Reygaerts CVMichel Reygaerts CV
Michel Reygaerts CV
 
HHH Budget Presentation 3-26-07
HHH Budget Presentation 3-26-07HHH Budget Presentation 3-26-07
HHH Budget Presentation 3-26-07
 
Energy
EnergyEnergy
Energy
 
City Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction UpdateCity Council July 19, 2011 City Hall Construction Update
City Council July 19, 2011 City Hall Construction Update
 
technical audit in murugappa group - toward converting the audit from cost ...
 technical audit in murugappa group - toward converting the audit from  cost ... technical audit in murugappa group - toward converting the audit from  cost ...
technical audit in murugappa group - toward converting the audit from cost ...
 
Introducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityIntroducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State University
 
Introducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State UniversityIntroducing Natural Light To East Tennessee State University
Introducing Natural Light To East Tennessee State University
 
Energy modeling 101 (public)
Energy modeling 101 (public)Energy modeling 101 (public)
Energy modeling 101 (public)
 
Finance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project OpportunitiesFinance workshop Session 1 - Project Financing and Project Opportunities
Finance workshop Session 1 - Project Financing and Project Opportunities
 
Realizing the Economic Impacts of Energy Efficiency in Pennsylvania
Realizing the Economic Impacts of Energy Efficiency in PennsylvaniaRealizing the Economic Impacts of Energy Efficiency in Pennsylvania
Realizing the Economic Impacts of Energy Efficiency in Pennsylvania
 
A case study on total Energy Conservation opportunities in a Solar power assi...
A case study on total Energy Conservation opportunities in a Solar power assi...A case study on total Energy Conservation opportunities in a Solar power assi...
A case study on total Energy Conservation opportunities in a Solar power assi...
 
ASBA Presentation: Schools and Energy Efficiency
ASBA Presentation: Schools and Energy Efficiency ASBA Presentation: Schools and Energy Efficiency
ASBA Presentation: Schools and Energy Efficiency
 
Registered Energy Manager Slide: Energy Audit
Registered Energy Manager Slide: Energy AuditRegistered Energy Manager Slide: Energy Audit
Registered Energy Manager Slide: Energy Audit
 

More from Wellesley Public School (20)

Bulletin 6-17-11
 Bulletin 6-17-11 Bulletin 6-17-11
Bulletin 6-17-11
 
Superintendents' Bulletin 6-10-11
Superintendents' Bulletin 6-10-11Superintendents' Bulletin 6-10-11
Superintendents' Bulletin 6-10-11
 
Superintendent's Bulletin 6-3-11
Superintendent's Bulletin 6-3-11Superintendent's Bulletin 6-3-11
Superintendent's Bulletin 6-3-11
 
WMS Summer Locker
WMS Summer LockerWMS Summer Locker
WMS Summer Locker
 
WMS June 2011
WMS June 2011WMS June 2011
WMS June 2011
 
WES June11
WES June11WES June11
WES June11
 
WHS June 2011
WHS June 2011WHS June 2011
WHS June 2011
 
Superintendent's Bulletin 5-27-11
Superintendent's Bulletin 5-27-11Superintendent's Bulletin 5-27-11
Superintendent's Bulletin 5-27-11
 
Superintendent's Bulletin 5-20-11
Superintendent's Bulletin 5-20-11Superintendent's Bulletin 5-20-11
Superintendent's Bulletin 5-20-11
 
Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11
 
Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11
 
Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11Superintendent's Bulletin 5-13-11
Superintendent's Bulletin 5-13-11
 
Wiki Syllabus
Wiki SyllabusWiki Syllabus
Wiki Syllabus
 
Superintendent's Bulletin 5-6-11
Superintendent's Bulletin 5-6-11Superintendent's Bulletin 5-6-11
Superintendent's Bulletin 5-6-11
 
WHS Menus May 2011
WHS Menus May 2011WHS Menus May 2011
WHS Menus May 2011
 
Whsmay11
Whsmay11Whsmay11
Whsmay11
 
WES Menus May11
WES Menus May11WES Menus May11
WES Menus May11
 
WMS Menus May 2011
WMS Menus May 2011WMS Menus May 2011
WMS Menus May 2011
 
Superintendent's Bulletin 4-29-11
Superintendent's Bulletin 4-29-11Superintendent's Bulletin 4-29-11
Superintendent's Bulletin 4-29-11
 
Superintendent's Bulletin 4-15-11
Superintendent's Bulletin 4-15-11Superintendent's Bulletin 4-15-11
Superintendent's Bulletin 4-15-11
 

Fy12 Capital Outlay Requests

  • 1. Wellesley Public Schools FY 2012 Capital Outlay Request Presented to the School Committee October 19, 2010
  • 2. Debt Exclusion Update Summer 2008 Fiske/Hardy/Schofield - roof replacement Summer 2009 Fiske/Hardy/Schofield/Upham - boiler replacement Fiske/Hardy/Hunnewell/Schofield/Upham - abatement/flooring Hunnewell/Upham - gymnasium ceiling Upham/Hunnewell (partial) - roof replacement Fiske - abatement, ceiling replacement, sprinklers - phase 1
  • 3. Debt Exclusion Update Summer 2010 Fiske - abatement, window replacement, ceiling replacement, sprinklers - phase 2 Hunnewell - abatement/flooring Schofield - abatement/entry grates To Be Completed middle school - lower gymnasium floor replacement
  • 4. Capital Request Summary Non- Facilities Facilities Total Instructional 21,913 - 21,913 Equipment 2,090 13,258 15,348 Furniture/Furnishings 28,870 - 28,870 Infrastructure 35,000 126,350 161,350 Maintenance - - - Safety - 130,000 130,000 Technology 613,237 - 613,237 TOTAL 701,110 269,608 970,718
  • 5. Instructional Capital Defined  durable, educational items and/or materials  useful life of five years or more and/or a unit cost greater than $5,000  items necessary for students to experience the curriculum
  • 6. Instructional  Fitness and Health continuation of multi-year fitness center replacement  Performing Arts instruments  Science microscopes - enrollment need  Visual Arts phase one of multi-year kiln replacement continuation of multi-year enlarger replacement cameras - enrollment need Total - $21,913
  • 7. Operations Capital Defined  services and/or non-expendable items repair or reconditioning of school buildings, grounds and/or equipment  useful life of five years or more  items can be exchanged between schools and/or classrooms with no affect on curriculum  five subcategories equipment, furniture/furnishings, infrastructure, maintenance, and safety
  • 8. Operations Equipment Non-Facilities continuation of wall mat replacement refrigerator for Sprague nursing copier replacement deferred one year Facilities vacuum cleaners and floor scrubber AC replacement - Hardy main office barrel cart - district-wide recycling program Total - $15,348
  • 9. Furniture/Furnishings classroom furniture • mostly replacement • new for enrollment increases rug replacement shade/blinds - phase 1 of multi-year plan to repair or replace in all schools Total - $28,870
  • 10. Furniture Highlights Hunnewell shades P t r a e b s l c e h s o o l
  • 11. Infrastructure Non-Facilities contingency for interior modifications Facilities Preschool - exhaust vents/hot water system Hardy - faucets/restroom partitions/smoke detectors Hunnewell - steam trap replacement Sprague - lighting/floor repair All buildings - annual roof inspection/repair Total - $161,350
  • 14. Safety Schofield - drainage improvements • remediation based on engineering review contingency for environmental safety testing and/or mitigation Total - $130,000
  • 15. Safety - Schofield Photographs taken Friday, October 15, 2010 Overnight precipitation approximately 1.6”
  • 16. Technology Capital Defined  computer hardware and peripherals  network infrastructure and cabling  installation/setup of equipment  four subcategories replacement/enrollment/system maintenance/new equipment
  • 17. Technology  cyclical replacement 102 desktop - 7 year cycle 276 laptop - 5 year cycle 30 printers  enrollment laptop carts for middle school laptops for new professional staff
  • 18. Technology  system maintenance year 1 of 5 year plan to enhance security and management of WAN/LAN • elementary and middle school switches  new equipment continuation of multi-year plan - SMARTboard, document camera, projection system Total - $613,237
  • 19. Capital Request Summary Non- Facilities Facilities Total Instructional 21,913 - 21,913 Equipment 2,090 13,258 15,348 Furniture/Furnishings 28,870 - 28,870 Infrastructure 35,000 126,350 161,350 Maintenance - - - Safety - 130,000 130,000 Technology 613,237 - 613,237 TOTAL 701,110 269,608 970,718
  • 20. Request vs. Advisory Guideline Non-Facilities Facilities Total FY11 Budget 569,714 243,747 813,461 FY12 Request 701,110 269,608 970,718 ADVISORY GUIDELINE (1.5%) 825,663 Variance from Guideline 145,055
  • 21. Recommendation  funds from Facilities Maintenance Reserve Account correct Schofield safety now 120,000  reallocate FY11 funds for vehicles improve ventilation and relocate hot water system at preschool 22,500 Total - $142,500
  • 22. Request vs. Advisory Guideline Non-Facilities Facilities Total FY11 Budget 569,714 243,747 813,461 FY12 Request 701,110 269,608 970,718 ADVISORY GUIDELINE (1.5%) 825,663 Variance from Guideline 145,055 Recommended Changes (142,500) Variance from Guideline 2,555